NH-12014/12481 2018/PB/Zone-11
Government of India
Ministry of Road Transport & Highways
Transport Bhawan, 1, Parliament Street, New Delhi-110001
Date:c9J.03.2018
The Secretary
Government of Punjab,
Public Works Department.
Ref.:- Letter no. 1014/NH dated 22.02.2018 received from CE(NH),State PWD,Punjab.
Sir,
I am directed to convey the technical, financial sanction and administrative approval of
the President of India to the estimate for the work mentioned in the subject heading as per the
following details subject to the condition stipulated in the attached technical note:
(Rupees Three Hundred, Twenty two Crore and Forty Eight Lakh Only)
3. The expenditure on the work is debatable to NH (0) Plan Head 5054, Roads& Bridges,
01-National Highways, 01.337 RoadsWorks, 03-National Highways ( Major Works); 03.01 works
financed by Central road Fund; 03.01.53 Major works for which the corresponding Demandfor
the current financial year 2017-2018 is "81" Ministry of RoadTransport and Highways.
4. Quarterly progress reports in the stipulated proforma may be sent to this Ministry as is
being done for all sanctioned works.
5. The technical approval and financial sanction may lapse after six months from the date
of its issue in case the work is not awarded within that period.
6. The following physical and financial target shall be strictly adhered subject to
availability of fund:
Yours faithfully,
Encl: As above
~
(Vijay Kumar Patnayak)
Under Secretary to the Government of India
Copy with a copy of technical note forwarded to: -
Encl: As above.
~
(Vijay KUm~yak)
Under Secretary to the Government of India
Copy with enclosures also forwarded to: -
End: As above.
(GhanshyamMeena)
Section Officer (Zone-It)
No.RW INH-12014/1248/2018/PB/Zone-1i
Government of India
Ministry of Road Transport & Highways
Transport Bhawan, 1, Parliament Street, New Delhi-110001
Date: 28.03.2018
TECHNICALNOTE
2. State/Division Punjab/Ferozepur
50.89 50.89
5. Length (in km)
6. Reference letter no. 1014/NH dated 22.02.2018 from CE (NH), State PWD Punjab
COMMENTS
i. Raising of FRL of existing road and construction of Four Lane road 4.715 TCS-1
with Flexible Pavement
ii. Raising of FRL of existing road and construction of two Lane road 19.295 TCS-2&3
with paved shoulders ,Flexible Pavement
iii. Raising of FRL of existing road and construction of two Lane road 2.040 TCS-4&5
with paved shoulders, Flexible Pavement in Cattle under pass
iv. Concentric Widening & Strengthening of existing road to Two Lane 22.085 TCS-6,7&8
with paved shoulders, Flexible Pavement
v. Reconstruction of existing road to Two Lane with paved shoulders 1.625 TCS-9 & 10
,Flexible Pavement (low lying area)
vi. Two laning with paved shoulders, New Construction at Additional 0.725 TCS-11
Bridge parallel to the existing Bridge with Flexible Pavement
Page 1 of 10
vii. Toll Plaza: Rigid Pavement 0.400
Total 50.885
TCS1: Typical crosssection-1 refers to the configuration for Raisingto four Lane
divided Carriageway(Flexible Pavement)with Paver Block & Footpath cum drain
in heavy built-up area havingcarriagewaywidth of 7.0 m on both side with overall
width of 23.5 m i.e. (2*7.0 m carriagewaywidth+2*0.50 Kerb Shyness+ 2*1.5 m
footpath cum drain + 2*2.0 m paver block+ 2*2.0mutility corridor).
TCS-2&3: Typical cross section-2&3 refers to the carriageway configuration for
Raising of existing road to two lane plus paved shoulder (2L+PS) having
carriageway width of 7.0 m and overall width of 14.0 m i.e. (2*1.5 m paved
shoulderon both side + 2*2.0 m earthen shoulder).
Page2 orlO
Sr. No. Bridge Location Span Arrangement Super-structure Waterway
1.3.2 Minor Bridge: There are total 7 nos. of existing Minor Bridges in the project
stretch, 3 No.'s are reconstructed and 1 is proposed parallel to the existing
minor bridge and 3 No's. are proposed to be widened in accordance with Clause
No. 7.3 of IRC: SP: 73-2015 (For reconstruction) carriageway width of 11.0 m,
2*1.50 footpath, 2*0.50 RCCcrash barrier, 2*0.50 RCCRailing i.e. overall width
of 16.0 m & for additional bridge carriageway width of 16.0 m, 2*1.50 footpath,
2*0.50 RCCcrash barrier, 2*0.50 RCC Railing & overall width of 16.0 m). The
details of reconstructed, widen & additional bridge proposal are given below:
1.3.3 Culvert: There are total 105 nos of existing culverts up to road width in the
project stretch which are in poor & distress condition which are proposed to be
reconstructed as per following details. The location and type of these culverts
have been included in the schedule B.
1.3.4 Additional Pipe culverts: At junctions 30 No. Hume Pipe Culverts have also
been proposed and allowed in the scope of the estimate.
1.3.5 Junctions Improvement: The State PWD has proposed the provision for
improvement of three (03) major and 69 nos. of minor junctions at grade in the
Page J of 10
cost estimate. Besides, 22 nos. of Bus lay bays along with bus shelters have also
been allowed in the scope of the estimate.
1.3.6 Drains and Protective works: Provision of concrete lined drain cum footpath
for 10.630 Km (details mentioned in schedule B) in built portion of NH and
unlined drain for remaining portion of the road on both side of carriageway has
also been proposed and allowed in the estimate. Besides, w-metal beam crash
barrier for a length of 17320 m for road embankment having height more than 3
m and turfing sods for lesser height is allowed in the scope of cost estimate.
1.3.7 Toll Plaza: The total design length of the instant project is 50.885 km. State
PWD has proposed 1 No. of 8 lane (4+4) staggered Toll Plaza on this stretch at
Km 5+250 which is allowed.
1.3.8 Slip/Service road: Aggregate length of 300 m long and 3.75 wide Service road
has been proposed at the location of from 17+500 to 17+650 along CUP. No
service road has been proposed in built area.
1.3.10 Besides, Cantilever overhead signages (12), Full width overhead sign (4),
Cantilever type (8), Street light (161 nos. Double arm) & 6 nos. high mast lights
as per schedule (C) at bus lay byes, truck lay byes and built up area); Bus Bay-
byes(22 nos.); pedestrian guard rail; inter locking paver block etc. have also
been allowed as per details mentioned in the schedule B.
2. Geometric Design and General Features: Geometric design and general features of the
Project Highway shall be in accordance with the section 2 of Manual (IRC:SP 73-2015).
The design speed shall be 100 kmph and 80 kmph for ruling design and minimum design
speed respectively for plain terrain.
3. Horizontal curves: There are 6 horizontal curves in the existing alignment and to meet
the desirable minimum design speed of 80kmph as per IRC: SP: 73-2015, these are
proposed to be improved within available ROW.
4. Land acquisition and afforestation: It is reported by the State PWDthat land acquisition
of 5.663 acre area needs to be done at Toll Plaza location at Ch 5+250 near Village
Chakra and additional bridge locations at Km. 40+909, km 40+975 & 42+595. However,
49.11 km project length (96.51% length) is encumbrance free.
Page4 of10
5. State PWD shall ensure that encumbrance free land is made available to the
contractor at the time of award/LoA. Any increase in cost on account of delays in
handing over the land and other pre-construction obligations on the part of state PWD
shall be borne by the State Government, recoverable from agency charges.
6,Besides, wild life and environment clearance is also required from RD5+500to 22+500.
Provisionof Rs.2.82 crore (@ Rs.50 lakh per Acre) for LA has been taken in the estimate
proposedby Sate PWDand allowed. Further, the provision of Rs 32.15 crore for 10650
nos.Tree felling/Avenues Plantation and compensatoryafforestation have been proposed
by the State PWDwhich has been allowed for estimate purpose. It is reported by State
PWDvide letter dated 08.03.2018that NOe hasalready been given by Wild life Division,
ForestDepartmentwith the instructions that height of fence be increasedfrom 1.20 m to
3.0 m on 17.01.2018.Further, it is also emphasized that State PWDshall sort out the
issues relating to wild lifel forest clearance with the concerned Department of State
Government well before start of project in conformity with the applicable rules and
regulations.
7. Utility Shifting: Provisionof Rs.5.08 crore (as per following details) for shifting of utility
service has been allowed as proposedfor estimate purpose. However, State PWDshould
obtain the sub-estimate from the concerned department and got approved Regional
officer. Besides,B&R Department, Punjab shall take necessaryaction to ensure shifting
of the utilities well in advanceso that the progressof the work is not affected.
Page50flO
materials salvaged from dismantling of the existing utility services shall be disposed of
through open auction and the proceeds shall become a part of the project funding.
Further, Secretary (RT8:H) also noted that the State PWD shall ensure that utility
services are shifted to the edge of ROWand no further cost towards shifting shall be
paid in future if they are required to be shifted on account of further road widening.
Moreover, the cost of shifting of BSNL cables and telephone poles was deliberated and
proposed to be deleted from the scope of the estimate. Accordingly, the total cost of
utility shifting has been modified from Rs. 5.08 Cr. to Rs. 4.57 Cr.
9. Pavement Design:
(a) The crust in main carriageway for widening and new construction has been designed
for a design life of 15 years and design traffic as 50 MSA. The proposed crust is BC
40 mm + DBM 100mm + WMM 250 mm+ GSB 230 mm (total 620 mm).
(c) Rigid pavement: Rigid pavement has been proposed for Toll plaza area in a length of
340 m for a design life of 30 years. The crust proposed for a rigid pavement PQC 270
10. Design specifications including deviations, if any: All material, design and
construction operations for the project are proposed conforming to IRC: SP: 73-2015. To
carry out improvement of geometrics within existing land availability in some urban
location and to avoid impact on settlement, cross sections are proposed to be customized
11. Cost estimates 8: rates: Rates of different items have been worked out based on
Rate Analysis of Ministry's standard data book and common S.O.R (year 2010) of Punjab
along with latest premium of year 2013 and Cement & Steel rates of year 2016 along with
aggregate rates as per approved quarry rates of Punjab Govt. dated 14.06.2017. These
Page6 of10
12. Miscellaneous: Retro-reflectorized cautionary, mandatory and informatory sign as
per IRC:67-2012, hot applied thermoplastic compound 2.5 mm thick centre line and edge
line marking as per IRC:35-2015, Painting two coats after filling the surface with synthetic
enamel paint in all shades on new plastered concrete surfaces in accordance with
Ministry's technical specifications clause No.803 shall be provided to serve the
appropriate structural and functional need of road and structures.
14. Modifications:
14.1 Construction period has been retained as 18 months as proposed and escalation
charges have been allowed total @ 5%. Contingencies @ 2.8%, Agency charges @ 3%, and
Maintenance charges @ 5.0 %for four years [0.5% for 1st year & 1%, 1.5% & 2%for 2nd,
3rd and 4th year respectively for road works and 1.75 %for bridge works ( 0.25 %for 1st
year, and 0.5 % for each year for three years) has been considered in the estimate as
per Ministry's circulars dated 14.08.2013,15.01.2014 & 11.09.2015. Further, out of 2.8%
contingency provision, 0.05% of the total estimated cost of the civil work shall be used
for skill development of workmen in the Highway sector as per conditions stipulated in
Ministry's circular no. RW/NH-12037/17/2016-EAP dated 18th October, 2016 and balance
2.75%of contingency provision shall be available for main work.
Page 7 of 10
14.2 Earlier, State PWD has proposed LA of 9.316 Ha at parallel Toll Plaza and new
construction of Bridges. However, to minimize the land acquisition, staggered Toll Plaza
was suggested at Ministry and accordingly, LA was reduced to 5.6 acre.
14.3 Provision of lossening and compaction has been deleted from the scope of the
estimate in raising portion as the same may not be required due to raising of proposed
FRLby about 2.0 m.
14.4 It is also mentioned that State PWD had proposed DBM in VG-30 and BC in CRMB
which is not as per IRC:37-2012 therefore, grade of bitumen in DBM &: BC has been
modified to VG-40 as per afore said IRC codal provisions. Provision of fly ash in
embankmenthas replaced with earthwork from borrow pit are as the provisionof flyash
in water loggingarea may endangerthe soil slopestability.
14.6 Provisionsof road marking, traffic sign boards, roadside furniture, road safety
works, crash barrier, delineators, boundaryI hectometerIkilometer, pedestrian
facilities, etc. have been proposedin the scopeof work.
14.8 RFPis proposedto be invited from fresh bidders in single stage two cover systems
by prescribing necessaryeligibility (qualifying) criteria of the bidders as per Ministry's
standard RFPdocument &: Ministry's extant guidelines. The work will be executed by
State PWD,Punjab.
14.9 Construction period for this work has been proposedas 18 months including the
rainy period. Defects liability period and maintenanceperiod has been consideredas 4
yearsas specified in the Model EPCDocumentapprovedby the Ministry.
14.10 Detailed Technical note along with schedule B will be sent to State PWD.
RemainingEPCschedulesneed to be approvedfrom Regionalofficer, Chandigarhbefore
award of work.
PageS of 10
15. The time limit for awarding of this work is 6 months from the date of sanction and
should be strictly followed as per the instructions communicated to all State PWDsvides
this Ministry's letter no. RW/NH-15015/29/2001-PL dated 05.07.2001 and compliance
reported submitted to the Ministry. If the work is not awarded within the stipulated
time, it may lead to de-sanction of the work unless Ministry's prior approval to
extension of the time limit is obtained.
16.1 The provision of contingencies should be utilized as per Ministry's circular letter
no. RW/G-20011/8/98-WA(R) dated 16.08.2002 and subsequent circulars issued from
time to time as per the norms. The estimates for carrying out the activities under the
provision of contingencies including change in scope of work will be approved by
Ministry on assurance/certification by Authority's Engineer/ CE(NH), State PWD,
Punjab that the amount provided against contingencies is available and the same has
not been indirectly utilized by accepting higher tender rates. Authority's Engineer/
CE(NH), State PWD shall also certify that approval of estimates to be charged to
contingencies will not cause revision of the sanctioned estimate.
16.3 No work beyond the scope of the sanctioned estimate leading to increase in the
scope of the work or change in specification should be undertaken without obtaining
prior written approval of the Ministry. In case, the estimate needs revision due to
change in rates/tender rates for any reasons, the revised estimate shall be submitted
immediately for Ministry's approval. No expenditure beyond permissible In this
connection, this Ministry's letter No. RW/NHIIi/Coord/32/84 dated 19.5.84 and NH-
11026/2199-US (DI) dated 29.10.2001 may be referred.
16.4 In order to ensure that there is no slippage in achieving the targets, the progress
may be closely monitored by CE(NH), State PWD, Punjab /RO, MoRT&H, Chandigarh
and quarterly status report furnished to the Ministry in the prescribed Performa.
16.5 During the course of execution, the traffic may be regulated in accordance with
guidelines laid down vide Ministry's letter no. NHIII-33 (126)/72 dated 20.03.1973 and
letter No.RW/NH-11060/1/1998-D.O.1 dated 07.10.1987. Smooth flow of the traffic
Page 9 of 10
may be ensured by providing adequate traffic control devices in accordance with
stipulation of IRe: SP: 55:2001 "Guidelines on Safety in construction Zone".
16.6 It is observed that simultaneous working at large number of work fronts in long
stretches is causing severe inconvenience to traffic during construction. Therefore, it
is suggested that fronts may not be operated in more than 3 km length
simultaneously, without completing the bituminous surfacing in the stretches where
excavation/granular layers are carried out. Suitable provisions in the contract shall be
incorporated for proper traffic management.
16.7 The display boards on development activities of the work shall be made as per
guidelines issued vide Ministry's letter no. RW/NH-33044/1 0/2002-S&R (R) dated 26th
May, 2003. The cost of the same will be met out of the provision of contingencies
allowed in the estimate.
17. Targets: Following cumulative physical targets and financial phasing of expenditure
shall be adhered to subject to overall availability of funds:
(Devender Kumar)
Asst. ExecutiveEngineer(Zone-It)
For Director General (RD)& SpecialSecretary
Page 10 of 10
Schedule-B
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 1
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
SCHEDULE - B
(See Clause 2.1)
Development of the Project Highway
1 Development of the Project Highway
Development of the Project Highway shall include design and construction of the Project Highway as
described in this Schedule-B and in Schedule-C.
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 2
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
Annex - I
(Schedule-B)
Description of Two-Laning
The Project Highway comprises the section of National Highway no 354 E commencing on NH-
07 (Malout-Abohar- Ganga Nagar Section). i.e. Abohar Bye Pass in the Abohar city via Sito
Gunno and ends on junction with existing National Highway (NH-09 Malout-Dabwali Road) in the
state of Punjab.
1 WIDENING OF THE EXISTING HIGHWAY
1.1 The Project Highway shall follow the existing alignment unless otherwise specified by the
Authority and shown in the alignment plans specified in Annex III of Schedule-A. Geometric
deficiencies, if any, in the existing horizontal and vertical profiles shall be corrected as per the
prescribed standards for plain terrain to the extent land is available.
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 3
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
Built-up
Sr. Location (km to Typical cross section
stretch Width (m)
No. km) (Ref. to Manual)
(Township)
27+290 to 27+960 2 Lane carriageway TCS-7
4 - 36+650 to 36+965 with paved shoulder (Sr. No. 2.11 Annex.-I
37+465 to 37+915 & footpath cum drain Schedule –B.)
32+800 to 33+310 2 Lane carriageway TCS-10
5 - 36+965 to 37+465 with paved shoulder (Sr. No. 2.11 Annex.-I
37+915 to 38+030 & footpath cum drain Schedule –B.)
1.2.2 Except as otherwise provided in this Agreement, the width of the paved carriageway
and cross-sectional features shall conform to paragraph 1.2 above.
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 4
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
Fully paved
Sr. Location (km to
shoulder/Footpath Reference to cross Section
No. km)
/Paver block
0+000 to 0+650 Fig. 2.5 of Manual
2x2.0 paver Block +
1 15+865 to 16+560 (TCS : 4 Lane divided carriageway,
2x1.50 RCC Drain
17+720 to 18+280 builtup area)
0+650 to 1+465 Fig. 2.5 of Manual
2x2.0 paver Block +
2 16+560 to 17+720 (TCS : 4 Lane divided carriageway,
2x1.50 Footpath
18+280 to 19+115 builtup area)
Paved shoulder & TCS-3
3 24+265 to 25+115
footpath cum drain (Sr. No. 2.11 Annex.-I Schedule –B.)
27+290 to 27+960
Paved shoulder & TCS-7
4 36+650 to 36+965
footpath cum drain (Sr. No. 2.11 Annex.-I Schedule –B.)
37+465 to 37+915
32+800 to 33+310
36+965 to 37+465 Paved shoulder & TCS-10
5
37+915 to 38+030 footpath cum drain (Sr. No. 2.11 Annex.-I Schedule –B.)
(b) In open country, paved shoulders of 1.5 m width shall be provided and earthen
shoulders of 2.0m width shall be covered with 150 mm thick compacted layer of granular
material.
(c) Design and specifications of paved shoulders and earthen shoulders shall conform to the
requirements specified in paragraphs 5.10 and 5.11 of the Manual.
(d) Space between the main carriageway and drain will be paved with Heavy duty paver
blocks in following locations.
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 5
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 6
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 7
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 8
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 9
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
NIL
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 10
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
Section
Sr. No. Length in m Extent of raising
(from km to km)
As per Clause 4.1 of
1 0+000 to 26+450 26+450
Schedule B
Note:- 1.The water table in complete stretch of the alignment is high being water logged area. Hence
the level of sub grade shall be fixed as per clause 4.2.1 of the Manual , The capillary cut off
technique described under Para 4.7 of IRC:34-2011 for water logged area shall be adopted in
making embankment in reaches given under clause 4.2 of schedule-B as per the typical
drawing shown in Fig.4.7 (a) of the IRC:34-2011.
5 PAVEMENT DESIGN
5.1 Pavement design shall be carried out in accordance with Section 5 of the Manual.
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 11
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
Design shall be computed for 50 MSA .The minimum overlay shall be as follows:-
Bituminous course (BC) = 40mm ,Dense Bituminous Macadam(DBM)=100 mm and Wet Mix
Macadam (WMM)=155 mm
6 Roadside Drainage:
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 12
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
6.1 Drainage system including surface and subsurface drains for the Project Highway shall
be provided as per Section 6 of the Manual. The minimum locations/length of new construction
of RCC covered side drains shall be provided as below:
Location (Km) Length Size
Sr. No. Side
From To (M) (m)
At Junction RD 0+000 towards
1. 2 x 215 = 430 1.5x1.0 Both
Abohar city
2. 0+000 0+650 1300 1.5x1.0 Both
3. 15+865 16+560 1390 1.5x1.0 Both
4. 17+720 18+280 1120 1.5x1.0 Both
5. 24+265 25+115 1700 1.5x1.0 Both
6. 27+290 27+960 1340 1.5x1.0 Both
7. 32+800 33+310 1020 1.5x1.0 Both
8. 36+650 37+465 1630 1.5x1.0 Both
9. 37+465 38+030 1130 1.5x1.0 Both
Note : These drains shall be extended in a length that the water is disposed to the disposal
point
6.2 Rain Water Harvesting: As per Ministry of environment and forest notification dated 14-01-1997
as amended on 13-01-1998, 05-01-1999 and 06-11-2000.
7 Design of Structures
7.1 General
7.1.1 All bridges, culverts and structures shall be designed and constructed in accordance
with section 7 of the Manual and shall conform to the cross- sectional features and other
details specified therein.
7.1.2 Width of the carriageway of new bridges and structures shall be as follows:
Major Bridges: Nil
Minor Bridge: Nil
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 13
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
7.1.5 The following structures shall be designed to carry utility services specified in table below:
7.1.6 Cross-section of the new culverts and bridges at deck level for the Project Highway shall
conform to the typical cross-sections given in section 7 of the Manual.
7.1.7 Lining of the existing canals shall be reconstructed/repaired adjacent to the existing &
proposed bridges as per specifications & requirements of irrigation department.
7.1.8 Temporary diversion roads with provision of required waterway will be provided adjacent to
the proposed bridges before these are dismantled. This diversion shall be maintained and
dismantled after completion of project.
7.2 Culverts
7.2.1 Overall width of all culverts shall be equal to the roadway width of the approaches.
7.2.2 Reconstruction of existing culverts:
5 No. of existing culverts shall be abandoned.
2 No. culverts not to be considered in the project as left in the portion before start of the
project.
The b a l a n c e existing culverts at the following locations shall be re-constructed as
new culverts:
Culvert Span/Opening Remarks/
Sr. No. Type
Location (m) Minimum Width (m)
1. -0+072 Box 1X2X2 24.0
2. 0+381 Box 1X2X2 24 .0
3. 0+776 Box 1X2X2 24 .0
4. 1+805 Box 1X2X2 15 .0
5. 4+255 Pipe 1200 Dia 15 .0
6. 4+720 Pipe 1200 Dia 20 .0
7. 5+890 Box 1X2X2 15.0
8. 6+024 Box 1X2X2 15.0
9. 6+230 Box 1X2X2 15.0
10. 6+530 Box 1X2X2 15.0
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 14
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 15
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 16
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
Nil
7.2.4 Additional new culverts shall be constructed as per particulars given in the table below:
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 17
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
*The locations shown are tentative & shall be finalized in consultation with A.E./Client.
7.2.6 Floor protection works shall be as specified in the relevant IRC Codes and Specifications.
7.3 Bridges.
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 18
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
Adequacy or
Bridge otherwise of the
Sr. Salient details of
location existing Remarks
No. existing bridge
(km) waterway, vertical
clearance, etc*
RCC Slab H.L. bridge over Existing bridge shall be
canal,abutment/pier of brick replaced with new
1 3+041 masonry Inadequate structure.
Span=3x4.6 m, Single Span 16.0 m(Skew)
Total width=7.75m as per
RCC Slab H.L. bridge over Fig. 7.6 of Manual
Existing bridge shall be
canal,abutment/pier of brick replaced with new structure.
Inadequate
2 5+958 masonry Single Span 20.0 m(Skew)
Span=1x 8.5 m, as per
Total width=7.60m Fig. 7.6 of Manual
RCC Slab H.L. bridge over Existing bridge shall be
canal,abutment/pier of brick replaced with new structure
Inadequate
3 32+940 masonry Single Span 20.0 m(Skew)
Span=3x5.5 m, as per
Total width=7.6m Fig. 7.6 of Manual
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 19
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
New bridges at the following locations on the Project Highway shall be constructed
parallel to the existing narrow bridge.
Major Bridge:
Sr. Bridge at Width of carriageway and cross Remarks
No. km sectional features @
Proposed Steel Bridge
Width of carriageway=11 m and Single Span 80.0 m
1 40+975 Railing= 2x0.50 m ,Footpath= 2x1.50 m , As per Fig. 7.6 of Manual
Crash barrier= 2x0.50 m (Parallel to existing narrow
Major Bridge on D/S)
Minor Bridge:
Nil
7.3.5 Drainage system for bridge decks
An effective drainage system for bridge decks shall be provided as specified in paragraph
7.20 of the Manual
7.3.6 Structures in marine environment Nil
7.4. Rail-road bridges
7.4.1 Design, construction and detailing of ROB/RUB shall be as specified in section
of the Manual red along with MORTH circular No. RW-NH-35075/9/2006-& R(B) dated 2
Sep,2016
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 20
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
Note:- *The span arrangement and height in railway portion shall be as per requirements of
railways/GAD to be approved by railways.
7.4.3 Road under-bridges
Road under-bridges (road under railway line) shall be provided at the following level
crossings, as per GAD drawings attached:
Location of Level
Number and length of span
Sl. No. crossing
(m)
(chainage km)
Nil
B. ROB / RUB
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 21
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
Nil
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 22
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
13 Change of Scope
The length of Structures and bridges specified herein above shall be treated as an
approximate assessment. The actual lengths as required on the basis of detailed
investigations shall be determined by the Contractor in accordance with the Specifications
and Standards. Any variations in the lengths specified in this Schedule-B shall not constitute
a Change of Scope, save and except any variations in the length arising out of a Change of
Scope expressly undertaken in accordance with the provisions of Article 13.
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 23
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
Annex-1 (Schedule : B)
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 24
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 25
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 26
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 27
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 28
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 29
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 30
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 31
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 32
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 33
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 34
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 35
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab
Govt. of Punjab PWD B&R Branch Request For Proposal – Bid Document
Volume – III: Schedules
Rehabilitation & upgradation to 2 Lane with paved Shoulders of Abohar-Sito-Gunno-Dabwali Road from 36
Km. 0.00 to Km. 50.885 of In-Principle approved NH including construction of one High Level Major Steel
Bridge on EPC Mode in the State of Punjab