CHAPTER 1: INTRODUCTION
4.1 Introduction
It is in everyone's interest that an industrial effluent treatment system (IETS)
functions optimally to achieve an effluent quality that continuously complies with
the discharge standards. The operator of industrial effluent treatment systems
(IETS) is an important player behind any successful story of effiuent treatment. In
successful organizations, typically the operators are tasked with specific
responsibilities that include such daily chores as general daily walk through
inspection of the IETS to ensure no effluent pipe leakages, and equipment
breakdown, preventive maintenance and performance monitoring (sampling,
record keeping and etc). These activities need to be conducted in a coordinated
manner to ensure proper functioning of all the IETS components. Even a state of
the art and expensive IETS, which is not run and maintained optimally, will not
produce the desired results
Currently, the DOE enforce the requirement of competent person for IETS in the
nation through Written Approval or directives issued to factories or industries.
This is to ensure that awareness of pollution control and environment
conservation is set in each industry in order to give a better control of
environmental quality for all, especially to the next generation in future.
Performance monitoring of an IETS is the proactive and preventive monitoring of
all the major IETS components to ensure that each component is working
properly and optimally as designed. This requires someone to monitor some
relevant parameters and characteristic of the unit processes or unit operations of
the IETS on a scheduled basis. Performance monitoring concentrates on the
IETS itse'f not on the final effluent hence can be viewed as an “upstream” activity
as opposed to compliance monitoring, which is a “downstream” activity,
Performance monitoring is not the monitoring of the final effiuent as
misunderstood by some industries. Focusing only on the final effluent may leadto a “too-late” situation where things have gone out of hand and consequently
difficult to control or get back on track.
1.2. Background of Company
TORAY MALAYSIA GROUP's traditional business in textile is conducted at the
four mills under Penfabric, a vertically integrated textile manufacturer involving
spinning, weaving, dyeing, printing and finishing operations to produce yarn, grey
fabric, finished fabric, yarn-dyed fabric (gingham) and grey and dyed yarn for
sewing thread. Four mills under Penfabric are;
* Penfabric Mill 1 (Spinning of Yam)
+ Penfabric Mill 2 (Weaving of Grey Fabrics)
+ Penfabric Mill 3 (Yarn-Dyed Woven Fabrics & Sewing
Thread Yarn)
+ Penfabric Mill 4 (Dyeing, Printing & Fi
ing of Fabric)
Figure 1.1: Product of PenfabricPenfabric Sdn Bhd Mill 4 is located at Plot 117-119 & 200-202, Prai Free
Industrial Zone, 13600 Prai, Penang. Penfabric Mill 4 is the single largest,
advanced, integrated finishing processor of grey fabric in the region. The
specialized finished fabrics are exported to international apparel manufacturers
in the USA, EU countries and other part of the world.
Figure 1. 2: Penfabric Sdn. Berhad Mill 4
Penfabric Mill 4 has approximately 614 staffs working in 3 shifts. Area of factory
site is about 266 000 square metres. Penfabric products comply to all standard
such as ISO 9001, ISO 14001, OKO TEX and regularly audited by external
bodies such as SIRIM, Marks & Spencer, customers and etc. Penfabric Sdn Bhd.
Mill 4 was certified with ISO 9001 in 1994 and ISO 14001 in 2005.
1.3 Organizational Structure
1.3.1 Company's environmental policy
This environmental policy was the existing policy. This policy was reviewed on
01* April 2009, Penfabric Sdn. Berhad Mill 4 environmental policy as below;Environmental Policy
Penfabric Sdn. Berhad Mill 4 is a manufacturer of dyed, white and printed woven
fabrics.
Penfabric is committed to its corporate and social responsibility for environmental
preservation and sustainable development by:
Complying with applicable environmental legal requirements and other
regulations to which the company subscribes.
Continual improvement to prevent pollution, conserve energy and resources
using 3Rs (Reduce, Reuse & Recycle)
This policy should be understood, implemented, maintained at all levels and be
communicated to all persons working for or on behalf of the organization using
appropriate means such as meetings, booklets, brochures, strategically placed
information, and other methods deemed necessary from time to time.
1.3.2 Emplacement and Functions of CePIETSO
CePIETSO are placed under Safety and Environment Department. Please refer
to Organization Chart as attachment 1
The main duties of CePIETSO are as ;
1. Supervision on Operation of Waste Water Treatment Plant and Incinerator.
2. Control and monitoring of both Waste Water Treatment Plant and Incinerator.
3. Special waste water treatment and /or environmental project including related
laboratory analysis when deem necessary
Please refer to Job Description of Environment Officer as Attachment 21.4 Nature of Business
The main products of factory are grey fabric, finished fabric and yarn-dyed fabric
(gingham). Currently the capacity of production is around 7.91 million-yard per
month. Those products are mainly for export purpose and not for domestic market.
So far, there are more than 30 over countries in all continents being exported from
Penfabric Sdn. Berhad Mill 4
1.5 Industrial Effluent Treatment System (IETS)
Various types of effluent treatment technology are introduced in the decades as
the public awareness to environmental pollution is increasing. In a practical way,
the industrial effluents usually contain various types of contaminants and may
require a few combinations of treatment methods or processes to remove the
contamination. The selection of the unit operations are depending on the
treatment methodology which may need to consider the factors below:
> The characteristic of the effluent
> Degree of treatment required
> Capital investment & operating cost
> Effluent standard imposed
> Space availabilty of the premise
ag
Manpower involved
The biological (aeration) treatment processes, which also known as biological
unit processes, are classified as secondary treatment in the design of removing
dissolved organic matters. Microorganisms are the fundamental element in this
contest as they are used to utilize the organic matters with presence of oxygen
which represented as BOD and COD. The activated sludge process is used
routinely for biological treatment in both industrial and municipal wastewater. A
basic diagram for activated sludge process consists of 3 components as
illustrated as below:Recyor Stoaige
To Sludge Treatment
Figure 1.3 : Basic diagram for activated sludge process
Typically, the biological processes are divided into 2 main categories: suspended
growth and attached growth (biofilm). The Conventional Activated Sludge,
Extended Aeration Activated Sludge, Contact Stabilization, Sequencing Batch
Reactor (SBR), Oxidation Ditch are suspended growth system where the bacteria
are kept in suspended form and part of the sludge are return to aeration tank for
mixing with influent and aeration. While Rotating Biological Contactors (RBC),
Upfiow Anaerobic Sludge Blanket (UASB), Trickling Filters are attached growth
system. In the attached growth system, the bacteria will growth on a solid media,
e.g. rocks, redwood or plastic materials and the slime layer will adsorb the
organic matter and nutrients from effluent. The sludge layer subsequently will be
getting thicker and thicker as the time passing. Below is the detail information of
Rotating Biological Contactors and Upfiow Anaerobic Sludge Blanket
Rotating biological contactors (RBCs)
Rotating biological contactors (RBCs) are mechanical secondary treatment
systems, which are robust and capable of withstanding surges in organic load.
RBCs were first installed in Germany in 1960 and have since been developed
and refined into a reliable operating unit. The rotating disks support the growth of
bacteria and microorganisms present in the sewage, which breakdown and
stabilize organic pollutants. To be successful, microorganisms need both oxygento live and food to grow. Oxygen is obtained from the atmosphere as the disks
rotate. As the micro-organisms grow, they build up on the media until they are
sloughed off due to shear forces provided by the rotating discs in the sewage.
Effiuent from the RBC is then passed through final clarifiers where the
microorganisms in suspension settle as sludge. The sludge is withdrawn from the
clarifier for further treatment.
A functionally similar biological filtering system has become popular as part of
home aquarium filtration and purification. The aquarium water is drawn up out of
the tank and then cascaded over a freely spinning corrugated fiber-mesh wheel
before passing through a media filter and back into the aquarium. The spinning
mesh wheel develops a biofilm coating of microorganisms that feed on the
suspended wastes in the aquarium water and are also exposed to the
atmosphere as the wheel rotates. This is especially good at removing waste urea
and ammonia urinated into the aquarium water by the fish and other animals.
‘one media
Media dscs: acl
A Meda vise: Medi
oF panels s
35.40%
iubmerced
‘Side View| Front View
Optional sie
distrisster pipe
Figure 1.4: Rotating biological contactors
Upflow anaerobic sludge blanket (UASB)
Upflow anaerobic sludge blanket (UASB) technology, normally referred to as
UASB reactor, is a form of anaerobic digester that is used in the treatment of
wastewater.UASB uses an anaerobic process whilst forming a blanket of granular sludge
which suspends in the tank. Wastewater flows upwards through the blanket and
is processed (degraded) by the anaerobic microorganisms. The upward flow
combined with the settling action of gravity suspends the blanket with the aid of
flocculants. The blanket begins to reach maturity at around 3 months. Small
sludge granules begin to form whose surface area is covered in aggregations of
bacteria. In the absence of any support matrix, the flow conditions create a
selective environment in which only those microorganisms, capable of attaching
to each other, survive and proliferate. Eventually the aggregate form into dense
compact biofilms referred to as "granules" A picture of anaerobic sludge granules.
can be found here.
Biogas with a high concentration of methane is produced as a by-product, and
this may be captured and used as an energy source to generate electricity for
export and to cover its own running power. The technology needs constant
monitoring when put into use to ensure that the sludge blanket is maintained, and
not washed out. The heat produced as a by-product of electricity generation can
be reused to heat the digestion tanks.
The blanketing of the sludge enables a dual solid and hydraulic (liquid) retention
time in the digesters. Solids requiring a high degree of digestion can remain in
the reactors for periods up to 90 days. Sugars dissolved in the liquid waste
stream can be converted into gas quickly in the liquid phase, which can exit the
system in less than a day
Figure 1.5 : Upflow anaerobic sludge blanketCHAPTER 2: INDUSTRIAL EFFLUENT TREATMENT SYSTEM
2.1 Description of IETS
Waste Water Treatment Plant in Penfabric Sdn. Berhad Mill 4 was use to treat
the continuous effluent from textile production (100% cotton and polyestericotton)
with the maximum flow rate of 380 m*/hour.
Treated effluent discharge from the WWTP shall comply with Standard B (Third
Schedule of Environmental Quality (Sewage and Industrial Effluent) Regulation
1979) except for COD which the limit discharge is 250 mg/l as the Written
Approval SPE/04/2007 (attachment 3). The flow process of WWTP as below
WASTE WATER TREATMENT PROCESS FLOW.
(©) Aeration Fak &
(@) Anaerobic Lagoon
!
(Dey Bea
‘waste water
Roti Activated Shadge
Waste Actvaled Sludge
Figure 2.1: Penfabric Sdn. Berhad Mill 4 Waste Water Treatment Plant Process
flowDescription of process unit
(1) Neutralization
- To adjust the pH to 8~9 to optimize the anaerobic /aerobic process.
- We use sulfuric acid 98% to neutralize our inlet waste water.
(2) Buffer Pit
- To stabilize the waste water.
- To homogenize the waste water supply and reduce the fluctuation.
= Start the anaerobic process.
+ Capacity of this pit are 8000 m°.
- 1.6 days retention time.
(3) Anaerobic Lagoon
- Bacterial process that is carried out in the absence of oxygen.
- To breakdown the COD/BOD prior to treatment in aerobic condition.
- Provides retention time for further biological improvement.
- Capacity of lagoon are 36000 m?.
- Retention time of 3.9 days.
(4) Aeration Tank
- AtPenfabric Sdn. Berhad Mill 4, we have 2 aeration tanks.
- Aeration Tank is the heart of waste water treatment,
- Bacterial process occurring in the presence of oxygen.
- Under aerobic conditions, bacteria rapidly consume organic matter and
convert it into carbon dioxide.
= The point of control is on how to maintain bugs active and separate treated
water from sludge.
- Capacity of 8000m? for Tank A and 6000m° for Tank B. Tank A using air
diffuser aerators and Tank B using surface aerators.= 1.1 days retention time for Tank A and 1.6 days retention time for Tank B.
(8) Settling Tank
= AtPenfabric Sdn. Berhad Mill 4, we have 2 settling tanks.
- Function of Settling Tank is for settling of sludge and separation of treated
water.
-_Itis important to have clear treated water by sludge separation and controlling
of Settling Tank correlating to aeration tank.
- Sludge settling status is affected by situation of ASM treatment, operation
condition and short pass of water may affects quality of treated water.
= Capacity of 2500m3 for Tank A and 200m? for Tank B.
(6) Dry Bed
- AtPenfabric Sdn. Berhad Mill 4, we have 11 dry beds.
- These dry beds use to dewatering the waste activated sludge.
2.2 IETS performance monitoring committee
Environment Chairman
MT Boey
CEPIETSO
Kairul Anwar
Committe
Bleaching Dyehouse |! Environment ishing Printing
SS Chee PY Lim Jaya Paul SP Ong SB Saw
Figure 2.2: IETS performance monitoring committee
Under CePIETSO, there have 2 technicians that operate the IETS. These
technicians will operate this IETS under supervision of CePIETSO. Typical duties
of these technicians are;- Operation of Waste Water treatment Plant and Incinerator.
- Daily inspection and checking of both Waste Water Plant and Incinerator.
- Taking samples and conduct laboratory analysis for COD, BOD, Color (PtCo),
SS, MLSS, SV» and etc. Arrange sample for external monthly laboratory
analysis.
- Collection, packing, labeling and storing of scheduled waste and maintain the
scheduled waste inventory.
- Minor maintenance and general cleanliness of plant and immediate
surrounding
- Others as requested by CePIETSO.
Any problem or upset condition will be reported daily to CePIETSO. If the
problem is major, CePIETSO will directly reported to Environment Management
Representative (EMR), Mr. Jaya Paul. He will then try to solve the problem by his
own experience or by consulting his superior. In every circumstance he will notify
the Environment Chairman.
Once every two months, Environment Meeting will be conduct to discuss all the
issues arise for environment items. Performance of waste water treatment plan,
upset condition, future plan, Environment Management Program and ete will also
been discussed in this meeting.
2.3 Conduct of performance monitoring
2.3.1 Formation of Performance Monitoring System In Penfabric Sdn.
Berhad Mill 4
Based on the technical guidance, the IETS in Penfabric Sdn Berhad Mill 4 falls
under the categories of Biological Unit Process. Table 2.1 below summarizes the
monitoring parameters and frequency based on the process category:
12Paramé Frequene
Flowrate (mh) Daily
pH Dail
DO Daily
SG) Daily
BOD Weekly
CoD. Week
COLOR Weekly
‘SUSPENDED SOLID Weekly
Sv Week
MLSS, Week
MLVSS Week!
Table 2.1 : Monitoring parameter
2.3.2 Selection Of Sampling Points At IETS
The selection of sampling points at IETS was done based on the treatment
system process flow and the necessary information to calculate the removal
efficiency. Table 2.2 and Figure 2.1 below show the sampling points for different
parameters at different process stage
Parameter ‘Sample location
Flow rate (m°/hr) ‘ASM 4 and ASM2
pH ‘ASM 1 and ASM 2
DO ‘ASM 1 and ASM 2
‘SV (mi) ‘ASM 1 and ASM2
BOD INFLUENT
ASM 4
ASM2
EFFLUENT
CoD INFLUENT
‘ASM 1
ASM2
EFFLUENT
COLOR INFLUENT
ASM 1
ASM 2
EFFLUENT
‘SUSPENDED CLARIFIER ASM 1
SOLID CLARIFIER ASM 2
SVI ‘ASM 4 and ASM2
MLSS CHANNEL 1 UNTIL 8 OF ASM
CHANNEL 1 UNTIL 3 OF ASM 2
MLVSS CHANNEL 1 UNTIL 8 OF ASM 1
CHANNEL 1 UNTIL 3 OF ASM 2
BTable 2.2 : Sampling Point
WASTE WATER TREATMENT PROCESS FLOW.
‘Gy Anaetubic Lagoon
(6) Setting Tank
Legend:
Plowrare
Q
@o
0D, COD & Color
os
OILS MLSs
Figure 2.3: Location of Sampling Point
2.3.3 Sampling Method
The sampling bottles used are made of plastic, with wide mouth and have a
volume of 1000mL. During sampling, the sampling bottles are rinsed then filled to
the top with water sample before sending to the lab for analysis. For performance
monitoring, only grab sampling is apply. A grab sample may be defined as an
individual discrete sampling over a period of time not exceeding 15 minutes. It
can be taken manually using a scoop.
2.3.4 Monitoring and Analysis Method
4The pH, DO and flow rate are checked in real time mode, data is recorded by
chart recorder and checked by technician. BOD, COD, MLSS and MLVSS are
monitored follow the Standard Methods for the Examination of Water and
Wastewater. SS and Color are monitored using HACH DR/2000.
2.3.5 Situation before course attendance
Before attending the course, the performance monitoring was already carried out
but does not follow the (Guidance Document on Performance Monitoring of
Industrial Effluent Treatment Systems — DOE — IETS ~ 1, 2006.). Parameter such
as MLVSS was not recorded because we do not know the importance of
monitoring this parameter. Sampling point for some parameters was carried out
not appropriate such as MLSS. Before attending this course, we just carried out
random sampling point for this parameter.
2.3.6 Changes instituted
The changes after attending this course was summarize as the table below;
ITEM BEFORE AFTER
SAMPLING |Not appropriate. Example Sampling point was carried out as|
POINT for MLSS we just pick|instructed in class and following the
random sampling point —_|Guidance Document on]
Performance Monitoring of Industrial
Effluent Treatment Systems — DOE,
= IETS ~ 1, 2006.
FREQUENCY |Not appropriate. Some|Sampling point was carried out as|
OF SAMPLING | frequency of parameter was|instructed in class and following the|
sampling not —accurate.|Guidance Document on}
Example SV, Performance Monitoring of Industrial
Effluent Treatment Systems — DOE
— IETS ~ 1, 2006.
TYPE OF |Parameter such as MLVSS|Quickly arranged to buy the furnace
SAMPLING |and suspended solid not/and filtering apparatus. Now we
chee! already test the MLVSS and SS
2.3.7 Current performance monitoring procedureThe current practice for IETS performance monitoring was following the
Guidance Document on Performance Monitoring of Industrial Effiuent Treatment
Systems — DOE — IETS - 1, 2006.
For daily performance data record, we record the flow rate, pH, DO and SV30 for
both plant (ASM1 and ASM2). Summary of performance monitoring as below;
Parameter | Sample | Sample type
location
Flowrate ‘ASM 1 _| Flowrate meter
(m°shr) ASM2
pH ‘ASM 1 Tn situ
ASM 2
DO ASM 1 Tn situ
ASM2
SVa0 (ml) ‘ASM 1 Grab
ASM2
Meanwhile, for weekly performance data record, we record the BOD, COD,
COLOR, Suspended Solid (SS) and SVI for both plant (ASM1 and ASM2). For
MLVSS and MLSS, we record weekly at every channel of aeration tank for ASM1
and ASM2. Summary of performance monitoring as below;
BOD INFLUENT Grab
ASM 1
ASM 2
EFFLUENT.
coD INFLUENT Grab
ASM 1
ASM 2
EFFLUENT.
COLOR INFLUENT Grab
ASM 1
ASM 2
EFFLUENT.
SUSPENDED SETTLING TANK ASM 1 Grab
SOLID SETTLING TANK ASM 2
SVI ASM 1 Grab
ASM 2
16MLSS CHANNEL 1 UNTIL 8 OF ASM 1 Grab
CHANNEL 1 UNTIL 3 OF ASM 2
MLVSS CHANNEL 1 UNTIL 8 OF ASM 1 Grab
CHANNEL 1 UNTIL 3 OF ASM 2
CHAPTER 3: DISCUSSION OF PERFORMANCE MONITORING RESULTS
3.1 Performance Monitoring Data
3.1.1 pH Control
Monitoring of pH is important from several standpoints. The optimum biological
activity of the microorganisms for the treatment process is in the pH range from
6.0 to 9.0. Below show the monthly pH control.
MONTHLY pH CONTROL
40.00
00 -— —_———— —— ——__
£00 — pHULC
8.00 tc
= 4.00 ~ pHASM 1
500 > pH ASM 2
0.00
Wuk09 —Aug-09 Ock09 Dec-09 Jan-10
MONTH
Figure 3.1 : Monthly pH Control
3.1.2 DO Control
Biological unit processes require a sufficient amount of dissolved oxygen (DO)
for growth and metabolism of microorganisms. In practice, depending on the type
of aerobic systems employed, the DO concentration of about 1.0 to 4 ppm needs
to be maintained in all the areas of the aeration tank. Higher DO concentration
will not necessarily increase the biodegradation efficiency hence represents
wasted energy. For every IETS an optimum DO concentration depending on the
type of microorganism and effluent characteristics can be evaluated by
optimizing the DO concentration and the removal efficiency of BOD and COD.
7DO been measured by using a portable hand held DO meter and measured
continuously by on line DO probe and transmitter equipped with recording
device. Below show the monthly DO control
MONTHLY DO CONTROL
9
409 —— bo ULE
3.00 -———— —po.c
DO (PPM
| | DOASM1
190 DO ASM 2
0.00 —$—$—————————
JukO9 — Aug-09 Oct-09 Dec-09—_Jan-10
MONTH
Figure 3.2 : Monthly DO Control
3.1.3 Monthly Variation of COD and BOD
The overall performance of a biological treatment process in treating an organic
effluent been monitored on chemical oxygen demand (COD) and biological
oxygen demand (BOD). Both IETS was functioning in good operating condition
and meet the regulation and written approval. The mean value for COD is 160
ppm and BOD is 18 ppm. Below show the monthly variation of COD and BOD.MONTHLY VARIATION OF COD
260
240
= ooo —COD DOE STD
= 180 = COD ASM 1
a =
Bix COD EFFLUENT
140
120
100
Jul-09 Aug-09 Oct-09 Dec-09 Jan-10
MONTH
Figure 3.3 : Monthly Variation of COD
MONTHLY VARIATION BOD
60
50 fT
= 40 —— BOD DOE STD
Ey —s- BOD ASM 1
8 50 ~~ BOD ASM2
g = 2S +» BOD EFFLUENT]
10
———— es
Jul-09 Aug-09 = Oct-09 Dec-09 = Jan-10
MONTH
Figure 3.3 : Monthly Variation of BOD
3.1.5 Efficiency Removal of COD and BOD
The value of removal efficiency is important to show the performance of the
IETS. The formula for computing the removal efficiency is as follows:
% Removal = Influent- Effiuenx 100Influent
Overall BOD; removal efficiency is 96% and COD removal efficiency is 90%.
EFFICIENCY REMOVAL OF COD
2500 92.00 &
2
~ nal
4500 1.00 [mm COD INFLUENT
90.602 | m=acon EFFLUENT
cop (PPM)
1999 90.008 | COD % REMOVAL
500 20.508
o 89,00 *
‘Aug- Sep-Oct-0'Nov-09Dec-
09 09 09
MONTH
Figure 3.5 : Efficiency Removal of COD
EFFICIENCY REMOVAL OF BOD
600 97.00
500 96.80
96.60
= 400 8
2 96.40% [mmmBOD INFLUENT
© 300 ; 96.204} | EEaBOD EFFLUENT
6 = | 0p % REMOVAL
8 one 96.008
6.80 8
‘to 95.60 *
0 95.40
‘Aug-09Sep-090ct-09Nov.09Dec-09
MONTH
Figure 3.6 : Efficiency Removal of BOD
Based on the performance monitoring conducted from 02" July 2009 until 02
January 2010 and the data collected which were plotted for trend analysis and
20statistically analyzed the following condusion can be made about the IETS
operation:
a) The IETS was functioning in good operating condition with an overall BOD
removal efficiency of 96% and COD removal efficiency of 90%.
b) The operational parameter of SVI, MLSS, MLVSS, SS, pH, DO and flowmeter
were all within the recommended ranges
c) The mean DO level of ASM 1 is 1.80 ppm and ASM 2 is 2.82 ppm in the
aeration tank was consider in the acceptable range.
d) The final effluent COD and BOD; complied with the stipulated Standard B
CHAPTER 4: CORRECTIVE ACTIONS
ASM condition can become poor like treated water getting bad, sludge floating or
not settling in Settling Tank and even if experienced personal are controlling the
processes. However, it is possible to minimize a development of abnormal
situation and recover a upset condition in short period by well controlled daily
activities. It is also important to check ASM treatment everyday and work for
bacteria with affection as well as to take correct an appropriate action for
abnormal happening.
The upset conditions encountered during my field training were discussed as
below.
4.1 Sludge floating
‘Sludge does not settle but floats when apparent density of sludge get lower than
treated water. Floating sludge including tiny nitrogen bubbles caused by
nitrification.
4.1.1 Phenomena
auSludge does not settle but floats when apparent density of sludge gets lower than
treated water. Floating sludge including tiny bubbles.
4.1.2 Troubles
‘Sludge flow out without settling and high TSS in treated water
4.1.3 Causes
Nitrification goes on when aeration tank is operated at low loading, low DO and
long detention time
4.1.4 Countermeasure
* Prevent sludge flow out by reducing incoming waste water to aeration tank
‘* Knock down showering on the floating sludge
* Increase DO at aeration tank and decrease sludge detention time in clarifier
* Depress nitrification reaction by lowering MLSS.
4.2 Pinpoint floc
Phenomena and causes on pinpoint floc are quite similar to bulking. The
countermeasures taken are slightly different from them because the supemate
gets murky.
4.2.1 Phenomena
Fine flocs are seen dispersed in supernate.
The border between sludge zone and supernate is not clear
4.2.2 Troubles
High TSS in treated water and reduction in MLSS concentration by sludge
outflow
4.2.3 Causes
* Introduction of high concentration water or overloading by high flow.* Introduction of detergents
* Early stage of acclimation
4.2.4 Countermeasure
* Optimize loading and dilute with fresh water
* Increase MLSS by increasing retum sludge rate
* Keep DO high (3-4)CHAPTER 5: FURTHER IMPROVEMENT
In future we plan to buy new equipment for wastewater analysis such
as COD reactor, spectrophotometer and YSI BOD and. Now we use the
titration method to monitoring the COD and BOD and | thing this
method is quiet difficult for technician to perform. So with this new
equipment, we can get the results faster and easy for technician to
carry out the test. With spectrophotometer, we can monitoring many
parameter such nutrient, COD, BOD, color (ADMI) and etc.
24CHAPTER 6: CONCLUSIONS
As a conclusion, implementation of performance monitoring has benefit to my
company. Performance monitoring of an IETS is the proactive and preventive
monitoring of all the major IETS components to ensure that each component was
working properly and optimally as designed. Performance monitoring
concentrates on the IETS itself not on the final effluent hence can be viewed as
an “upstream” activity as opposed to compliance monitoring, which is a
“downstream” activity. Focussing only on final effluent may lead to a too late
situation where things have gone out of hand and consequently difficult to control
or get back on track.
The
plementation of performance monitoring system on IETS has enabled
Penfabric Sdn Berhad Mill 4 to evaluate the efficiency of our IETS and to make
plan to for improvement. In addition, it also helps to evaluate the effectiveness of
the operation and maintenance program.
Analysis of the performance trend will rigger early detection of any abnormality
or treatment system deficiencies and will enable us to take immediate action for
containment and rectification. Analysis on the influent chemical characteristic
enables us to determine the optimum chemical dosage setting at treatment plant
as well as to provide more effective control on chemical discharge which may
upset the capability of the treatment system.
The effective implementation of this performance monitoring system ensures the
sustainability and continuity of our business as well as safeguarding the company
from legal issues.Overall performance of my IETS was very good and can comply the DOE
regulation. The benefits from the implementation of performance monitoring are;
a) IETS in optimum operation at all times
b) prevent IETS failure hence avoid costly IETS recovery work
c) helps to maintain continued compliance hence improve corporate image and
avoid embarrassing enforcement action
d) maintains record of IETS performance which facilitates optimization of IETS
and analysis of performance.References:
1) Guidance Document on Performance Monitoring of Industrial Effluent
Treatment Systems ~ DOE ~ IETS ~ 1, 2006.
2) Certified IETS operator training material
3) Success Stories of Performance Monitoring of Industrial Effluent Treatment
System issues 1/2008
a7APPENDICES
Appendix
A\list of analytical equipment used
No Equipment Manufacturer
z) Incubator Velp Scientifica
2 ‘Oven Memmert
3 Muffie Fumace WiseTherm
4 |Filtering Appratus (Water Duran
Jet Pump
28pH meter Yokogawa
DO meter Horiba
Weighing balance | Mettler Toledo
Heater for COD testing
Extraction Mantle
29A table showing the locations of sampling point
Flowrate (m'shr)
‘ASM 1
ASM2
pH
ASM 1
ASM 2
DO
ASM 1
ASM2
SVoo (mi)
ASM 1
ASM2
BOD
INFLUENT
ASM 1
ASM 2
EFFLUENT
cop
INFLUENT
ASM 1
ASM 2
EFFLUENT
COLOR
INFLUENT
ASM 1
ASM 2
EFFLUENT
‘SUSPENDED
SOLID
CLARIFIER ASM 1
CLARIFIER ASM 2
SvI
ASM 1
ASM 2
MLSS
CHANNEL 1 UNTIL 8 OF ASM
CHANNEL 1 UNTIL 3 OF ASM 2
MLVSS
CHANNEL 1 UNTIL 8 OF ASM 1
CHANNEL 1 UNTIL 3 OF ASM 2
30A table showing the list of performance monitoring parameters and the sampling
frequency
Parameter_| Frequency
Flowrate Daily
(nn)
pH Dai
DO. Dail
SVo» (rn) Daily
‘BOD Weekiy
‘CoD, Weekly
COLOR Weekly
‘SUSPENDED Weekly
SOLID
Sv Weekly
MLSS Weekly
MLVSS Weekly
31‘Appendix
‘An example of an IETS Perfomance Monitoring Report submitted by you to the IETS Performance Monitoring Committee
‘as taught in the CePIETSO course.
PENFABRIC SDN BERHAD MILL 4
Prai Free Industrial Zone 1, 13600 Prai, Penang.
From: Kairul Anwar Abdul Rahim To: Mr. MT Boey
(Factory Manager)
IETS report for Month of December 2009
1. Daily record (Avera
FLOWRATE (mth) | pH (Gontrollmit | DO (malt) (Contar] SV (ml) (Contot
(Contra iit 380 9) iimitt=mgity" | tint Average DO of ASM I is 1.80 ppm and ASM 2 is 2.82 ppm.
> Average pH of ASM 1 is 7.95 and ASM 2 is 8.15
> The final effluent of COD and BOD complied to Standard B and Writen Approval
4. Upset condition
No major upset arises
Appendix V