prosect: Cawtnal Lkm—
[Document No: |TQCERT. IPSISAFETYI CULCIO10; Rev 01; Dt 09.04.2024
Labour camp Inspection Report
Date
sino |. Observation
; {Are the entry roads / walkways / passages to camp kept clear?
2. [Ate the walkways & roads are even and fee from water logging?
3.__|Isthe enty inside workmen camp resticted?
4 Is Ilumination level OK in access / egress?
5 |Are dustbin/ garbage bins alocated for each & every colony?
5 ___ |Isthe garbage being disposed of on regular basis?
Se
4 _ |Isthere any emergency commuricaton system estabished?
«9. [isthe workmen camp constuced wit Noire Hazard Matra?
isthe workmen camp conevucted with mater, whieh ae ngiTeadly
40_* |tammsbie? :
vi_ [Ae re Enger & re Bucs wae andaiied ey?
ja. _[Relosaton of Fie Extinguishers & Fre Buctetstited cute aleyee? «| Aled quai JeLL
13._ [Me Fist fcites avaliable? Wes
14___|Whether dsinfecton activities carried out on weeky basis? To be minha.
Fal Whether Cement Flooring provided? | Ne
1g __ [Cando ofthe Side was / Root Shoot oRey
17__ [5 sheterstong enought with stand wind pressure? ue
te |Whether he electrical connections povided are sae 14)
19 lis the ventilation of the rooms adequate? Ys
20 __ Ite tuminain of he rooms adequate? Yo.
a4 [Arete doors and windows in good condition? Yar
ay _|stne general hygienic condton fhe eons adequate? To _be_imlehen dv)
33 _[Arektchens kept clean and tay? Yer
n4__|!sthe water suply adequate or cooking? 44
a5 _ [lhe garbage oktchen being posed ot every ay? yes
a[Are the utensils are being cleaned on regular basis?
26
|Are gas cylinders & other flammable materials kept in safe area (away from “ 23
27 fire)?
28 \Are suitable regulator, Connecting tube & connections with the cylinder O.K
nq__ [Ae extinguishers kept outside ener? ive a rae
=
a0 _|!sthe Wash area - Water tanks constructed as pre Design Drawing? | y gg a eae
Al |Are adequate tollets available? yas.
32___ [Ate the toilets are being cleaned on regular basis? yes
33 _|!S there adequate water faciliy available for tolet and bath? Ws
34 ~ |Are the septic tanks and soak pit working properly? us
35 _!$2ree around bathrooms cleaned & kept dry and nen slippery? Us
———t
4g” |!S Proper drainage provided? / Ues
a ng watr avatar 7 Tyas
gg__ |!S water tank tap not leaking? ay ( $4
a ls Water tank cleaned regulary? ue
CONTRACTOR PMc
mame MQ. haba ShefUok yore Be
Designation:“| KE sfc eb &
s& Lec]
Signature
pate. + \2-We et
\ 5
esTQ Cert Services Private Limited — Project Services
(A wholly owned subsidiary of Tata Projects Limited)
Document No: TQCERT /PSISAFETY/ CLI WMIO:
PROJECT: Cembral [pon
WELDING MACHINE CHECK LIST
; Rev 01 Dt:09.04.2024
in good condition
Sek _—
Description Sr. No Remarks
|_S.No
Loc
GENERAL
1 [In good working condition ys
2 | Provided with earthing or 7
grounding 92
3 | Fire extinguishers available Ys
TERMINALS /JOINTS
5 _| In good working condition :
6 _| Secured and effectively insulated
7 __| Electric joints are healthy Tye
@ [Is the lugging was crimped with T
too! Les
CABLES uy _
9 Is the cable is free from heat CG
70 | Properly insulated and no exposed onl
cables Lae |
TT | Size of cable suilable for voltage i
supply 7
12 Hang up to prevent tripping hazard eg
13 | Hang on insulated hook or
material Yo
14 | Cables and joints are proper and
ELECTRODE HOLDER / CLAMP
15 Electrode holder is free from |
defects 13
16 | Return cable clamp is free from
defects 4
7 Detach electrodes when not in T
use(HOLDER STAND)
Welding machine check list- TOCERT /PSISAFETY! CLI WMVO027; Rev 01 01:08.04.2028TQ Cert Services Private Limited — Project Services
(A wholly owned subsidiary of Tata Projects Limited)
Document No: TQCERT /PSISAFETY/ CL! WM/027; Rev 01 Dt:09.04.2024
Provect: C.exhxl Teo
WELDING MACHINE CHECK LIST
Description Sr.No] > Remarks
S.No
Loc | >
WORK AREA
18 No combustibie or flammable
materials | a7
19 | Fire blanket is provided
20 | Maintain good housekeeping 4
24 Flooring is free from water g_ ~
22 __| Fire watch person available yd
7
Contractor PMC Client
Name 5 Lf >
ae yet fody Ua 9
Designation Hs€ ffir . bse dad
Directo free
fp
Signature Se yo
on
Date = 200% (2-24
‘Welding machine chock lst- TACERT /PS/SAFETY! CL WNIO27; Rev Of Di:09.06.2024
[a-the WHY
ooTQ Cert Services Private Limited — Project Services ie.
(Awholly owned subsidiary of Tata Projects Limited) 7
Document No: TQCERT /PS/SAFETY! CL/DG/047; Rev 01 Dt:09.04.2024
PROJECT:
DG INSPECTION CHECKLIST
Name ofsite : Ceatyal TK 06 identification No: 1203NASL Contractor: Gop
Inspected by : yy. yorgesh Parteyoate d2a)upory ~F2
land Me valid Shaflar
Sl.No Points __| Observations | Measures
1 ‘Whether the continuity and tightness of earth conductor
are checked? Ve
2 Mention the SWG of the earth conductor used Gemn
3 Whether earth resistance is measured?( Mention the I~ alll
value of Earth Resistance) Nad-macitey —
4 Is rubber mat provided in front for DG yes
5 Is Emergency stop switch is provided for DG? T ys
6 Is DG provided under shed / coyer? ys
7 Whether entry is restricted into the DG room? Tye
8 ‘Are cable trenches are covered? Us
9 Is insulation provided on the battery terminals? YY. Dp
10 Is thermal insulation done for the DG exhaust l ye
1 Whether stack height is maintained as per Environment ene
requirements given in procedure manual? os
12 __| Whether DG exhaust is diverted outside the shed? yu Nel _inpenbaliben
13 | Areal the rotating parts of OG guarded (coupling, radiator
fan)? y 2
14 _| Whether any leakage of fuel / oil in the DG room? Wi
15 | Whether DG surrounding is free from flammable material |) of
& is accessible from all sides? ¥
16 ‘Whether fire extinguisher / fire buckets with stand are T
provided? _ ys
7 Whether DG is fitted with Acoustics & Silencer by
insulations?
_ Contractor PMC
Name. de chal, Shaw ae Verret
Designation | st {fob 1
Signature Sof
Date tf 02924 ae WV 94