0% found this document useful (0 votes)
111 views5 pages

Inspection Checklist

Checklist for Inspection

Uploaded by

aasif
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
111 views5 pages

Inspection Checklist

Checklist for Inspection

Uploaded by

aasif
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 5
TQ Cert Services Private Limited — Project Services. (tat med ae aa Protein ert prosect: Cawtnal Lkm— [Document No: |TQCERT. IPSISAFETYI CULCIO10; Rev 01; Dt 09.04.2024 Labour camp Inspection Report Date sino |. Observation ; {Are the entry roads / walkways / passages to camp kept clear? 2. [Ate the walkways & roads are even and fee from water logging? 3.__|Isthe enty inside workmen camp resticted? 4 Is Ilumination level OK in access / egress? 5 |Are dustbin/ garbage bins alocated for each & every colony? 5 ___ |Isthe garbage being disposed of on regular basis? Se 4 _ |Isthere any emergency commuricaton system estabished? «9. [isthe workmen camp constuced wit Noire Hazard Matra? isthe workmen camp conevucted with mater, whieh ae ngiTeadly 40_* |tammsbie? : vi_ [Ae re Enger & re Bucs wae andaiied ey? ja. _[Relosaton of Fie Extinguishers & Fre Buctetstited cute aleyee? «| Aled quai JeLL 13._ [Me Fist fcites avaliable? Wes 14___|Whether dsinfecton activities carried out on weeky basis? To be minha. Fal Whether Cement Flooring provided? | Ne 1g __ [Cando ofthe Side was / Root Shoot oRey 17__ [5 sheterstong enought with stand wind pressure? ue te |Whether he electrical connections povided are sae 14) 19 lis the ventilation of the rooms adequate? Ys 20 __ Ite tuminain of he rooms adequate? Yo. a4 [Arete doors and windows in good condition? Yar ay _|stne general hygienic condton fhe eons adequate? To _be_imlehen dv) 33 _[Arektchens kept clean and tay? Yer n4__|!sthe water suply adequate or cooking? 44 a5 _ [lhe garbage oktchen being posed ot every ay? yes a [Are the utensils are being cleaned on regular basis? 26 |Are gas cylinders & other flammable materials kept in safe area (away from “ 23 27 fire)? 28 \Are suitable regulator, Connecting tube & connections with the cylinder O.K nq__ [Ae extinguishers kept outside ener? ive a rae = a0 _|!sthe Wash area - Water tanks constructed as pre Design Drawing? | y gg a eae Al |Are adequate tollets available? yas. 32___ [Ate the toilets are being cleaned on regular basis? yes 33 _|!S there adequate water faciliy available for tolet and bath? Ws 34 ~ |Are the septic tanks and soak pit working properly? us 35 _!$2ree around bathrooms cleaned & kept dry and nen slippery? Us ———t 4g” |!S Proper drainage provided? / Ues a ng watr avatar 7 Tyas gg__ |!S water tank tap not leaking? ay ( $4 a ls Water tank cleaned regulary? ue CONTRACTOR PMc mame MQ. haba ShefUok yore Be Designation:“| KE sfc eb & s& Lec] Signature pate. + \2-We et \ 5 es TQ Cert Services Private Limited — Project Services (A wholly owned subsidiary of Tata Projects Limited) Document No: TQCERT /PSISAFETY/ CLI WMIO: PROJECT: Cembral [pon WELDING MACHINE CHECK LIST ; Rev 01 Dt:09.04.2024 in good condition Sek _— Description Sr. No Remarks |_S.No Loc GENERAL 1 [In good working condition ys 2 | Provided with earthing or 7 grounding 92 3 | Fire extinguishers available Ys TERMINALS /JOINTS 5 _| In good working condition : 6 _| Secured and effectively insulated 7 __| Electric joints are healthy Tye @ [Is the lugging was crimped with T too! Les CABLES uy _ 9 Is the cable is free from heat CG 70 | Properly insulated and no exposed onl cables Lae | TT | Size of cable suilable for voltage i supply 7 12 Hang up to prevent tripping hazard eg 13 | Hang on insulated hook or material Yo 14 | Cables and joints are proper and ELECTRODE HOLDER / CLAMP 15 Electrode holder is free from | defects 13 16 | Return cable clamp is free from defects 4 7 Detach electrodes when not in T use(HOLDER STAND) Welding machine check list- TOCERT /PSISAFETY! CLI WMVO027; Rev 01 01:08.04.2028 TQ Cert Services Private Limited — Project Services (A wholly owned subsidiary of Tata Projects Limited) Document No: TQCERT /PSISAFETY/ CL! WM/027; Rev 01 Dt:09.04.2024 Provect: C.exhxl Teo WELDING MACHINE CHECK LIST Description Sr.No] > Remarks S.No Loc | > WORK AREA 18 No combustibie or flammable materials | a7 19 | Fire blanket is provided 20 | Maintain good housekeeping 4 24 Flooring is free from water g_ ~ 22 __| Fire watch person available yd 7 Contractor PMC Client Name 5 Lf > ae yet fody Ua 9 Designation Hs€ ffir . bse dad Directo free fp Signature Se yo on Date = 200% (2-24 ‘Welding machine chock lst- TACERT /PS/SAFETY! CL WNIO27; Rev Of Di:09.06.2024 [a-the WHY oo TQ Cert Services Private Limited — Project Services ie. (Awholly owned subsidiary of Tata Projects Limited) 7 Document No: TQCERT /PS/SAFETY! CL/DG/047; Rev 01 Dt:09.04.2024 PROJECT: DG INSPECTION CHECKLIST Name ofsite : Ceatyal TK 06 identification No: 1203NASL Contractor: Gop Inspected by : yy. yorgesh Parteyoate d2a)upory ~F2 land Me valid Shaflar Sl.No Points __| Observations | Measures 1 ‘Whether the continuity and tightness of earth conductor are checked? Ve 2 Mention the SWG of the earth conductor used Gemn 3 Whether earth resistance is measured?( Mention the I~ alll value of Earth Resistance) Nad-macitey — 4 Is rubber mat provided in front for DG yes 5 Is Emergency stop switch is provided for DG? T ys 6 Is DG provided under shed / coyer? ys 7 Whether entry is restricted into the DG room? Tye 8 ‘Are cable trenches are covered? Us 9 Is insulation provided on the battery terminals? YY. Dp 10 Is thermal insulation done for the DG exhaust l ye 1 Whether stack height is maintained as per Environment ene requirements given in procedure manual? os 12 __| Whether DG exhaust is diverted outside the shed? yu Nel _inpenbaliben 13 | Areal the rotating parts of OG guarded (coupling, radiator fan)? y 2 14 _| Whether any leakage of fuel / oil in the DG room? Wi 15 | Whether DG surrounding is free from flammable material |) of & is accessible from all sides? ¥ 16 ‘Whether fire extinguisher / fire buckets with stand are T provided? _ ys 7 Whether DG is fitted with Acoustics & Silencer by insulations? _ Contractor PMC Name. de chal, Shaw ae Verret Designation | st {fob 1 Signature Sof Date tf 02924 ae WV 94 DG Inspection Check List- TQCERT IPSISAFETY/ CL//DGIO47; Rev 01 Dt:09.04.2024

You might also like