INSPECTION TEST PLAN
RUA’s SALES CENTER
Title: ITP Soil investigation
REV DATE REVISION DETAILS STATUS
00 1st Submission For approval
Prepared by Reviewed By
QA/QC Engineer Project Manager
AL-RAJHI BCC AL-RAJHI BCC
RUAL MADINAH SALES CENTER INSPECTION AND TEST PLAN
WORK SCOPE (Soil Investigation)
PART 1- APPROVALS REQUIRED PRIOR TO COMMENCEMENT OF THE WORKS
Hold, or Witness Point
Item Frequency of Records
Description of Operation
No. Inspection Generated Rajhi BCC KEO
Shop Drawings / design drawings / location Approved
1 Once Sub R&A
drawing Drawings
2 Method Statement Once MST Sub R&A
3 Inspection test plan Once ITP Sub R&A
Note*- All deviation from the approved drawings/documents to be recorded and discussed with the PMCM (Engineers)
prior to proceeding.
PART 2- INSPECTION AND TEST DURING CONSTRUCTION WORKS
Item Frequency of Records Hold, or Witness Point
Description of Operation
No. Inspection Generated Rajhi BCC KEO
By
1 Borehole’s location (layout of the boreholes) WIR H I&A
Area/Stages/Layout
Abbreviations: Sub- SUBMIT, H- HOLD, R&A- REVIEW & APPROVE, RC- RANDOM CHECK, I&A- INSPECT &
APPROVE, S- SURVEILANCE, CL= CHECKLIST, WI=WITNESS, WIR- WORK INSPECTION REQUEST, I- INSPECT