Hydrotherapy Units Roof Plan
Hydrotherapy Units Roof Plan
+00MM FIN.FLR.LVL.
+450MM FIN.FLR.LVL.
SLOPE: 1:12 SMALER SCALE DRAWINGS.
UP
MD2 UP MS LADDER
244 C/C CM TREAD
1100 34 342
27 EQUAL RISERS 7.THESE DRAWINGS SHALL BE READ IN CONJUNCTION
WITH OTHER RELEVENT STRUCTURAL & MEP
100
100
Y9 Y9
D5 DRAWINGS.
W4 D3
OPEN SHOWER
SWIMMING POOL DECK 1.50 MWIDE STORE
1200
R 11 8.CHECK ALL DIAMENSIONS AT SITE PRIOR TO
384
2200X2200 PUMP ROOM 00
244
2400 1200 5300 1500 CARRYING OUT WORK,ANY DISCREPANCIES SHALL
2400
+ 450MM FIN.FLR.LVL. 2800X2200
35
HANDRAIL ELEC.ROOM R 100 BE REFERRED TO THE ENGINEER.
+150MM FIN.FLR.LVL. 1400X2200
1034
+150MM FIN.FLR.LVL. UP
D3
1400
DN RAMP 1:8
850
Y8 Y8
W5
500
SWIMMING POOL DECK 1.50 MWIDE
D2 M/TOILET
1
2300
2300
2200X1550
+430MMLVL AR 07
SD M/CHANGING ROOM
1800
2800X3200
-1050MM FIN.FLR.LVL.
+440MMLVL
SWIMMING POOL
Y7 8000X6000
-350MM FIN.FLR.LVL. M/TOILET Y7
D2 2200X1550
300 300
1100
1100
V1
500
PASSAGE WIDE 1.50 M
OPEN - 2
+ 440MM FIN.FLR.LVL.
Y6 Y6
650
600 300 300 300
1
V1
500
DN AR 05
2100
W5 D2 F/TOILET
14300
14300
2200X1550
2
3400
3400
AR 05 F/CHANGING ROOM
1700
2800X3200
LADDER HANDRAIL
2 HANDLE PIPE 15CM ABOVE WATER
+440MM FIN.FLR.LVL. F/TOILET
2200X1550
+ 450MM FIN.FLR.LVL.
AR 07 D2 +430MM FIN.FLR.LVL.
SWIMMING POOL DECK 1.50 MWIDE
SD V1
500
Y5 Y5
1000
W3 By Engineer.Ghadeer Mohd at 11:18 am, May 22, 2023
1700
D4
1700
1700
D1
OPEN - 1
500
TOILET V1
F/TOILET 2100X1600
1400X2400
900
Y4 V1 Y4
500
900
4000X3900 W2
1250
M/TOILET
2050
+450MM FIN.FLR.LVL. TREATMENT ROOM JACUZZI HALL
1600
1600
2600X1400 3000X3000 3600X3000
V1
500
MD1
650
Y2 Y2
PROJECT NAME
100 700
100 700
100 2200
W1 W1
1100
Y1 MAIN ENTRANCE Y1 HYDROTHERAPY UNITS
1500
1500
UP 7200X1500
SLOPE: 1:12 +450MM FIN.FLR.LVL. W1 W1
400
OWNER
300 2000 1000 1500 400
300 300
+00MM FIN.FLR.LVL.
600
UP
5900X2200 MINISTRY OF SOCIAL DEVELOPMENT
SLOPE: 1:12 +00MM FIN.FLR.LVL.
3
1500
UP
AR 05
1500 3200
200 900 200 5800 200
X1 X2 X3 X4 X5 X6 X7 X8 X9 X10 X11
DESIGN BY CHECKED BY DATE
YAHYA YAHYA OCT/2022
500
DRAWINGS.
100
Y9 Y9
8.CHECK ALL DIAMENSIONS AT SITE PRIOR TO
DN CARRYING OUT WORK,ANY DISCREPANCIES SHALL
BE REFERRED TO THE ENGINEER.
slop
e
slope
slope
20CM THICK CONCREATE SLAB
13400
13400
14900
TERRACE
slop
14900
e
+4450MM. ST.LVL. slope
slope
slope
slope
By Engineer.Ghadeer Mohd at 11:19 am, May 22, 2023
slop
e
slope
Y2 slope Y2 PROJECT NAME
700
300 700
HYDROTHERAPY UNITS
Y1 +5450MM. ST.LVL. Y1
700
OWNER
ROOF PLAN GF
17/01/2023 10:34:43
NAS 2022 520 AR 03
EXCHAUST FAN APPROVED PAINT EXCHAUST FAN APPROVED PAINT GRAY TILE NOTE:
+5450.0 +5450.0 GENERAL NOTES:
PARAPET PARAPET
ALL MATERIAL AND PAINT COLOR SHALL
400
400
BE APPROVED BY THE ENGINEER. 1.THE CONTENTS OF THIS SHEET SHALL NOT BE
+4450.0 +4450.0
1000
1000
COPY,REPRODUCED OR USED WITH OUT WRITEN
800
1000
GROUND FLOOR ROOF GROUND FLOOR ROOF
PERMISSION.
1200
3.ROOM SIZES ARE IN MILLIMETERS,
CLEAR WALL TO WALL(X&YAXIS).
800
4.FINISHED GROUND AND FLOOR LEVELS
5450
5450
200
SHOWN IN MILLIMETERS.
4000
4000
5.DRAWING NOT TO BE SCALED,WORK TO
FIGURED GIVEN DIAMENSIONS.
2200
+450.0 +450.0 6.PREFERERENCE TO BE GIVEN TO DETAILS OVER
GROUND FLOOR GROUND FLOOR
SMALER SCALE DRAWINGS.
450
450
WITH OTHER RELEVENT STRUCTURAL & MEP
+0.0 +0.0 DRAWINGS.
GROUND LVL AR LEFT SIDE ELEVATION GROUND LVL
400
+4450.0 +4450.0
1000
1000
800
GROUND FLOOR ROOF GROUND FLOOR ROOF
200
5450
5450
4000
4000
+450.0 +450.0
GROUND FLOOR GROUND FLOOR
450
450
+0.0 +0.0
GROUND LVL GROUND LVL
+4450.0 +4450.0
1000
1000
GROUND FLOOR ROOF GROUND FLOOR ROOF
By Engineer.Ghadeer Mohd at 11:21 am, May 22, 2023
200
800
5450
5450
200
4000
4000
+450.0 +450.0
GROUND FLOOR GROUND FLOOR
PROJECT NAME
450
450
+0.0 +0.0 HYDROTHERAPY UNITS
GROUND LVL GROUND LVL
1000 400
230
230
+4450.0 +4450.0
1000
300
770
400
COMMERCIAL 290 AL AMRAT
600
AL AMRAT
600
600
5450
ELEVATIONS GF
4000
4000
150 600 150 DESIGN BY CHECKED BY DATE
2200
450
+0.0 +0.0 ATHUL SULTAN 1 : 80
GROUND LVL GROUND LVL
17/01/2023 10:35:06
NAS 2022 520 AR 04
04 SCALE 1:80
TILE FINISH GENERAL NOTES:
1000 GAUGE GEOTEXTILE MEMBRANE
1.THE CONTENTS OF THIS SHEET SHALL NOT BE
50 THK. INSULATION
COPY,REPRODUCED OR USED WITH OUT WRITEN
PERMISSION.
WATER PROOFING MEMBRANE 2.ALL DIMENSION SHOWN IN MILLIMETERS,
WITH 150 MIN. LAPS
UNLES OTHERWISE NOTED.
CONC. SPEED 1:2:4, LAID TO FALL 1:100 1500 400 3.ROOM SIZES ARE IN MILLIMETERS,
+5450.0 EXCHAUST FAN EXCHAUST FAN +5450.0 CLEAR WALL TO WALL(X&YAXIS).
STRUCTURAL ROOF SLAB
PARAPET PARAPET 4.FINISHED GROUND AND FLOOR LEVELS
400
400
SHOWN IN MILLIMETERS.
+4450.0 +4450.0 5.DRAWING NOT TO BE SCALED,WORK TO
1000
1000
GROUND FLOOR ROOF GROUND FLOOR ROOF FIGURED GIVEN DIAMENSIONS.
6.PREFERERENCE TO BE GIVEN TO DETAILS OVER
SMALER SCALE DRAWINGS.
5450
4000
4000
8.CHECK ALL DIAMENSIONS AT SITE PRIOR TO
CARRYING OUT WORK,ANY DISCREPANCIES SHALL
BE REFERRED TO THE ENGINEER.
SS HANDRAIL
+450.0
GROUND FLOOR
+0.0
450
450
GROUND LVL
-1050.0 -1050.0
1050
1050
POOL BASE FLOOR FINISH POOL BASE
50mm SCREED
CONCRETE SLAB
1500 1200 5300 1500
1000 GAUGE POLYTHENE SHEET
8000
ANTI TERMITE TREAMENT
TILE FINISH
1000
1000
1000
GROUND FLOOR ROOF
GROUND FLOOR ROOF GROUND FLOOR ROOF
600 600
PROJECT NAME
LOCKERS HYDROTHERAPY UNITS
5450
5450
5450
80MM DIA SS HANDRAIL
4000
4000
60MM DIA SS HANDRAIL
1.5M WALL TILE OWNER
2800
+450.0 450 60 300 150 +450.0
GROUND FLOOR GROUND FLOOR
+450.0 MINISTRY OF SOCIAL DEVELOPMENT
GROUND FLOOR
650
+0.0 +0.0
450
600
450
450
GROUND LVL GROUND LVL
+0.0
USE PLOT No LOCATION
1500
400
GROUND LVL
-1050.0 -1050.0
1050
1050
COMMERCIAL 290 AL AMRAT
200 400
50mm SCREED
DRAWING TITLE No of floors
CONCRETE SLAB
1500 5300 1200 AR SECTION 3
1000 GAUGE POLYTHENE SHEET SECTION 2 GF
8000
05 SCALE 1:75
ANTI TERMITE TREAMENT
DESIGN BY CHECKED BY DATE
50mm THK. SAND BED
SULTAN YAHYA OCT/2022
15mm THK. HARD CORE
AR SECTION 1 DRAWN BY APPROVD BY SCALE
COMPACTED EARTH FILLING
05 SCALE 1:75 ATHUL SULTAN 1 : 75
PROJECT No SHEET No REV
17/01/2023 10:35:22
NAS 2022 520 AR 05
1000 3300 GENERAL NOTES:
3500
1600 1.THE CONTENTS OF THIS SHEET SHALL NOT BE
1000
COPY,REPRODUCED OR USED WITH OUT WRITEN
FIXED GLASS FIXED GLASS FIXED GLASS FIXED GLASS PERMISSION.
2.ALL DIMENSION SHOWN IN MILLIMETERS,
UNLES OTHERWISE NOTED.
2800
2800
2800
3.ROOM SIZES ARE IN MILLIMETERS,
2200
2200
FIXED GLASS FIXED GLASS FIXED GLASS CLEAR WALL TO WALL(X&YAXIS).
FIXED GLASS
4.FINISHED GROUND AND FLOOR LEVELS
FFL SHOWN IN MILLIMETERS.
5.DRAWING NOT TO BE SCALED,WORK TO
FIGURED GIVEN DIAMENSIONS.
* 12 MM TEMPERED GLASS IN HEAVY DUTY UPVC FRAME * DOUBLE LEAF HEAVY DUTY UPVC DOOR 7.THESE DRAWINGS SHALL BE READ IN CONJUNCTION
* 12 MM TEMPERED GLASS IN HEAVY DUTY * 12 MM TEMPERED GLASS IN HEAVY DUTY UPVC FRAME * 12 MM TEMPERED GLASS IN HEAVY DUTY ALUMINUM FRAME WITH OTHER RELEVENT STRUCTURAL & MEP
UPVC FRAME * WITH AUTOMATIC SLIDING DOOR 2400X2700MM * WITH 12 MM TEMPERED GLASS . DRAWINGS.
* HEAVY DUTY UPVC WINDOW * HEAVY DUTY UPVC WINDOW
* HEAVY DUTY ALUMINUM WINDOW * LOCKING SYSTEM * HEAVY DUTY DOOR CLOSER 8.CHECK ALL DIAMENSIONS AT SITE PRIOR TO
* LOCATION * LOCATION CARRYING OUT WORK,ANY DISCREPANCIES SHALL
* LOCATION * TWO SIDE SLIDING * DOUBLE LEAF BE REFERRED TO THE ENGINEER.
TREATMENT ROOM RECEPTION AREA,WAITING HALL
RECEPTION,WAITING AREA,JACUZZI HALL & * LOCATION * LOCATION
TRAETMENT ROOM
MAIN ENTRANCE SWIMMING POOL DECK
6000 3500
800
1200
2600
2600
2600
2400
2400
1400
FFL
W4 W5 SD V1
OPEN- 1 OPEN- 2
SHUTTER : BOTTOM HINGED INWARD OPENING UPVC SHUTTERS
*12 MM TEMPERED GLASS IN HEAVY DUTY ALUMINUM FRAME * 12 MM TEMPERED GLASS IN HEAVY DUTY
WITH PANELS AND FLY MESH
UPVC FRAME
* SHUTTER : BOTTOM HINGED INWARD OPENING UPVC SHUTTERS WITH PANELS AND FLY MESH By Engineer.Ghadeer Mohd at 11:23 am, May 22, 2023
GLAZED PANEL : 6 MM. PLATE GLASS,6MM. AIR GAP&6 MM. PLATE GLASS
* WITH AUTOMATIC SLIDING DOOR 2400X2700MM
SOLID PANEL : NIL
* 12 MM TEMPERED GLASS IN HEAVY DUTY UPVC FRAME
* LOCKING SYSTEM
FLY MESH : REMOVABLE DOUBLE MESH FLY SCREEN AS PER APPROVAL
* HEAVY DUTY UPVC WINDOW
* ONE SIDE SLIDING
WINDOW FRAME : POWDER COATED ALUMINUM
* WITH EXCHAUST FAN
* LOCATION
FINISH : WHITE POWDER COATED
* LOCATION
WINDOW GRILLE : NIL
RECEPTION
SPECIAL FEATURES: COMPLETE WITH BOTTOM HINGES & CATCHES
SWIMMING POOL AREA
PROJECT NAME
1000 1000 1000 800
800 HYDROTHERAPY UNITS
OWNER
125
. 00°
2200
2200
2200
2200
2200
MINISTRY OF SOCIAL DEVELOPMENT
FFL
17/01/2023 10:35:31
CHANGING ROOM,JACUZZI HALL&TREATMENT ROOM * LOCATION NAS 2022 520 AR 06
ELECTRICAL ROOM
+5450.0
PARAPET GENERAL NOTES:
1000
2.ALL DIMENSION SHOWN IN MILLIMETERS,
+4450.0 UNLES OTHERWISE NOTED.
GROUND FLOOR ROOF
5450
8.CHECK ALL DIAMENSIONS AT SITE PRIOR TO
4000
CARRYING OUT WORK,ANY DISCREPANCIES SHALL
BE REFERRED TO THE ENGINEER.
760
1600
750
750
700
+450.0
480
GROUND FLOOR
+0.0
450
GROUND LVL
FAUCET @400MM
VERTICAL GRAB RAIL @800MM AFFL HORIZONTAL GRAB RAIL @700MM AFFL
600MM LONG STAINLES STEEL 600MM LONG STAINLES STEEL
WASH BASIN@750MM AFFL FAUCET @400MM By Engineer.Ghadeer Mohd at 11:22 am, May 22, 2023
700 700
PROJECT NAME
HYDROTHERAPY UNITS
10MM DROP IN FLOOR FINISH 1400
OWNER
H.BATH
1550
+440MMLVL
2200X1550 AR TOILET DETAILS
MINISTRY OF SOCIAL DEVELOPMENT
02 SCALE 1:15
+430MMLVL
3
AR 07
USE PLOT No LOCATION
COMMERCIAL 290 AL AMRAT
AL AMRAT
DRAWING TITLE No of floors
TOILET DETAILS GF
17/01/2023 10:35:41
02 SCALE 1:15 NAS 2022 520 AR 07
Muscat municipality
General Directorate
of Technical Affairs
Building Permits Department
Approved as per the issued permit
Building facade to be painted in white colour only
- The project contractor and the supervision
consultant must construct the project as
per the approved drawings and comply with
conditional approvals, local and internation-
al approved regulations during construc-
tion.
- The design consultant, the supervision
consultant and the project contractor takes
full responsibility, each on their scope,
towards the safety of the building, the data
provided in this approval, the attachment of
correct documents, the compliance of the
attached designs with the local order
number 23/92, laws, regulations, circulars,
and krooki requirements, and the provision
of other authorities approvals, specifica-
tions and guidelines without conflict with
the approved drawings from this directo-
rate.
- The project contractor and the supervision
consultant are committed to provide the
required safety of the buildings, the neigh-
boring services as well as considering the
soil nature and the structural effects on the
surrounding environment.
- If the plot is nearby a mountain (Jabal) or a
valley (Wadi), the supervision consultant
must provide a detailed study on the Jabal
cutting or the required protection towards
the Wadi side prior to construction.
- The project contractor and the supervision
consultant must return to this directorate
prior to construction in case of a technical
issue is occurred which constrain construc-
tion and when the approved drawings does
not match with other approved drawings or
with the existing plot conditions.
By Eng.Amal Said AlBahri at 12:41 pm, May 23, 2023
By Eng.Amal Said AlBahri at 12:41 pm, May 23, 2023
Muscat municipality
General Directorate
of Technical Affairs
Building Permits Department
Approved as per the issued permit
Building facade to be painted in white colour only
- The project contractor and the supervision
consultant must construct the project as
per the approved drawings and comply with
conditional approvals, local and internation-
al approved regulations during construc-
tion.
- The design consultant, the supervision
consultant and the project contractor takes
full responsibility, each on their scope,
towards the safety of the building, the data
provided in this approval, the attachment of
correct documents, the compliance of the
attached designs with the local order
number 23/92, laws, regulations, circulars,
and krooki requirements, and the provision
of other authorities approvals, specifica-
tions and guidelines without conflict with
the approved drawings from this directo-
rate.
- The project contractor and the supervision
consultant are committed to provide the
required safety of the buildings, the neigh-
boring services as well as considering the
soil nature and the structural effects on the
surrounding environment.
- If the plot is nearby a mountain (Jabal) or a
valley (Wadi), the supervision consultant
must provide a detailed study on the Jabal
cutting or the required protection towards
the Wadi side prior to construction.
- The project contractor and the supervision
consultant must return to this directorate
prior to construction in case of a technical
issue is occurred which constrain construc-
tion and when the approved drawings does
not match with other approved drawings or
with the existing plot conditions.
By Eng.Amal Said AlBahri at 12:41 pm, May 23, 2023
Muscat municipality
General Directorate
of Technical Affairs
Building Permits Department
Approved as per the issued permit
Building facade to be painted in white colour only
- The project contractor and the supervision
consultant must construct the project as
per the approved drawings and comply with
conditional approvals, local and internation-
al approved regulations during construc-
tion.
- The design consultant, the supervision
consultant and the project contractor takes
full responsibility, each on their scope,
towards the safety of the building, the data
provided in this approval, the attachment of
correct documents, the compliance of the
attached designs with the local order
number 23/92, laws, regulations, circulars,
and krooki requirements, and the provision
of other authorities approvals, specifica-
tions and guidelines without conflict with
the approved drawings from this directo-
rate.
- The project contractor and the supervision
consultant are committed to provide the
required safety of the buildings, the neigh-
boring services as well as considering the
soil nature and the structural effects on the
surrounding environment.
- If the plot is nearby a mountain (Jabal) or a
valley (Wadi), the supervision consultant
must provide a detailed study on the Jabal
cutting or the required protection towards
the Wadi side prior to construction.
- The project contractor and the supervision
consultant must return to this directorate
prior to construction in case of a technical
issue is occurred which constrain construc-
tion and when the approved drawings does
not match with other approved drawings or
with the existing plot conditions.
By Eng.Amal Said AlBahri at 12:41 pm, May 23, 2023
By Eng.Amal Said AlBahri at 12:41 pm, May 23, 2023
GENERAL NOTES:
X1 X3 X4 X5 X6 X7 X8 X9 X10 X11
1.THE CONTENTS OF THIS SHEET SHALL NOT BE
COPY,REPRODUCED OR USED WITH OUT WRITEN
X2 PERMISSION.
18400 2.ALL DIMENSION SHOWN IN MILLIMETERS,
UNLES OTHERWISE NOTED.
100 2800 4200 2200 2000 1700 700 800 1500 700 1600 100
3.ROOM SIZES ARE IN MILLIMETERS,
CLEAR WALL TO WALL(X&YAXIS).
2 4.FINISHED GROUND AND FLOOR LEVELS
2
SHOWN IN MILLIMETERS.
5.DRAWING NOT TO BE SCALED,WORK TO
100
100
Y9 Y9 FIGURED GIVEN DIAMENSIONS.
PB3 PB3 PB3 PB3 6.PREFERERENCE TO BE GIVEN TO DETAILS OVER
SMALER SCALE DRAWINGS.
+0.34m SSL
2400
2400
PB3 +0.35m SSL PB1 +0.05m SSL PB1 +0.05m SSL PB2 7.THESE DRAWINGS SHALL BE READ IN CONJUNCTION
WITH OTHER RELEVENT STRUCTURAL & MEP
DRAWINGS.
PB2 PB3 PB3
Y8 Y8 8.CHECK ALL DIAMENSIONS AT SITE PRIOR TO
CARRYING OUT WORK,ANY DISCREPANCIES SHALL
BE REFERRED TO THE ENGINEER.
+0.33m SSL
3400
PB2 PB3
+0.34m SSL PB3
Y7 Y7
Y6 PB3 Y6
4 4 PB3
+0.33m SSL
14300
14300
PB2 +0.34m SSL
PB3
5 5 150mm THK. GRADE SLAB
3400
3400
WITH BRC A-252 MESH
PB2 PB1
PB2
+0.34m SSL
PB3 PB3 PB2 PB3
Y5 Y5
1700
1700
PB2 PB1 Q Q
PB1
Y4 Y4 By Eng.Amal Said AlBahri at 10:00 am, Jun 05, 2023
PB3 PB3 +0.35m SSL PB1 +0.35m SSL PB2 PB3
900
900
150mm THK. GRADE SLAB
Y3 PB3 Y3
WITH BRC A-252 MESH
PB3 PB3
+0.35m SSL +0.35m SSL
PB2
1600
1600
150mm THK. GRADE SLAB 150mm THK. GRADE SLAB
1 WITH BRC A-252 MESH WITH BRC A-252 MESH
PB2 PB2 PB2
Y2 Y2
Q
100700
100 700
PB2 PB2
Y1 Y1
RAMP
+0.35m SSL Q
RAMP SBW
OWNER
2 2
X1 X2 X3 X4 X5 X6 X7 X8 X9 X10 X11
100 2800 4200 4200 1700 700 800 1500 700 1600 100 MINISTRY OF SOCIAL DEVELOPMENT
18400
100
DESIGN BY CHECKED BY DATE
SRI SRI JUNE/2023
100
100
100
100
100
Y9 Y9 5.DRAWING NOT TO BE SCALED,WORK TO
C4 C4 FIGURED GIVEN DIAMENSIONS.
C4
1400 600
100 400 6.PREFERERENCE TO BE GIVEN TO DETAILS OVER
8400 SMALER SCALE DRAWINGS.
2400
2400
100 7.THESE DRAWINGS SHALL BE READ IN CONJUNCTION
WITH OTHER RELEVENT STRUCTURAL & MEP
RW DRAWINGS.
1000
C4 C2 C2
100
100
100
8.CHECK ALL DIAMENSIONS AT SITE PRIOR TO
Y8 Y8 CARRYING OUT WORK,ANY DISCREPANCIES SHALL
BE REFERRED TO THE ENGINEER.
500
100
2300
2300
200
C4 RW RW
6300
Y7 Y7
1100
1001100
100
C2 C3
100
Y6 Y6
1400
100 600
1900
RW
3400
3400
C4 400
C4
C5 C5 C2 C1
100
100
100
100
Y5 Y5
200
100
C1
4200
4200
100
2100
PROJECT NAME
C2 HYDROTHERAPY UNITS
C1 C2
Y2 Y2
100
100
100
OWNER
C2 C2 C2
700
100 700
Y1 100 100 100 Y1
100
100
MINISTRY OF SOCIAL DEVELOPMENT
100
100
100
100
100
Y9 Y9 5.DRAWING NOT TO BE SCALED,WORK TO
C4 C4 FIGURED GIVEN DIAMENSIONS.
C4
1400 600
100 400 6.PREFERERENCE TO BE GIVEN TO DETAILS OVER
8400 SMALER SCALE DRAWINGS.
2400
2400
100 7.THESE DRAWINGS SHALL BE READ IN CONJUNCTION
WITH OTHER RELEVENT STRUCTURAL & MEP
RW DRAWINGS.
1000
C4 C2 C2
100
100
100
8.CHECK ALL DIAMENSIONS AT SITE PRIOR TO
Y8 Y8 CARRYING OUT WORK,ANY DISCREPANCIES SHALL
BE REFERRED TO THE ENGINEER.
500
100
2300
2300
200
C4 RW RW
6300
Y7 Y7
1100
1001100
100
C2 C3
100
Y6 Y6
1400
100 600
1900
RW
3400
3400
C4 400
C4
C5 C5 C2 C1
100
100
100
Y5 Y5
200
100
100 400
By Eng.Amal Said AlBahri at 11:58 am, Jun 13, 2023
200
250 600
C1
4200
4200
100
2100
PROJECT NAME
C2 HYDROTHERAPY UNITS
C1 C2
Y2 Y2
100
100
100
OWNER
C2 C2 C2
700
100 700
Y1 100 100 100 Y1
100
100
MINISTRY OF SOCIAL DEVELOPMENT
200(TYP.)
THE SAID CONSULTANCY.
200 THK. RAMP 2. ALL DRAWINGS TO BE THROUGHLY CHECKED BY THE
CONTRACTOR BEFORE START OF WORK. DISCREPANCIES IF ANY
WITH T10@200C/C T&B BOTH SHOULD BE BROUGHT TO THE NOTICE OF THE SUPERVISING
WAYS CONSULTANTS FOR CLARIFICATIONS.
200 THK. WALL 3. DO NOT SCALE THESE DRAWINGS. ONLY WRITTEN DIMENSIONS
+ 0.00 FGL ARE TO BE FOLLOWED.
200 THK. RAMP 4. ALL DIMENSIONS ARE IN MILLIMETRES ONLY, UNLESS
WITH T10@200C/C T&B BOTH WAYS OTHERWISE INDICATED.
200 5. ALL DIMENSIONS LEVELS AND / OR HTS. INDICATED ON THESE
12mm FILLER BOARD DRAWINGS ARE OF FINISHED SURFACES.
400 150 THK. SUSPENDED GRADE SLAB
6. PLINTH LEVEL TO BE ESTABLISHED AT SITE ON CONSULTATION
WITH BRC A-252 MESH
WITH THE ARCHITECT / ENGINEER. MINIMUM BEING WHAT IS
200
RAMP SSL VERIES SHOWN ON THESE DRAWINGS.
+0.35 SSL
7. ALL WORKS TO BE CARRIED OUT STRICTLY IN ACCORDANCE
WITH THESE DRAWINGS AND ACCOMPANYING DOC CHANGES IF
T10@200 C/C PLINTH BEAM ANY WOULD BE INSTRUCTED AND OR APPROVED BY THE
AS PER SCH. ARCHITECT / ENGINEER.
100mm RUBBLE PACKING +0.00 FGL 8. WHENEVERH PROPREITARY MATERIALS ARE SPECIFIED, THEY
525
T10
300 SHALL BE EMPLOYED STRICTLY IN ACCORDANCE WITH
100
AMNUFACTURERS RECOMMENDATIONS.
+ 0.150 FGL 2 COATS OF BITUMINOUS PAINT (TYP) 9. ALL MATERIALS USED SHALL COMPLY WITH RELEVANT OMANI
WELL COMPACTED EARTH UP 25 STANDARDS. IN ABSENCE OF OMANI STANDARDS IT SHALL
T12@200 C/C(V) 100mm THK. P.C.C (TYP) COMPLY WITH RELEVANT OR EQUIVALENT INTERNATIONAL
TO 95% S.P.D. 100mm RUBBLE PACKING STANDARDS, SAMPLES / TRADE LITERATURE SHALL BE SUBMITTED
BOTH FACE. 1000 g POLYETHENE SHEET.(TYP.)
TO THE CONSULTANT FOR THEIR APPROVAL BEFORE EMPLOYING
T10@200 C/C(H) WELL COMPACTED EARTH UP WELL COMPACTED EARTH
SECTION 2-2 (RAMP END) BOTH FACE
4-T12
TO 95% S.P.D. ± NGL (VARIES) UP TO 95% S.P.D.
2 COATS OF BITUMINOUS PAINT
ANY MATERIALS ON SITE.
PURPOSE OF SUBMISSION BY
300
(TYP) REV NO. DATE
0
100
BLOCK WALL
PLINTH BEAM
2 COATS OF BITUMINOUS PAINT (TYP) SECTION 3-3 100MM THK. P.C.C
AS PER SCH.
100mm THK. P.C.C (TYP) 1000 g POLYETHENE SHEET.(TYP.)
2 COATS OF BITUMINOUS PAINT (TYP) 1000 g POLYETHENE SHEET.(TYP.) WELL COMPACTED EARTH UP TO 95% S.P.D.
WELL COMPACTED EARTH
UP TO 95% S.P.D.
100MM THK. P.C.C
SECTION 5-5
(TYPICAL INTERNAL WALL DETAIL)
40 COVER 40 COVER
1000
75mm COVER
MIN. 2 COATS OF
BITUMINOUS PAINT (TYP.)
T12@150c/c 200 400 CLIENT NAME :
+0.35m SSL
MIN 2000 BELOW LOWEST NATURAL GROUND LEVEL
200
200
TOP BARS
(SHORT BARS) MAIN REINFORCEMENT.
(LONG BARS)
MN
IS
I TRYOFSOCA
I LDEVELOPMENT
KICKER 75
25x25mm CHAMFER
(TYP.) 4-T12 4-T12
T12@150c/c Y12@150c/c
`THICKNESS VARIES AS PER SCH.
75
ARCH. (1.5m)
BOTTOM BARS Y-12(TYP)*
PROJECT PLOT NO.
(SHORT BARS)
AS PER
(LONG BARS) 1497
T12@150c/c T12@150c/c
BOT. OF FOOTING 1000 GAUGE POLYTHENE HYDROTHERAPY UNITS
75
AL BURAIMI AL BURAIMI
* T12 EDGE REINFORCEMENT
100 `B` 100 APPLICABLE WHERE NO TOP REINFORCEMENT
200mm SOLID BLOCK WORK ALL AROUND
T12@100mmc/c T12@100mmc/c DRAWING TITLE
MIN. 2 COATS OF BITUMINOUS PAINT (TYP.) WATER STOPPER
SECTION -1 3 COATS OF BITUMEN PAINT
100mm THK. P.C.C (TYP)
100 300
300
763.8102
763.8102
CL OF FOOTING / COL.
100 100
100
P.C.C LINE
FOOTING LINE 100 mm P.C.C 100 mm P.C.C -1.60m B.O.C
CONSULTANT
EQUAL
REINF. - `D`
100
(TOP)
1000 GAUGE POLYTHENE 1000 GAUGE POLYTHENE
REINF. - `A`
REINF. - `C`
(BOTT.)
(TOP.)
C
`B`
L OF FOOTING / COL.
SWIMMING POOL DETAILS
EQUAL
REINF. - `B`
SECTION 6-6
(BOTT.)
100
EQUAL EQUAL
B2
2400
B1-T16@200mm C/C B3 5.DRAWING NOT TO BE SCALED,WORK TO
S1 FIGURED GIVEN DIAMENSIONS.
10000
600
T1 B2 B2 SMALER SCALE DRAWINGS.
7000
Y8 B3 Y8
T12@200
2 7.THESE DRAWINGS SHALL BE READ IN CONJUNCTION
WITH OTHER RELEVENT STRUCTURAL & MEP
SLAB AS PER DRAWINGS.
2300
2300
200
SCH.
B2 S1 8.CHECK ALL DIAMENSIONS AT SITE PRIOR TO
S2
2
9000
BE REFERRED TO THE ENGINEER.
Y7 T2 Y7
T10@200
B1-T16@200mm C/C
1100
1100
800
B3 B1
Y6 S1 Y6
T12@200
11000
B3
14100
14100
AS PER SCHEDULE
200
2 2
3400
3400
B2 S1 B2
3 3 T10@200
T1 T1 B3 BLOCK WORK
B3 B3 B3
Y5 Y5
1700
1700
B2
Y4 Y4 SEC 2-2
900
900
B2 S1 B1 S1 B1 S1 S1 S1
B3 B2
Y3 Y3
B2
1600
1600
1
700
B4 B4/B2**
CB1* S1 S1 S1
Y1 Y1
CB1* CB1* CB1*
B2** - @5.45m LEVEL
B2* B2* 1 B2* B2*
CB1* & B2* - @3.45m LEVEL
2800 4200 2200 2000 1700 700 800 1500 700 1600
CB1* & B2* - INVERTED BEAM
T12@150 T10@200
X1 X2 X3 X4 X5 X6 X7 X8 X9 X10 X11
PROJECT NAME
AS PER BEAMS 5.45m SSL
HYDROTHERAPY UNITS
ST GROUND FLOOR ROOF BEAM AND SLAB PLAN SCHEDULE PARAPET LEVEL
04 SCALE 1:75
OWNER
AS PER SLABS
T12@200 SCHEDULE
MINISTRY OF SOCIAL DEVELOPMENT
2-T12 BLOCK WORK 100mm SLAB
T10@200
DESIGN BY CHECKED BY DATE
600
AS PER SLAB DETAILS DRAWN BY APPROVD BY SCALE
BLOCK WORK SRI SULTAN As indicated
PROJECT No SHEET No REV
SCHEDULE OF FOOTINGS SCHEDULE OF COLUMNS 1.THE CONTENTS OF THIS SHEET SHALL NOT BE
COPY,REPRODUCED OR USED WITH OUT WRITEN
PERMISSION.
P.C.C.in 'mm' R.C.C in 'mm'
TYPE MAIN BARS DIST. BARS REMARKS TYPE FOUNDATION 2.ALL DIMENSION SHOWN IN MILLIMETERS,
BxL D B L D OF TO ABOVE PB UNLES OTHERWISE NOTED.
REMARKS
COLUMN UPTO PB LEVEL 3.ROOM SIZES ARE IN MILLIMETERS,
F1 100 1400 2200 400 T12@200mm c/c T12@200mm c/c - CLEAR WALL TO WALL(X&YAXIS).
FROM ALL SIDES OF FOOTINGS 4.FINISHED GROUND AND FLOOR LEVELS
F2 100 2000 2600 400 T12@125mm c/c T12@125mm c/c - SHOWN IN MILLIMETERS.
5.DRAWING NOT TO BE SCALED,WORK TO
F3 100 1800 3300 450 T12@100mm c/c T12@100mm c/c - FIGURED GIVEN DIAMENSIONS.
100mm PROJECTION
Muscat municipality
100 T12@200mm c/c T12@200mm c/c COLUMN SIZE:270x570mm COLUMN SIZE : 200x500mm
CF1 1800 4400 450 T&B - The project contractor and the supervision
consultant must construct the project as 7.THESE DRAWINGS SHALL BE READ IN CONJUNCTION
per the approved drawings and comply with
conditional approvals, local and internation- WITH OTHER RELEVENT STRUCTURAL & MEP
VERICAL BARS STRRIUPS VERICAL BARS STRRIUPS al approved regulations during construc-
DRAWINGS.
CF2 100 1800 6400 450 T12@200mm c/c T12@200mm c/c T&B tion.
- The design consultant, the supervision
consultant and the project contractor takes
full responsibility, each on their scope,
towards the safety of the building, the data 8.CHECK ALL DIAMENSIONS AT SITE PRIOR TO
CF3 100 2400 3600 450 T12@200mm c/c T12@200mm c/c T&B 10-T16 T8@150mm C/C 10-T16 T8@150mm C/C
provided in this approval, the attachment of
correct documents, the compliance of the CARRYING OUT WORK,ANY DISCREPANCIES SHALL
attached designs with the local order
number 23/92, laws, regulations, circulars, BE REFERRED TO THE ENGINEER.
and krooki requirements, and the provision
of other authorities approvals, specifica-
tions and guidelines without conflict with
the approved drawings from this directo-
rate.
- The project contractor and the supervision
consultant are committed to provide the
required safety of the buildings, the neigh-
boring services as well as considering the
soil nature and the structural effects on the
C2 surrounding environment.
COL. SIZE : 270x670mm COLUMN SIZE : 200x600mm must provide a detailed study on the Jabal
cutting or the required protection towards
the Wadi side prior to construction.
BOTTOM REINFOR. TOP REINFOR. - The project contractor and the supervision
consultant must return to this directorate
VERICAL BARS STRRIUPS VERICAL BARS STRRIUPS 40mm prior to construction in case of a technical
TYPE TYPE STIRRUPS S.F.R REMARKS COVER
issue is occurred which constrain construc-
Straight Curtailed Straight Ext. at tion and when the approved drawings does
not match with other approved drawings or
cont end 12-T16 T8@150mm C/C 12-T16 T8@150mm C/C
with the existing plot conditions.
- 50 DIA.
PB3 200x700 3-T16 2-T16 2-T16 2-T16 T8@150mm c/c 2-T12 -
PB LEVEL
C3
B1 200x500 3-T16 - 2-T16 1-T16 T8@150mm c/c - -
COLUMN SIZE : 270x670mm COLUMN SIZE : 200x600mm
75mm
B2 200x600 2-T16 2-T16 2-T16 2-T16 T8@150mm c/c - - COVER
VERICAL BARS STRRIUPS VERICAL BARS STRRIUPS
B3 200x800 3-T16 2-T20 2-T16 2-T20 T8@150mm c/c 2-T16 -
14-T16 T8@150mm C/C 14-T16 T8@150mm C/C
B4 200x1200 3-T20 2-T20 2-T20 2-T16 T8@150mm c/c 4-T16 -
By Eng.Amal Said AlBahri at 11:56 am, Jun 13, 2023
CB1* 200x500 3-T16 - 2-T20 2-T20 T8@150mm c/c - -
C4
COLUMN SIZE : 370x770mm COLUMN SIZE : 300x700mm
SCHEDULE OF EXTRA BARS
VERICAL BARS STRRIUPS VERICAL BARS STRRIUPS
BARS DETAILS RUNNING
TYPE BAR LENGTH LENGTH REMARKS 4-T20+10-T16 T8@150mm C/C 4-T20+10-T16 T8@150mm C/C
IN 'mm' LOCATION BARS DETAILS
OF BARS PROJECT NAME
HYDROTHERAPY UNITS
B1 6000 BOTTOM BARS T16@200mm C/C REFER DRAWING
T1 3000 OWNER
TOP BARS T16@200mm C/C 3000mm
T2 2000
TOP BARS T16@200mm C/C 2000mm
C5 MINISTRY OF SOCIAL DEVELOPMENT
850
1300
439kN TB2 TB2 F1 2. FOOTING DEPTH IS 2m BELOW NGL.
FIGURED GIVEN DIAMENSIONS.
1800
Y9 Y9
F1 TB2 TB2 CF1 206kN 6.PREFERERENCE TO BE GIVEN TO DETAILS OVER
F3 471kN 263kN 3. FOUNDATION IS DESIGNED FOR G+ROOF STOREY ONLY SMALER SCALE DRAWINGS.
192kN 850
2400
2400
TB2 7.THESE DRAWINGS SHALL BE READ IN CONJUNCTION
300
3600 4. ALL FOOTINGS ARE CENTER OF THE COLUMNS UNLESS
SPECIFIED OTHER WISE. WITH OTHER RELEVENT STRUCTURAL & MEP
DRAWINGS.
950
1300
TB2 CF3 264kN TB2 F2 5. CLEAR COVER FOR FOOTINGS & STRAP BEAMS ARE
75mm ON ALL SIDES.
8.CHECK ALL DIAMENSIONS AT SITE PRIOR TO
Y8 Y8
2400
CARRYING OUT WORK,ANY DISCREPANCIES SHALL
529kN TB2
BE REFERRED TO THE ENGINEER.
1700 294kN 6. CLEAR COVER FOR COLUMNS ARE 75mm(FOR SUB STRUCTURE)
& 40mm(FOR SUPER STRUCTURE).
2300
2300
350mm THK. BOTTOM SLAB
F3 T12@100mm C/C T&B MESH TB2
TB2 6. ALL EXTERNAL DIMENSIONS SHALL BE ACCORDING TO
ARCHITECTURE PLANS & ELEVATIONS.
Y7 300 Y7
192kN
1100
1100
F2 TB2 F2
Y6 TB2 Y6
336kN
342kN
300
2200
TB2 900
TB2
3450
3450
25mm FILLER Muscat municipality
TB2 BOARD
300
General Directorate
of Technical Affairs
Building Permits Department
Approved as per the issued permit
Building facade to be painted in white colour only
F2
900
4150
TB2 of other authorities approvals, specifica-
tions and guidelines without conflict with
192kN the approved drawings from this directo- By Eng.Amal Said AlBahri at 11:55 am, Jun 15, 2023
Y3 rate.
700
339kN TB2 TB2 the Wadi side prior to construction.
OWNER
X1 X2 X3 X4 X5 X6 X7 X8 X9 X10 X11
ST FOUNDATION PLAN
USE PLOT No LOCATION
01 SCALE 1:75
GOV 290 AL AMERAT
AL AMERAT
DRAWING TITLE No of floors