Aconex Shop Drawing Log
Aconex Shop Drawing Log
D 0 1242
Response
ACONEX
Workflow Total
Workflow Document JVC Planned WSP Status Overdue Overdue Submittal
Transmittal Drawing No. Rev. Status Description Location Discipline Sub-Discipline Submitted by Status Duration
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
date
Today
JVC-WTRAN- R02Z00-C021-JVC-01-XXX-SDW-UT-SM- Shop Drawing for Tie-in Point Connection with AIP Package from MH- UT-Utilities &
WF-000142 C0 Latest Zone 01 Shop Drawing Storm Water Engr. Fawzy 2-Jan-24 16-Jan-24 18-Jan-24 B Closed 16 Aconex
000120 01410 EP-5 to MH3-1 at Zone 01 Infrastructure
R02Z00-C021-JVC-01-XXX-ABD-GT-GT-
WF-000181 C0 Latest As-Built CMC Layout for Zone 01 VTR 01 from sta 0+450 to 0+500 Zone 01 As Built Geotechnical Geotechnical Engr. Yaseen 4-Jan-24 18-Jan-24 15-Jan-24 B Closed 11 Aconex
JVC-WTRAN- 02001
000159 R02Z00-C021-JVC-01-XXX-ABD-GT-GT-
WF-000181 C0 Latest As-Built CMC Layout for Zone 01 VTR 01 from sta 0+450 to 0+500 Zone 01 As Built Geotechnical Geotechnical Engr. Yaseen 4-Jan-24 18-Jan-24 15-Jan-24 B Closed 11 Aconex
02002
Shop Drawing for Excavation Cross sections of Junction At Zone-
R02Z00-C021-JVC-02-XXX-SDW-CL-CL- Zone 02, Zone
WF-000185 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
07500 08 and 09
0+584.23)
Shop & Zone
Drawing 09(From sta:0+012.85
for Excavation toof
Cross sections 0+041.02
Junction At Zone-
R02Z00-C021-JVC-02-XXX-SDW-CL-CL- Zone 02, Zone
WF-000185 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
07501 08 and 09
0+584.23) & Zone 09(From sta:0+012.85 to 0+041.02
Shop Drawing for Excavation Cross sections of Junction At Zone-
R02Z00-C021-JVC-02-XXX-SDW-CL-CL- Zone 02, Zone
WF-000185 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
07502 08 and 09
0+584.23)
Shop & Zone
Drawing 09(From sta:0+012.85
for Excavation toof
Cross sections 0+041.02
Junction At Zone-
R02Z00-C021-JVC-02-XXX-SDW-CL-CL- Zone 02, Zone
WF-000185 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
07503 08 and 09
0+584.23) & Zone 09(From sta:0+012.85 to 0+041.02
Shop Drawing for Excavation Cross sections of Junction At Zone-
R02Z00-C021-JVC-02-XXX-SDW-CL-CL- Zone 02, Zone
WF-000185 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
07504 08 and 09
0+584.23)
Shop & Zone
Drawing 09(From sta:0+012.85
for Excavation toof
Cross sections 0+041.02
Junction At Zone-
R02Z00-C021-JVC-02-XXX-SDW-CL-CL- Zone 02, Zone
WF-000185 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
07505 08 and 09
0+584.23)
Shop & Zone
Drawing 09(From sta:0+012.85
for Excavation toof
Cross sections 0+041.02
Junction At Zone-
R02Z00-C021-JVC-02-XXX-SDW-CL-CL- Zone 02, Zone
WF-000185 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
07506 08 and 09
0+584.23) & Zone 09(From sta:0+012.85 to 0+041.02
Shop Drawing for Excavation Cross sections of Junction At Zone-
R02Z00-C021-JVC-08-XXX-SDW-CL-CL- Zone 02, Zone
WF-000185 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
07507 08 and 09
0+584.23)
Shop & Zone
Drawing 09(From sta:0+012.85
for Excavation toof
Cross sections 0+041.02
Junction At Zone-
R02Z00-C021-JVC-08-XXX-SDW-CL-CL- Zone 02, Zone
WF-000185 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
07508 08 and 09
0+584.23)
Shop & Zone
Drawing 09(From sta:0+012.85
for Excavation toof
Cross sections 0+041.02
Junction At Zone-
R02Z00-C021-JVC-08-XXX-SDW-CL-CL- Zone 02, Zone
WF-000185 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
JVC-WTRAN- 07509 08 and 09
0+584.23) & Zone 09(From sta:0+012.85 to 0+041.02
Shop Drawing for Excavation Cross sections of Junction At Zone-
000163 R02Z00-C021-JVC-08-XXX-SDW-CL-CL- Zone 02, Zone
WF-000185 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
07510 08 and 09
0+584.23)
Shop & Zone
Drawing 09(From sta:0+012.85
for Excavation toof
Cross sections 0+041.02
Junction At Zone-
Zone 02, Zone
WF-000185 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07511 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
08 and 09
0+584.23) & Zone 09(From sta:0+012.85 to 0+041.02
Shop Drawing for Excavation Cross sections of Junction At Zone-
Zone 02, Zone
WF-000185 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07512 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
08 and 09
0+584.23)
Shop & Zone
Drawing 09(From sta:0+012.85
for Excavation toof
Cross sections 0+041.02
Junction At Zone-
Zone 02, Zone
WF-000185 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07513 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
08 and 09
0+584.23)
Shop & Zone
Drawing 09(From sta:0+012.85
for Excavation toof
Cross sections 0+041.02
Junction At Zone-
Zone 02, Zone
WF-000185 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07514 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
08 and 09
0+584.23) & Zone 09(From sta:0+012.85 to 0+041.02
Shop Drawing for Excavation Cross sections of Junction At Zone-
Zone 02, Zone
WF-000185 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07515 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
08 and 09
0+584.23)
Shop & Zone
Drawing 09(From sta:0+012.85
for Excavation toof
Cross sections 0+041.02
Junction At Zone-
Zone 02, Zone
WF-000185 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07516 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
08 and 09
0+584.23) & Zone 09(From sta:0+012.85 to 0+041.02
Shop Drawing for Excavation Cross sections of Junction At Zone-
Zone 02, Zone
WF-000185 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07517 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
08 and 09
0+584.23)
Shop Drawing& Zone 09(From sta:0+012.85
for Excavation toof
Cross sections 0+041.02
Junction At Zone-
Zone 02, Zone
WF-000185 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07518 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
08 and 09
0+584.23)
Shop & Zone
Drawing 09(From sta:0+012.85
for Excavation toof
Cross sections 0+041.02
Junction At Zone-
Zone 02, Zone
WF-000185 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07519 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
08 and 09
0+584.23) & Zone 09(From sta:0+012.85 to 0+041.02 Zone 01, 02
R02Z00-C021-JVC-XX-XXX-SDW-GT-GT- Shop Drawing CMC Layout for Soil Improvement Levels at
WF-000193 C1 Latest and KAAR Shop Drawing Geotechnical Geotechnical Engr. Yaseen 6-Jan-24 20-Jan-24 10-Jan-24 B Closed 4 Aconex
01001 Intersection 01 at Zone 02 and KAAR Tunnel
Tunnel
Zone 01, 02
Shop Drawing CMC Cross Section for Soil Improvement Levels at
WF-000193 R02Z00-C021-JVC-XX-XXX-SDW-GT-GT-01002C1 Latest and KAAR Shop Drawing Geotechnical Geotechnical Engr. Yaseen 6-Jan-24 20-Jan-24 10-Jan-24 B Closed 4 Aconex
Intersection 01 at Zone 02 and KAAR Tunnel
Tunnel
Zone 01, 02
Shop Drawing Coordinates for Soil Improvement Levels at
WF-000193 R02Z00-C021-JVC-XX-XXX-SDW-GT-GT-01003C1 Latest and KAAR Shop Drawing Geotechnical Geotechnical Engr. Yaseen 6-Jan-24 20-Jan-24 10-Jan-24 B Closed 4 Aconex
Intersection 01 at Zone 02 and KAAR Tunnel Sheet 1
Tunnel
Zone 01, 02
Shop Drawing Coordinates for Soil Improvement Levels at
WF-000193 R02Z00-C021-JVC-XX-XXX-SDW-GT-GT-01004C1 Latest and KAAR Shop Drawing Geotechnical Geotechnical Engr. Yaseen 6-Jan-24 20-Jan-24 10-Jan-24 B Closed 4 Aconex
Intersection 01 at Zone 02 and KAAR Tunnel Sheet 2
Tunnel
Zone 01, 02
Shop Drawing Coordinates for Soil Improvement Levels at
WF-000193 R02Z00-C021-JVC-XX-XXX-SDW-GT-GT-01005C1 Latest and KAAR Shop Drawing Geotechnical Geotechnical Engr. Yaseen 6-Jan-24 20-Jan-24 10-Jan-24 B Closed 4 Aconex
Intersection 01 at Zone 02 and KAAR Tunnel Sheet 3
Tunnel
Zone 01, 02
JVC-WTRAN- Shop Drawing Coordinates for Soil Improvement Levels at
WF-000193 R02Z00-C021-JVC-XX-XXX-SDW-GT-GT-01006C1 Latest and KAAR Shop Drawing Geotechnical Geotechnical Engr. Yaseen 6-Jan-24 20-Jan-24 10-Jan-24 B Closed 4 Aconex
000171 Intersection 01 at Zone 02 and KAAR Tunnel Sheet 4
Tunnel
Zone 01, 02
Shop Drawing Coordinates for Soil Improvement Levels at
WF-000193 R02Z00-C021-JVC-XX-XXX-SDW-GT-GT-01007C1 Latest and KAAR Shop Drawing Geotechnical Geotechnical Engr. Yaseen 6-Jan-24 20-Jan-24 10-Jan-24 B Closed 4 Aconex
Intersection 01 at Zone 02 and KAAR Tunnel Sheet 5
Tunnel
Zone 01, 02
Shop Drawing Coordinates for Soil Improvement Levels at
WF-000193 R02Z00-C021-JVC-XX-XXX-SDW-GT-GT-01008C1 Latest and KAAR Shop Drawing Geotechnical Geotechnical Engr. Yaseen 6-Jan-24 20-Jan-24 10-Jan-24 B Closed 4 Aconex
Intersection 01 at Zone 02 and KAAR Tunnel Sheet 6
Tunnel
Zone 01, 02
Shop Drawing Coordinates for Soil Improvement Levels at
WF-000193 R02Z00-C021-JVC-XX-XXX-SDW-GT-GT-01009C1 Latest and KAAR Shop Drawing Geotechnical Geotechnical Engr. Yaseen 6-Jan-24 20-Jan-24 10-Jan-24 B Closed 4 Aconex
Intersection 01 at Zone 02 and KAAR Tunnel Sheet 7
Tunnel
Zone 01, 02
Shop Drawing Coordinates for Soil Improvement Levels at
WF-000193 R02Z00-C021-JVC-XX-XXX-SDW-GT-GT-01010C1 Latest and KAAR Shop Drawing Geotechnical Geotechnical Engr. Yaseen 6-Jan-24 20-Jan-24 10-Jan-24 B Closed 4 Aconex
Intersection 01 at Zone 02 and KAAR Tunnel Sheet 8
Tunnel
Zone 01, 02
Shop Drawing Coordinates for Soil Improvement Levels at
WF-000209 R02Z00-C021-JVC-XX-XXX-SDW-GT-GT-01011C1 Latest and KAAR Shop Drawing Geotechnical Geotechnical Engr. Yaseen 6-Jan-24 20-Jan-24 10-Jan-24 B Closed 4 Aconex
Intersection 01 at Zone 02 and KAAR Tunnel Sheet 9
Tunnel
Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to
WF-000249 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04001C0 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Jan-24 21-Jan-24 10-Jan-24 B Closed 3 Aconex
1+980 - Layout Sheet 01
Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to
WF-000249 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04002C0 Re-S Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Jan-24 21-Jan-24 10-Jan-24 B Closed 3 Aconex
1+980 - Layout Sheet 02
Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to
WF-000249 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04003C0 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Jan-24 21-Jan-24 10-Jan-24 B Closed 3 Aconex
1+980 - Layout Sheet 03
Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to
WF-000249 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04004C0 Re-S Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Jan-24 21-Jan-24 10-Jan-24 B Closed 3 Aconex
1+980 - Layout Sheet 04
JVC-WTRAN- Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to
WF-000249 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04005C0 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Jan-24 21-Jan-24 10-Jan-24 B Closed 3 Aconex
000227 1+980 - Cross Section
Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to
WF-000249 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04006C0 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Jan-24 21-Jan-24 10-Jan-24 B Closed 3 Aconex
1+980 - Reinforcement Details
Latest Status
D 0 1242
JVC-WTRAN-
000227
Response
ACONEX
Workflow Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to Total
Workflow Document JVC Planned 10-Jan-24
WSP Status
B Overdue Overdue Submittal
WF-000249 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04007C0 Status 1+980 - Elevation Sheet 1 Description Zone 05
Location Shop Drawing Geotechnical
Discipline Geotechnical Submitted
Sub-Discipline Engr. Yaseen
by 7-Jan-24 21-Jan-24 Closed
Status 3
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to date
WF-000249 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04008C0 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Jan-24 21-Jan-24 10-Jan-24 B Closed Today
3 Aconex
1+980 - Elevation Sheet 2
Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to
WF-000249 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04009C0 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Jan-24 21-Jan-24 10-Jan-24 B Closed 3 Aconex
1+980 - Anchor Schedule
UT-Utilities &
WF-000285 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01401C0 Latest Storm Water Network Plan and Profile For (Part 01 and 02) No Zone Shop Drawing Storm Water Engr. Fawzy 8-Jan-24 22-Jan-24 23-Jan-24 B Closed 15 Aconex
Infrastructure
UT-Utilities &
WF-000285 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01402C0 Latest Storm Water Network Plan and Profile For (Part 01 and 02) No Zone Shop Drawing Storm Water Engr. Fawzy 8-Jan-24 22-Jan-24 23-Jan-24 B Closed 15 Aconex
Infrastructure
UT-Utilities &
WF-000285 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01451C0 Re-S Storm Water Network Plan and Profile For (Part 01 and 02) No Zone Shop Drawing Storm Water Engr. Fawzy 8-Jan-24 22-Jan-24 23-Jan-24 B Closed 15 Aconex
Infrastructure
UT-Utilities &
WF-000285 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01452C0 Latest Storm Water Network Plan and Profile For (Part 01 and 02) No Zone Shop Drawing Storm Water Engr. Fawzy 8-Jan-24 22-Jan-24 23-Jan-24 B Closed 15 Aconex
Infrastructure
JVC-WTRAN- UT-Utilities &
WF-000285 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01453C0 Re-S Storm Water Network Plan and Profile For (Part 01 and 02) No Zone Shop Drawing Storm Water Engr. Fawzy 8-Jan-24 22-Jan-24 23-Jan-24 B Closed 15 Aconex
000263 Infrastructure
UT-Utilities &
WF-000285 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01455C0 Re-S Storm Water Network Plan and Profile For (Part 01 and 02) No Zone Shop Drawing Storm Water Engr. Fawzy 8-Jan-24 22-Jan-24 23-Jan-24 B Closed 15 Aconex
Infrastructure
UT-Utilities &
WF-000285 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01456C0 Re-S Storm Water Network Plan and Profile For (Part 01 and 02) No Zone Shop Drawing Storm Water Engr. Fawzy 8-Jan-24 22-Jan-24 23-Jan-24 B Closed 15 Aconex
Infrastructure
UT-Utilities &
WF-000285 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01464C0 Re-S Storm Water Network Plan and Profile For (Part 01 and 02) No Zone Shop Drawing Storm Water Engr. Fawzy 8-Jan-24 22-Jan-24 23-Jan-24 B Closed 15 Aconex
Infrastructure
UT-Utilities &
WF-000285 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01467C0 Re-S Storm Water Network Plan and Profile For (Part 01 and 02) No Zone Shop Drawing Storm Water Engr. Fawzy 8-Jan-24 22-Jan-24 23-Jan-24 B Closed 15 Aconex
Infrastructure
Shop Drawings Layout and Anchor Schedule for Shoring Works at
WF-000307 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-01001C3 Latest Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 9-Jan-24 23-Jan-24 18-Jan-24 B Closed 9 Aconex
Zone 6B from 2+380 to 2+720 Sheet 1
Shop Drawings Layout and Anchor Schedule for Shoring Works at
WF-000307 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-01002C3 Latest Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 9-Jan-24 23-Jan-24 18-Jan-24 B Closed 9 Aconex
Zone 6B from 2+380 to 2+720 Sheet 2
Shop Drawings Layout and Anchor Schedule for Shoring Works at
WF-000307 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-01003C3 Latest Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 9-Jan-24 23-Jan-24 18-Jan-24 B Closed 9 Aconex
Zone 6B from 2+380 to 2+720 Sheet 3
Shop Drawings Pile Sections and BBS for Shoring Works at Zone 6B
WF-000307 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-01004C3 Latest Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 9-Jan-24 23-Jan-24 18-Jan-24 B Closed 9 Aconex
from 2+380 to 2+720
Shop Drawings Capping Beam Layout for Shoring Works at Zone 6B
WF-000307 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-01005C3 Latest Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 9-Jan-24 23-Jan-24 18-Jan-24 B Closed 9 Aconex
from 2+380 to 2+720
JVC-WTRAN- Shop Drawings Anchor Cross Sections for Shoring Works at Zone 6B
WF-000307 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-01006C3 Latest Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 9-Jan-24 23-Jan-24 18-Jan-24 B Closed 9 Aconex
000285 from 2+380 to 2+720 Sheet 1
Shop Drawings Anchor Layout for Shoring Works at Zone 6B from
WF-000307 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-01007C3 Latest Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 9-Jan-24 23-Jan-24 18-Jan-24 B Closed 9 Aconex
2+380 to 2+720
Shop Drawings Anchor Cross Sections for Shoring Works for Zone 6B
WF-000307 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-01008C3 Latest Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 9-Jan-24 23-Jan-24 18-Jan-24 B Closed 9 Aconex
from 2+380 to 2+720 Sheet 2
Shop Drawings Anchor Cross Sections for Shoring Works for Zone 6B
WF-000307 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-01009C3 Latest Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 9-Jan-24 23-Jan-24 18-Jan-24 B Closed 9 Aconex
from 2+380 to 2+720 Sheet 3
Shop Drawings Summary of Anchor Forces for Shoring Works for
WF-000307 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-01010C3 Latest Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 9-Jan-24 23-Jan-24 18-Jan-24 B Closed 9 Aconex
Zone 6B from 2+380 to 2+720
Shop Drawings Anchor Cross Sections for Shoring Works at Zone 6B
WF-000307 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-01011C3 Latest Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 9-Jan-24 23-Jan-24 18-Jan-24 B Closed 9 Aconex
from 2+380 to 2+720 Sheet 4
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00100C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00101C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00103C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00104C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00105C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00106C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00107C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00108C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00109C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00110C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00111C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00112C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00113C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
JVC-WTRAN- details) in D02, D09 and D10 000145-02
000369 Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00114C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00115C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00116C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00117C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00118C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00119C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Latest Status
D 0 1242
Response
ACONEX
Workflow Shop drawings for Medium Voltage Manholes and Ducts (sections & Total MIP-JVC-SHD-ELE-
Workflow Document JVC Planned WSP Status
B Overdue Overdue Submittal
WF-000801 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00120C2 Status details) in D02, D09 and D10
Description No Zone
Location Shop Drawing Electrical
Discipline Medium Voltage Submitted
Sub-Discipline by 13-Jan-24 27-Jan-24 31-Jan-24
Engr. Sherif Closed
Status 18
Duration Aconex
Ref.
Alternative Ref. #
000145-02 Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop drawings for Medium Voltage Manholes and Ducts (sections & date MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00121C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed Today
18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00122C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00123C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00124C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00125C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00126C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000376 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07520 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Jan-24 27-Jan-24 24-Jan-24 C Closed 11 Aconex
Sta: 2+400 to 2+560
Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000376 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07533 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Jan-24 27-Jan-24 24-Jan-24 C Closed 11 Aconex
Sta: 2+400 to 2+560
Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000376 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07534 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Jan-24 27-Jan-24 24-Jan-24 C Closed 11 Aconex
Sta: 2+400 to 2+560
Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000376 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07535 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Jan-24 27-Jan-24 24-Jan-24 C Closed 11 Aconex
Sta: 2+400 to 2+560
Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000376 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07536 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Jan-24 27-Jan-24 24-Jan-24 C Closed 11 Aconex
JVC-WTRAN- Sta: 2+400 to 2+560
000252 Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000376 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07537 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Jan-24 27-Jan-24 24-Jan-24 C Closed 11 Aconex
Sta: 2+400 to 2+560
Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000376 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07538 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Jan-24 27-Jan-24 24-Jan-24 C Closed 11 Aconex
Sta: 2+400 to 2+560
Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000376 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07539 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Jan-24 27-Jan-24 24-Jan-24 C Closed 11 Aconex
Sta: 2+400 to 2+560
Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000376 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07540 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Jan-24 27-Jan-24 24-Jan-24 C Closed 11 Aconex
Sta: 2+400 to 2+560
Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000376 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07541 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Jan-24 27-Jan-24 24-Jan-24 C Closed 11 Aconex
Sta: 2+400 to 2+560
Shop Drawings Shoring Piles Layout for Shoring Works at Zone 08 MIP-JVC-SHD-GEO-
WF-000403 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-03001C4 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 14-Jan-24 28-Jan-24 21-Jan-24 B Closed 7 Aconex
KAAR Tunnel from sta. 0+100 to 0+200 000037-04
Shop Drawings Anchor Side A 1st Row Layout for Shoring Works at MIP-JVC-SHD-GEO-
WF-000403 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-03002C4 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 14-Jan-24 28-Jan-24 21-Jan-24 B Closed 7 Aconex
Zone 08 KAAR Tunnel from sta. 0+100 to 0+201 000037-04
Shop Drawings Anchor Side B 1st Row Layout for Shoring Works at MIP-JVC-SHD-GEO-
WF-000403 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-03003C4 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 14-Jan-24 28-Jan-24 21-Jan-24 B Closed 7 Aconex
Zone 08 KAAR Tunnel from sta. 0+100 to 0+204 000037-04
Shop Drawings Anchor Side A 2nd Row Layout for Shoring Works at MIP-JVC-SHD-GEO-
WF-000403 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-03004C4 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 14-Jan-24 28-Jan-24 21-Jan-24 B Closed 7 Aconex
Zone 08 KAAR Tunnel from sta. 0+100 to 0+202 000037-04
JVC-WTRAN- Shop Drawings Anchor Side B 2nd Row Layout for Shoring Works at MIP-JVC-SHD-GEO-
WF-000403 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-03005C4 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 14-Jan-24 28-Jan-24 21-Jan-24 B Closed 7 Aconex
000379 Zone 08 KAAR Tunnel from sta. 0+100 to 0+203 000037-04
Shop Drawings Side A Elevation for Shoring Works at Zone 08 KAAR MIP-JVC-SHD-GEO-
WF-000403 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-03006C4 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 14-Jan-24 28-Jan-24 21-Jan-24 B Closed 7 Aconex
Tunnel from sta. 0+100 to 0+204 000037-04
Shop Drawings Side B Elevation for Shoring Works at Zone 08 KAAR MIP-JVC-SHD-GEO-
WF-000403 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-03007C4 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 14-Jan-24 28-Jan-24 21-Jan-24 B Closed 7 Aconex
Tunnel from sta. 0+100 to 0+205 000037-04
Shop Drawings Side A Cross Section for Shoring Works at Zone 08 MIP-JVC-SHD-GEO-
WF-000403 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-03008C4 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 14-Jan-24 28-Jan-24 21-Jan-24 B Closed 7 Aconex
KAAR Tunnel from sta. 0+100 to 0+206 000037-04
Shop Drawings Side B Cross Section for Shoring Works at Zone 08 MIP-JVC-SHD-GEO-
WF-000403 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-03009C4 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 14-Jan-24 28-Jan-24 21-Jan-24 B Closed 7 Aconex
KAAR Tunnel from sta. 0+100 to 0+207 000037-04
JVC-WTRAN- As-Built CMC Layout for Zone 05 from sta. 1+793 to 1+833 (Seg 78
WF-000423 R02Z00-C021-JVC-05-XXX-ABD-GT-GT-01001 C0 Re-S Zone 05 As Built Geotechnical Geotechnical Engr. Yaseen 15-Jan-24 29-Jan-24 17-Jan-24 B Closed 2 Aconex
000399 & 79)
Shop Drawing for Excavation at Kaar Tunnel Zone-08 Sta: 0+480
WF-000466 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-05419 C0 Re-S Zone 08 Shop Drawing Civil Civil Engr. Sunil 16-Jan-24 30-Jan-24 28-Jan-24 C Closed 12 Aconex
to0+552.99
Shop Drawing for Excavation at Kaar Tunnel Zone-08 Sta: 0+480
WF-000466 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-05420 C0 Re-S Zone 08 Shop Drawing Civil Civil Engr. Sunil 16-Jan-24 30-Jan-24 28-Jan-24 C Closed 12 Aconex
to0+552.99
Shop Drawing for Excavation at Kaar Tunnel Zone-08 Sta: 0+480
WF-000466 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-05421 C0 Re-S Zone 08 Shop Drawing Civil Civil Engr. Sunil 16-Jan-24 30-Jan-24 28-Jan-24 C Closed 12 Aconex
to0+552.99
JVC-WTRAN- Shop Drawing for Excavation at Kaar Tunnel Zone-08 Sta: 0+480
WF-000466 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-05422 C0 Re-S Zone 08 Shop Drawing Civil Civil Engr. Sunil 16-Jan-24 30-Jan-24 28-Jan-24 C Closed 12 Aconex
000442 to0+552.99
Shop Drawing for Excavation at Kaar Tunnel Zone-08 Sta: 0+480
WF-000466 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-05423 C0 Re-S Zone 08 Shop Drawing Civil Civil Engr. Sunil 16-Jan-24 30-Jan-24 28-Jan-24 C Closed 12 Aconex
to0+552.99
Shop Drawing for Excavation at Kaar Tunnel Zone-08 Sta: 0+480
WF-000466 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-05424 C0 Re-S Zone 08 Shop Drawing Civil Civil Engr. Sunil 16-Jan-24 30-Jan-24 28-Jan-24 C Closed 12 Aconex
to0+552.99
Shop Drawing for Excavation at Kaar Tunnel Zone-08 Sta: 0+480
WF-000466 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-05425 C0 Re-S Zone 08 Shop Drawing Civil Civil Engr. Sunil 16-Jan-24 30-Jan-24 28-Jan-24 C Closed 12 Aconex
to0+552.99
Shop Drawings General layout Sheet 1 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01001C0 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings General layout Sheet 2 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01002C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 1+953 incl. ES 19, 20 000079-00
Shop Drawings General layout Sheet 3 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01003C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+953 to 2+200 incl. ES 21, 22 and VTR 10 000079-00
Shop Drawings Cross Section for Soil Improvement Works in Zone 05 MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01004C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings Cordinates Sheet 1 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01005C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings Cordinates Sheet 2 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01006C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings Cordinates Sheet 3 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01007C1 Re-S Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings Cordinates Sheet 4 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01008C1 Re-S Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
JVC-WTRAN-
000445
Latest Status
D 0 1242
Response
ACONEX
Workflow Shop Drawings Cordinates Sheet 5 for Soil Improvement Works in Total MIP-JVC-SHD-GEO-
Workflow Document JVC Planned 24-Jan-24
WSP Status
B Overdue Overdue Submittal
WF-000469 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01009C1 Status Zone 05 from sta. 1+773 toDescription
2+200 incl. ES 19, 20, 21, 22 and VTR 10
Zone 05
Location Shop Drawing Geotechnical
Discipline Geotechnical Submitted
Sub-Discipline by 16-Jan-24
Engr. Yaseen 30-Jan-24 Closed
Status 8
Duration Aconex
Ref.
Alternative Ref. #
000079-00 Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawings Cordinates Sheet 6 for Soil Improvement Works in date MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01010C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed Today
8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings Cordinates Sheet 7 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01011C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
JVC-WTRAN- Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
000445 Shop Drawings Cordinates Sheet 8 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01012C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings Cordinates Sheet 9 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01013C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings Cordinates Sheet 10 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01014C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings Cordinates Sheet 11 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01015C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings Cordinates Sheet 12 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01016C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings Cordinates Sheet 13 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01017C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings Cordinates Sheet 14 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01018C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings Cordinates Sheet 15 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01019C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings Cordinates Sheet 16 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01020C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings Cordinates Sheet 17 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01021C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings Cordinates Sheet 18 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01022C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
UT-Utilities &
WF-000473 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03601C0 Latest Grey water collection Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing Grey Water Engr. Fawzy 16-Jan-24 30-Jan-24 25-Jan-24 B Closed 9 Aconex
Infrastructure
UT-Utilities &
WF-000473 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03602C0 Latest Grey water collection Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing Grey Water Engr. Fawzy 16-Jan-24 30-Jan-24 25-Jan-24 B Closed 9 Aconex
Infrastructure
UT-Utilities &
WF-000473 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03610C0 Latest Grey water collection Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing Grey Water Engr. Fawzy 16-Jan-24 30-Jan-24 25-Jan-24 B Closed 9 Aconex
Infrastructure
JVC-WTRAN- UT-Utilities &
WF-000473 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03659C0 Latest Grey water collection Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing Grey Water Engr. Fawzy 16-Jan-24 30-Jan-24 25-Jan-24 B Closed 9 Aconex
000449 Infrastructure
UT-Utilities &
WF-000473 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03660C0 Latest Grey water collection Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing Grey Water Engr. Fawzy 16-Jan-24 30-Jan-24 25-Jan-24 B Closed 9 Aconex
Infrastructure
UT-Utilities &
WF-000473 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03681C0 Latest Grey water collection Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing Grey Water Engr. Fawzy 16-Jan-24 30-Jan-24 25-Jan-24 B Closed 9 Aconex
Infrastructure
UT-Utilities &
WF-000473 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03682C0 Latest Grey water collection Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing Grey Water Engr. Fawzy 16-Jan-24 30-Jan-24 25-Jan-24 B Closed 9 Aconex
Infrastructure
Shop Drawing for Excavation Cross section of Tunnel-02- Zone-10 at MIP-JVC-SHD-CIV-
WF-000516 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05219 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 18-Jan-24 1-Feb-24 28-Jan-24 C Open 370 Aconex
Sta: 0+020.35 to 0+032.87 000026-02
Shop Drawing for Excavation Cross section of Tunnel-02- Zone-10 at MIP-JVC-SHD-CIV-
WF-000516 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05220 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 18-Jan-24 1-Feb-24 28-Jan-24 C Open 370 Aconex
Sta: 0+020.35 to 0+032.87 000026-02
Shop Drawing for Excavation Cross section of Tunnel-02- Zone-10 at MIP-JVC-SHD-CIV-
WF-000516 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05221 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 18-Jan-24 1-Feb-24 28-Jan-24 C Open 370 Aconex
JVC-WTRAN- Sta: 0+020.35 to 0+032.87 000026-02
000490 Shop Drawing for Excavation Cross section of Tunnel-02- Zone-10 at MIP-JVC-SHD-CIV-
WF-000516 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05222 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 18-Jan-24 1-Feb-24 28-Jan-24 C Open 370 Aconex
Sta: 0+020.35 to 0+032.87 000026-02
Shop Drawing for Excavation Cross section of Tunnel-02- Zone-10 at MIP-JVC-SHD-CIV-
WF-000516 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05223 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 18-Jan-24 1-Feb-24 28-Jan-24 C Open 370 Aconex
Sta: 0+020.35 to 0+032.87 000026-02
Shop Drawing for Excavation Cross section of Tunnel-02- Zone-10 at MIP-JVC-SHD-CIV-
WF-000516 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05224 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 18-Jan-24 1-Feb-24 28-Jan-24 C Open 370 Aconex
Sta: 0+020.35 to 0+032.87 000026-02
JVC-WTRAN- Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to As per Engr.
WF-000556 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04001-C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Jan-24 23-Jan-24 Terminated Aconex
000529 1+980 - Layout Sheet 01 Yaseen
JVC-WTRAN- Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to
WF-000558 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04004C1 Re-S Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Jan-24 3-Feb-24 28-Jan-24 C Closed 8 Aconex
000531 1+980 - Layout Sheet 04
JVC-WTRAN- UT-Utilities &
WF-000587 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-05052C0 Latest Grey Water Collection Network Pipe Trench Details RAM-MIP Shop Drawing Grey Water Engr. Fawzy 21-Jan-24 4-Feb-24 29-Jan-24 B Closed 8 Aconex
000556 Infrastructure
JVC-WTRAN- Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to
WF-000635 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04002C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 22-Jan-24 5-Feb-24 28-Jan-24 C Open 366 Aconex
000601 1+980 - Layout Sheet 02
JVC-WTRAN- As-built CMC Layout for Zone 02 Int. 01 from sta. 0+910 to 0+932
WF-000640 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01001 C0 Latest Zone 05 As Built Geotechnical Geotechnical Engr. Yaseen 23-Jan-24 6-Feb-24 24-Jan-24 B Closed 1 Aconex
000606 (Area 01) [partially]
JVC-WTRAN- Facilities Facilities
WF-000644 R02Z00-C021-JVC-XX-XXX-SDW-FM-FM-00001C0 Latest Proposed gate barrier new location Zone 05 Shop Drawing Engr. Elfeky 23-Jan-24 6-Feb-24 31-Jan-24 A Closed 8 Aconex
000610 Management Management
JVC-WTRAN- As-built CMC Layout for Zone 02 Int. 01 from sta. 0+932 to 0+972
WF-000672 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01002 C0 Latest Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 24-Jan-24 7-Feb-24 3-Feb-24 B Closed 10 Aconex
000637 (Area 04) [partially]
Shop Drawings Shoring Layout and Co-ordinates Sheet 1 for Shoring
WF-000689 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-03001C2 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 24-Jan-24 7-Feb-24 6-Feb-24 C Closed 13 Aconex
Works at Zone 07 Airport Tunnel from sta. 0+080 to 0+150
Shop Drawings Shoring Layout and Co-ordinates Sheet 2 for Shoring
WF-000689 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-03002C2 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 24-Jan-24 7-Feb-24 6-Feb-24 C Closed 13 Aconex
Works at Zone 07 Airport Tunnel from sta. 0+080 to 0+150
Shop Drawings Anchoring Layout and Co-ordinates Sheet 1 for
WF-000689 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-03003C2 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Fawzy 24-Jan-24 7-Feb-24 6-Feb-24 C Closed 13 Aconex
Shoring Works at Zone 07 Airport Tunnel from sta. 0+080 to 0+150
JVC-WTRAN- Shop Drawings Anchoring Layout and Co-ordinates Sheet 2 for
WF-000689 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-03004C2 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 24-Jan-24 7-Feb-24 6-Feb-24 C Closed 13 Aconex
000654 Shoring Works at Zone 07 Airport Tunnel from sta. 0+080 to 0+150
Shop Drawings Elelvation for Shoring Works at Zone 07 Airport
WF-000689 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-03005C2 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 24-Jan-24 7-Feb-24 6-Feb-24 C Closed 13 Aconex
Tunnel from sta. 0+080 to 0+150
Shop Drawings Cross Sections Sheet 1 for Shoring Works at Zone 07
WF-000689 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-03006C2 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Elfeky 24-Jan-24 7-Feb-24 6-Feb-24 C Closed 13 Aconex
Airport Tunnel from sta. 0+080 to 0+150
Shop Drawings Cross Sections Sheet 2 for Shoring Works at Zone 07
WF-000689 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-03007C2 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 24-Jan-24 7-Feb-24 6-Feb-24 C Closed 13 Aconex
Airport Tunnel from sta. 0+080 to 0+150
Sewerage
WF-000700 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01201C0 Re-S Sewage Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing
UT-Utilities & Infrastructure Engr. Fawzy 25-Jan-24 8-Feb-24 3-Feb-24 B Closed 9 Aconex
Effluent
JVC-WTRAN-
000665
Latest Status
D 0 1242
Response
ACONEX
Workflow Sewerage Total
Workflow Document JVC Planned WSP Status
B Overdue Overdue Submittal
WF-000700 Transmittal Drawing No. Rev. Status
R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01202C0 Re-S Sewage Network Plan and Profile for (Part 01 and 02)
Description RAM-MIP
Location Shop Drawing
UT-Utilities & Infrastructure
Discipline Sub-Discipline
Effluent by 25-Jan-24
Engr. Fawzy
Submitted 8-Feb-24 3-Feb-24 Closed
Status 9
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Sewerage date
WF-000700 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01216C0 Re-S Sewage Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing
UT-Utilities & Infrastructure Engr. Fawzy 25-Jan-24 8-Feb-24 3-Feb-24 B Closed Today
9 Aconex
Effluent
JVC-WTRAN- Sewerage
WF-000700 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01217C0 Re-S Sewage Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing
UT-Utilities & Infrastructure Engr. Fawzy 25-Jan-24 8-Feb-24 3-Feb-24 B Closed 9 Aconex
000665 Effluent
Sewerage
WF-000700 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01254C0 Re-S Sewage Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing
UT-Utilities & Infrastructure Engr. Fawzy 25-Jan-24 8-Feb-24 3-Feb-24 B Closed 9 Aconex
Effluent
Sewerage
WF-000700 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01255C0 Re-S Sewage Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing
UT-Utilities & Infrastructure Engr. Fawzy 25-Jan-24 8-Feb-24 3-Feb-24 B Closed 9 Aconex
Effluent
Sewerage
WF-000700 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01264C0 Re-S Sewage Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing
UT-Utilities & Infrastructure Engr. Fawzy 25-Jan-24 8-Feb-24 3-Feb-24 B Closed 9 Aconex
Effluent
Shop Drawing Layout for Soil Improvement works in Zone 01 Dry As per Engr.
WF-000717 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02001-C0 Latest RAM-MIP Shop Drawing Geotechnical Geotechnical Engr. Yaseen 25-Jan-24 29-Jan-24 Terminated Aconex
Utility Culvert from sta. 0+140 to 0+210 Yaseen
JVC-WTRAN- Shop Drawing Cross-Sectionsfor Soil Improvement works in Zone 01 As per Engr.
WF-000717 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02002-C0 Latest RAM-MIP Shop Drawing Geotechnical Geotechnical Engr. Yaseen 25-Jan-24 29-Jan-24 Terminated Aconex
000681 Dry Utility Culvert from sta. 0+140 to 0+211 Yaseen
Shop Drawing Coordinates and Levels for Soil Improvement works in As per Engr.
WF-000717 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02003-C0 Latest RAM-MIP Shop Drawing Geotechnical Geotechnical Engr. Yaseen 25-Jan-24 29-Jan-24 Terminated Aconex
Zone 01 Dry Utility Culvert from sta. 0+140 to 0+212 Yaseen
Shop Drawing for Excavation Cross sections and Egress Stair 19 At MIP-JVC-SHD-CIV-
WF-000765 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05244 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 B Closed 14 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98 000118-01
Shop Drawing for Excavation Cross sections and Egress Stair 19 At MIP-JVC-SHD-CIV-
WF-000765 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05250 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 B Closed 14 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98 000118-01
Shop Drawing for Excavation Cross sections and Egress Stair 19 At MIP-JVC-SHD-CIV-
WF-000765 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05251 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 B Closed 14 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98 000118-01
Shop Drawing for Excavation Cross sections and Egress Stair 19 At MIP-JVC-SHD-CIV-
WF-000765 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05252 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 B Closed 14 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98 000118-01
Shop Drawing for Excavation Cross sections and Egress Stair 19 At MIP-JVC-SHD-CIV-
WF-000765 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05253 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 B Closed 14 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98 000118-01
Shop Drawing for Excavation Cross sections and Egress Stair 19 At MIP-JVC-SHD-CIV-
WF-000765 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05254 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 B Closed 14 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98 000118-01
JVC-WTRAN- Shop Drawing for Excavation Cross sections and Egress Stair 19 At MIP-JVC-SHD-CIV-
WF-000765 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05255 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 B Closed 14 Aconex
000729 Zone-05 from Sta: 1+855.48 to 1+961.98 000118-01
Shop Drawing for Excavation Cross sections and Egress Stair 19 At MIP-JVC-SHD-CIV-
WF-000765 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05256 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 B Closed 14 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98 000118-01
Shop Drawing for Excavation Cross sections and Egress Stair 19 At MIP-JVC-SHD-CIV-
WF-000765 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05257 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 B Closed 14 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98 000118-01
Shop Drawing for Excavation Cross sections and Egress Stair 19 At MIP-JVC-SHD-CIV-
WF-000765 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07090 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 B Closed 14 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98 000118-01
Shop Drawing for Excavation Cross sections and Egress Stair 19 At MIP-JVC-SHD-CIV-
WF-000765 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07091 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 B Closed 14 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98 000118-01
Shop Drawing for Excavation Cross sections and Egress Stair 19 At MIP-JVC-SHD-CIV-
WF-000765 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07092 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 B Closed 14 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98 000118-01
Shop Drawing for Excavation Cross sections and Egress Stair 19 At MIP-JVC-SHD-CIV-
WF-000765 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07093 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 B Closed 14 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98 000118-01
JVC-WTRAN- As-Built CMC Layout for Zone 05 from sta. 1+793 to 1+833 (Seg 78
WF-000771 R02Z00-C021-JVC-05-XXX-ABD-GT-GT-01001 C1 Re-S Zone 05 As Built Geotechnical Geotechnical Engr. Yaseen 28-Jan-24 11-Feb-24 11-Feb-24 C Closed 14 Aconex
000733 & 79)
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-000784 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05453-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 Terminated Aconex
to0+200 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-000784 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05454-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 Terminated Aconex
to0+200 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-000784 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05455-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 Terminated Aconex
to0+200 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-000784 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05456-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 Terminated Aconex
to0+200 000044-02 Withdraw by
JVC-WTRAN- Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV- Engr Nahell
WF-000784 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05457-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 Terminated Aconex
000746 to0+200 000044-02 dated 11-02-
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV- 2024
WF-000784 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05458-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 Terminated Aconex
to0+200 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-000784 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05459-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 Terminated Aconex
to0+200 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-000784 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05460-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 Terminated Aconex
to0+200 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-000784 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05461-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 Terminated Aconex
to0+200 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+280 MIP-JVC-SHD-CIV-
WF-000786 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05465-C1 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 Terminated Aconex
to0+360 000109-01
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+280 MIP-JVC-SHD-CIV-
WF-000786 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05466-C1 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 Terminated Aconex
to0+360 000109-01 Withdraw by
JVC-WTRAN- Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+280 MIP-JVC-SHD-CIV- Engr Nahell
WF-000786 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05467-C1 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 Terminated Aconex
000748 to0+360 000109-01 dated 11-02-
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+280 MIP-JVC-SHD-CIV- 2024
WF-000786 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05468-C1 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 Terminated Aconex
to0+360 000109-01
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+280 MIP-JVC-SHD-CIV-
WF-000786 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05469-C1 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 Terminated Aconex
to0+360 000109-01
Shop Drawing Layout for Soil Improvement works in Zone 01 Wet
WF-000799 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02001C0 Re-S Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 29-Jan-24 12-Feb-24 31-Jan-24 B Closed 2 Aconex
Utility Culvert from sta. 0+140 to 0+210
JVC-WTRAN- Shop Drawing Coordinates and Levels for Soil Improvement works in
WF-000799 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02002C0 Re-S Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 29-Jan-24 12-Feb-24 31-Jan-24 B Closed 2 Aconex
000760 Zone 01 Wet Utility Culvert from sta. 0+140 to 0+212
Shop Drawing Coordinates and Levels for Soil Improvement works in
WF-000799 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02003C0 Re-S Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 29-Jan-24 12-Feb-24 31-Jan-24 B Closed 2 Aconex
Zone 01 Wet Utility Culvert from sta. 0+140 to 0+212
Shop Drawing for As built & Design Excavation at D9-1 Near Zone-02 MIP-JVC-SHD-CIV-
WF-000913 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-09755-C4 Latest D9-1 Shop Drawing Civil Civil Engr. Sunil 1-Feb-24 15-Feb-24 11-Feb-24 Terminated Aconex
Sta: 0+000 to 0+020 000065-04 Withdraw by
JVC-WTRAN- Shop Drawing for As built & Design Excavation at D9-1 Near Zone-02 MIP-JVC-SHD-CIV- Engr Nahell
WF-000913 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-09756-C4 Latest D9-1 Shop Drawing Civil Civil Engr. Sunil 1-Feb-24 15-Feb-24 11-Feb-24 Terminated Aconex
000860 Sta: 0+000 to 0+020 000065-04 dated 11-02-
2024
Latest Status
D 0 1242
Withdraw by
JVC-WTRAN- Engr Nahell
000860 Response dated 11-02-
ACONEX
Workflow Shop Drawing for As built & Design Excavation at D9-1 Near Zone-02 Total MIP-JVC-SHD-CIV- 2024
Workflow Document JVC Planned 11-Feb-24
WSP Status Terminated Overdue Overdue Submittal
WF-000913 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-09759-C4 Status Sta: 0+000 to 0+020 Description D9-1
Location Shop Drawing Civil
Discipline Civil
Sub-Discipline Engr. Sunilby 1-Feb-24
Submitted 15-Feb-24 Status Duration Aconex
Ref.
Alternative Ref. #
000065-04 Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
JVC-WTRAN- Transportation Transportation & date MIP-JVC-SHD-
WF-000895 R02Z00-C021-JVC-11-XXX-SDW-TR-TR-06168 C4 Latest Shop Drawing Plan & Profile for Tunnel 03 D9-1 Shop Drawing Engr. Khalid 1-Feb-24 15-Feb-24 13-Feb-24 B Closed Today
12 Aconex
000849 & Road Road RDW-000053-01
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05110 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05111 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05112 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05113 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05114 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05115 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05116 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05117 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05118 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05119 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05120 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05121 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05122 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05123 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
JVC-WTRAN- Sta: 2+200 to 2+660 000004-02
000877 Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05124 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05125 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05126 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05127 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05128 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05129 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05130 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05131 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05132 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05133 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05134 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05135 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05136 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05137 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000931 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07520-C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 12-Feb-24 Terminated Aconex
JVC-WTRAN- Sta: 2+400 to 2+560
000878 Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000931 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07533-C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 12-Feb-24 Terminated Aconex
Sta: 2+400 to 2+560
Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000937 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07534-C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 12-Feb-24 Terminated Aconex
Sta: 2+400 to 2+560
Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000937 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07535-C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 12-Feb-24 Terminated Aconex
JVC-WTRAN- Sta: 2+400 to 2+560
000884 Shop Drawing for Backfilling Cross sections At Zone-06 from Withdraw by
WF-000937 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07536-C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 12-Feb-24 Terminated Aconex
Sta: 2+400 to 2+560 Engr Nahell
Shop Drawing for Backfilling Cross sections At Zone-06 from dated 11-02-
WF-000937 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07537-C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 12-Feb-24 Terminated Aconex 2024
Sta: 2+400 to 2+560
Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000931 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07538-C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 12-Feb-24 Terminated Aconex
Sta: 2+400 to 2+560
Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000931 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07539-C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 12-Feb-24 Terminated Aconex
JVC-WTRAN- Sta: 2+400 to 2+560
000878 Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000931 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07540-C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 12-Feb-24 Terminated Aconex
Sta: 2+400 to 2+560
Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000931 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07541-C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 12-Feb-24 Terminated Aconex
Sta: 2+400 to 2+560
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00109C1 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00110C1 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
Latest Status
D 0 1242
Response
ACONEX
Workflow UT-Utilities & UT-Utilities & Total MIP-JVC-SHD-INF-
Workflow Document JVC Planned 15-Feb-24
WSP Status
B Overdue Overdue Submittal
WF-000939 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00111C1 Status Combined Utility Plan for Road 11-D09
Description Road 11-D09
Location Shop Drawing Discipline
Infrastructure Sub-Discipline Engr. Fawzy 3-Feb-24
Infrastructure Submitted by Submitted
17-Feb-24 Closed
Status 12
Duration Aconex
Ref.
Alternative Ref. #
000022-01 Remarks
Ref. No. Type Reply Response Code from WSP from JVC
No. as of
UT-Utilities & UT-Utilities & date MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00112C1 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed Today
12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00113C1 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00114C1 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00115C1 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00116C1 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00117C1 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00118C1 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00119C1 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
JVC-WTRAN- Infrastructure Infrastructure 000022-01
000886 UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00120C1 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00121C1 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00122C1 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00123C0 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00124C0 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00125C0 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00126C0 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00127C0 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00128C0 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00129C0 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00130C0 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
JVC-WTRAN- Transportation Transportation &
WF-000950 R02Z00-C021-JVC-06-XXX-SDW-TR-TR-06156 C0 Latest Shop Drawing Plan & Profile for Existing Road 02 Road 02 Shop Drawing Engr. Khalid 3-Feb-24 17-Feb-24 11-Feb-24 B Closed 8 Aconex
000896 & Road Road
JVC-WTRAN- Transportation Transportation & MIP-JVC-SHD-
WF-001008 R02Z00-C021-JVC-10-XXX-SDW-TR-TR-06167 C0 Latest Shop Drawing Plan & Profile for Tunnel 02 Tunnel 02 Shop Drawing Engr. Khalid 5-Feb-24 19-Feb-24 18-Feb-24 B Closed 13 Aconex
000949 & Road Road RDW-000051-01
Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to
WF-001011 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04004C2 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 5-Feb-24 19-Feb-24 11-Feb-24 B Closed 6 Aconex
1+980 - Layout Sheet 04
Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to
WF-001011 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04005C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 5-Feb-24 19-Feb-24 11-Feb-24 B Closed 6 Aconex
JVC-WTRAN- 1+980 - Cross Section
000952 Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to
WF-001011 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04006C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 5-Feb-24 19-Feb-24 11-Feb-24 B Closed 6 Aconex
1+980 - Reinforcement Details
Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to
WF-001011 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04008C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 5-Feb-24 19-Feb-24 11-Feb-24 B Closed 6 Aconex
1+980 - Elevation Sheet 2
JVC-WTRAN- As-Built CMC Layout for Zone 05 from sta. 1+793 to 1+833 (Seg 78
WF-001169 R02Z00-C021-JVC-05-XXX-ABD-GT-GT-01001 C2 Re-S Zone 05 As Built Geotechnical Geotechnical Engr. Yaseen 11-Feb-24 25-Feb-24 18-Feb-24 B Closed 7 Aconex
001101 & 79)
Shop Drawing Layout for Soil Improvement works in Zone 01 Wet
WF-001177 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02001C1 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Feb-24 25-Feb-24 21-Feb-24 B Closed 10 Aconex
Utility Culvert from sta. 0+140 to 0+210
JVC-WTRAN- Shop Drawing Coordinates and Levels for Soil Improvement works in
WF-001177 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02002C1 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Feb-24 25-Feb-24 21-Feb-24 B Closed 10 Aconex
001109 Zone 01 Wet Utility Culvert from sta. 0+140 to 0+212
Shop Drawing Coordinates and Levels for Soil Improvement works in
WF-001177 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02003C1 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Feb-24 25-Feb-24 21-Feb-24 B Closed 10 Aconex
Zone 01 Wet Utility Culvert from sta. 0+140 to 0+212
Shop Drawing for As built & Design Excavation at D9-1 Near Zone-02
WF-001184 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-09755 C4 Latest D9-1 Shop Drawing Civil Civil Engr. Sunil 12-Feb-24 26-Feb-24 15-Feb-24 B Closed 3 Aconex
Sta: 0+000 to 0+020
JVC-WTRAN- Shop Drawing for As built & Design Excavation at D9-1 Near Zone-02
WF-001184 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-09756 C4 Latest D9-1 Shop Drawing Civil Civil Engr. Sunil 12-Feb-24 26-Feb-24 15-Feb-24 B Closed 3 Aconex
001116 Sta: 0+000 to 0+020
Shop Drawing for As built & Design Excavation at D9-1 Near Zone-02
WF-001184 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-09759 C4 Latest D9-1 Shop Drawing Civil Civil Engr. Sunil 12-Feb-24 26-Feb-24 15-Feb-24 B Closed 3 Aconex
Sta: 0+000 to 0+020
Shop Drawing for Indicative section of material Backfilling At Zone-
WF-001239 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07520 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Feb-24 27-Feb-24 24-Feb-24 B Closed 11 Aconex
06(From Sta: 2+400 to 2+560)
Shop Drawing for Indicative section of material Backfilling At Zone-
WF-001239 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07533 C1 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Feb-24 27-Feb-24 24-Feb-24 B Closed 11 Aconex
06(From Sta: 2+400 to 2+560)
Shop Drawing for Indicative section of material Backfilling At Zone-
WF-001239 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07534 C1 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Feb-24 27-Feb-24 24-Feb-24 B Closed 11 Aconex
06(From Sta: 2+400 to 2+560)
Shop Drawing for Indicative section of material Backfilling At Zone-
WF-001239 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07535 C1 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Feb-24 27-Feb-24 24-Feb-24 B Closed 11 Aconex
06(From Sta: 2+400 to 2+560)
Shop Drawing for Indicative section of material Backfilling At Zone-
WF-001239 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07536 C1 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Feb-24 27-Feb-24 24-Feb-24 B Closed 11 Aconex
JVC-WTRAN- 06(From Sta: 2+400 to 2+560)
001170 Shop Drawing for Indicative section of material Backfilling At Zone-
WF-001239 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07537 C1 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Feb-24 27-Feb-24 24-Feb-24 B Closed 11 Aconex
06(From Sta: 2+400 to 2+560)
Shop Drawing for Indicative section of material Backfilling At Zone-
WF-001239 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07538 C1 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Feb-24 27-Feb-24 24-Feb-24 B Closed 11 Aconex
06(From Sta: 2+400 to 2+560)
Shop Drawing for Indicative section of material Backfilling At Zone-
WF-001239 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07539 C1 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Feb-24 27-Feb-24 24-Feb-24 B Closed 11 Aconex
06(From Sta: 2+400 to 2+560)
Shop Drawing for Indicative section of material Backfilling At Zone-
WF-001239 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07540 C1 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Feb-24 27-Feb-24 24-Feb-24 B Closed 11 Aconex
06(From Sta: 2+400 to 2+560)
Latest Status
Response
ACONEX
Workflow Shop Drawing for Indicative section of material Backfilling At Zone- Total
Workflow Document JVC Planned 24-Feb-24
WSP Status
B Overdue Overdue Submittal
WF-001239 TransmittalR02Z00-C021-JVC-06-XXX-SDW-CL-CL-07541
Drawing No. Rev.
C1 Status
Re-S
06(From Sta: 2+400 to 2+560) Description Zone 06
Location Shop Drawing Civil
Discipline Civil
Sub-Discipline Engr. Sunilby 13-Feb-24
Submitted 27-Feb-24 Closed
Status 11
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
JVC-WTRAN- As-built CMC Layout for Zone 02 Int. 01 from sta. 0+932 to 0+972 date
WF-001282 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01003 C0 Latest Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 15-Feb-24 29-Feb-24 19-Feb-24 B Closed Today
4 Aconex
001208 (Area 02 and 03) (partially)
JVC-WTRAN-
WF-001356 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01004 C0 Latest As-Built CMC Layout for Zone 02 from sta 0+570.033 to 0+590.033 Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 19-Feb-24 4-Mar-24 7-Mar-24 A Closed 17 Aconex
001278
As built Excavation Cross sections At Zone-06 from sta: 2+440 to
WF-001337 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11000 C0 Latest Zone 06 As Built Civil Civil Engr. Sunil 18-Feb-24 3-Mar-24 4-Mar-24 A Closed 15 Aconex
2+560
As built Excavation Cross sections At Zone-06 from sta: 2+440 to
WF-001337 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11001 C0 Re-S Zone 06 As Built Civil Civil Engr. Sunil 18-Feb-24 3-Mar-24 4-Mar-24 A Closed 15 Aconex
2+560
As built Excavation Cross sections At Zone-06 from sta: 2+440 to
WF-001337 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11002 C0 Re-S Zone 06 As Built Civil Civil Engr. Sunil 18-Feb-24 3-Mar-24 4-Mar-24 A Closed 15 Aconex
2+560
As built Excavation Cross sections At Zone-06 from sta: 2+440 to
WF-001337 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11003 C0 Re-S Zone 06 As Built Civil Civil Engr. Sunil 18-Feb-24 3-Mar-24 4-Mar-24 A Closed 15 Aconex
JVC-WTRAN- 2+560
001260 As built Excavation Cross sections At Zone-06 from sta: 2+440 to
WF-001337 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11004 C0 Re-S Zone 06 As Built Civil Civil Engr. Sunil 18-Feb-24 3-Mar-24 4-Mar-24 A Closed 15 Aconex
2+560
As built Excavation Cross sections At Zone-06 from sta: 2+440 to
WF-001337 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11005 C0 Re-S Zone 06 As Built Civil Civil Engr. Sunil 18-Feb-24 3-Mar-24 4-Mar-24 A Closed 15 Aconex
2+560
As built Excavation Cross sections At Zone-06 from sta: 2+440 to
WF-001337 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11006 C0 Re-S Zone 06 As Built Civil Civil Engr. Sunil 18-Feb-24 3-Mar-24 4-Mar-24 A Closed 15 Aconex
2+560
As built Excavation Cross sections At Zone-06 from sta: 2+440 to
WF-001337 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11007 C0 Re-S Zone 06 As Built Civil Civil Engr. Sunil 18-Feb-24 3-Mar-24 4-Mar-24 A Closed 15 Aconex
2+560
Shop Drawing for Cross Sections for Road and Drainage at Tunnel 02- Transportation Transportation &
WF-001481 R02Z00-C021-JVC-10-XXX-SDW-TR-TR-06200 C0 Latest Zone 10 Shop Drawing Engr. Khalid 25-Feb-24 10-Mar-24 5-Mar-24 B Closed 9 Aconex
Zone 10 & Road Road
Shop Drawing for Cross Sections for Road and Drainage at Tunnel 02- Transportation Transportation &
WF-001481 R02Z00-C021-JVC-10-XXX-SDW-TR-TR-06201 C0 Latest Zone 10 Shop Drawing Engr. Khalid 25-Feb-24 10-Mar-24 5-Mar-24 B Closed 9 Aconex
Zone 10 & Road Road
Shop Drawing for Cross Sections for Road and Drainage at Tunnel 02- Transportation Transportation &
WF-001481 R02Z00-C021-JVC-10-XXX-SDW-TR-TR-06202 C0 Latest Zone 10 Shop Drawing Engr. Khalid 25-Feb-24 10-Mar-24 5-Mar-24 B Closed 9 Aconex
JVC-WTRAN- Zone 10 & Road Road
001390 Shop Drawing for Cross Sections for Road and Drainage at Tunnel 02- Transportation Transportation &
WF-001481 R02Z00-C021-JVC-10-XXX-SDW-TR-TR-06203 C0 Latest Zone 10 Shop Drawing Engr. Khalid 25-Feb-24 10-Mar-24 5-Mar-24 B Closed 9 Aconex
Zone 10 & Road Road
Shop Drawing for Cross Sections for Road and Drainage at Tunnel 02- Transportation Transportation &
WF-001481 R02Z00-C021-JVC-10-XXX-SDW-TR-TR-06204 C0 Latest Zone 10 Shop Drawing Engr. Khalid 25-Feb-24 10-Mar-24 5-Mar-24 B Closed 9 Aconex
Zone 10 & Road Road
Shop Drawing for Cross Sections for Road and Drainage at Tunnel 02- Transportation Transportation &
WF-001481 R02Z00-C021-JVC-10-XXX-SDW-TR-TR-06205 C0 Latest Zone 10 Shop Drawing Engr. Khalid 25-Feb-24 10-Mar-24 5-Mar-24 B Closed 9 Aconex
Zone 10 & Road Road
Shop Drawings Layout for Soil Improvement Works in Zone 01 from MIP-JVC-SHD-GEO-
WF-001511 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02004C3 Re-S Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 25-Feb-24 10-Mar-24 4-Mar-24 B Closed 8 Aconex
sta. 0+400 to 0+500 incl VTR 01 and LS 06 000069-03
Shop Drawings Cross-Sections for Soil Improvement Works in Zone MIP-JVC-SHD-GEO-
WF-001511 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02005C3 Re-S Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 25-Feb-24 10-Mar-24 4-Mar-24 B Closed 8 Aconex
JVC-WTRAN- 01 from sta. 0+400 to 0+500 incl VTR 01 and LS 07 000069-03
001420 Shop Drawings Coordinates Sheet 1 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-001511 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02006C3 Re-S Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 25-Feb-24 10-Mar-24 4-Mar-24 B Closed 8 Aconex
Zone 01 from sta. 0+400 to 0+500 incl VTR 01 and LS 08 000069-03
Shop Drawings Coordinates Sheet 2 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-001511 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02007C3 Re-S Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 25-Feb-24 10-Mar-24 4-Mar-24 B Closed 8 Aconex
Zone 01 from sta. 0+400 to 0+500 incl VTR 01 and LS 09 000069-03
JVC-WTRAN- As-Built CMC Layout for Zone 02 at Lift Station 01 from
WF-001514 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01005 C0 Re-S Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 25-Feb-24 10-Mar-24 28-Feb-24 C Closed 3 Aconex
001423 sta. 0+980 to 1+020
JVC-WTRAN- As-Built CMC Layout for Zone 01 Wet Culvert from sta. 0+140 to
WF-001527 R02Z00-C021-JVC-01-XXX-ABD-GT-GT-02003 C0 Latest Zone 01 As Built Geotechnical Geotechnical Engr. Yaseen 26-Feb-24 11-Mar-24 7-Mar-24 B Closed 10 Aconex
001436 0+210 incl MR 21
JVC-WTRAN-
WF-001581 R02Z00-C021-JVC-00-XXX-SDW-GT-GT-00001C0 Latest Shop Drawing for Ground Water Piezometers Layout RAM-MIP Shop Drawing Geotechnical Geotechnical Engr. Yaseen 28-Feb-24 13-Mar-24 7-Mar-24 B Closed 8 Aconex
001481
JVC-WTRAN- As-built CMC Layout for Zone 02 Int. 01 from sta. 0+972 to 1+000
WF-001624 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01011 C0 Latest RAM-MIP As Built Geotechnical Geotechnical Engr. Yaseen 29-Feb-24 14-Mar-24 7-Mar-24 B Closed 7 Aconex
001521 (Area 07) [partially]
Shop Drawings for Soil Improvement Works in Zone 08 from sta.
WF-001637 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-01001C0 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 29-Feb-24 14-Mar-24 13-Mar-24 B Closed 13 Aconex
0+370 to 0+582 - General Layout
Shop Drawings for Soil Improvement Works in Zone 08 from sta.
WF-001637 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-01002C0 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 29-Feb-24 14-Mar-24 13-Mar-24 B Closed 13 Aconex
0+370 to 0+480 - Part General Layout
Shop Drawings for Soil Improvement Works in Zone 08 from sta.
WF-001637 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-01003C0 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 29-Feb-24 14-Mar-24 13-Mar-24 B Closed 13 Aconex
0+480 to 0+582 - Part General Layout
Shop Drawings for Soil Improvement Works in Zone 08 from sta.
WF-001637 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-01004C0 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 29-Feb-24 14-Mar-24 13-Mar-24 B Closed 13 Aconex
0+370 to 0+582 - Cross Sections
Shop Drawings for Soil Improvement Works in Zone 08 from sta.
WF-001637 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-01005C0 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 29-Feb-24 14-Mar-24 13-Mar-24 B Closed 13 Aconex
JVC-WTRAN- 0+370 to 0+582 - Coordinates Sheet 1
001534 Shop Drawings for Soil Improvement Works in Zone 08 from sta.
WF-001637 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-01006C0 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 29-Feb-24 14-Mar-24 13-Mar-24 B Closed 13 Aconex
0+370 to 0+582 - Coordinates Sheet 2
Shop Drawings for Soil Improvement Works in Zone 08 from sta.
WF-001637 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-01007C0 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 29-Feb-24 14-Mar-24 13-Mar-24 B Closed 13 Aconex
0+370 to 0+582 - Coordinates Sheet 3
Shop Drawings for Soil Improvement Works in Zone 08 from sta.
WF-001637 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-01008C0 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 29-Feb-24 14-Mar-24 13-Mar-24 B Closed 13 Aconex
0+370 to 0+582 - Coordinates Sheet 4
Shop Drawings for Soil Improvement Works in Zone 08 from sta.
WF-001637 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-01009C0 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 29-Feb-24 14-Mar-24 13-Mar-24 B Closed 13 Aconex
0+370 to 0+582 - Coordinates Sheet 5
Shop Drawings for Soil Improvement Works in Zone 08 from sta.
WF-001637 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-01010C0 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 29-Feb-24 14-Mar-24 13-Mar-24 B Closed 13 Aconex
0+370 to 0+582 - Coordinates Sheet 6
Shop Drawing for Excavation at Kaar Tunnel Zone-08 Sta: 0+480
WF-001674 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-05419 C1 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 7-Mar-24 B Closed 5 Aconex
to0+552.99
Shop Drawing for Excavation at Kaar Tunnel Zone-08 Sta: 0+480
WF-001674 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-05420 C1 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 7-Mar-24 B Closed 5 Aconex
to0+552.99
Shop Drawing for Excavation at Kaar Tunnel Zone-08 Sta: 0+480
WF-001674 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-05421 C1 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 7-Mar-24 B Closed 5 Aconex
to0+552.99
JVC-WTRAN- Shop Drawing for Excavation at Kaar Tunnel Zone-08 Sta: 0+480
WF-001674 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-05422 C1 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 7-Mar-24 B Closed 5 Aconex
001569 to0+552.99
Shop Drawing for Excavation at Kaar Tunnel Zone-08 Sta: 0+480
WF-001674 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-05423 C1 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 7-Mar-24 B Closed 5 Aconex
to0+552.99
Shop Drawing for Excavation at Kaar Tunnel Zone-08 Sta: 0+480
WF-001674 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-05424 C1 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 7-Mar-24 B Closed 5 Aconex
to0+552.99
Shop Drawing for Excavation at Kaar Tunnel Zone-08 Sta: 0+480
WF-001674 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-05425 C1 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 7-Mar-24 B Closed 5 Aconex
to0+552.99
Latest Status
D 0 1242
Response
ACONEX
Workflow Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01 Total
Workflow Document JVC Planned 14-Mar-24
WSP Status Terminated Overdue Overdue Submittal
WF-001690 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07116-C2 Status Sta: 0+041.04 to 0+300 Description Location
Zone 09
Shop Drawing Civil
Discipline Civil
Sub-Discipline Engr. Sunilby
Submitted 2-Mar-24 16-Mar-24 Status Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01 date
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07117-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Today Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07118-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07119-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05425-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05426-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05427-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05428-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05429-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05430-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05431-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05432-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05433-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05434-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05435-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
JVC-WTRAN- Sta: 0+041.04 to 0+300 Zone 09 Withdraw by
001585 Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01 Engr Nahell
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05436-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05437-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05438-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05439-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05440-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05441-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05442-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05443-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05444-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05445-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05446-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05447-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05448-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05449-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05450 C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross sections of Junction At Haram
WF-001703 R02Z00-C021-JVC-00-XXX-SDW-CL-CL-07551 C0 Re-S Tunnel Zone-05(From sta: 1+968.99 to 2+032.098) & Airport Tunnel Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 3-Mar-24 17-Mar-24 14-Mar-24 C Closed 11 Aconex
Zone-07(From sta:0+020
Shop Drawing for to 0+040)
Excavation Cross sections of Junction At Haram
WF-001703 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07552 C0 Re-S Tunnel Zone-05(From sta: 1+968.99 to 2+032.098) & Airport Tunnel Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 3-Mar-24 17-Mar-24 14-Mar-24 C Closed 11 Aconex
Zone-07(From
Shop sta:0+020
Drawing for to 0+040)
Excavation Cross sections of Junction At Haram
WF-001703 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07553 C0 Re-S Tunnel Zone-05(From sta: 1+968.99 to 2+032.098) & Airport Tunnel Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 3-Mar-24 17-Mar-24 14-Mar-24 C Closed 11 Aconex
Zone-07(From
Shop sta:0+020
Drawing for to 0+040)
Excavation Cross sections of Junction At Haram
WF-001703 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07554 C0 Re-S Tunnel Zone-05(From sta: 1+968.99 to 2+032.098) & Airport Tunnel Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 3-Mar-24 17-Mar-24 14-Mar-24 C Closed 11 Aconex
Zone-07(From sta:0+020 to 0+040)
Shop Drawing for Excavation Cross sections of Junction At Haram
JVC-WTRAN-
WF-001703 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07555 C0 Re-S Tunnel Zone-05(From sta: 1+968.99 to 2+032.098) & Airport Tunnel Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 3-Mar-24 17-Mar-24 14-Mar-24 C Closed 11 Aconex
001598
Zone-07(From
Shop sta:0+020
Drawing for to 0+040)
Excavation Cross sections of Junction At Haram
WF-001703 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07556 C0 Re-S Tunnel Zone-05(From sta: 1+968.99 to 2+032.098) & Airport Tunnel Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 3-Mar-24 17-Mar-24 14-Mar-24 C Closed 11 Aconex
Zone-07(From sta:0+020 to 0+040)
Shop Drawing for Excavation Cross sections of Junction At Haram
WF-001703 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-07557 C0 Re-S Tunnel Zone-05(From sta: 1+968.99 to 2+032.098) & Airport Tunnel Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 3-Mar-24 17-Mar-24 14-Mar-24 C Closed 11 Aconex
Zone-07(From
Shop sta:0+020
Drawing for to 0+040)
Excavation Cross sections of Junction At Haram
WF-001703 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-07558 C0 Re-S Tunnel Zone-05(From sta: 1+968.99 to 2+032.098) & Airport Tunnel Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 3-Mar-24 17-Mar-24 14-Mar-24 C Closed 11 Aconex
Zone-07(From
Shop sta:0+020
Drawing for to 0+040)
Excavation Cross sections of Junction At Haram
WF-001703 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-07559 C0 Re-S Tunnel Zone-05(From sta: 1+968.99 to 2+032.098) & Airport Tunnel Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 3-Mar-24 17-Mar-24 14-Mar-24 C Closed 11 Aconex
Zone-07(From sta:0+020 to 0+040)
As-Built Drawing for Shoring Works in Zone 02 from sta. 0+750 to
WF-001725 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01006 C0 Latest Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 3-Mar-24 17-Mar-24 17-Mar-24 A Closed 14 Aconex
0+870 - Anchor Layout and Details
As-Built Drawing for Shoring Works in Zone 02 from sta. 0+750 to
WF-001725 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01007 C0 Latest Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 3-Mar-24 17-Mar-24 17-Mar-24 A Closed 14 Aconex
0+870 - Anchor Layout and Details Sheet 2
As-Built Drawing for Shoring Works in Zone 02 from sta. 0+750 to
WF-001725 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01008 C0 Latest Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 3-Mar-24 17-Mar-24 17-Mar-24 A Closed 14 Aconex
JVC-WTRAN- 0+870 - Piles Layout and Co-ordinates
001620
Latest Status
D 0 1242
JVC-WTRAN- Response
ACONEX
Workflow
001620 As-Built Drawing for Shoring Works in Zone 02 from sta. 0+750 to Total
Workflow Document JVC Planned 17-Mar-24
WSP Status
A Overdue Overdue Submittal
WF-001725 TransmittalR02Z00-C021-JVC-02-XXX-ABD-GT-GT-01009
Drawing No. Rev. Status 0+870 - Piles Layout and Details
C0 Latest Description Zone 02
Location As Built Geotechnical
Discipline Geotechnical Submitted
Sub-Discipline Engr. Yaseen
by 3-Mar-24 17-Mar-24 Closed
Status 14
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
As-Built Drawing for Shoring Works in Zone 02 from sta. 0+750 to date
WF-001725 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01010 C0 Latest Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 3-Mar-24 17-Mar-24 17-Mar-24 A Closed Today
14 Aconex
0+870 - Anchor Co-ordinates
As-Built Drawing for Shoring Works in Zone 02 from sta. 0+750 to
WF-001725 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01012 C0 Latest Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 3-Mar-24 17-Mar-24 17-Mar-24 A Closed 14 Aconex
0+870 - Pile Reinforcement Details
Shop Drawing for soil improvement works in Zone 02 from Sta 0+500
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01012C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
CMC
Shop Layout
Drawing for soil improvement works in Zone 02 from Sta 0+500
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01013C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
CMC Layout
Shop Drawing Sheet 2 improvement works in Zone 02 from Sta 0+500
for soil
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01014C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
Cross Drawing
Shop Sectionsfor soil improvement works in Zone 02 from Sta 0+500
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01015C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
Coordinates
Shop Drawing Sheet 01 improvement works in Zone 02 from Sta 0+500
for soil
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01016C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
Coordinates
Shop DrawingSheet 02 improvement works in Zone 02 from Sta 0+500
for soil
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01017C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
Coordinates
Shop DrawingSheet 03 improvement works in Zone 02 from Sta 0+500
for soil
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01018C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
Coordinates Sheet 04 improvement works in Zone 02 from Sta 0+500
Shop Drawing for soil
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01019C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
Coordinates
Shop DrawingSheet 05 improvement works in Zone 02 from Sta 0+500
for soil
JVC-WTRAN- MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01020C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
001657 000040-05
Coordinates Sheet 06 improvement works in Zone 02 from Sta 0+500
Shop Drawing for soil
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01021C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
Coordinates
Shop Drawing Sheet 07 improvement works in Zone 02 from Sta 0+500
for soil
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01022C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
Coordinates
Shop DrawingSheet 08 improvement works in Zone 02 from Sta 0+500
for soil
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01023C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
Coordinates Sheet 09 improvement works in Zone 02 from Sta 0+500
Shop Drawing for soil
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01024C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
Coordinates
Shop DrawingSheet 10 improvement works in Zone 02 from Sta 0+500
for soil
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01025C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
Coordinates
Shop DrawingSheet 11 improvement works in Zone 02 from Sta 0+500
for soil
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01026C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
CMC Layout Sheet 3
Shop Drawing for soil improvement works in Zone 02 from Sta 0+500
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01027C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
Coordinates
Shop DrawingSheet 11 improvement works in Zone 02 from Sta 0+500
for soil
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01028C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
Coordinates Sheet 12
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-001831 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02001C0 Re-S Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Mar-24 21-Mar-24 19-Mar-24 B Closed 12 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 1
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-001831 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02002C0 Re-S Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Mar-24 21-Mar-24 19-Mar-24 B Closed 12 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-001831 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02003C0 Re-S Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Mar-24 21-Mar-24 19-Mar-24 B Closed 12 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-001831 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02004C0 Re-S Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Mar-24 21-Mar-24 19-Mar-24 B Closed 12 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Cross-Sections
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-001831 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02005C0 Re-S Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Mar-24 21-Mar-24 19-Mar-24 B Closed 12 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 1
JVC-WTRAN- Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-001831 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02006C0 Re-S Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Mar-24 21-Mar-24 19-Mar-24 B Closed 12 Aconex
001723 from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-001831 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02007C0 Re-S Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Mar-24 21-Mar-24 19-Mar-24 B Closed 12 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-001831 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02008C0 Re-S Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Mar-24 21-Mar-24 19-Mar-24 B Closed 12 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 4
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-001831 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02009C0 Re-S Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Mar-24 21-Mar-24 19-Mar-24 B Closed 12 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 5
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-001831 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02010C0 Re-S Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Mar-24 21-Mar-24 19-Mar-24 B Closed 12 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 6
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-001831 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02011C0 Re-S Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Mar-24 21-Mar-24 19-Mar-24 B Closed 12 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 7
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-001859 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05453-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 Terminated Aconex
to0+200 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-001859 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05454-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 Terminated Aconex
to0+200 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-001859 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05455-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 Terminated Aconex
to0+200 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-001859 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05456-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 Terminated Aconex
to0+200 000044-02
JVC-WTRAN- Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-001859 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05457-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 Terminated Aconex
001750 to0+200 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-001859 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05458-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 Terminated Aconex
to0+200 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-001859 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05459-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 Terminated Aconex
to0+200 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-001859 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05460-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 Terminated Aconex
to0+200 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-001859 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05461-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 Terminated Aconex
to0+200 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+280 MIP-JVC-SHD-CIV-
WF-001866 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05465 C1 Re-S Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 C Closed 15 Aconex
to0+360 000109-01
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+280 MIP-JVC-SHD-CIV-
WF-001866 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05466 C1 Re-S Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 C Closed 15 Aconex
to0+360 000109-01
JVC-WTRAN-
001757
Latest Status
D 0 1242
Response
ACONEX
Workflow
JVC-WTRAN- Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+280 Total MIP-JVC-SHD-CIV-
Workflow Document JVC Planned 24-Mar-24
WSP Status
C Overdue Overdue Submittal
WF-001866 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05467
Transmittal
001757 Drawing No. Rev.
C1 Status
Re-S
to0+360 Description Zone 07
Location Shop Drawing Civil
Discipline Civil
Sub-Discipline Engr. Sunilby
Submitted 9-Mar-24 23-Mar-24 Closed
Status 15
Duration Aconex
Ref.
Alternative Ref. #
000109-01 Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+280 date MIP-JVC-SHD-CIV-
WF-001866 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05468 C1 Re-S Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 C Closed Today
15 Aconex
to0+360 000109-01
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+280 MIP-JVC-SHD-CIV-
WF-001866 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05469 C1 Re-S Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 C Closed 15 Aconex
to0+360 000109-01
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta 0+220 to MIP-JVC-SHD-CIV-
WF-001868 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05462-C1 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 Terminated Aconex
0+260 000116-01
JVC-WTRAN- Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta 0+220 to MIP-JVC-SHD-CIV-
WF-001868 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05463-C1 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 Terminated Aconex
001759 0+260 000116-01
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta 0+220 to MIP-JVC-SHD-CIV-
WF-001868 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05464 C1 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 Terminated Aconex
0+260 000116-01
JVC-WTRAN- As-Built CMC Layout for Zone 02 at Lift Station 01 from
WF-001877 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01005 C1 Latest Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 10-Mar-24 24-Mar-24 19-Mar-24 B Closed 9 Aconex
001768 sta. 0+980 to 1+020
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07116 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07117 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07118 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07119 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05425 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05426 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05427 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05428 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05429 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05430 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05431 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05432 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05433 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05434 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
JVC-WTRAN- Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05435 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
002013 from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05436 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05437 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05438 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05439 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05440 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05441 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05442 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05443 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05444 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05445 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05446 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05447 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05448 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05449 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Haram tunnel-Zone MIP-JVC-SHD-CIV-
WF-002127 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-05054 C4 Latest Zone 03 Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
03 sta. 1+000 and sta.1+040 000028-04
JVC-WTRAN- Shop Drawing for Excavation Cross Sections at Haram tunnel-Zone MIP-JVC-SHD-CIV-
WF-002127 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-05299 C4 Latest Zone 03 Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
002012 03 sta. 1+000 and sta.1+040 000028-04
Shop Drawing for Excavation Cross Sections at Haram tunnel-Zone MIP-JVC-SHD-CIV-
WF-002127 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-05301 C4 Latest Zone 03 Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
03 sta. 1+000 and sta.1+040 000028-04
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-002190 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05453 C2 Re-S Zone 07 Shop Drawing Civil Civil Engr. Khalid 25-Mar-24 8-Apr-24 8-Apr-24 B Closed 14 Aconex
to0+240 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-002190 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05454 C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Khalid 25-Mar-24 8-Apr-24 8-Apr-24 B Closed 14 Aconex
to0+240 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-002190 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05455 C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Khalid 25-Mar-24 8-Apr-24 8-Apr-24 B Closed 14 Aconex
to0+240 000044-02
JVC-WTRAN-
002074
Latest Status
D 0 1242
Response
ACONEX
Workflow Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 Total MIP-JVC-SHD-CIV-
Workflow Document JVC Planned WSP Status
B Overdue Overdue Submittal
WF-002190 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-07-XXX-SDW-CL-CL-054566C2 Status to0+240 Description Zone 07
Location Shop Drawing Civil
Discipline Civil
Sub-Discipline by 25-Mar-24
Engr. Khalid
Submitted 8-Apr-24 8-Apr-24 Closed
Status 14
Duration Aconex
Ref.
Alternative Ref. #
000044-02 Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 date MIP-JVC-SHD-CIV-
WF-002190 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05457 C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Khalid 25-Mar-24 8-Apr-24 8-Apr-24 B Closed Today
14 Aconex
to0+240 000044-02
JVC-WTRAN- Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-002190 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05458 C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Khalid 25-Mar-24 8-Apr-24 8-Apr-24 B Closed 14 Aconex
002074 to0+240 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-002190 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05459 C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Khalid 25-Mar-24 8-Apr-24 8-Apr-24 B Closed 14 Aconex
to0+240 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-002190 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05460 C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Khalid 25-Mar-24 8-Apr-24 8-Apr-24 B Closed 14 Aconex
to0+240 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-002190 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05461 C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Khalid 25-Mar-24 8-Apr-24 8-Apr-24 B Closed 14 Aconex
to0+240 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-002190 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05462 C1 Latest Zone 07 Shop Drawing Civil Civil Engr. Khalid 25-Mar-24 8-Apr-24 8-Apr-24 B Closed 14 Aconex
to0+240 000116-01
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-002190 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05463 C1 Latest Zone 07 Shop Drawing Civil Civil Engr. Khalid 25-Mar-24 8-Apr-24 8-Apr-24 B Closed 14 Aconex
to0+240 000116-01
Shop Drawings Shoring Layout and Co-ordinates Sheet 1 for Shoring
WF-002222 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-03001C3 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 26-Mar-24 9-Apr-24 15-Apr-24 B Closed 20 Aconex
Works at Zone 07 Airport Tunnel from sta. 0+080 to 0+150
Shop Drawings Shoring Layout and Co-ordinates Sheet 2 for Shoring
WF-002222 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-03002C3 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 26-Mar-24 9-Apr-24 15-Apr-24 B Closed 20 Aconex
Works at Zone 07 Airport Tunnel from sta. 0+080 to 0+150
Shop Drawings Anchoring Layout and Co-ordinates Sheet 1 for
WF-002222 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-03003C3 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Fawzy 26-Mar-24 9-Apr-24 15-Apr-24 B Closed 20 Aconex
Shoring Works at Zone 07 Airport Tunnel from sta. 0+080 to 0+150
JVC-WTRAN- Shop Drawings Anchoring Layout and Co-ordinates Sheet 2 for
WF-002222 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-03004C3 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 26-Mar-24 9-Apr-24 15-Apr-24 B Closed 20 Aconex
002105 Shoring Works at Zone 07 Airport Tunnel from sta. 0+080 to 0+150
Shop Drawings Elelvation for Shoring Works at Zone 07 Airport
WF-002222 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-03005C3 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 26-Mar-24 9-Apr-24 15-Apr-24 B Closed 20 Aconex
Tunnel from sta. 0+080 to 0+150
Shop Drawings Cross Sections Sheet 1 for Shoring Works at Zone 07
WF-002222 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-03006C3 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 26-Mar-24 9-Apr-24 15-Apr-24 B Closed 20 Aconex
Airport Tunnel from sta. 0+080 to 0+150
Shop Drawings Cross Sections Sheet 2 for Shoring Works at Zone 07
WF-002222 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-03007C3 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 26-Mar-24 9-Apr-24 15-Apr-24 B Closed 20 Aconex
Airport Tunnel from sta. 0+080 to 0+150
Shop Drawings Shoring Layout for Shoring Works at Zone 09 Tunnel
WF-002255 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-04001C0 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 27-Mar-24 10-Apr-24 30-Mar-24 B Closed 3 Aconex
01 from sta. 0+130 to 0+300
Shop Drawings Shoring Layout for Shoring Works at Zone 09 Tunnel
WF-002255 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-04002C0 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 27-Mar-24 10-Apr-24 30-Mar-24 B Closed 3 Aconex
01 from sta. 0+130 to 0+300 Partial Sheet 1
JVC-WTRAN- Shop Drawings Shoring Layout for Shoring Works at Zone 09 Tunnel
WF-002255 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-04003C0 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 27-Mar-24 10-Apr-24 30-Mar-24 B Closed 3 Aconex
002137 01 from sta. 0+130 to 0+300 Partial Sheet 2
Shop Drawings Shoring Layout for Shoring Works at Zone 09 Tunnel
WF-002255 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-04004C0 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 27-Mar-24 10-Apr-24 30-Mar-24 B Closed 3 Aconex
01 from sta. 0+130 to 0+300 Partial Sheet 3
Shop Drawings Shoring Layout for Shoring Works at Zone 09 Tunnel
WF-002255 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-04005C0 Latest 01 from sta. 0+130 to 0+300 Steel Reinforcement, Coordinates and Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 27-Mar-24 10-Apr-24 30-Mar-24 B Closed 3 Aconex
Anchor Details
Shop Drawing for Excavation Cross section Zone-01 at Sta: 0+240
WF-002237 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05056 C1 Re-S Zone 01 Shop Drawing Civil Civil Engr. Khalid 27-Mar-24 10-Apr-24 8-Apr-24 B Closed 12 Aconex
to 0+260
JVC-WTRAN- Shop Drawing for Excavation Cross section Zone-01 at Sta: 0+240
WF-002237 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05358 C1 Re-S Zone 01 Shop Drawing Civil Civil Engr. Khalid 27-Mar-24 10-Apr-24 8-Apr-24 B Closed 12 Aconex
002119 to 0+260
Shop Drawing for Excavation Cross section Zone-01 at Sta: 0+240
WF-002237 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05359 C1 Re-S Zone 01 Shop Drawing Civil Civil Engr. Khalid 27-Mar-24 10-Apr-24 8-Apr-24 B Closed 12 Aconex
to 0+260
JVC-WTRAN-
WF-002269 R02Z00-C021-JVC-03-XXX-SDW-TR-TR-06169 C0 Re-S Shop drawing Plan and Profile For Road Haram Ra-01 Zone 03 Shop Drawing
Transportation &Transportation
Road & RoadEngr. Khalid 28-Mar-24 11-Apr-24 8-Apr-24 C Open 300 Aconex
002150
JVC-WTRAN-
WF-002278 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01013 C0 Latest As-Built CMC Layout for Zone 02 from sta 0+500.000 to 0+550.033 Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 28-Mar-24 11-Apr-24 8-Apr-24 A Closed 11 Aconex
002158
JVC-WTRAN- Terminated by
WF-002306 R02Z00-C021-JVC-03-XXX-SDW-TR-TR-06170-C0 Latest Shop drawing Plan and Profile for Road Haram Ra-2 Zone 03 Shop Drawing
Transportation &Transportation
Road & RoadEngr. Khalid 30-Mar-24 13-Apr-24 6-Apr-24 Terminated Aconex
002185 Engr Khalid
JVC-WTRAN- As-built CMC Layout for Zone 02 Int. 01 from sta. 0+932.746 to
WF-002414 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01034 C0 Latest Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 2-Apr-24 16-Apr-24 8-Apr-24 B Closed 6 Aconex
002281 0+972.746 (Area 05 and 06)
As-Built CMC Layout for Zone 02 from sta 0+550.033 to 0+570.033
WF-002445 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01014 C0 Latest Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 3-Apr-24 17-Apr-24 15-Apr-24 B Closed 12 Aconex
and 0+590.033 to 0+610.033
WF-002445 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01015 C0 Latest As-Built CMC Layout for Zone 02 from sta 0+610.033 to 0+670.033 Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 3-Apr-24 17-Apr-24 15-Apr-24 B Closed 12 Aconex
WF-002445 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01016 C0 Latest As-Built CMC Layout for Zone 02 from sta 0+670.033 to 0+730.033 Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 3-Apr-24 17-Apr-24 15-Apr-24 B Closed 12 Aconex
JVC-WTRAN-
002310 As-Built CMC Layout for Zone 02 from sta 0+730.033 to 0+790.033
WF-002445 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01017 C0 Latest Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 3-Apr-24 17-Apr-24 15-Apr-24 B Closed 12 Aconex
incl. ES 03
As-Built CMC Layout for Zone 02 from sta 0+790.000 to 0+850.033
WF-002445 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01019 C0 Latest Zone 02 As Built Geotechnical Geotechnical Engr. Khalid 3-Apr-24 17-Apr-24 15-Apr-24 B Closed 12 Aconex
incl. ES 04
WF-002445 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01018 C0 Latest As-Built CMC Layout for Zone 02 from sta 0+850.000 to 0+910.033 Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 3-Apr-24 17-Apr-24 15-Apr-24 B Closed 12 Aconex
JVC-WTRAN- MIP-JVC-SHD-CIV-
WF-002562 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-05275 C3 Latest Shop Drawing for Excavation cross section at Zone 04 Sta 1+360 Zone 04 Shop Drawing Civil Civil Engr. Khalid 14-Apr-24 28-Apr-24 30-Apr-24 B Closed 16 Aconex
002416 000038-03
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections MIP-JVC-SHD-CIV-
WF-002574 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05361 C2 Re-S Zone 01 Shop Drawing Civil Civil Engr. Khalid 14-Apr-24 28-Apr-24 30-Apr-24 C Closed 16 Aconex
from sta.0+300 to sta.0+340 at Zone 01 000031-02
JVC-WTRAN- Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections MIP-JVC-SHD-CIV-
WF-002574 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05362 C2 Re-S Zone 01 Shop Drawing Civil Civil Engr. Khalid 14-Apr-24 28-Apr-24 30-Apr-24 C Closed 16 Aconex
002428 from sta.0+300 to sta.0+340 at Zone 01 000031-02
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections MIP-JVC-SHD-CIV-
WF-002574 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05363 C2 Re-S Zone 01 Shop Drawing Civil Civil Engr. Khalid 14-Apr-24 28-Apr-24 30-Apr-24 C Closed 16 Aconex
from sta.0+300 to sta.0+340 at Zone 01 000031-02
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00131-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00132-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00133-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00134-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00135-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
Latest Status
D 0 1242
Response
ACONEX
Workflow UT-Utilities & UT-Utilities & Total
Workflow Document JVC Planned WSP Status Terminated Overdue Overdue Submittal
WF-002581 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00136-C0 Status Combined Utility Plan for Roads 12 & 13 - D09
Description D09
Location Shop Drawing Discipline
Infrastructure Sub-Discipline Engr. Fawzy 14-Apr-24
Infrastructure Submitted by Submitted
28-Apr-24 Status Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Reply Response Code from WSP from JVC
No. as of
UT-Utilities & UT-Utilities & date
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00137-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Today Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00138-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00139-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00140-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00141-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00142-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00143-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00144-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00145-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00146-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00147-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00148-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00149-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00150-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00151-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00152-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00153-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
JVC-WTRAN- UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00154-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
002435 Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00155-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00156-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00157-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00158-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00159-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00160-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00161-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00162-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00163-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00164-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00165-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00166-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00167-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00168-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00169-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00170-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00171-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00172-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00173-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00174-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00175-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00176-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00177-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
Latest Status
D 0 1242
Response
ACONEX
Workflow
JVC-WTRAN- Total
Workflow Document JVC Planned WSP Status
B Overdue Overdue Submittal
WF-002598 R02Z00-C021-JVC-03-XXX-SDW-TR-TR-06169
Transmittal
002452 Drawing No. Rev. Status Shop drawing Plan and Profile
C1 Latest For Road Haram Ra-01
Description Zone 03
Location Shop DrawingTransportation
Discipline&Transportation
Road & Road
Sub-Discipline by 15-Apr-24 29-Apr-24 17-Apr-24
Engr. Khalid
Submitted Closed
Status 2
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
JVC-WTRAN- As-built CMC layout for zone 08 from sta 0+412.99 to 0+452.99 date
WF-002626 R02Z00-C021-JVC-08-XXX-ABD-GT-GT-01001 C0 Latest Zone 08 As Built Geotechnical Geotechnical Engr. Yaseen 16-Apr-24 30-Apr-24 22-Apr-24 B Closed Today
6 Aconex
002480 (Seg. KAR-20 & 21)
Shop Drawing for Shoring Works Layout and Elevation at Zone 01 for
WF-002664 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-04001C0 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 17-Apr-24 1-May-24 25-Apr-24 B Closed 8 Aconex
JVC-WTRAN- AIP Dry Culvert from sta.0+300 to 0+340
002518 Shop Drawing for Shoring Works Cross Section and Reinforcement
WF-002664 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-04002C0 Re-S Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 17-Apr-24 1-May-24 25-Apr-24 B Closed 8 Aconex
Details at Zone 01 for AIP Dry Culvert from sta.0+300 to 0+340
JVC-WTRAN-
WF-002675 R02Z00-C021-JVC-03-XXX-SDW-TR-TR-06170 C0 Latest Shop drawing Plan and Profile for Road Haram Ra-2 Zone 03 Shop Drawing
Transportation &Transportation
Road & RoadEngr. Khalid 18-Apr-24 2-May-24 22-Apr-24 B Closed 4 Aconex
002529
JVC-WTRAN- As-Built CMC Layout for Zone 08 from Sta 0+392.99 To 0+412.99
WF-002790 R02Z00-C021-JVC-08-XXX-ABD-GT-GT-01002 C0 Latest Zone 08 As Built Geotechnical Geotechnical Engr. Yaseen 22-Apr-24 6-May-24 30-Apr-24 B Closed 8 Aconex
002642 (Seg. KAR-Z08-19)
JVC-WTRAN- As-Built CMC Layout for Zone 08 from Sta 0+452.99 to 0+492.99
WF-002798 R02Z00-C021-JVC-08-XXX-ABD-GT-GT-01003 C0 Latest Zone 08 As Built Geotechnical Geotechnical Engr. Yaseen 22-Apr-24 6-May-24 30-Apr-24 B Closed 8 Aconex
002650 (Seg. KAR-Z08-22 & 23)
JVC-WTRAN- As-Built CMC Layout for Zone 08 from Sta 0+492.99 to 0+512.99
WF-002830 R02Z00-C021-JVC-08-XXX-ABD-GT-GT-01004 C0 Latest Zone 08 As Built Geotechnical Geotechnical Engr. Yaseen 24-Apr-24 8-May-24 30-Apr-24 B Closed 6 Aconex
002679 (seg. KAR-Z08-24) [partially]
JVC-WTRAN-
WF-002802 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05138 C0 Re-S Shop drawing for Excavation Cross Section at Zone 06A St 2+550.43 Zone 06a Shop Drawing Civil Civil Engr. Khalid 24-Apr-24 8-May-24 9-May-24 C Closed 15 Aconex
002654
JVC-WTRAN- As-Built CMC Layout for Zone 05 from Sta. 1+773.979 to 1+833.979
WF-002832 R02Z00-C021-JVC-05-XXX-ABD-GT-GT-01001 C3 Latest Zone 05 As Built Geotechnical Geotechnical Engr. Yaseen 24-Apr-24 8-May-24 30-Apr-24 B Closed 6 Aconex
002681 (Seg. 02, 03 & 04)
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00208C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00209C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00210C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00211C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00212C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00213C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00214C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00215C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00216C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00131C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00132C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00133C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00134C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00135C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00136C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00137C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00138C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00139C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00140C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00141C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00142C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00143C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00144C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00145C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00146C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00147C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00148C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00149C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00150C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00151C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00152C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00153C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
Latest Status
D 0 1242
Response
ACONEX
Workflow UT-Utilities & UT-Utilities & Total
Workflow Document JVC Planned 6-May-24
WSP Status
C Overdue Overdue Submittal
WF-002864 Transmittal Drawing No. Rev. Status
R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00154C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09
Description D09
Location Shop Drawing Discipline
Infrastructure Sub-Discipline Engr. Fawzy 27-Apr-24
Infrastructure Submitted by Submitted
11-May-24 Closed
Status 9
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Reply Response Code from WSP from JVC
No. as of
UT-Utilities & UT-Utilities & date
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00155C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed Today
9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00156C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00157C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00158C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00159C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00160C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00161C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00162C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00163C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00164C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
JVC-WTRAN- Infrastructure Infrastructure
002708 UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00165C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00166C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00167C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00168C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00169C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00170C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00171C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00172C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00173C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00174C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00175C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00176C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00177C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00178C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00179C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00180C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00181C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00182C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00183C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00184C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00185C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00186C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00187C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00188C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00189C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00190C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00191C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00192C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00193C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00194C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00195C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
Latest Status
D 0 1242
Response
ACONEX
Workflow UT-Utilities & UT-Utilities & Total
Workflow Document JVC Planned 6-May-24
WSP Status
C Overdue Overdue Submittal
WF-002864 Transmittal Drawing No. Rev. Status
R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00196C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09
Description D09
Location Shop Drawing Discipline
Infrastructure Sub-Discipline Engr. Fawzy 27-Apr-24
Infrastructure Submitted by Submitted
11-May-24 Closed
Status 9
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Reply Response Code from WSP from JVC
No. as of
UT-Utilities & UT-Utilities & date
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00197C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed Today
9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00198C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00199C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00200C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00201C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00202C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00203C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00204C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00205C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00206C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00207C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
WF-002887 R02Z00-C021-JVC-00-XXX-SDW-ST-FO-00001 C0 Re-S Foundation Details for Street Light Poles RAM-MIP Shop Drawing Structural Foundation Engr. Shaheen 28-Apr-24 12-May-24 14-May-24 C Closed 16 Aconex
JVC-WTRAN-
002731
WF-002887 R02Z00-C021-JVC-00-XXX-SDW-ST-FO-00002 C0 Re-S Foundation Details for Street Light Poles RAM-MIP Shop Drawing Structural Foundation Engr. Shaheen 28-Apr-24 12-May-24 14-May-24 C Closed 16 Aconex
Shop Drawing for Excavation cross section for long section at tunnel
WF-002923 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07120 C0 Latest Tunnel 01 Shop Drawing Civil Civil Engr. Khalid 29-Apr-24 13-May-24 4-May-24 C Open 268 Aconex
JVC-WTRAN- 01 sta.0+301.03
002766 Shop Drawing for Excavation cross section for long section at tunnel
WF-002923 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07121 C0 Latest Tunnel 01 Shop Drawing Civil Civil Engr. Khalid 29-Apr-24 13-May-24 4-May-24 C Open 268 Aconex
01 sta.0+301.03
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections
WF-002948 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05361 C3 Re-S Zone 01 Shop Drawing Civil Civil Engr. Khalid 30-Apr-24 14-May-24 14-May-24 B Closed 14 Aconex
from sta.0+300 to sta.0+340 at Zone 01
JVC-WTRAN- Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections
WF-002948 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05362 C3 Re-S Zone 01 Shop Drawing Civil Civil Engr. Khalid 30-Apr-24 14-May-24 14-May-24 B Closed 14 Aconex
002791 from sta.0+300 to sta.0+340 at Zone 01
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections
WF-002948 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05363 C3 Re-S Zone 01 Shop Drawing Civil Civil Engr. Khalid 30-Apr-24 14-May-24 14-May-24 B Closed 14 Aconex
from sta.0+300 to sta.0+340 at Zone 01
Shop Drawing for Excavation cross section for long section at tunnel
WF-002991 R02Z00-C021-JVC-11-XXX-SDW-CL-CL-07159 C0 Latest Tunnel 03 Shop Drawing Civil Civil Engr. Khalid 2-May-24 16-May-24 4-May-24 B Closed 2 Aconex
JVC-WTRAN- 03 sta.0+434.07
002831 Shop Drawing for Excavation cross section for long section at tunnel
WF-002991 R02Z00-C021-JVC-11-XXX-SDW-CL-CL-07160 C0 Latest Tunnel 03 Shop Drawing Civil Civil Engr. Khalid 2-May-24 16-May-24 4-May-24 B Closed 2 Aconex
03 sta.0+434.07
JVC-WTRAN-
WF-003003 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05465 C2 Re-S Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+280 Zone 07 Shop Drawing Civil Civil Engr. Khalid 2-May-24 16-May-24 4-May-24 C Closed 2 Aconex
002842
Shop Drawings Shoring Layout for Shoring Works at Zone 09 Tunnel
WF-003030 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-04001C1 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-May-24 18-May-24 2-Jun-24 C Open 263 Aconex
01 from sta. 0+130 to 0+300
Shop Drawings Shoring Layout for Shoring Works at Zone 09 Tunnel
WF-003030 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-04002C1 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-May-24 18-May-24 2-Jun-24 C Open 263 Aconex
01 from sta. 0+130 to 0+300 Partial Sheet 1
Shop Drawings Shoring Layout for Shoring Works at Zone 09 Tunnel
WF-003030 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-04003C1 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-May-24 18-May-24 2-Jun-24 C Open 263 Aconex
JVC-WTRAN- 01 from sta. 0+130 to 0+300 Partial Sheet 2
002869 Shop Drawings Shoring Layout for Shoring Works at Zone 09 Tunnel
WF-003030 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-04004C1 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-May-24 18-May-24 2-Jun-24 C Open 263 Aconex
01 from sta. 0+130 to 0+300 Partial Sheet 3
Shop Drawings Shoring Layout for Shoring Works at Zone 09 Tunnel
WF-003030 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-04005C1 Latest 01 from sta. 0+130 to 0+300 Steel Reinforcement, Coordinates and Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-May-24 18-May-24 2-Jun-24 C Open 263 Aconex
Anchor Details
Shop Drawings Shoring Layout for Shoring Works at Zone 09 Tunnel
WF-003030 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-04006C0 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-May-24 18-May-24 2-Jun-24 C Open 263 Aconex
01 from sta. 0+130 to 0+300 Elevation and Anchor Layout
Shop Drawings Layout for Soil Improvement Works in Zone 10 from
WF-003058 R02Z00-C021-JVC-10-XXX-SDW-GT-GT-02001C0 Re-S Zone 10 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 5-May-24 19-May-24 21-May-24 C Closed 16 Aconex
sta. 0+342 to 0+402 incl. VTR 11
JVC-WTRAN- Shop Drawings Cross Section for Soil Improvement Works in Zone 10
WF-003058 R02Z00-C021-JVC-10-XXX-SDW-GT-GT-02002C0 Re-S Zone 10 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 5-May-24 19-May-24 21-May-24 C Closed 16 Aconex
002897 from sta. 0+342 to 0+402 incl. VTR 11
Shop Drawings Coordinates for Soil Improvement Works in Zone 10
WF-003058 R02Z00-C021-JVC-10-XXX-SDW-GT-GT-02003C0 Re-S Zone 10 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 5-May-24 19-May-24 21-May-24 C Closed 16 Aconex
from sta. 0+342 to 0+402 incl. VTR 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003133 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11200- C0 Latest Tunnel 03 As Built Civil Civil Engr. Khalid 7-May-24 21-May-24 Terminated Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003133 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11201- C0 Latest Tunnel 03 As Built Civil Civil Engr. Khalid 7-May-24 21-May-24 Terminated Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003133 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11202- C0 Latest Tunnel 03 As Built Civil Civil Engr. Khalid 7-May-24 21-May-24 Terminated Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003133 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11203- C0 Latest Tunnel 03 As Built Civil Civil Engr. Khalid 7-May-24 21-May-24 Terminated Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003133 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11204- C0 Latest Tunnel 03 As Built Civil Civil Engr. Khalid 7-May-24 21-May-24 Terminated Aconex
JVC-WTRAN- Tunnel 03-Zone 11
002869 As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003133 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11205- C0 Latest Tunnel 03 As Built Civil Civil Engr. Khalid 7-May-24 21-May-24 Terminated Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003133 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11206- C0 Latest Tunnel 03 As Built Civil Civil Engr. Khalid 7-May-24 21-May-24 Terminated Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003133 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11207- C0 Latest Tunnel 03 As Built Civil Civil Engr. Khalid 7-May-24 21-May-24 Terminated Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003133 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11208- C0 Latest Tunnel 03 As Built Civil Civil Engr. Khalid 7-May-24 21-May-24 Terminated Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003133 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11209- C0 Latest Tunnel 03 As Built Civil Civil Engr. Khalid 7-May-24 21-May-24 Terminated Aconex
Tunnel 03-Zone 11
JVC-WTRAN-
WF-003160 R02Z00-C021-JVC-08-XXX-ABD-GT-GT-01005 C0 Latest As-Built CMC layout for zone 08 from STA. 0+512.99 to 0+552.9 Zone 08 As Built Geotechnical Geotechnical Engr. Yaseen 8-May-24 22-May-24 4-May-24 B Closed -4 Aconex
002999
Latest Status
D 0 1242
Response
ACONEX
Workflow
JVC-WTRAN- Total
Workflow Document JVC Planned 16-May-24
WSP Status
C Overdue Overdue Submittal
WF-003161 R02Z00-C021-JVC-00-XXX-SDW-ST-FO-00003
Transmittal
003000 Drawing No. Rev.
C0 Status
Re-S Shop Drawing for MV Manholes
Description RAM-MIP
Location Shop Drawing Structural
Discipline Foundation
Sub-Discipline Engr. by 9-May-24
Shaheen
Submitted 23-May-24 Closed
Status 7
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities & date
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00109C2 Re-S Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed Today
11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00110C2 Latest Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00111C2 Latest Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00112C2 Latest Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00113C2 Latest Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00114C2 Latest Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00115C2 Latest Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00116C2 Latest Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00117C2 Re-S Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00118C2 Re-S Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00119C2 Re-S Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
JVC-WTRAN- EI-00046 Infrastructure Infrastructure
003008 Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00120C2 Re-S Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00121C2 Re-S Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00122C2 Re-S Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00123C2 Re-S Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00124C2 Re-S Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00125C2 Re-S Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00126C2 Re-S Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00127C2 Re-S Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00128C2 Re-S Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00129C2 Re-S Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00130C2 Re-S Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01203C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01204C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01205C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01206C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01207C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01208C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01209C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01210C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01211C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01218C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01219C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01220C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01221C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01222C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01223C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01224C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01225C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01226C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01227C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
JVC-WTRAN-
003063
Latest Status
D 0 1242
Response
ACONEX
Workflow Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage Total
Workflow Document JVC Planned WSP Status
C Overdue Overdue Submittal
WF-003225 Transmittal Drawing No. Rev. Status
R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01228C0 Re-S
08 and 09) Description RAM-MIP
Location Shop Drawing Discipline
Infrastructure Sub-Discipline
Effluent Submitted by 12-May-24 26-May-24 25-May-24
Engr. Fawzy Closed
Status 13
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage date
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01229C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed Today
13 Aconex
JVC-WTRAN- 08 and 09) Infrastructure Effluent
003063 Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01230C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01231C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01232C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01233C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01234C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01235C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01236C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01237C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01251C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01252C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01253C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01256C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01257C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01258C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01259C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01260C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01261C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01262C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01263C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01265C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01266C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Shop Drawing for Shoring Works Layout and Elevation at Zone 01 for
WF-003227 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-04001C1 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 12-May-24 26-May-24 28-May-24 B Closed 16 Aconex
JVC-WTRAN- AIP Dry Culvert from sta.0+300 to 0+340
003065 Shop Drawing for Shoring Works Cross Section and Reinforcement
WF-003227 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-04002C1 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 12-May-24 26-May-24 28-May-24 B Closed 16 Aconex
Details at Zone 01 for AIP Dry Culvert from sta.0+300 to 0+340
JVC-WTRAN- As-Built CMC Layout for Zone 06 Dry Utility Culvert from sta.
WF-003243 R02Z00-C021-JVC-06-XXX-ABD-GT-GT-02001 C0 Latest Zone 06 As Built Geotechnical Geotechnical Engr. Yaseen 12-May-24 26-May-24 21-May-24 B Closed 9 Aconex
003081 2+594 to 2+664
Shop drawings for Soil Improvement for Zone 4 Including PS 03 VTR
JVC-WTRAN-
WF-003257 R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01015C5 Re-S 06 and ES 13, 14, 17 & 18 from sta. 1+260 to sta. 1+773 - Co- Zone 04 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 13-May-24 27-May-24 21-May-24 B Closed 8 Aconex
003095
ordinate Sheet 10
WF-003327 R02Z00-C021-JVC-04-XXX-ABD-GT-GT-01001 C0 Latest As-Built CMC Layout for Zone 02 from sta 1+260 to 1+313.979 Zone 04 As Built Geotechnical Geotechnical Engr. Yaseen 14-May-24 28-May-24 28-May-24 A Closed 14 Aconex
WF-003327 R02Z00-C021-JVC-04-XXX-ABD-GT-GT-01003 C0 Latest As-Built CMC Layout for Zone 02 from sta 1+373.979 to 1+433.979 Zone 04 As Built Geotechnical Geotechnical Engr. Yaseen 14-May-24 28-May-24 28-May-24 C Open 253 Aconex
WF-003327 R02Z00-C021-JVC-04-XXX-ABD-GT-GT-01004 C0 Latest As-Built CMC Layout for Zone 02 from sta 1+433.979 to 1+493.979 Zone 04 As Built Geotechnical Geotechnical Engr. Yaseen 14-May-24 28-May-24 28-May-24 A Closed 14 Aconex
JVC-WTRAN-
WF-003327 R02Z00-C021-JVC-04-XXX-ABD-GT-GT-01005 C0 Latest As-Built CMC Layout for Zone 02 from sta 1+493.979 to 1+553.979 Zone 04 As Built Geotechnical Geotechnical Engr. Yaseen 14-May-24 28-May-24 28-May-24 A Closed 14 Aconex
003163
WF-003327 R02Z00-C021-JVC-04-XXX-ABD-GT-GT-01006 C0 Latest As-Built CMC Layout for Zone 02 from sta 1+553.979 to 1+613.979 Zone 04 As Built Geotechnical Geotechnical Engr. Yaseen 14-May-24 28-May-24 28-May-24 A Closed 14 Aconex
WF-003327 R02Z00-C021-JVC-04-XXX-ABD-GT-GT-01008 C0 Latest As-Built CMC Layout for Zone 02 from sta 1+673.979 to 1+733.979 Zone 04 As Built Geotechnical Geotechnical Engr. Yaseen 14-May-24 28-May-24 28-May-24 A Closed 14 Aconex
WF-003327 R02Z00-C021-JVC-04-XXX-ABD-GT-GT-01009 C0 Latest As-Built CMC Layout for Zone 02 from sta 1+733.979 to 1+773.979 Zone 04 As Built Geotechnical Geotechnical Engr. Yaseen 14-May-24 28-May-24 28-May-24 A Closed 14 Aconex
As-Built CMC Layout for Zone 03 from sta 1+020 to 1+073.979 incl.
WF-003335 R02Z00-C021-JVC-03-XXX-ABD-GT-GT-01001 C0 Latest Zone 03 As Built Geotechnical Geotechnical Engr. Yaseen 15-May-24 29-May-24 28-May-24 A Closed 13 Aconex
ES 10
WF-003335 R02Z00-C021-JVC-03-XXX-ABD-GT-GT-01002 C0 Latest As-Built CMC Layout for Zone 03 from sta 1+073.979 to 1+133.979 Zone 03 As Built Geotechnical Geotechnical Engr. Yaseen 15-May-24 29-May-24 28-May-24 A Closed 13 Aconex
JVC-WTRAN-
003171
WF-003335 R02Z00-C021-JVC-03-XXX-ABD-GT-GT-01003 C0 Latest As-Built CMC Layout for Zone 03 from sta 1+133.979 to 1+193.979 Zone 03 As Built Geotechnical Geotechnical Engr. Yaseen 15-May-24 29-May-24 28-May-24 A Closed 13 Aconex
WF-003335 R02Z00-C021-JVC-03-XXX-ABD-GT-GT-01004 C0 Latest As-Built CMC Layout for Zone 03 from sta 1+193.979 to 1+260 Zone 03 As Built Geotechnical Geotechnical Engr. Yaseen 15-May-24 29-May-24 28-May-24 A Closed 13 Aconex
D 0 1242
Response
ACONEX
Workflow
JVC-WTRAN- Shop Drawings Sections, Reinforcements and Details for Shoring Total
Workflow Document JVC Planned WSP Status
B Overdue Overdue Submittal
WF-003364 Transmittal
003198 Drawing No. Rev. Status
R02Z00-C021-JVC-01-XXX-SDW-GT-GT-04004C0 Re-S
Works at Zone 01 LS06 fromDescription
sta. 0+470 to 0+500 Sheet 1
Zone 01
Location Shop Drawing Geotechnical
Discipline Geotechnical Submitted
Sub-Discipline by 15-May-24 29-May-24 30-May-24
Engr. Yaseen Closed
Status 15
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type SubmittedReply Response Code from WSP from JVC
No. as of
Shop Drawings Sections, Reinforcements and Details for Shoring date
WF-003364 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-04005C0 Re-S Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 15-May-24 29-May-24 30-May-24 B Closed Today
15 Aconex
Works at Zone 01 LS06 from sta. 0+470 to 0+500 Sheet 2
Shop Drawing for Excavation Cross section Zone 01 (vehicular Room As per Engr.
WF-003422 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05056-C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Khalid 18-May-24 1-Jun-24 3-Jun-24 Terminated Aconex
-01) from St 0+407.06 to 0+500 Nahell
Shop Drawing for Excavation Cross section Zone 01 (vehicular Room As per Engr.
WF-003422 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05367-C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Khalid 18-May-24 1-Jun-24 3-Jun-24 Terminated Aconex
-01) from St 0+407.06 to 0+500 Nahell
Shop Drawing for Excavation Cross section Zone 01 (vehicular Room As per Engr.
WF-003422 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05368-C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Khalid 18-May-24 1-Jun-24 3-Jun-24 Terminated Aconex
-01) from St 0+407.06 to 0+500 Nahell
JVC-WTRAN- Shop Drawing for Excavation Cross section Zone 01 (vehicular Room As per Engr.
WF-003422 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05369-C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Khalid 18-May-24 1-Jun-24 3-Jun-24 Terminated Aconex
003255 -01) from St 0+407.06 to 0+500 Nahell
Shop Drawing for Excavation Cross section Zone 01 (vehicular Room As per Engr.
WF-003422 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05370-C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Khalid 18-May-24 1-Jun-24 3-Jun-24 Terminated Aconex
-01) from St 0+407.06 to 0+500 Nahell
Shop Drawing for Excavation Cross section Zone 01 (vehicular Room As per Engr.
WF-003422 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05371-C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Khalid 18-May-24 1-Jun-24 3-Jun-24 Terminated Aconex
-01) from St 0+407.06 to 0+500 Nahell
Shop Drawing for Excavation Cross section Zone 01 (vehicular Room As per Engr.
WF-003422 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05372-C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Khalid 18-May-24 1-Jun-24 3-Jun-24 Terminated Aconex
-01) from St 0+407.06 to 0+500 Nahell
WF-003492 R02Z00-C021-JVC-00-XXX-SDW-ST-FO-00001 C1 Re-S Foundation Details for Street Light Poles RAM-MIP Shop Drawing Structural Foundation Engr. Shaheen 21-May-24 4-Jun-24 1-Jun-24 B Closed 11 Aconex
JVC-WTRAN-
003324
WF-003492 R02Z00-C021-JVC-00-XXX-SDW-ST-FO-00002 C1 re-s Foundation Details for Street Light Poles RAM-MIP Shop Drawing Structural Foundation Engr. Shaheen 21-May-24 4-Jun-24 1-Jun-24 B Closed 11 Aconex
JVC-WTRAN-
WF-003494 R02Z00-C021-JVC-00-XXX-SDW-ST-FO-00003 C1 Latest Structural Details of MV Manholes RAM-MIP Shop Drawing Structural Foundation Engr. Shaheen 21-May-24 4-Jun-24 1-Jun-24 B Closed 11 Aconex
003326
WF-003506 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05000C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 09 D9 Shop Drawing Electrical Medium Voltage Engr. Sherif 21-May-24 4-Jun-24 2-Jun-24 C Open 246 Aconex
WF-003506 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05001C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 09 D9 Shop Drawing Electrical Medium Voltage Engr. Sherif 21-May-24 4-Jun-24 2-Jun-24 C Open 246 Aconex
WF-003506 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05002C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 09 D9 Shop Drawing Electrical Medium Voltage Engr. Sherif 21-May-24 4-Jun-24 2-Jun-24 C Open 246 Aconex
JVC-WTRAN-
WF-003506 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05003C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 09 D9 Shop Drawing Electrical Medium Voltage Engr. Sherif 21-May-24 4-Jun-24 2-Jun-24 C Open 246 Aconex
003338
WF-003506 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05004C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 09 D9 Shop Drawing Electrical Medium Voltage Engr. Sherif 21-May-24 4-Jun-24 2-Jun-24 C Open 246 Aconex
WF-003506 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05005C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 09 D9 Shop Drawing Electrical Medium Voltage Engr. Sherif 21-May-24 4-Jun-24 2-Jun-24 C Open 246 Aconex
WF-003506 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05006C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 09 D9 Shop Drawing Electrical Medium Voltage Engr. Sherif 21-May-24 4-Jun-24 2-Jun-24 C Open 246 Aconex
WF-003649 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05007C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 10 D10 Shop Drawing Electrical Medium Voltage Engr. Sherif 26-May-24 9-Jun-24 10-Jun-24 C Open 241 Aconex
WF-003649 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05008C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 10 D10 Shop Drawing Electrical Medium Voltage Engr. Sherif 26-May-24 9-Jun-24 10-Jun-24 C Open 241 Aconex
WF-003649 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05009C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 10 D10 Shop Drawing Electrical Medium Voltage Engr. Sherif 26-May-24 9-Jun-24 10-Jun-24 C Open 241 Aconex
WF-003649 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05010C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 10 D10 Shop Drawing Electrical Medium Voltage Engr. Sherif 26-May-24 9-Jun-24 10-Jun-24 C Open 241 Aconex
WF-003649 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05011C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 10 D10 Shop Drawing Electrical Medium Voltage Engr. Sherif 26-May-24 9-Jun-24 10-Jun-24 C Open 241 Aconex
WF-003649 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05012C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 10 D10 Shop Drawing Electrical Medium Voltage Engr. Sherif 26-May-24 9-Jun-24 10-Jun-24 C Open 241 Aconex
JVC-WTRAN-
003476
WF-003649 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05013C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 10 D10 Shop Drawing Electrical Medium Voltage Engr. Sherif 26-May-24 9-Jun-24 10-Jun-24 C Open 241 Aconex
WF-003649 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05014C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 10 D10 Shop Drawing Electrical Medium Voltage Engr. Sherif 26-May-24 9-Jun-24 10-Jun-24 C Open 241 Aconex
WF-003649 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05015C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 10 D10 Shop Drawing Electrical Medium Voltage Engr. Sherif 26-May-24 9-Jun-24 10-Jun-24 C Open 241 Aconex
WF-003649 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05016C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 10 D10 Shop Drawing Electrical Medium Voltage Engr. Sherif 26-May-24 9-Jun-24 10-Jun-24 C Open 241 Aconex
WF-003649 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05017C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 10 D10 Shop Drawing Electrical Medium Voltage Engr. Sherif 26-May-24 9-Jun-24 10-Jun-24 C Open 241 Aconex
WF-003649 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05018C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 10 D10 Shop Drawing Electrical Medium Voltage Engr. Sherif 26-May-24 9-Jun-24 10-Jun-24 C Open 241 Aconex
JVC-WTRAN-
WF-003671 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05465 C3 Re-S Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+280 Zone 07 Shop Drawing Civil Civil Engr. Khalid 27-May-24 10-Jun-24 10-Jun-24 C Closed 14 Aconex
003496
JVC-WTRAN-
WF-003677 R02Z00-C021-JVC-00-XXX-SDW-ST-FO-00004 C0 Latest ELV Manhole Structural Details RAM-MIP Shop Drawing Structural Foundation Engr. Shaheen 27-May-24 10-Jun-24 12-Jun-24 B Closed 16 Aconex
003501
Shop Drawing for Potable Water Network Plan and Profile for part 07 UT-Utilities &
WF-003689 R02Z00-C021-JVC-XX-XXX-SDW-UT-PW-01607C0 Latest D09 Shop Drawing Potable Water Engr. Elsayed 28-May-24 11-Jun-24 12-Jun-24 C Open 239 Aconex
(D-09 area) Infrastructure
Shop Drawing for Potable Water Network Plan and Profile for part 07 UT-Utilities &
WF-003689 R02Z00-C021-JVC-XX-XXX-SDW-UT-PW-01610C0 Latest D09 Shop Drawing Potable Water Engr. Elsayed 28-May-24 11-Jun-24 12-Jun-24 C Open 239 Aconex
(D-09 area) Infrastructure
Shop Drawing for Potable Water Network Plan and Profile for part 07 UT-Utilities &
WF-003689 R02Z00-C021-JVC-XX-XXX-SDW-UT-PW-01611C0 Latest D09 Shop Drawing Potable Water Engr. Elsayed 28-May-24 11-Jun-24 12-Jun-24 C Open 239 Aconex
(D-09 area) Infrastructure
JVC-WTRAN- Shop Drawing for Potable Water Network Plan and Profile for part 07 UT-Utilities &
WF-003689 R02Z00-C021-JVC-XX-XXX-SDW-UT-PW-01612C0 Latest D09 Shop Drawing Potable Water Engr. Elsayed 28-May-24 11-Jun-24 12-Jun-24 C Open 239 Aconex
003513 (D-09 area) Infrastructure
Shop Drawing for Potable Water Network Plan and Profile for part 07 UT-Utilities &
WF-003689 R02Z00-C021-JVC-XX-XXX-SDW-UT-PW-01613C0 Latest D09 Shop Drawing Potable Water Engr. Elsayed 28-May-24 11-Jun-24 12-Jun-24 C Open 239 Aconex
(D-09 area) Infrastructure
Shop Drawing for Potable Water Network Plan and Profile for part 07 UT-Utilities &
WF-003689 R02Z00-C021-JVC-XX-XXX-SDW-UT-PW-01614C0 Latest D09 Shop Drawing Potable Water Engr. Elsayed 28-May-24 11-Jun-24 12-Jun-24 C Open 239 Aconex
(D-09 area) Infrastructure
Shop Drawing for Potable Water Network Plan and Profile for part 07 UT-Utilities &
WF-003689 R02Z00-C021-JVC-XX-XXX-SDW-UT-PW-01615C0 Latest D09 Shop Drawing Potable Water Engr. Elsayed 28-May-24 11-Jun-24 12-Jun-24 C Open 239 Aconex
(D-09 area) Infrastructure
Shop Drawing for Gray Water Distribution Network Plan and Profile UT-Utilities &
WF-003707 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03617C0 Latest D09 Shop Drawing Gray Water Engr. Elsayed 28-May-24 11-Jun-24 12-Jun-24 C Closed 15 Aconex
for part 07 (D-09 area) Infrastructure
Shop Drawing for Gray Water Distribution Network Plan and Profile UT-Utilities &
WF-003707 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03620C0 Latest D09 Shop Drawing Gray Water Engr. Elsayed 28-May-24 11-Jun-24 12-Jun-24 C Closed 15 Aconex
for part 07 (D-09 area) Infrastructure
JVC-WTRAN-
003528
Superseded
Latest Status
D 0 1242
Response
ACONEX
Workflow Shop Drawing for Gray Water Distribution Network Plan and Profile UT-Utilities & Total
Workflow Document JVC Planned WSP Status
C Overdue Overdue Submittal
WF-003707 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03621C0 Status for part 07 (D-09 area) Description D09
Location Shop Drawing Discipline
Infrastructure
Gray Water
Sub-Discipline Submitted by 28-May-24 11-Jun-24 12-Jun-24
Engr. Elsayed Closed
Status 15
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
JVC-WTRAN- Shop Drawing for Gray Water Distribution Network Plan and Profile UT-Utilities & date
WF-003707 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03622C0 Latest D09 Shop Drawing Gray Water Engr. Elsayed 28-May-24 11-Jun-24 12-Jun-24 C Closed Today
15 Aconex
003528 for part 07 (D-09 area) Infrastructure
Superseded
Shop Drawing for Gray Water Distribution Network Plan and Profile UT-Utilities &
WF-003707 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03623C0 Latest D09 Shop Drawing Gray Water Engr. Elsayed 28-May-24 11-Jun-24 12-Jun-24 C Closed 15 Aconex
for part 07 (D-09 area) Infrastructure
Shop Drawing for Gray Water Distribution Network Plan and Profile UT-Utilities &
WF-003707 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03624C1 Latest D09 Shop Drawing Gray Water Engr. Elsayed 28-May-24 11-Jun-24 12-Jun-24 C Closed 15 Aconex
for part 07 (D-09 area) Infrastructure
Shop Drawing for Gray Water Distribution Network Plan and Profile UT-Utilities &
WF-003707 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03625C1 Latest D09 Shop Drawing Gray Water Engr. Elsayed 28-May-24 11-Jun-24 12-Jun-24 C Closed 15 Aconex
for part 07 (D-09 area) Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00131C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00132C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00133C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00134C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00135C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00136C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00137C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00138C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00139C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00140C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00141C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00142C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00143C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00144C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00145C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00146C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00147C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00148C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00149C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00150C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00151C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00152C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00153C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00154C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00155C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00156C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00157C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00158C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00159C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00160C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00161C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00162C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00163C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00164C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00165C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00166C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00167C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
Latest Status
D 0 1242
Response
ACONEX
Workflow UT-Utilities & Total
Workflow Document JVC Planned WSP Status
C Overdue Overdue Submittal
WF-003719 Transmittal Drawing No. Rev. Status
R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00168C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09
Description D09
Location Shop Drawing UT-Utilities
Discipline
Infrastructure
& Infrastructure
Sub-Discipline Submitted by 29-May-24 12-Jun-24 19-Jun-24
Engr. Fawzy Closed
Status 21
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
UT-Utilities & date
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00169C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24
UT-Utilities & Infrastructure C Closed Today
21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00170C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00171C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00172C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00173C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
JVC-WTRAN- Infrastructure
003540 UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00174C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00175C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00176C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00177C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00178C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00179C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00180C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00181C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00182C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00183C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00184C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00185C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00186C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00187C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00188C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00189C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00190C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00191C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00192C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00193C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00194C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00195C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00196C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00197C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00198C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00199C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00200C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00201C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00202C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00203C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00204C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00205C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00206C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00207C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00208C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00209C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
Latest Status
D 0 1242
Response
ACONEX
Workflow UT-Utilities & Total
Workflow Document JVC Planned WSP Status
C Overdue Overdue Submittal
WF-003719 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00210C1 Status Combined Utility Plan for Roads 12 & 13 - D09
Description D09
Location Shop Drawing UT-Utilities
Discipline
Infrastructure
& Infrastructure
Sub-Discipline Submitted by 29-May-24 12-Jun-24 19-Jun-24
Engr. Fawzy Open
Status 238
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
UT-Utilities & date
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00211C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24
UT-Utilities & Infrastructure C Open Today
238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00212C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00213C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00214C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00215C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00216C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
As built Excavation Cross sections from sta. 0+060 to 0+220 at
WF-003719 R02Z00-C021-JVC-10-XXX-ABD-CL-CL-06200 C0 Latest Zone 10 As Built Civil Civil Engr. Khalid 30-May-24 13-Jun-24 19-Jun-24 C Open 237 Aconex
Tunnel 02-Zone 10
As built Excavation Cross sections from sta. 0+060 to 0+220 at
WF-003746 R02Z00-C021-JVC-10-XXX-ABD-CL-CL-06203 C0 Latest Zone 10 As Built Civil Civil Engr. Khalid 30-May-24 13-Jun-24 13-Jun-24 C Open 237 Aconex
Tunnel 02-Zone 10
As built Excavation Cross sections from sta. 0+060 to 0+220 at
WF-003746 R02Z00-C021-JVC-10-XXX-ABD-CL-CL-06204 C0 Latest Zone 10 As Built Civil Civil Engr. Khalid 30-May-24 13-Jun-24 13-Jun-24 C Open 237 Aconex
Tunnel 02-Zone 10
As built Excavation Cross sections from sta. 0+060 to 0+220 at
WF-003746 R02Z00-C021-JVC-10-XXX-ABD-CL-CL-06205 C0 Latest Zone 10 As Built Civil Civil Engr. Khalid 30-May-24 13-Jun-24 13-Jun-24 C Open 237 Aconex
Tunnel 02-Zone 10
As built Excavation Cross sections from sta. 0+060 to 0+220 at
WF-003746 R02Z00-C021-JVC-10-XXX-ABD-CL-CL-06206 C0 Latest Zone 10 As Built Civil Civil Engr. Khalid 30-May-24 13-Jun-24 13-Jun-24 C Open 237 Aconex
Tunnel 02-Zone 10
As built Excavation Cross sections from sta. 0+060 to 0+220 at
WF-003746 R02Z00-C021-JVC-10-XXX-ABD-CL-CL-06207 C0 Latest Zone 10 As Built Civil Civil Engr. Khalid 30-May-24 13-Jun-24 13-Jun-24 C Open 237 Aconex
JVC-WTRAN- Tunnel 02-Zone 10
003566 As built Excavation Cross sections from sta. 0+060 to 0+220 at
WF-003746 R02Z00-C021-JVC-10-XXX-ABD-CL-CL-06208 C0 Latest Zone 10 As Built Civil Civil Engr. Khalid 30-May-24 13-Jun-24 13-Jun-24 C Open 237 Aconex
Tunnel 02-Zone 10
As built Excavation Cross sections from sta. 0+060 to 0+220 at
WF-003746 R02Z00-C021-JVC-10-XXX-ABD-CL-CL-06209 C0 Latest Zone 10 As Built Civil Civil Engr. Khalid 30-May-24 13-Jun-24 13-Jun-24 C Open 237 Aconex
Tunnel 02-Zone 10
As built Excavation Cross sections from sta. 0+060 to 0+220 at
WF-003746 R02Z00-C021-JVC-10-XXX-ABD-CL-CL-06210 C0 Latest Zone 10 As Built Civil Civil Engr. Khalid 30-May-24 13-Jun-24 13-Jun-24 C Open 237 Aconex
Tunnel 02-Zone 10
As built Excavation Cross sections from sta. 0+060 to 0+220 at
WF-003746 R02Z00-C021-JVC-10-XXX-ABD-CL-CL-06211 C0 Latest Zone 10 As Built Civil Civil Engr. Khalid 30-May-24 13-Jun-24 13-Jun-24 C Open 237 Aconex
Tunnel 02-Zone 10
As built Excavation Cross sections from sta. 0+060 to 0+220 at
WF-003746 R02Z00-C021-JVC-10-XXX-ABD-CL-CL-06212 C0 Latest Zone 10 As Built Civil Civil Engr. Khalid 30-May-24 13-Jun-24 13-Jun-24 C Open 237 Aconex
Tunnel 02-Zone 10
JVC-WTRAN- As-Built CMC layout for Tunnel 01 (Zone 09) from station 0+41 to 0
WF-003764 R02Z00-C021-JVC-09-XXX-ABD-GT-GT-02001 C0 Latest Zone 09 As Built Geotechnical Geotechnical Engr. Yaseen 30-May-24 13-Jun-24 11-Jun-24 B Closed 12 Aconex
003584 104 incl. ES 05
JVC-WTRAN- As-Built CMC Layout for Zone 06 Dry Utility Culvert from
WF-003769 R02Z00-C021-JVC-06-XXX-ABD-GT-GT-02002 C0 Latest Zone 06 As Built Geotechnical Geotechnical Engr. Yaseen 1-Jun-24 15-Jun-24 5-Jun-24 B Closed 4 Aconex
003589 sta. 2+394 to 2+500
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-003796 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00127C0 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 2-Jun-24 16-Jun-24 12-Jun-24 C Closed 10 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-003796 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00128C0 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 2-Jun-24 16-Jun-24 12-Jun-24 C Closed 10 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-003796 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00129C0 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 2-Jun-24 16-Jun-24 12-Jun-24 C Closed 10 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-003796 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00130C0 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 2-Jun-24 16-Jun-24 12-Jun-24 C Closed 10 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-003796 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00131C0 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 2-Jun-24 16-Jun-24 12-Jun-24 C Closed 10 Aconex
JVC-WTRAN- details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
003616 Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-003796 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00132C0 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 2-Jun-24 16-Jun-24 12-Jun-24 C Closed 10 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-003796 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00133C0 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 2-Jun-24 16-Jun-24 12-Jun-24 C Closed 10 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-003796 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00134C0 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 2-Jun-24 16-Jun-24 12-Jun-24 C Closed 10 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-003796 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00135C0 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 2-Jun-24 16-Jun-24 12-Jun-24 C Closed 10 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-003796 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00136C0 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 2-Jun-24 16-Jun-24 12-Jun-24 C Closed 10 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Shop Drawing for Shoring Works in Zone 07 from sta. 0+045 to
WF-003835 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-04001C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Jun-24 17-Jun-24 11-Jun-24 B Closed 8 Aconex
0+175 - General Layout
Shop Drawing for Shoring Works in Zone 07 from sta. 0+045 to
WF-003835 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-04002C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Jun-24 17-Jun-24 11-Jun-24 B Closed 8 Aconex
0+175 - Cross-Sections Sheet 1
JVC-WTRAN- Shop Drawing for Shoring Works in Zone 07 from sta. 0+045 to
WF-003835 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-04003C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Jun-24 17-Jun-24 11-Jun-24 B Closed 8 Aconex
003653 0+175 - Cross-Sections Sheet 2
Shop Drawing for Shoring Works in Zone 07 from sta. 0+045 to
WF-003835 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-04004C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Jun-24 17-Jun-24 11-Jun-24 B Closed 8 Aconex
0+175 - Reinforcement Details
Shop Drawing for Shoring Works in Zone 07 from sta. 0+045 to
WF-003835 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-04005C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Jun-24 17-Jun-24 11-Jun-24 B Closed 8 Aconex
0+175 - Coordinates and Levels
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-003836 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02001C1 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Jun-24 17-Jun-24 12-Jun-24 B Closed 9 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 1
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-003836 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02002C1 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Jun-24 17-Jun-24 12-Jun-24 B Closed 9 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-003836 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02003C1 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Jun-24 17-Jun-24 12-Jun-24 B Closed 9 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-003836 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02004C1 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Jun-24 17-Jun-24 12-Jun-24 B Closed 9 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Cross-Sections
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-003836 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02005C1 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Jun-24 17-Jun-24 12-Jun-24 B Closed 9 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 1
JVC-WTRAN- Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-003836 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02006C1 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Jun-24 17-Jun-24 12-Jun-24 B Closed 9 Aconex
003654 from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-003836 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02007C1 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Jun-24 17-Jun-24 12-Jun-24 B Closed 9 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 3
Latest Status
D 0 1242
JVC-WTRAN-
003654
Response
ACONEX
Workflow Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09 Total
Workflow Document JVC Planned 12-Jun-24
WSP Status
B Overdue Overdue Submittal
WF-003836 Transmittal Drawing No. Rev. Status
R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02008C1 re-s Description
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 4
Zone 09
Location Shop Drawing Geotechnical
Discipline Geotechnical Submitted
Sub-Discipline Engr. Yaseen
by 3-Jun-24 17-Jun-24 Closed
Status 9
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09 date
WF-003836 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02009C1 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Jun-24 17-Jun-24 12-Jun-24 B Closed Today
9 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 5
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-003836 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02010C1 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Jun-24 17-Jun-24 12-Jun-24 B Closed 9 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 6
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-003836 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02011C1 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Jun-24 17-Jun-24 12-Jun-24 B Closed 9 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 7
Shop Drawing Layout for Soil Improvement works in Zone 01 from
WF-003846 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02008C0 re-s Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Jun-24 18-Jun-24 12-Jun-24 B Closed 8 Aconex
sta. 0+293 to 0+350
JVC-WTRAN- Shop Drawing Cross-Section for Soil Improvement works in Zone 01
WF-003846 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02009C0 re-s Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Jun-24 18-Jun-24 12-Jun-24 B Closed 8 Aconex
003664 from sta. 0+293 to 0+350
Shop Drawing Coordinates and Levels for Soil Improvement works in
WF-003846 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02010C0 re-s Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Jun-24 18-Jun-24 12-Jun-24 B Closed 8 Aconex
Zone 01 from sta. 0+293 to 0+350
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003868 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11200 C0 re-s Tunnel 03 As Built Civil Civil Engr. Khalid 4-Jun-24 18-Jun-24 13-Jun-24 C Closed 9 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003868 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11201 C0 re-s Tunnel 03 As Built Civil Civil Engr. Khalid 4-Jun-24 18-Jun-24 13-Jun-24 C Closed 9 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003868 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11202 C0 re-s Tunnel 03 As Built Civil Civil Engr. Khalid 4-Jun-24 18-Jun-24 13-Jun-24 C Closed 9 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003868 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11203 C0 re-s Tunnel 03 As Built Civil Civil Engr. Khalid 4-Jun-24 18-Jun-24 13-Jun-24 C Closed 9 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003868 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11204 C0 re-s Tunnel 03 As Built Civil Civil Engr. Khalid 4-Jun-24 18-Jun-24 13-Jun-24 C Closed 9 Aconex
JVC-WTRAN- Tunnel 03-Zone 11
003666 As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003868 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11205 C0 re-s Tunnel 03 As Built Civil Civil Engr. Khalid 4-Jun-24 18-Jun-24 13-Jun-24 C Closed 9 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003868 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11206 C0 re-s Tunnel 03 As Built Civil Civil Engr. Khalid 4-Jun-24 18-Jun-24 13-Jun-24 C Closed 9 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003868 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11207 C0 re-s Tunnel 03 As Built Civil Civil Engr. Khalid 4-Jun-24 18-Jun-24 13-Jun-24 C Closed 9 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003868 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11208 C0 re-s Tunnel 03 As Built Civil Civil Engr. Khalid 4-Jun-24 18-Jun-24 13-Jun-24 C Closed 9 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003868 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11209 C0 re-s Tunnel 03 As Built Civil Civil Engr. Khalid 4-Jun-24 18-Jun-24 13-Jun-24 C Closed 9 Aconex
Tunnel 03-Zone 11
Shop Drawing for Shotcrete Works in Zone 03 for Egress Staircase 10
WF-003972 R02Z00-C021-JVC-03-XXX-SDW-GT-GT-08001C0 re-s Zone 03 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Jun-24 24-Jun-24 24-Jun-24 C Closed 14 Aconex
JVC-WTRAN- from sta. 1+040 to 1+080 - General Layout
003785 Shop Drawing for Shotcrete Works in Zone 03 for Egress Staircase 10
WF-003972 R02Z00-C021-JVC-03-XXX-SDW-GT-GT-08002C0 re-s Zone 03 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Jun-24 24-Jun-24 24-Jun-24 C Closed 14 Aconex
from sta. 1+040 to 1+080 - Coordinates and Cross-section
Shop Drawing for Indicative section of material Backfilling at Tunnel
WF-004004 R02Z00-C021-JVC-11-XXX-SDW-CL-CL-07576 C0 Latest Tunnel 03 Shop Drawing Civil Civil Engr. Sunil 11-Jun-24 25-Jun-24 13-Jun-24 B Closed 2 Aconex
03 from Sta: 0+160 to 0+320
Shop Drawing for Indicative section of material Backfilling at Tunnel
WF-004004 R02Z00-C021-JVC-11-XXX-SDW-CL-CL-07577 C0 Latest Tunnel 03 Shop Drawing Civil Civil Engr. Sunil 11-Jun-24 25-Jun-24 13-Jun-24 B Closed 2 Aconex
03 from Sta: 0+160 to 0+320
Shop Drawing for Indicative section of material Backfilling at Tunnel
WF-004004 R02Z00-C021-JVC-11-XXX-SDW-CL-CL-07578 C0 Latest Tunnel 03 Shop Drawing Civil Civil Engr. Sunil 11-Jun-24 25-Jun-24 13-Jun-24 B Closed 2 Aconex
03 from Sta: 0+160 to 0+320
Shop Drawing for Indicative section of material Backfilling at Tunnel
WF-004004 R02Z00-C021-JVC-11-XXX-SDW-CL-CL-07579 C0 Latest Tunnel 03 Shop Drawing Civil Civil Engr. Sunil 11-Jun-24 25-Jun-24 13-Jun-24 B Closed 2 Aconex
03 from Sta: 0+160 to 0+320
Shop Drawing for Indicative section of material Backfilling at Tunnel
WF-004004 R02Z00-C021-JVC-11-XXX-SDW-CL-CL-07580 C0 Latest Tunnel 03 Shop Drawing Civil Civil Engr. Sunil 11-Jun-24 25-Jun-24 13-Jun-24 B Closed 2 Aconex
JVC-WTRAN- 03 from Sta: 0+160 to 0+320
003814 Shop Drawing for Indicative section of material Backfilling at Tunnel
WF-004004 R02Z00-C021-JVC-11-XXX-SDW-CL-CL-07581 C0 Latest Tunnel 03 Shop Drawing Civil Civil Engr. Sunil 11-Jun-24 25-Jun-24 13-Jun-24 B Closed 2 Aconex
03 from Sta: 0+160 to 0+320
Shop Drawing for Indicative section of material Backfilling at Tunnel
WF-004004 R02Z00-C021-JVC-11-XXX-SDW-CL-CL-07582 C0 Latest Tunnel 03 Shop Drawing Civil Civil Engr. Sunil 11-Jun-24 25-Jun-24 13-Jun-24 B Closed 2 Aconex
03 from Sta: 0+160 to 0+320
Shop Drawing for Indicative section of material Backfilling at Tunnel
WF-004004 R02Z00-C021-JVC-11-XXX-SDW-CL-CL-07583 C0 Latest Tunnel 03 Shop Drawing Civil Civil Engr. Sunil 11-Jun-24 25-Jun-24 13-Jun-24 B Closed 2 Aconex
03 from Sta: 0+160 to 0+320
Shop Drawing for Indicative section of material Backfilling at Tunnel
WF-004004 R02Z00-C021-JVC-11-XXX-SDW-CL-CL-07584 C0 Latest Tunnel 03 Shop Drawing Civil Civil Engr. Sunil 11-Jun-24 25-Jun-24 13-Jun-24 B Closed 2 Aconex
03 from Sta: 0+160 to 0+320
Shop Drawing for Indicative section of material Backfilling at Tunnel
WF-004004 R02Z00-C021-JVC-11-XXX-SDW-CL-CL-07585 C0 Latest Tunnel 03 Shop Drawing Civil Civil Engr. Sunil 11-Jun-24 25-Jun-24 13-Jun-24 B Closed 2 Aconex
03 from Sta: 0+160 to 0+320
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03604C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
08-09) Infrastructure Infrastructure
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03605C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
08-09) Infrastructure Infrastructure
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03606C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
08-09) Infrastructure Infrastructure
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03607C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
08-09) Infrastructure Infrastructure
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03608C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
08-09) Infrastructure Infrastructure
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03609C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
08-09) Infrastructure Infrastructure
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03611C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
08-09) Infrastructure Infrastructure
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03612C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
08-09) Infrastructure Infrastructure
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03613C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
JVC-WTRAN- 08-09) Infrastructure Infrastructure
003817 Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03651C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
08-09) Infrastructure Infrastructure
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03652C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
08-09) Infrastructure Infrastructure
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03653C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
08-09) Infrastructure Infrastructure
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03654C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
08-09) Infrastructure Infrastructure
Latest Status
Response
ACONEX
Workflow Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities & Total
Workflow Document JVC Planned 26-Jun-24
WSP Status
C Overdue Overdue Submittal
WF-004007 Transmittal Drawing No. Rev. Status
R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03655C0 re-s
08-09) Description RAM-MIP
Location Shop Drawing Discipline
Infrastructure Sub-Discipline Engr. Tarek 11-Jun-24
Infrastructure Submitted by Submitted
25-Jun-24 Closed
Status 15
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Reply Response Code from WSP from JVC
No. as of
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities & date
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03656C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed Today
15 Aconex
08-09) Infrastructure Infrastructure
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03657C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
08-09) Infrastructure Infrastructure
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03658C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
08-09) Infrastructure Infrastructure
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03663C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
08-09) Infrastructure Infrastructure
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004031 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07610 C0 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 12-Jun-24 26-Jun-24 13-Jun-24 C Closed 1 Aconex
from Sta: 1+460 to 1+500
JVC-WTRAN- Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004031 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07611 C0 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 12-Jun-24 26-Jun-24 13-Jun-24 C Closed 1 Aconex
003840 from Sta: 1+460 to 1+500
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004031 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07612 C0 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 12-Jun-24 26-Jun-24 13-Jun-24 C Closed 1 Aconex
from Sta: 1+460 to 1+500
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004119 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07610 C1 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 22-Jun-24 6-Jul-24 6-Jul-24 C Open 214 Aconex
from Sta: 1+460 to 1+500
JVC-WTRAN- Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004119 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07611 C1 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 22-Jun-24 6-Jul-24 6-Jul-24 C Open 214 Aconex
003922 from Sta: 1+460 to 1+500
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004119 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07612 C1 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 22-Jun-24 6-Jul-24 6-Jul-24 C Open 214 Aconex
from Sta: 1+460 to 1+500
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004171 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07628 C0 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 24-Jun-24 8-Jul-24 7-Jul-24 C Closed 13 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004171 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07629 C0 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 24-Jun-24 8-Jul-24 7-Jul-24 C Closed 13 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004171 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07630 C0 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 24-Jun-24 8-Jul-24 7-Jul-24 C Closed 13 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004171 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07631 C0 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 24-Jun-24 8-Jul-24 7-Jul-24 C Closed 13 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004171 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07632 C0 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 24-Jun-24 8-Jul-24 7-Jul-24 C Closed 13 Aconex
from Sta: 0+060 to 0+240
JVC-WTRAN- Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004171 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07633 C0 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 24-Jun-24 8-Jul-24 7-Jul-24 C Closed 13 Aconex
003974 from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004171 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07634 C0 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 24-Jun-24 8-Jul-24 7-Jul-24 C Closed 13 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004171 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07635 C0 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 24-Jun-24 8-Jul-24 7-Jul-24 C Closed 13 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004171 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07636 C0 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 24-Jun-24 8-Jul-24 7-Jul-24 C Closed 13 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004171 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07637 C0 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 24-Jun-24 8-Jul-24 7-Jul-24 C Closed 13 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004171 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07638 C0 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 24-Jun-24 8-Jul-24 7-Jul-24 C Closed 13 Aconex
from Sta: 0+060 to 0+240
WF-004179 R02Z00-C021-JVC-04-XXX-ABD-CL-CL-11210 C0 Latest As built Side Slope Cross Section Zone-04 Sta: 1+460 to 1+500 Zone 04 As Built Civil Civil Engr. Sunil 25-Jun-24 9-Jul-24 11-Jul-24 B Closed 16 Aconex
JVC-WTRAN-
WF-004179 R02Z00-C021-JVC-04-XXX-ABD-CL-CL-11211 C0 Latest As built Side Slope Cross Section Zone-04 Sta: 1+460 to 1+500 Zone 04 As Built Civil Civil Engr. Sunil 25-Jun-24 9-Jul-24 11-Jul-24 B Closed 16 Aconex
003982
WF-004179 R02Z00-C021-JVC-04-XXX-ABD-CL-CL-11212 C0 Latest As built Side Slope Cross Section Zone-04 Sta: 1+460 to 1+500 Zone 04 As Built Civil Civil Engr. Sunil 25-Jun-24 9-Jul-24 11-Jul-24 B Closed 16 Aconex
JVC-WTRAN- As-Built CMC Layout for Zone 06 Dry Utility Culvert VTR 02 from
WF-004208 R02Z00-C021-JVC-06-XXX-ABD-GT-GT-02003 C0 re-s Zone 06 As Built Geotechnical Geotechnical Engr. Yaseen 26-Jun-24 10-Jul-24 3-Jul-24 B Closed 7 Aconex
004011 sta. 2+510 To 2+560
WF-004249 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11216 C0 Latest As built Side Slope Cross Section at Zone06 Sta. 2+720 to 2+820 Zone 06 As Built Civil Civil Engr. Sunil 29-Jun-24 13-Jul-24 11-Jul-24 B Closed 12 Aconex
WF-004249 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11217 C0 Latest As built Side Slope Cross Section at Zone06 Sta. 2+720 to 2+820 Zone 06 As Built Civil Civil Engr. Sunil 29-Jun-24 13-Jul-24 11-Jul-24 B Closed 12 Aconex
WF-004249 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11218 C0 Latest As built Side Slope Cross Section at Zone06 Sta. 2+720 to 2+820 Zone 06 As Built Civil Civil Engr. Sunil 29-Jun-24 13-Jul-24 11-Jul-24 B Closed 12 Aconex
JVC-WTRAN-
004050
WF-004249 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11219 C0 Latest As built Side Slope Cross Section at Zone06 Sta. 2+720 to 2+820 Zone 06 As Built Civil Civil Engr. Sunil 29-Jun-24 13-Jul-24 11-Jul-24 B Closed 12 Aconex
WF-004249 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11220 C0 Latest As built Side Slope Cross Section at Zone06 Sta. 2+720 to 2+820 Zone 06 As Built Civil Civil Engr. Sunil 29-Jun-24 13-Jul-24 11-Jul-24 B Closed 12 Aconex
WF-004249 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11221 C0 Latest As built Side Slope Cross Section at Zone06 Sta. 2+720 to 2+820 Zone 06 As Built Civil Civil Engr. Sunil 29-Jun-24 13-Jul-24 11-Jul-24 B Closed 12 Aconex
D 0 1242
JVC-WTRAN-
004092
Response
ACONEX
Workflow As built Side Slope Cross Section at Zone 04 from Sta: Total
Workflow Document JVC Planned WSP Status
C Overdue Overdue Submittal
WF-004292 TransmittalR02Z00-C021-JVC-04-XXX-ABD-CL-CL-11226
Drawing No. Rev. Status 1+340 to 1+440
C0 Latest Description Zone 04
Location As Built Civil
Discipline Civil
Sub-Discipline Engr. Sunilby 30-Jun-24
Submitted 14-Jul-24 9-Jul-24 Closed
Status 9
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
As built Side Slope Cross Section at Zone 04 from Sta: date
WF-004292 R02Z00-C021-JVC-04-XXX-ABD-CL-CL-11227 C0 Latest Zone 04 As Built Civil Civil Engr. Sunil 30-Jun-24 14-Jul-24 9-Jul-24 C Closed Today
9 Aconex
1+340 to 1+440
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004330 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07601 C0 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 2-Jul-24 16-Jul-24 16-Jul-24 C Closed 14 Aconex
from Sta : 1+340 to 1+440
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004330 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07602 C0 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 2-Jul-24 16-Jul-24 16-Jul-24 C Closed 14 Aconex
from Sta : 1+340 to 1+440
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004330 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07603 C0 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 2-Jul-24 16-Jul-24 16-Jul-24 C Closed 14 Aconex
from Sta : 1+340 to 1+440
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004330 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07604 C0 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 2-Jul-24 16-Jul-24 16-Jul-24 C Closed 14 Aconex
from Sta : 1+340 to 1+440
JVC-WTRAN- Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004330 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07605 C0 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 2-Jul-24 16-Jul-24 16-Jul-24 C Closed 14 Aconex
004129 from Sta : 1+340 to 1+440
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004330 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07606 C0 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 2-Jul-24 16-Jul-24 16-Jul-24 C Closed 14 Aconex
from Sta : 1+340 to 1+440
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004330 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07607 C0 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 2-Jul-24 16-Jul-24 16-Jul-24 C Closed 14 Aconex
from Sta : 1+340 to 1+440
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004330 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07608 C0 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 2-Jul-24 16-Jul-24 16-Jul-24 C Closed 14 Aconex
from Sta : 1+340 to 1+440
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004330 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07609 C0 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 2-Jul-24 16-Jul-24 16-Jul-24 C Closed 14 Aconex
from Sta : 1+340 to 1+440
As per Engr.
WF-004380 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11228- C0 Latest As built Side Slope Cross Section Zone 06 Sta: 2+880 to 2+960 Zone 06 As Built Civil Civil Engr. Sunil 4-Jul-24 18-Jul-24 6-Jul-24 Terminated Aconex
Nahell
As per Engr.
WF-004380 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-01122- C0 Latest As built Side Slope Cross Section Zone 06 Sta: 2+880 to 2+960 Zone 06 As Built Civil Civil Engr. Sunil 4-Jul-24 18-Jul-24 6-Jul-24 Terminated Aconex
Nahell
JVC-WTRAN- As per Engr.
WF-004380 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11230- C0 Latest As built Side Slope Cross Section Zone 06 Sta: 2+880 to 2+960 Zone 06 As Built Civil Civil Engr. Sunil 4-Jul-24 18-Jul-24 6-Jul-24 Terminated Aconex
004177 Nahell
As per Engr.
WF-004380 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11231- C0 Latest As built Side Slope Cross Section Zone 06 Sta: 2+880 to 2+960 Zone 06 As Built Civil Civil Engr. Sunil 4-Jul-24 18-Jul-24 6-Jul-24 Terminated Aconex
Nahell
As per Engr.
WF-004380 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11232- C0 Latest As built Side Slope Cross Section Zone 06 Sta: 2+880 to 2+960 Zone 06 As Built Civil Civil Engr. Sunil 4-Jul-24 18-Jul-24 6-Jul-24 Terminated Aconex
Nahell
Shop Drawing Layout for Soil Improvement works in Zone 01 from
WF-004399 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02008C1 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 6-Jul-24 20-Jul-24 16-Jul-24 B Closed 10 Aconex
sta. 0+293 to 0+350
JVC-WTRAN- Shop Drawing Cross-Section for Soil Improvement works in Zone 01
WF-004399 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02009C1 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 6-Jul-24 20-Jul-24 16-Jul-24 B Closed 10 Aconex
004195 from sta. 0+293 to 0+350
Shop Drawing Coordinates and Levels for Soil Improvement works in
WF-004399 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02010C1 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 6-Jul-24 20-Jul-24 16-Jul-24 B Closed 10 Aconex
Zone 01 from sta. 0+293 to 0+350
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta 0+220 to
WF-004408 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05464 C1 re-s Zone 01 Shop Drawing Civil Civil Engr. Sunil 6-Jul-24 20-Jul-24 16-Jul-24 C Closed 10 Aconex
0+260
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta 0+220 to
WF-004408 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05465 C4 re-s Zone 07 Shop Drawing Civil Civil Engr. Sunil 6-Jul-24 20-Jul-24 16-Jul-24 C Closed 10 Aconex
0+260
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta 0+220 to
WF-004408 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05466 C2 re-s Zone 07 Shop Drawing Civil Civil Engr. Sunil 6-Jul-24 20-Jul-24 16-Jul-24 C Closed 10 Aconex
JVC-WTRAN- 0+260
004204 Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta 0+220 to
WF-004408 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05467 C1 re-s Zone 01 Shop Drawing Civil Civil Engr. Sunil 6-Jul-24 20-Jul-24 16-Jul-24 C Closed 10 Aconex
0+260
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta 0+220 to
WF-004408 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05468 C1 re-s Zone 01 Shop Drawing Civil Civil Engr. Sunil 6-Jul-24 20-Jul-24 16-Jul-24 C Closed 10 Aconex
0+260
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta 0+220 to
WF-004408 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05469 C1 re-s Zone 01 Shop Drawing Civil Civil Engr. Sunil 6-Jul-24 20-Jul-24 16-Jul-24 C Closed 10 Aconex
0+260
WF-004418 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11228 C0 Latest As built Side Slope Cross Section Zone 06 Sta: 2+880 to 2+960 Zone 06 As Built Civil Civil Engr. Sunil 7-Jul-24 21-Jul-24 21-Jul-24 A Closed 14 Aconex
WF-004418 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11229 C0 Latest As built Side Slope Cross Section Zone 06 Sta: 2+880 to 2+960 Zone 06 As Built Civil Civil Engr. Sunil 7-Jul-24 21-Jul-24 21-Jul-24 A Closed 14 Aconex
JVC-WTRAN-
WF-004418 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11230 C0 Latest As built Side Slope Cross Section Zone 06 Sta: 2+880 to 2+960 Zone 06 As Built Civil Civil Engr. Sunil 7-Jul-24 21-Jul-24 21-Jul-24 A Closed 14 Aconex
004214
WF-004418 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11231 C0 Latest As built Side Slope Cross Section Zone 06 Sta: 2+880 to 2+960 Zone 06 As Built Civil Civil Engr. Sunil 7-Jul-24 21-Jul-24 21-Jul-24 A Closed 14 Aconex
WF-004418 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11232 C0 Latest As built Side Slope Cross Section Zone 06 Sta: 2+880 to 2+960 Zone 06 As Built Civil Civil Engr. Sunil 7-Jul-24 21-Jul-24 21-Jul-24 A Closed 14 Aconex
JVC-WTRAN-
004273
Latest Status
D 0 1242
Response
ACONEX
Workflow As built Side Slope Cross Section at Zone 04 from Sta: Total
Workflow Document JVC Planned WSP Status
A Overdue Overdue Submittal
WF-004482 TransmittalR02Z00-C021-JVC-04-XXX-ABD-CL-CL-11223
Drawing No. Rev. Status 1+340 to 1+440
C1 Latest Description Zone 04
Location As Built Civil
Discipline Civil
Sub-Discipline Engr. Sunilby
Submitted 9-Jul-24 23-Jul-24 20-Jul-24 Closed
Status 11
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
As built Side Slope Cross Section at Zone 04 from Sta: date
WF-004482 R02Z00-C021-JVC-04-XXX-ABD-CL-CL-11224 C1 Latest Zone 04 As Built Civil Civil Engr. Sunil 9-Jul-24 23-Jul-24 20-Jul-24 A Closed Today
11 Aconex
JVC-WTRAN- 1+340 to 1+440
004273 As built Side Slope Cross Section at Zone 04 from Sta:
WF-004482 R02Z00-C021-JVC-04-XXX-ABD-CL-CL-11225 C1 Latest Zone 04 As Built Civil Civil Engr. Sunil 9-Jul-24 23-Jul-24 20-Jul-24 A Closed 11 Aconex
1+340 to 1+440
As built Side Slope Cross Section at Zone 04 from Sta:
WF-004482 R02Z00-C021-JVC-04-XXX-ABD-CL-CL-11226 C1 Latest Zone 04 As Built Civil Civil Engr. Sunil 9-Jul-24 23-Jul-24 20-Jul-24 A Closed 11 Aconex
1+340 to 1+440
As built Side Slope Cross Section at Zone 04 from Sta:
WF-004482 R02Z00-C021-JVC-04-XXX-ABD-CL-CL-11227 C1 Latest Zone 04 As Built Civil Civil Engr. Sunil 9-Jul-24 23-Jul-24 20-Jul-24 A Closed 11 Aconex
1+340 to 1+440
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-004504 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11200 C1 Latest Tunnel 03 As Built Civil Civil Engr. Sunil 10-Jul-24 24-Jul-24 18-Jul-24 C Open 196 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-004504 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11201 C1 Latest Tunnel 03 As Built Civil Civil Engr. Sunil 10-Jul-24 24-Jul-24 18-Jul-24 C Open 196 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-004504 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11202 C1 Latest Tunnel 03 As Built Civil Civil Engr. Sunil 10-Jul-24 24-Jul-24 18-Jul-24 C Open 196 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-004504 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11203 C1 Latest Tunnel 03 As Built Civil Civil Engr. Sunil 10-Jul-24 24-Jul-24 18-Jul-24 C Open 196 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-004504 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11204 C1 Latest Tunnel 03 As Built Civil Civil Engr. Sunil 10-Jul-24 24-Jul-24 18-Jul-24 C Open 196 Aconex
JVC-WTRAN- Tunnel 03-Zone 11
004294 As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-004504 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11205 C1 Latest Tunnel 03 As Built Civil Civil Engr. Sunil 10-Jul-24 24-Jul-24 18-Jul-24 C Open 196 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-004504 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11206 C1 Latest Tunnel 03 As Built Civil Civil Engr. Sunil 10-Jul-24 24-Jul-24 18-Jul-24 C Open 196 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-004504 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11207 C1 Latest Tunnel 03 As Built Civil Civil Engr. Sunil 10-Jul-24 24-Jul-24 18-Jul-24 C Open 196 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-004504 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11208 C1 Latest Tunnel 03 As Built Civil Civil Engr. Sunil 10-Jul-24 24-Jul-24 18-Jul-24 C Open 196 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-004504 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11209 C1 Latest Tunnel 03 As Built Civil Civil Engr. Sunil 10-Jul-24 24-Jul-24 18-Jul-24 C Open 196 Aconex
Tunnel 03-Zone 11
JVC-WTRAN-
WF-004520 R02Z00-C021-JVC-00-XXX-SDW-ST-FO-00005 C0 re-s LV Network Typical Detail for Manholes RAM-MIP Shop Drawing Structural Foundation Engr. Shaheen 10-Jul-24 24-Jul-24 16-Jul-24 C Closed 6 Aconex
004309
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-004530 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02001C2 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Jul-24 25-Jul-24 21-Jul-24 B Closed 10 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 1
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-004530 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02002C2 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Jul-24 25-Jul-24 21-Jul-24 B Closed 10 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-004530 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02003C2 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Jul-24 25-Jul-24 21-Jul-24 B Closed 10 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-004530 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02004C2 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Jul-24 25-Jul-24 21-Jul-24 B Closed 10 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Cross-Sections
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-004530 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02005C2 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Jul-24 25-Jul-24 21-Jul-24 B Closed 10 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 1
JVC-WTRAN- Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-004530 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02006C2 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Jul-24 25-Jul-24 21-Jul-24 B Closed 10 Aconex
004319 from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-004530 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02007C2 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Jul-24 25-Jul-24 21-Jul-24 B Closed 10 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-004530 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02008C2 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Jul-24 25-Jul-24 21-Jul-24 B Closed 10 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 4
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-004530 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02009C2 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Jul-24 25-Jul-24 21-Jul-24 B Closed 10 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 5
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-004530 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02010C2 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Jul-24 25-Jul-24 21-Jul-24 B Closed 10 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 6
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-004530 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02011C2 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Jul-24 25-Jul-24 21-Jul-24 B Closed 10 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 7
As-Built CMC layout for Tunnel 01 (Zone 09) from
WF-004536 R02Z00-C021-JVC-09-XXX-ABD-GT-GT-02002-C0 Latest Zone 09 As Built Geotechnical Geotechnical Engr. Yaseen 11-Jul-24 25-Jul-24 15-Jul-24 Terminated Aconex
station 0+104 to 0+161 (Partially)
JVC-WTRAN- As-Built CMC layout for Tunnel 01 (Zone 09) from
WF-004536 R02Z00-C021-JVC-09-XXX-ABD-GT-GT-02003-C0 Latest Zone 09 As Built Geotechnical Geotechnical Engr. Yaseen 11-Jul-24 25-Jul-24 15-Jul-24 Terminated Aconex
004325 station 0+161 to 0+200 (Partially)
As-Built CMC layout for Tunnel 01 (Zone 09) from
WF-004536 R02Z00-C021-JVC-09-XXX-ABD-GT-GT-02004-C0 Latest Zone 09 As Built Geotechnical Geotechnical Engr. Yaseen 11-Jul-24 25-Jul-24 15-Jul-24 Terminated Aconex
station 0+201 to 0+236 (Partially)
JVC-WTRAN-
WF-004543 R02Z00-C021-JVC-00-XXX-SDW-ST-FO-00006 C0 re-s LV Network Typical Detail for Manholes (1700x1500) RAM-MIP Shop Drawing Structural Foundation Engr. Shaheen 11-Jul-24 25-Jul-24 20-Jul-24 C Closed 9 Aconex
004330
JVC-WTRAN-
WF-004553 R02Z00-C021-JVC-01-XXX-ABD-GT-GT-02004 C0 Latest As-Built CMC layout for Zone 01 from station 0+300 to 0+350 Zone 09 As Built Geotechnical Geotechnical Engr. Yaseen 11-Jul-24 25-Jul-24 18-Jul-24 B Closed 7 Aconex
004340
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01200C0 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01203C1 re-s RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01204C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01205C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01206C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01207C1 re-s RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01208C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01209C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01210C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01211C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Latest Status
D 0 1242
Response
ACONEX
Workflow Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage Total
Workflow Document JVC Planned WSP Status
B Overdue Overdue Submittal
WF-004561 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01218C1 Status 08 and 09) Description RAM-MIP
Location Shop Drawing Discipline
Infrastructure Sub-Discipline
Effluent Submitted by 11-Jul-24
Engr. Fawzy 25-Jul-24 28-Jul-24 Closed
Status 17
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage date
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01219C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed Today
17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01220C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01221C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01222C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01223C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01224C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01225C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01226C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01227C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01228C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
JVC-WTRAN- Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01229C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
004347 08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01230C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01231C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01232C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01233C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01234C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01235C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01236C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01237C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01251C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01252C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01253C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01256C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01257C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01258C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01259C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01260C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01261C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01262C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01263C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01265C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01266C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
As built Side Slope Cross Section at Zone 06 from Sta:
WF-004576 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11001 C1 Latest Zone 06 As Built Civil Civil Engr. Sunil 13-Jul-24 27-Jul-24 20-Jul-24 C Open 193 Aconex
2+440 to 2+620
As built Side Slope Cross Section at Zone 06 from Sta:
WF-004576 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11002 C1 Latest Zone 06 As Built Civil Civil Engr. Sunil 13-Jul-24 27-Jul-24 20-Jul-24 C Open 193 Aconex
2+440 to 2+620
As built Side Slope Cross Section at Zone 06 from Sta:
WF-004576 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11003 C1 Latest Zone 06 As Built Civil Civil Engr. Sunil 13-Jul-24 27-Jul-24 20-Jul-24 C Open 193 Aconex
2+440 to 2+620
As built Side Slope Cross Section at Zone 06 from Sta:
WF-004576 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11004 C1 Latest Zone 06 As Built Civil Civil Engr. Sunil 13-Jul-24 27-Jul-24 20-Jul-24 C Open 193 Aconex
2+440 to 2+620
As built Side Slope Cross Section at Zone 06 from Sta:
WF-004576 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11005 C1 Latest Zone 06 As Built Civil Civil Engr. Sunil 13-Jul-24 27-Jul-24 20-Jul-24 C Open 193 Aconex
JVC-WTRAN- 2+440 to 2+620
004362 As built Side Slope Cross Section at Zone 06 from Sta:
WF-004576 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11006 C1 Latest Zone 06 As Built Civil Civil Engr. Sunil 13-Jul-24 27-Jul-24 20-Jul-24 C Open 193 Aconex
2+440 to 2+620
As built Side Slope Cross Section at Zone 06 from Sta:
WF-004576 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11007 C1 Latest Zone 06 As Built Civil Civil Engr. Sunil 13-Jul-24 27-Jul-24 20-Jul-24 C Open 193 Aconex
2+440 to 2+620
As built Side Slope Cross Section at Zone 06 from Sta:
WF-004576 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11008 C0 Latest Zone 06 As Built Civil Civil Engr. Sunil 13-Jul-24 27-Jul-24 20-Jul-24 C Open 193 Aconex
2+440 to 2+620
As built Side Slope Cross Section at Zone 06 from Sta:
WF-004576 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11009 C0 Latest Zone 06 As Built Civil Civil Engr. Sunil 13-Jul-24 27-Jul-24 20-Jul-24 C Open 193 Aconex
2+440 to 2+620
Latest Status
Response
ACONEX
Workflow As built Side Slope Cross Section at Zone 06 from Sta: Total
Workflow Document JVC Planned WSP Status
C Overdue Overdue Submittal
WF-004576 TransmittalR02Z00-C021-JVC-06-XXX-ABD-CL-CL-11010
Drawing No. Rev. Status 2+440 to 2+620
C0 Latest Description Zone 06
Location As Built Civil
Discipline Civil
Sub-Discipline Engr. Sunilby
Submitted 13-Jul-24 27-Jul-24 20-Jul-24 Open
Status 193
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Transportation Transportation & date
WF-004621 R02Z00-C021-JVC-00-XXX-SDW-TR-TR-06300 C0 re-s Typical Kerb details (3/3) RAM-MIP Shop Drawing Engr. Khalid 14-Jul-24 28-Jul-24 22-Jul-24 C Closed Today
8 Aconex
& Road Road
JVC-WTRAN- Transportation Transportation &
WF-004621 R02Z00-C021-JVC-00-XXX-SDW-TR-TR-06301 C0 re-s Typical Kerb details (3/3) RAM-MIP As Built Engr. Khalid 14-Jul-24 28-Jul-24 22-Jul-24 C Closed 8 Aconex
004405 & Road Road
Transportation Transportation &
WF-004621 R02Z00-C021-JVC-00-XXX-SDW-TR-TR-06302 C0 re-s Typical Kerb details (3/3) RAM-MIP As Built Engr. Khalid 14-Jul-24 28-Jul-24 22-Jul-24 C Closed 8 Aconex
& Road Road
Shop Drawings Layout for Shoring Works at Zone 01 LS06 from
WF-004631 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-04003C1 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 15-Jul-24 29-Jul-24 18-Jul-24 B Closed 3 Aconex
sta. 0+470 to 0+500
Shop Drawings Sections, Reinforcements and Details for Shoring
WF-004631 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-04004C1 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 15-Jul-24 29-Jul-24 18-Jul-24 B Closed 3 Aconex
Works at Zone 01 LS06 from sta. 0+470 to 0+500 Sheet 1
JVC-WTRAN-004415
Shop Drawings Sections, Reinforcements and Details for Shoring
WF-004631 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-04005C1 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 15-Jul-24 29-Jul-24 18-Jul-24 B Closed 3 Aconex
Works at Zone 01 LS06 from sta. 0+470 to 0+500 Sheet 2
Shop Drawings Capping Beam Sections, Reinforcements and Details
WF-004631 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-04006C0 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 15-Jul-24 29-Jul-24 18-Jul-24 B Closed 3 Aconex
for Shoring Works at Zone 01 LS06 from sta. 0+470 to 0+500
JVC-WTRAN- Transportation Transportation &
WF-004644 R02Z00-C021-JVC-00-XXX-SDW-TR-TR-06303 C0 re-s Typical Sign Board Details RAM-MIP Shop Drawing Engr. Khalid 15-Jul-24 29-Jul-24 22-Jul-24 C Closed 7 Aconex
004428 & Road Road
JVC-WTRAN- Transportation Transportation &
WF-004641 R02Z00-C021-JVC-00-XXX-SDW-TR-TR-06304 C0 Latest Shop Drawing for Marking Details RAM-MIP Shop Drawing Engr. Khalid 15-Jul-24 29-Jul-24 22-Jul-24 B Closed 7 Aconex
004425 & Road Road
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05244 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05250 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05251 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05252 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05253 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05254 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05255 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05256 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05257 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
JVC-WTRAN- Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07090 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
004428 Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07091 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07092 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07093 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07094 C0 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07095 C0 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07096 C0 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07097 C0 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07098 C0 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07099 C0 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
UT-Utilities & Sewerage
WF-004646 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-04031C0 re-s Sewage Network Manhole Details for GRP Pipe 2400mm RAM-MIP Shop Drawing Engr. Fawzy 15-Jul-24 29-Jul-24 22-Jul-24 C Closed 7 Aconex
JVC-WTRAN- Infrastructure Effluent
004430 UT-Utilities & Sewerage
WF-004646 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-04032C0 re-s Sewage Network Manhole Details for GRP Pipe 2400mm RAM-MIP Shop Drawing Engr. Fawzy 15-Jul-24 29-Jul-24 22-Jul-24 C Closed 7 Aconex
Infrastructure Effluent
JVC-WTRAN-
WF-004649 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05138 C1 Latest Shop drawing for Excavation Cross Section at Zone 06A St 2+550.43 Zone 06a Shop Drawing Civil Civil Engr. Khalid 15-Jul-24 29-Jul-24 30-Jul-24 C Open 191 Aconex
004433
WF-004666 R02Z00-C021-JVC-00-XXX-SDW-CL-CL-05490 C0 Latest Plan & Excavation Cross Section for North Pump Station RAM-MIP Shop Drawing Civil Civil Engr. Sunil 16-Jul-24 30-Jul-24 31-Jul-24 B Closed 15 Aconex
JVC-WTRAN-
004447
WF-004666 R02Z00-C021-JVC-00-XXX-SDW-CL-CL-05491 C0 Latest Plan & Excavation Cross Section for North Pump Station Zone 06a Shop Drawing Civil Civil Engr. Sunil 16-Jul-24 30-Jul-24 31-Jul-24 B Closed 15 Aconex
JVC-WTRAN-
004515
Latest Status
D 0 1242
Response
ACONEX
Workflow Shop Drawing for Indicative section of material Backfilling at Zone 04 Total
Workflow Document JVC Planned WSP Status
B Overdue Overdue Submittal
WF-004744 TransmittalR02Z00-C021-JVC-04-XXX-SDW-CL-CL-07602
Drawing No. Rev.
C1 Status
re-s
from Sta : 1+340 to 1+440 Description
Zone 04
Location Shop Drawing Civil
Discipline Civil
Sub-Discipline Engr. Sunilby
Submitted 18-Jul-24 1-Aug-24 3-Aug-24 Closed
Status 16
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawing for Indicative section of material Backfilling at Zone 04 date
WF-004744 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07603 C1 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 18-Jul-24 1-Aug-24 3-Aug-24 B Closed Today
16 Aconex
from Sta : 1+340 to 1+440
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004744 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07604 C1 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 18-Jul-24 1-Aug-24 3-Aug-24 B Closed 16 Aconex
from Sta : 1+340 to 1+440
JVC-WTRAN- Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004744 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07605 C1 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 18-Jul-24 1-Aug-24 3-Aug-24 B Closed 16 Aconex
004515 from Sta : 1+340 to 1+440
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004744 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07606 C1 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 18-Jul-24 1-Aug-24 3-Aug-24 B Closed 16 Aconex
from Sta : 1+340 to 1+440
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004744 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07607 C1 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 18-Jul-24 1-Aug-24 3-Aug-24 B Closed 16 Aconex
from Sta : 1+340 to 1+440
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004744 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07608 C1 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 18-Jul-24 1-Aug-24 3-Aug-24 B Closed 16 Aconex
from Sta : 1+340 to 1+440
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004744 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07609 C1 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 18-Jul-24 1-Aug-24 3-Aug-24 B Closed 16 Aconex
from Sta : 1+340 to 1+440
WF-004763 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11216 C1 re-s As built Side Slope Cross Section at Zone 06 Sta. 2+720 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
WF-004763 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11217 C1 re-s As built Side Slope Cross Section at Zone 06 Sta. 2+720 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
WF-004763 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11218 C1 re-s As built Side Slope Cross Section at Zone 06 Sta. 2+720 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
WF-004763 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11219 C1 re-s As built Side Slope Cross Section at Zone 06 Sta. 2+720 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
JVC-WTRAN-
004532
WF-004763 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11220 C1 re-s As built Side Slope Cross Section at Zone 06 Sta. 2+720 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
WF-004763 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11221 C1 re-s As built Side Slope Cross Section at Zone 06 Sta. 2+720 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
WF-004763 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11222 C0 re-s As built Side Slope Cross Section at Zone 06 Sta. 2+720 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
WF-004763 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11223 C0 re-s As built Side Slope Cross Section at Zone 06 Sta. 2+720 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03600C0 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03603C0 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03604C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03605C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03606C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03607C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03608C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03609C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03624C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03625C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03626C0 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03627C0 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03628C0 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03629C0 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03630C0 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
JVC-WTRAN- 07-08 and 09) Infrastructure
004538 Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03631C0 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03632C0 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03633C0 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03634C0 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03635C0 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03636C0 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03651C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03652C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03653C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03654C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03655C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
JVC-WTRAN-
004538
Latest Status
D 0 1242
Response
ACONEX
Workflow Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities & Total
Workflow Document JVC Planned WSP Status
C Overdue Overdue Submittal
WF-004769 Transmittal Drawing No. Rev. Status
R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03656C1 re-s
07-08 and 09) Description RAM-MIP
Location Shop Drawing Discipline
Infrastructure
Grey Water
Sub-Discipline Submitted by 20-Jul-24
Engr. Fawzy 3-Aug-24 1-Aug-24 Closed
Status 12
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities & date
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03657C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed Today
12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03658C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03659C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Shop Drawing for Indicative section of material Backfilling at Zone 06
WF-004803 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07558 C0 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 21-Jul-24 4-Aug-24 5-Aug-24 B Closed 15 Aconex
from Sta : 2+880 to 2+960
Shop Drawing for Indicative section of material Backfilling at Zone 06
WF-004803 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07559 C0 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 21-Jul-24 4-Aug-24 5-Aug-24 B Closed 15 Aconex
from Sta : 2+880 to 2+960
JVC-WTRAN- Shop Drawing for Indicative section of material Backfilling at Zone 06
WF-004803 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07560 C0 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 21-Jul-24 4-Aug-24 5-Aug-24 B Closed 15 Aconex
004572 from Sta : 2+880 to 2+960
Shop Drawing for Indicative section of material Backfilling at Zone 06
WF-004803 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07561 C0 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 21-Jul-24 4-Aug-24 5-Aug-24 B Closed 15 Aconex
from Sta : 2+880 to 2+960
Shop Drawing for Indicative section of material Backfilling at Zone 06
WF-004803 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07562 C0 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 21-Jul-24 4-Aug-24 5-Aug-24 B Closed 15 Aconex
from Sta : 2+880 to 2+960
JVC-WTRAN-
WF-004836 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11233 C0 Latest As built Side Slope Cross Section Zone-06 Sta. 2+980 Zone 06 As Built Civil Civil Engr. Sunil 23-Jul-24 6-Aug-24 5-Aug-24 C Open 183 Aconex
004603
Shop Drawing for Proposed Storm Water Drainage Network - KAAR UT-Utilities &
WF-004846 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01410C0 re-s Zone 08 Shop Drawing Storm Water Engr. Fawzy 23-Jul-24 6-Aug-24 6-Aug-24 B Closed 14 Aconex
(Zone 08) Infrastructure
Shop Drawing for Proposed Storm Water Drainage Network - KAAR UT-Utilities &
WF-004846 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01411C0 re-s Zone 08 Shop Drawing Storm Water Engr. Fawzy 23-Jul-24 6-Aug-24 6-Aug-24 B Closed 14 Aconex
(Zone 08) Infrastructure
Shop Drawing for Proposed Storm Water Drainage Network - KAAR UT-Utilities &
WF-004846 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01414C0 Latest Zone 08 Shop Drawing Storm Water Engr. Fawzy 23-Jul-24 6-Aug-24 6-Aug-24 B Closed 14 Aconex
(Zone 08) Infrastructure
Shop Drawing for Proposed Storm Water Drainage Network - KAAR UT-Utilities &
WF-004846 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01415C0 Latest Zone 08 Shop Drawing Storm Water Engr. Fawzy 23-Jul-24 6-Aug-24 6-Aug-24 B Closed 14 Aconex
(Zone 08) Infrastructure
JVC-WTRAN- Shop Drawing for Proposed Storm Water Drainage Network - KAAR UT-Utilities &
WF-004846 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01416C0 Latest Zone 08 Shop Drawing Storm Water Engr. Fawzy 23-Jul-24 6-Aug-24 6-Aug-24 B Closed 14 Aconex
004613 (Zone 08) Infrastructure
Shop Drawing for Proposed Storm Water Drainage Network - KAAR UT-Utilities &
WF-004846 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01417C0 Latest Zone 08 Shop Drawing Storm Water Engr. Fawzy 23-Jul-24 6-Aug-24 6-Aug-24 B Closed 14 Aconex
(Zone 08) Infrastructure
Shop Drawing for Proposed Storm Water Drainage Network - KAAR UT-Utilities &
WF-004846 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01418C0 Latest Zone 08 Shop Drawing Storm Water Engr. Fawzy 23-Jul-24 6-Aug-24 6-Aug-24 B Closed 14 Aconex
(Zone 08) Infrastructure
Shop Drawing for Proposed Storm Water Drainage Network - KAAR UT-Utilities &
WF-004846 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01460C0 re-s Zone 08 Shop Drawing Storm Water Engr. Fawzy 23-Jul-24 6-Aug-24 6-Aug-24 B Closed 14 Aconex
(Zone 08) Infrastructure
Shop Drawing for Proposed Storm Water Drainage Network - KAAR UT-Utilities &
WF-004846 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01462C0 re-s Zone 08 Shop Drawing Storm Water Engr. Fawzy 23-Jul-24 6-Aug-24 6-Aug-24 B Closed 14 Aconex
(Zone 08) Infrastructure
JVC-WTRAN- Transportation Transportation &
WF-004898 R02Z00-C021-JVC-00-XXX-SDW-TR-TR-06303 C1 Latest Typical Sign Board Details Part 01 RAM-MIP Shop Drawing Engr. Khalid 25-Jul-24 8-Aug-24 31-Jul-24 B Closed 6 Aconex
004664 & Road Road
JVC-WTRAN- UT-Utilities &
WF-004916 R02Z00-C021-JVC-XX-XXX-SDW-UT-PW-08501C0 re-s Shop Drawing for Potable Water Network Pipe Trench Details RAM-MIP Shop Drawing Potable Water Engr. Fawzy 27-Jul-24 10-Aug-24 6-Aug-24 C Closed 10 Aconex
004681 Infrastructure
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-004918 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00127C1 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 27-Jul-24 10-Aug-24 3-Aug-24 C Closed 7 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-004918 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00128C1 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 27-Jul-24 10-Aug-24 3-Aug-24 C Closed 7 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-004918 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00129C1 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 27-Jul-24 10-Aug-24 3-Aug-24 C Closed 7 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-004918 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00130C1 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 27-Jul-24 10-Aug-24 3-Aug-24 C Closed 7 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-004918 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00131C1 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 27-Jul-24 10-Aug-24 3-Aug-24 C Closed 7 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-004918 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00132C1 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 27-Jul-24 10-Aug-24 3-Aug-24 C Closed 7 Aconex
JVC-WTRAN- details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
004683 Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-004918 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00133C1 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 27-Jul-24 10-Aug-24 3-Aug-24 C Closed 7 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-004918 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00134C1 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 27-Jul-24 10-Aug-24 3-Aug-24 C Closed 7 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-004918 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00135C1 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 27-Jul-24 10-Aug-24 3-Aug-24 C Closed 7 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-004918 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00136C1 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 27-Jul-24 10-Aug-24 3-Aug-24 C Closed 7 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-004918 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00137C0 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 27-Jul-24 10-Aug-24 3-Aug-24 C Closed 7 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-004918 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00138C0 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 27-Jul-24 10-Aug-24 3-Aug-24 C Closed 7 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
JVC-WTRAN- Potable Water Network Valve Chamber Details for Single Gate Valve UT-Utilities &
WF-004929 R02Z00-C021-JVC-XX-XXX-SDW-UT-PW-08506C0 Latest RAM-MIP Shop Drawing Potable Water Engr. Fawzy 27-Jul-24 10-Aug-24 7-Aug-24 C Open 179 Aconex
004694 Type 01 Diameters 150mm to 250mm Infrastructure
WF-005031 R02Z00-C021-JVC-00-XXX-SDW-ST-FO-00005 C1 Latest LV Network Typical Detail for Manholes RAM-MIP Shop Drawing Structural Foundation Engr. Shaheen 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
JVC-WTRAN-
004790
WF-005031 R02Z00-C021-JVC-00-XXX-SDW-ST-FO-00006 C1 Latest LV Network Typical Detail for Manholes (1700x1500) RAM-MIP Shop Drawing Structural Foundation Engr. Shaheen 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
D 0 1242
Response
ACONEX
Workflow Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 Total
Workflow Document JVC Planned 14-Aug-24
WSP Status
B Overdue Overdue Submittal
WF-005037 TransmittalR02Z00-C021-JVC-09-XXX-SDW-CL-CL-05427
Drawing No. Rev. Status from sta. 0+046 to sta.0+280
C3 Latest Description Location
Zone 09
Shop Drawing Civil
Discipline Civil
Sub-Discipline Engr. Sunilby
Submitted 31-Jul-24 14-Aug-24 Closed
Status 14
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 date
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05428 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed Today
14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05429 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05430 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05431 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05432 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05433 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05434 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
JVC-WTRAN- Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05435 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
004796 from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05436 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05437 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05438 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05439 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05440 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05441 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05442 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05443 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05444 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05445 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05446 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05447 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05448 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05449 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
JVC-WTRAN- As-Built CMC Layout for Zone 06 Dry Utility Culvert from
WF-005061 R02Z00-C021-JVC-06-XXX-ABD-GT-GT-02003 C1 Latest Zone 06 As Built Geotechnical Geotechnical Engr. Yaseen 1-Aug-24 15-Aug-24 13-Aug-24 B Closed 12 Aconex
004820 sta. 2+500 To 2+594 incl. VTR 02
As-Built CMC Layout for Zone 09 (Tunnel 01) VTR 03A from
WF-005068 R02Z00-C021-JVC-09-XXX-ABD-GT-GT-02005 C0 Latest Zone 09 As Built Geotechnical Geotechnical Engr. Yaseen 1-Aug-24 15-Aug-24 13-Aug-24 B Closed 12 Aconex
JVC-WTRAN- sta. 0+141.036 to 0+181.036
004826 As-Built CMC Layout for Zone 09 (Tunnel 01) VTR 03A from
WF-005068 R02Z00-C021-JVC-09-XXX-ABD-GT-GT-02006 C0 Latest Zone 09 As Built Geotechnical Geotechnical Engr. Yaseen 1-Aug-24 15-Aug-24 13-Aug-24 B Closed 12 Aconex
sta. 0+181.036 to 0+241.036
Transportation Transportation &
WF-005080 R02Z00-C021-JVC-00-XXX-SDW-TR-TR-06300 C1 Latest Typical Kerb details (3/3) RAM-MIP Shop Drawing Engr. Khalid 1-Aug-24 15-Aug-24 11-Aug-24 A Closed 10 Aconex
& Road Road
JVC-WTRAN- Transportation Transportation &
WF-005080 R02Z00-C021-JVC-00-XXX-SDW-TR-TR-06301 C1 Latest Typical Kerb details (3/3) RAM-MIP As Built Engr. Khalid 1-Aug-24 15-Aug-24 11-Aug-24 A Closed 10 Aconex
004838 & Road Road
Transportation Transportation &
WF-005080 R02Z00-C021-JVC-00-XXX-SDW-TR-TR-06302 C1 Latest Typical Kerb details (3/3) RAM-MIP As Built Engr. Khalid 1-Aug-24 15-Aug-24 11-Aug-24 A Closed 10 Aconex
& Road Road
UT-Utilities &
WF-005097 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01407C0 Latest Storm Water Network Plan and Profile for (Part 07) RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Aug-24 17-Aug-24 14-Aug-24 B Closed 11 Aconex
Infrastructure
UT-Utilities &
WF-005097 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01463C0 re-s Storm Water Network Plan and Profile for (Part 07) RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Aug-24 17-Aug-24 14-Aug-24 B Closed 11 Aconex
Infrastructure
JVC-WTRAN- UT-Utilities &
WF-005097 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01464C1 re-s Storm Water Network Plan and Profile for (Part 07) RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Aug-24 17-Aug-24 14-Aug-24 B Closed 11 Aconex
004855 Infrastructure
UT-Utilities &
WF-005097 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01465C0 re-s Storm Water Network Plan and Profile for (Part 07) RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Aug-24 17-Aug-24 14-Aug-24 B Closed 11 Aconex
Infrastructure
UT-Utilities &
WF-005097 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01466C0 re-s Storm Water Network Plan and Profile for (Part 07) RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Aug-24 17-Aug-24 14-Aug-24 B Closed 11 Aconex
Infrastructure
Shop Drawing for MV Network above Grade Plan, Profile and Manhole
WF-005099 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-07001C0 re-s Road 16 Shop Drawing Electrical Medium Voltage Engr. Hanzel 3-Aug-24 17-Aug-24 17-Aug-24 C Closed 14 Aconex
Details (MV MH-37 to 41) Road 16
JVC-WTRAN- Shop Drawing for MV Network above Grade Plan, Profile and Manhole
WF-005099 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-07002C0 re-s Road 16 Shop Drawing Electrical Medium Voltage Engr. Hanzel 3-Aug-24 17-Aug-24 17-Aug-24 C Closed 14 Aconex
004857 Details (MV MH-37 to 41) Road 16
Shop Drawing for MV Network above Grade Plan, Profile and Manhole
WF-005099 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-07003C0 re-s Road 16 Shop Drawing Electrical Medium Voltage Engr. Hanzel 3-Aug-24 17-Aug-24 17-Aug-24 C Closed 14 Aconex
Details (MV MH-37 to 41) Road 16
Shop Drawing for Shotcrete Works in Zone 03 for Egress Staircase 10
WF-005120 R02Z00-C021-JVC-03-XXX-SDW-GT-GT-08001C1 Latest Zone 03 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Aug-24 17-Aug-24 17-Aug-24 B Closed 14 Aconex
JVC-WTRAN- from sta. 1+040 to 1+080 - General Layout
004878 Shop Drawing for Shotcrete Works in Zone 03 for Egress Staircase 10
WF-005120 R02Z00-C021-JVC-03-XXX-SDW-GT-GT-08002C1 Latest Zone 03 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Aug-24 17-Aug-24 17-Aug-24 B Closed 14 Aconex
from sta. 1+040 to 1+080 - Coordinates and Cross-section
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03600C1 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03603C1 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03604C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Latest Status
D 0 1242
Response
ACONEX
Workflow Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities & Total
Workflow Document JVC Planned WSP Status
B Overdue Overdue Submittal
WF-005162 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03605C2 Status 07-08 and 09) Description RAM-MIP
Location Shop Drawing Discipline
Infrastructure
Grey Water
Sub-Discipline Submitted by 5-Aug-24 19-Aug-24 18-Aug-24
Engr. Fawzy Closed
Status 13
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities & date
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03606C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed Today
13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03607C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03608C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03609C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03624C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03625C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03626C1 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03627C1 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03628C1 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03629C1 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03630C1 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
JVC-WTRAN- 07-08 and 09) Infrastructure
004916 Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03631C1 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03632C1 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03633C1 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03634C1 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03635C1 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03636C1 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03651C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03652C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03653C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03654C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03655C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03656C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03657C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03658C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03659C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Shop Drawing for Gray Water Distribution Network Plan and Profile UT-Utilities &
WF-005169 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03617C1 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 20-Aug-24 B Closed 15 Aconex
for part 07 Infrastructure
Shop Drawing for Gray Water Distribution Network Plan and Profile UT-Utilities &
WF-005169 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03662C0 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 20-Aug-24 B Closed 15 Aconex
for part 07 Infrastructure
Shop Drawing for Gray Water Distribution Network Plan and Profile UT-Utilities &
WF-005169 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03667C0 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 20-Aug-24 B Closed 15 Aconex
for part 07 Infrastructure
JVC-WTRAN- Shop Drawing for Gray Water Distribution Network Plan and Profile UT-Utilities &
WF-005169 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03669C0 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 20-Aug-24 B Closed 15 Aconex
004923 for part 07 Infrastructure
Shop Drawing for Gray Water Distribution Network Plan and Profile UT-Utilities &
WF-005169 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03670C0 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 20-Aug-24 B Closed 15 Aconex
for part 07 Infrastructure
Shop Drawing for Gray Water Distribution Network Plan and Profile UT-Utilities &
WF-005169 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03671C0 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 20-Aug-24 B Closed 15 Aconex
for part 07 Infrastructure
Shop Drawing for Gray Water Distribution Network Plan and Profile UT-Utilities &
WF-005169 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03673C0 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 20-Aug-24 B Closed 15 Aconex
for part 07 Infrastructure
Excavation Cross section of Pump station-07 Zone-06 at Sta
WF-005172 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05138 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 5-Aug-24 19-Aug-24 20-Aug-24 B Closed 15 Aconex
2+546.06 to 2+550.70
Excavation Cross section of Pump station-07 Zone-06 at Sta
WF-005172 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05139 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 5-Aug-24 19-Aug-24 20-Aug-24 B Closed 15 Aconex
JVC-WTRAN- 2+546.06 to 2+550.70
004926 Excavation Cross section of Pump station-07 Zone-06 at Sta
WF-005172 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05140 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 5-Aug-24 19-Aug-24 20-Aug-24 B Closed 15 Aconex
2+546.06 to 2+550.70
Excavation Cross section of Pump station-07 Zone-06 at Sta
WF-005172 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05141 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 5-Aug-24 19-Aug-24 20-Aug-24 B Closed 15 Aconex
2+546.06 to 2+550.70
JVC-WTRAN- UT-Utilities &
WF-005221 R02Z00-C021-JVC-XX-XXX-SDW-UT-PW-08501C1 Latest Shop Drawing for Potable Water Network Pipe Trench Details RAM-MIP Shop Drawing Potable Water Engr. Fawzy 6-Aug-24 20-Aug-24 10-Aug-24 B Closed 4 Aconex
004973 Infrastructure
UT-Utilities & UT-Utilities &
WF-005249 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00217C0 Latest Combined Utility Plan at Road 15 D9 Road 15 D9 Shop Drawing Engr. Fawzy 7-Aug-24 21-Aug-24 22-Aug-24 B Closed 15 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-005249 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00218C0 Latest Combined Utility Plan at Road 15 D9 Road 15 D9 Shop Drawing Engr. Fawzy 7-Aug-24 21-Aug-24 22-Aug-24 B Closed 15 Aconex
Infrastructure Infrastructure
JVC-WTRAN- UT-Utilities & UT-Utilities &
WF-005249 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00219C0 Latest Combined Utility Plan at Road 15 D9 Road 15 D9 Shop Drawing Engr. Fawzy 7-Aug-24 21-Aug-24 22-Aug-24 B Closed 15 Aconex
004973 Infrastructure Infrastructure
Latest Status
D 0 1242
JVC-WTRAN-
004973 Response
ACONEX
Workflow UT-Utilities & UT-Utilities & Total
Workflow Document JVC Planned 22-Aug-24
WSP Status
B Overdue Overdue Submittal
WF-005249 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00220C0 Status Combined Utility Plan at Road 15 D9
Description Road 15 D9
Location Shop Drawing Discipline
Infrastructure Sub-Discipline Engr. Fawzy 7-Aug-24
Infrastructure Submitted by Submitted
21-Aug-24 Closed
Status 15
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Reply Response Code from WSP from JVC
No. as of
UT-Utilities & UT-Utilities & date
WF-005249 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00221C0 Latest Combined Utility Plan at Road 15 D9 Road 15 D9 Shop Drawing Engr. Fawzy 7-Aug-24 21-Aug-24 22-Aug-24 B Closed Today
15 Aconex
Infrastructure Infrastructure
WF-005255 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11215 C0 Latest As built Side Slope Cross Section at Zone 06 Sta. 2+709.71 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 8-Aug-24 22-Aug-24 20-Aug-24 C Open 167 Aconex
WF-005255 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11216 C2 Latest As built Side Slope Cross Section at Zone 06 Sta. 2+709.71 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 8-Aug-24 22-Aug-24 20-Aug-24 C Open 167 Aconex
WF-005255 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11217 C2 Latest As built Side Slope Cross Section at Zone 06 Sta. 2+709.71 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 8-Aug-24 22-Aug-24 20-Aug-24 C Open 167 Aconex
WF-005255 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11218 C2 Latest As built Side Slope Cross Section at Zone 06 Sta. 2+709.71 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 8-Aug-24 22-Aug-24 20-Aug-24 C Open 167 Aconex
JVC-WTRAN-
WF-005255 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11219 C2 Latest As built Side Slope Cross Section at Zone 06 Sta. 2+709.71 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 8-Aug-24 22-Aug-24 20-Aug-24 C Open 167 Aconex
005005
WF-005255 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11220 C2 Latest As built Side Slope Cross Section at Zone 06 Sta. 2+709.71 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 8-Aug-24 22-Aug-24 20-Aug-24 C Open 167 Aconex
WF-005255 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11221 C2 Latest As built Side Slope Cross Section at Zone 06 Sta. 2+709.71 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 8-Aug-24 22-Aug-24 20-Aug-24 C Open 167 Aconex
WF-005255 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11222 C1 Latest As built Side Slope Cross Section at Zone 06 Sta. 2+709.71 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 8-Aug-24 22-Aug-24 20-Aug-24 C Open 167 Aconex
WF-005255 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11223 C1 Latest As built Side Slope Cross Section at Zone 06 Sta. 2+709.71 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 8-Aug-24 22-Aug-24 20-Aug-24 C Open 167 Aconex
D 0 1242
JVC-WTRAN- Response
ACONEX
Workflow
005128 Shop Drawings for Shotcrete Works at Zone 05 Egress Staircase 20 Total
Workflow Document JVC Planned WSP Status
B Overdue Overdue Submittal
WF-005384 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04011C0 Status (3rd Side) at sta. 1+860 - Long.
Description
Section
Zone 05
Location Shop Drawing Geotechnical
Discipline Geotechnical Submitted
Sub-Discipline by 13-Aug-24 27-Aug-24 17-Aug-24
Engr. Yaseen Closed
Status 4
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections date
WF-005408 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05056 C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 14-Aug-24 28-Aug-24 20-Aug-24 B Closed Today
6 Aconex
from sta.0+088 to sta.0+280 at Zone 01
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections
WF-005408 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05349 C1 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 14-Aug-24 28-Aug-24 20-Aug-24 B Closed 6 Aconex
from sta.0+088 to sta.0+280 at Zone 01
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections
WF-005408 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05350 C1 re-s Zone 01 Shop Drawing Civil Civil Engr. Sunil 14-Aug-24 28-Aug-24 20-Aug-24 B Closed 6 Aconex
from sta.0+088 to sta.0+280 at Zone 01
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections
WF-005408 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05351 C1 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 14-Aug-24 28-Aug-24 20-Aug-24 B Closed 6 Aconex
from sta.0+088 to sta.0+280 at Zone 01
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections
WF-005408 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05352 C1 re-s Zone 01 Shop Drawing Civil Civil Engr. Sunil 14-Aug-24 28-Aug-24 20-Aug-24 B Closed 6 Aconex
from sta.0+088 to sta.0+280 at Zone 01
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections
WF-005408 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05353 C1 re-s Zone 01 Shop Drawing Civil Civil Engr. Sunil 14-Aug-24 28-Aug-24 20-Aug-24 B Closed 6 Aconex
from sta.0+088 to sta.0+280 at Zone 01
JVC-WTRAN- Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections
WF-005408 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05354 C1 re-s Zone 01 Shop Drawing Civil Civil Engr. Sunil 14-Aug-24 28-Aug-24 20-Aug-24 B Closed 6 Aconex
005151 from sta.0+088 to sta.0+280 at Zone 01
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections
WF-005408 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05355 C1 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 14-Aug-24 28-Aug-24 20-Aug-24 B Closed 6 Aconex
from sta.0+088 to sta.0+280 at Zone 01
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections
WF-005408 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05356 C1 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 14-Aug-24 28-Aug-24 20-Aug-24 B Closed 6 Aconex
from sta.0+088 to sta.0+280 at Zone 01
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections
WF-005408 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05357 C1 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 14-Aug-24 28-Aug-24 20-Aug-24 B Closed 6 Aconex
from sta.0+088 to sta.0+280 at Zone 01
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections
WF-005408 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05358 C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 14-Aug-24 28-Aug-24 20-Aug-24 B Closed 6 Aconex
from sta.0+088 to sta.0+280 at Zone 01
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections
WF-005408 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05359 C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 14-Aug-24 28-Aug-24 20-Aug-24 B Closed 6 Aconex
from sta.0+088 to sta.0+280 at Zone 01
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections
WF-005408 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05360 C1 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 14-Aug-24 28-Aug-24 20-Aug-24 B Closed 6 Aconex
from sta.0+088 to sta.0+280 at Zone 01
As built side slope Excavation cross section zone-08(sta
WF-005423 R02Z00-C021-JVC-08-XXX-ABD-CL-CL-11239 C0 Latest Zone 08 As Built Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 27-Aug-24 A Closed 12 Aconex
0+040.13 to 0+080)
JVC-WTRAN- As built side slope Excavation cross section zone-08(sta
WF-005423 R02Z00-C021-JVC-08-XXX-ABD-CL-CL-11240 C0 Latest Zone 08 As Built Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 27-Aug-24 A Closed 12 Aconex
005167 0+040.13 to 0+080)
As built side slope Excavation cross section zone-08(sta
WF-005423 R02Z00-C021-JVC-08-XXX-ABD-CL-CL-11241 C0 Latest Zone 08 As Built Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 27-Aug-24 A Closed 12 Aconex
0+040.13 to 0+080)
Shop Drawing for Excavation Cross Sections from sta.0+300 to
WF-005429 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05361 C4 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 29-Aug-24 B Closed 14 Aconex
sta.0+500 at Zone 01
Shop Drawing for Excavation Cross Sections from sta.0+300 to
WF-005429 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05362 C4 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 29-Aug-24 B Closed 14 Aconex
sta.0+500 at Zone 01
Shop Drawing for Excavation Cross Sections from sta.0+300 to
WF-005429 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05363 C4 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 29-Aug-24 B Closed 14 Aconex
sta.0+500 at Zone 01
Shop Drawing for Excavation Cross Sections from sta.0+300 to MIP-JVC-SHD-CIV-
WF-005429 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05364 C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 29-Aug-24 B Closed 14 Aconex
sta.0+500 at Zone 01 000031-01
Shop Drawing for Excavation Cross Sections from sta.0+300 to MIP-JVC-SHD-CIV-
WF-005429 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05365 C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 29-Aug-24 B Closed 14 Aconex
sta.0+500 at Zone 01 000031-01
Shop Drawing for Excavation Cross Sections from sta.0+300 to MIP-JVC-SHD-CIV-
WF-005429 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05366 C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 29-Aug-24 B Closed 14 Aconex
sta.0+500 at Zone 01 000031-01
JVC-WTRAN- Shop Drawing for Excavation Cross Sections from sta.0+300 to MIP-JVC-SHD-CIV-
WF-005429 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05367 C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 29-Aug-24 B Closed 14 Aconex
005173 sta.0+500 at Zone 01 000031-01
Shop Drawing for Excavation Cross Sections from sta.0+300 to MIP-JVC-SHD-CIV-
WF-005429 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05368 C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 29-Aug-24 B Closed 14 Aconex
sta.0+500 at Zone 01 000031-01
Shop Drawing for Excavation Cross Sections from sta.0+300 to MIP-JVC-SHD-CIV-
WF-005429 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05369 C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 29-Aug-24 B Closed 14 Aconex
sta.0+500 at Zone 01 000031-01
Shop Drawing for Excavation Cross Sections from sta.0+300 to MIP-JVC-SHD-CIV-
WF-005429 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05370 C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 29-Aug-24 B Closed 14 Aconex
sta.0+500 at Zone 01 000031-01
Shop Drawing for Excavation Cross Sections from sta.0+300 to MIP-JVC-SHD-CIV-
WF-005429 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05371 C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 29-Aug-24 B Closed 14 Aconex
sta.0+500 at Zone 01 000031-01
Shop Drawing for Excavation Cross Sections from sta.0+300 to MIP-JVC-SHD-CIV-
WF-005429 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05372 C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 29-Aug-24 B Closed 14 Aconex
sta.0+500 at Zone 01 000031-01
Shop Drawing for Excavation Cross Sections from sta.0+300 to
WF-005429 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05373 C0 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 29-Aug-24 B Closed 14 Aconex
sta.0+500 at Zone 01
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005451 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07753 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 20-Aug-24 B Closed 5 Aconex
from Sta: 0+040.13 to 0+100
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005451 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07754 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 20-Aug-24 B Closed 5 Aconex
JVC-WTRAN- from Sta: 0+040.13 to 0+100
005192 Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005451 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07755 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 20-Aug-24 B Closed 5 Aconex
from Sta: 0+040.13 to 0+100
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005451 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07756 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 20-Aug-24 B Closed 5 Aconex
from Sta: 0+040.13 to 0+100
Transportation Transportation &
WF-005509 R02Z00-C021-JVC-07-XXX-SDW-TR-TR-06141 C0 Latest Shop Drawing for Plan and profile at Zone 07 Airport Tunnel Zone 07 Shop Drawing Engr. Khalid 19-Aug-24 2-Sep-24 1-Sep-24 B Closed 13 Aconex
JVC-WTRAN- & Road Road
005249 Transportation Transportation &
WF-005509 R02Z00-C021-JVC-07-XXX-SDW-TR-TR-06142 C0 Latest Shop Drawing for Plan and profile at Zone 07 Airport Tunnel Zone 07 Shop Drawing Engr. Khalid 19-Aug-24 2-Sep-24 1-Sep-24 B Closed 13 Aconex
& Road Road
Duct beside
JVC-WTRAN- Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-005532 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00127C2 Latest Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Aug-24 2-Sep-24 4-Sep-24 B Closed 16 Aconex
005271 details) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-005532 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00128C2 Latest Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Aug-24 2-Sep-24 4-Sep-24 B Closed 16 Aconex
details) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-005532 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00129C2 Latest Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Aug-24 2-Sep-24 4-Sep-24 B Closed 16 Aconex
details) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-005532 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00130C2 Latest Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Aug-24 2-Sep-24 4-Sep-24 B Closed 16 Aconex
details) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-005532 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00131C2 Latest Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Aug-24 2-Sep-24 4-Sep-24 B Closed 16 Aconex
details) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-005532 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00132C2 Latest Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Aug-24 2-Sep-24 4-Sep-24 B Closed 16 Aconex
details) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Latest Status
D 0 1242
Response
Duct beside
ACONEX
Workflow Shop drawings for Medium Voltage Manholes and Ducts (sections & Total
Workflow Document JVC Planned WSP Status
B Overdue Overdue Submittal
WF-005532 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00133C2 Status details) for Duct beside Tunnel-01
Description
and Tunnel-02
Tunnel-01
Locationand Shop Drawing Electrical
Discipline Medium Voltage Submitted
Sub-Discipline by 19-Aug-24 2-Sep-24
Engr. Sherif 4-Sep-24 Closed
Status 16
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Tunnel-02 Type Submitted Reply Response Code from WSP from JVC
No. Duct beside as of
Shop drawings for Medium Voltage Manholes and Ducts (sections & date
WF-005532 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00134C2 Latest Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Aug-24 2-Sep-24 4-Sep-24 B Closed Today
16 Aconex
details) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-005532 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00135C2 Latest Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Aug-24 2-Sep-24 4-Sep-24 B Closed 16 Aconex
details) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-005532 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00136C2 Latest Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Aug-24 2-Sep-24 4-Sep-24 B Closed 16 Aconex
details) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-005532 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00137C2 Latest Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Aug-24 2-Sep-24 4-Sep-24 B Closed 16 Aconex
details) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-005532 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00138C2 Latest Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Aug-24 2-Sep-24 4-Sep-24 B Closed 16 Aconex
details) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-005534 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07628 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 19-Aug-24 2-Sep-24 20-Aug-24 B Closed 1 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-005534 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07629 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 19-Aug-24 2-Sep-24 20-Aug-24 B Closed 1 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-005534 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07630 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 19-Aug-24 2-Sep-24 20-Aug-24 B Closed 1 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-005534 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07631 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 19-Aug-24 2-Sep-24 20-Aug-24 B Closed 1 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-005534 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07632 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 19-Aug-24 2-Sep-24 20-Aug-24 B Closed 1 Aconex
from Sta: 0+060 to 0+240
JVC-WTRAN- Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-005534 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07633 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 19-Aug-24 2-Sep-24 20-Aug-24 B Closed 1 Aconex
005273 from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-005534 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07634 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 19-Aug-24 2-Sep-24 20-Aug-24 B Closed 1 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-005534 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07635 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 19-Aug-24 2-Sep-24 20-Aug-24 B Closed 1 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-005534 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07636 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 19-Aug-24 2-Sep-24 20-Aug-24 B Closed 1 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-005534 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07637 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 19-Aug-24 2-Sep-24 20-Aug-24 B Closed 1 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-005534 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07638 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 19-Aug-24 2-Sep-24 20-Aug-24 B Closed 1 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005548 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07757 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 20-Aug-24 3-Sep-24 4-Sep-24 B Closed 15 Aconex
from Sta: 0+120 to 0+300
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005548 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07758 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 20-Aug-24 3-Sep-24 4-Sep-24 B Closed 15 Aconex
from Sta: 0+120 to 0+300
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005548 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07759 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 20-Aug-24 3-Sep-24 4-Sep-24 B Closed 15 Aconex
from Sta: 0+120 to 0+300
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005548 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07760 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 20-Aug-24 3-Sep-24 4-Sep-24 B Closed 15 Aconex
from Sta: 0+120 to 0+300
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005548 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07761 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 20-Aug-24 3-Sep-24 4-Sep-24 B Closed 15 Aconex
JVC-WTRAN- from Sta: 0+120 to 0+300
005285 Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005548 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07762 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 20-Aug-24 3-Sep-24 4-Sep-24 B Closed 15 Aconex
from Sta: 0+120 to 0+300
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005548 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07763 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 20-Aug-24 3-Sep-24 4-Sep-24 B Closed 15 Aconex
from Sta: 0+120 to 0+300
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005548 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07764 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 20-Aug-24 3-Sep-24 4-Sep-24 B Closed 15 Aconex
from Sta: 0+120 to 0+300
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005548 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07765 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 20-Aug-24 3-Sep-24 4-Sep-24 B Closed 15 Aconex
from Sta: 0+120 to 0+300
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005548 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07766 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 20-Aug-24 3-Sep-24 4-Sep-24 B Closed 15 Aconex
from Sta: 0+120 to 0+300
JVC-WTRAN- Shop Drawing for Indicative section of Material Backfilling at Zone
WF-005567 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07650 C0 re-s Zone 03 Shop Drawing Civil Civil Engr. Sunil 20-Aug-24 3-Sep-24 4-Sep-24 B Closed 15 Aconex
005298 03 from Sta. 1+000
JVC-WTRAN-
WF-005568 R02Z00-C021-JVC-03-XXX-ABD-CL-CL-11042 C0 Latest As built side slope Excavation cross section at zone 03 (Sta 1+000) Zone 03 As Built Civil Civil Engr. Sunil 20-Aug-24 3-Sep-24 4-Sep-24 C Open 155 Aconex
005299
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-005574 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02001C3 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Aug-24 3-Sep-24 24-Aug-24 C Closed 4 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 1
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-005574 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02002C3 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Aug-24 3-Sep-24 24-Aug-24 C Closed 4 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-005574 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02003C3 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Aug-24 3-Sep-24 24-Aug-24 C Closed 4 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-005574 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02004C3 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Aug-24 3-Sep-24 24-Aug-24 C Closed 4 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Cross-Sections
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-005574 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02005C3 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Aug-24 3-Sep-24 24-Aug-24 C Closed 4 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 1
JVC-WTRAN- Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-005574 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02006C3 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Aug-24 3-Sep-24 24-Aug-24 C Closed 4 Aconex
005305 from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-005574 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02007C3 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Aug-24 3-Sep-24 24-Aug-24 C Closed 4 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-005574 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02008C3 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Aug-24 3-Sep-24 24-Aug-24 C Closed 4 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 4
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-005574 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02009C3 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Aug-24 3-Sep-24 24-Aug-24 C Closed 4 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 5
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-005574 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02010C3 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Aug-24 3-Sep-24 24-Aug-24 C Closed 4 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 6
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-005574 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02011C3 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Aug-24 3-Sep-24 24-Aug-24 C Closed 4 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 7
Shop Drawing for MV Network above Grade Plan, Profile and Manhole
WF-005577 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-07001C1 Latest Road 16 Shop Drawing Electrical Medium Voltage Engr. Sherif 20-Aug-24 3-Sep-24 4-Sep-24 B Closed 15 Aconex
Details (MV MH-37 to 41) Road 16
JVC-WTRAN- Shop Drawing for MV Network above Grade Plan, Profile and Manhole
WF-005577 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-07002C1 Latest Road 16 Shop Drawing Electrical Medium Voltage Engr. Sherif 20-Aug-24 3-Sep-24 4-Sep-24 B Closed 15 Aconex
005308 Details (MV MH-37 to 41) Road 16
Latest Status
D 0 1242
JVC-WTRAN-
005308 Response
ACONEX
Workflow Shop Drawing for MV Network above Grade Plan, Profile and Manhole Total
Workflow Document JVC Planned WSP Status
B Overdue Overdue Submittal
WF-005577 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-00-XXX-SDW-EL-MV-07003C1 Status Details (MV MH-37 to 41) Road
Description
16
Road 16
Location Shop Drawing Electrical
Discipline Medium Voltage Submitted
Sub-Discipline by 20-Aug-24 3-Sep-24
Engr. Sherif 4-Sep-24 Closed
Status 15
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Excavation Shop Drawing Cross section at Zone 07 from sta.0+260 date
WF-005682 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05453 C3 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 25-Aug-24 8-Sep-24 5-Sep-24 B Closed Today
11 Aconex
to 0+300
Excavation Shop Drawing Cross section at Zone 07 from sta.0+260
WF-005682 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05464 C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 25-Aug-24 8-Sep-24 5-Sep-24 B Closed 11 Aconex
JVC-WTRAN- to 0+300
005406 Excavation Shop Drawing Cross section at Zone 07 from sta.0+260
WF-005682 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05465 C5 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 25-Aug-24 8-Sep-24 5-Sep-24 B Closed 11 Aconex
to 0+300
Excavation Shop Drawing Cross section at Zone 07 from sta.0+260
WF-005682 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05466 C3 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 25-Aug-24 8-Sep-24 5-Sep-24 B Closed 11 Aconex
to 0+300
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05065 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05225 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05226 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05227 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05228 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05229 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05230 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05231 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05232 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05233 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05234 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05235 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05236 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05237 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05238 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05239 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
JVC-WTRAN- Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48 As per Engr.
005428 Shop Drawing for Excavation Cross sections and Egress Stair 12 At Nahell
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05240 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05241 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05242 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05243 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05244 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05245 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05246 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05247 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05248 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05249 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07130 C1 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07131 C1 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07132 C1 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07133 C1 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07134 C1 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07135 C1 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
JVC-WTRAN- As-Built Layout CMC Layout for Zone 05 From sta.
WF-005709 R02Z00-C021-JVC-05-XXX-ABD-GT-GT-01003-C0 Latest Zone 05 As Built Geotechnical Geotechnical Engr. Yaseen 26-Aug-24 9-Sep-24 4-Sep-24 Terminated Aconex
005429 1+933.979 To 1+953.979
As-Built Layout CMC Layout for Zone 05 From sta.
WF-005726 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01007C2 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 27-Aug-24 10-Sep-24 29-Aug-24 B Closed 2 Aconex
JVC-WTRAN- 1+933.979 To 1+953.979
005440 As-Built Layout CMC Layout for Zone 05 From sta.
WF-005726 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01008C2 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 27-Aug-24 10-Sep-24 29-Aug-24 B Closed 2 Aconex
1+933.979 To 1+953.979
JVC-WTRAN- Telecom Network Structural Details For at Grade Manhole
WF-005757 R02Z00-C021-JVC-00-XXX-SDW-ST-FO-00007 C0 Latest RAM-MIP Shop Drawing Structural Foundation Engr. Shaheen 28-Aug-24 11-Sep-24 9-Sep-24 B Closed 12 Aconex
005757 (1500X1500)
UT-Utilities &
WF-005791 R02Z00-C021-JVC-XX-XXX-SDW-UT-PW-01620C0 re-s Proposed Potable Water Network at KAAR zone 08 Plan and Profile Zone 08 Shop Drawing Potable Water Engr. Fawzy 29-Aug-24 12-Sep-24 4-Sep-24 B Closed 6 Aconex
JVC-WTRAN- Infrastructure
005491
Latest Status
D 0 1242
JVC-WTRAN- Response
ACONEX
Workflow
005491 UT-Utilities & Total
Workflow Document JVC Planned WSP Status
B Overdue Overdue Submittal
WF-005791 Transmittal Drawing No. Rev. Status
R02Z00-C021-JVC-XX-XXX-SDW-UT-PW-01656C0 re-s Proposed Potable Water Network at KAAR zone 08 Plan and Profile
Description Zone 08
Location Shop Drawing Discipline
Infrastructure
Potable Water Submitted
Sub-Discipline by 29-Aug-24 12-Sep-24 4-Sep-24
Engr. Fawzy Closed
Status 6
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawing for Proposed Storm Water Drainage Network - KAAR UT-Utilities & date
WF-005836 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01410C1 Latest Zone 08 Shop Drawing Storm Water Engr. Fawzy 31-Aug-24 14-Sep-24 7-Sep-24 B Closed Today
7 Aconex
(Zone 08) Infrastructure
Shop Drawing for Proposed Storm Water Drainage Network - KAAR UT-Utilities &
WF-005836 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01411C1 Latest Zone 08 Shop Drawing Storm Water Engr. Fawzy 31-Aug-24 14-Sep-24 7-Sep-24 B Closed 7 Aconex
JVC-WTRAN- (Zone 08) Infrastructure
005535 Shop Drawing for Proposed Storm Water Drainage Network - KAAR UT-Utilities &
WF-005836 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01460C1 re-s Zone 08 Shop Drawing Storm Water Engr. Fawzy 31-Aug-24 14-Sep-24 7-Sep-24 B Closed 7 Aconex
(Zone 08) Infrastructure
Shop Drawing for Proposed Storm Water Drainage Network - KAAR UT-Utilities &
WF-005836 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01462C1 re-s Zone 08 Shop Drawing Storm Water Engr. Fawzy 31-Aug-24 14-Sep-24 7-Sep-24 B Closed 7 Aconex
(Zone 08) Infrastructure
Shop Drawings Layout for Dewatering Works for Lift Station 06 at
WF-005900 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-06001-C0 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Sep-24 17-Sep-24 15-Sep-24 Terminated Aconex
JVC-WTRAN- Zone 01
005596 Shop Drawings Cross-Section for Dewatering Works for Lift
WF-005900 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-06002-C0 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Sep-24 17-Sep-24 15-Sep-24 Terminated Aconex
Station 06 at Zone 01
Excavation Cross section of Junction Haram & Airport Tunnel(Zone05
WF-005934 R02Z00-C021-JVC-00-XXX-SDW-CL-CL-07551 C1 Latest Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 4-Sep-24 18-Sep-24 21-Sep-24 B Closed 17 Aconex
& 07 at Sta 1+980 to 2+032.098, 0+020-0+040)
Excavation Cross section of Junction Haram & Airport Tunnel(Zone05
WF-005934 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07552 C1 Latest Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 4-Sep-24 18-Sep-24 21-Sep-24 B Closed 17 Aconex
& 07 at Sta 1+980 to 2+032.098, 0+020-0+040)
Excavation Cross section of Junction Haram & Airport Tunnel(Zone05
WF-005934 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07553 C1 Latest Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 4-Sep-24 18-Sep-24 21-Sep-24 B Closed 17 Aconex
& 07 at Sta 1+980 to 2+032.098, 0+020-0+040)
Excavation Cross section of Junction Haram & Airport Tunnel(Zone05
WF-005934 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07554 C1 Latest Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 4-Sep-24 18-Sep-24 21-Sep-24 B Closed 17 Aconex
& 07 at Sta 1+980 to 2+032.098, 0+020-0+040)
JVC-WTRAN- Excavation Cross section of Junction Haram & Airport Tunnel(Zone05
WF-005934 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07555 C1 Latest Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 4-Sep-24 18-Sep-24 21-Sep-24 B Closed 17 Aconex
005628 & 07 at Sta 1+980 to 2+032.098, 0+020-0+040)
Excavation Cross section of Junction Haram & Airport Tunnel(Zone05
WF-005934 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07556 C1 Latest Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 4-Sep-24 18-Sep-24 21-Sep-24 B Closed 17 Aconex
& 07 at Sta 1+980 to 2+032.098, 0+020-0+040)
Excavation Cross section of Junction Haram & Airport Tunnel(Zone05
WF-005934 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-07557 C1 Latest Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 4-Sep-24 18-Sep-24 21-Sep-24 B Closed 17 Aconex
& 07 at Sta 1+980 to 2+032.098, 0+020-0+040)
Excavation Cross section of Junction Haram & Airport Tunnel(Zone05
WF-005934 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-07558 C1 Latest Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 4-Sep-24 18-Sep-24 21-Sep-24 B Closed 17 Aconex
& 07 at Sta 1+980 to 2+032.098, 0+020-0+040)
Excavation Cross section of Junction Haram & Airport Tunnel(Zone05
WF-005934 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-07559 C1 Latest Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 4-Sep-24 18-Sep-24 21-Sep-24 B Closed 17 Aconex
& 07 at Sta 1+980 to 2+032.098, 0+020-0+040)
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005978 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07767 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 5-Sep-24 19-Sep-24 21-Sep-24 B Closed 16 Aconex
from Sta: 0+320 to 0+440
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005978 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07768 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 5-Sep-24 19-Sep-24 21-Sep-24 B Closed 16 Aconex
from Sta: 0+320 to 0+440
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005978 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07769 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 5-Sep-24 19-Sep-24 21-Sep-24 B Closed 16 Aconex
from Sta: 0+320 to 0+440
JVC-WTRAN- Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005978 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07770 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 5-Sep-24 19-Sep-24 21-Sep-24 B Closed 16 Aconex
005671 from Sta: 0+320 to 0+440
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005978 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07771 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 5-Sep-24 19-Sep-24 21-Sep-24 B Closed 16 Aconex
from Sta: 0+320 to 0+440
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005978 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07772 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 5-Sep-24 19-Sep-24 21-Sep-24 B Closed 16 Aconex
from Sta: 0+320 to 0+440
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005978 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07773 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 5-Sep-24 19-Sep-24 21-Sep-24 B Closed 16 Aconex
from Sta: 0+320 to 0+440
UT-Utilities &
WF-006097 R02Z00-C021-JVC-XX-XXX-SDW-UT-PW-01620C1 Latest Proposed Potable Water Network at KAAR zone 08 Plan and Profile Zone 08 Shop Drawing Potable Water Engr. Fawzy 10-Sep-24 24-Sep-24 21-Sep-24 B Closed 11 Aconex
JVC-WTRAN- Infrastructure
005787 UT-Utilities &
WF-006097 R02Z00-C021-JVC-XX-XXX-SDW-UT-PW-01656C1 Latest Proposed Potable Water Network at KAAR zone 08 Plan and Profile Zone 08 Shop Drawing Potable Water Engr. Fawzy 10-Sep-24 24-Sep-24 21-Sep-24 B Closed 11 Aconex
Infrastructure
Shop Drawing for Soil Improvement Works in Zone 03 from sta.
WF-006118 R02Z00-C021-JVC-03-XXX-SDW-GT-GT-01001C4 Latest Zone 03 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Sep-24 25-Sep-24 28-Sep-24 B Closed 17 Aconex
1+020 to 1+260 incl ES09 and ES10 - General Layout
Shop Drawing for Soil Improvement Works in Zone 03 from sta.
WF-006118 R02Z00-C021-JVC-03-XXX-SDW-GT-GT-01002C4 Latest Zone 03 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Sep-24 25-Sep-24 28-Sep-24 B Closed 17 Aconex
1+020 to 1+260 incl ES09 and ES10 - Detailed Layout for ES
Shop Drawing for Soil Improvement Works in Zone 03 from sta.
WF-006118 R02Z00-C021-JVC-03-XXX-SDW-GT-GT-01003C4 Latest Zone 03 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Sep-24 25-Sep-24 28-Sep-24 B Closed 17 Aconex
1+020 to 1+260 incl ES09 and ES10 - Detailed Layout
Shop Drawing for Soil Improvement Works in Zone 03 from sta.
WF-006118 R02Z00-C021-JVC-03-XXX-SDW-GT-GT-01004C4 Latest Zone 03 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Sep-24 25-Sep-24 28-Sep-24 B Closed 17 Aconex
1+020 to 1+260 incl ES09 and ES10 - Cross Sections
Shop Drawing for Soil Improvement Works in Zone 03 from sta.
WF-006118 R02Z00-C021-JVC-03-XXX-SDW-GT-GT-01005C4 Latest Zone 03 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Sep-24 25-Sep-24 28-Sep-24 B Closed 17 Aconex
1+020 to 1+260 incl ES09 and ES10 - Coordinates Sheet 1
JVC-WTRAN- Shop Drawing for Soil Improvement Works in Zone 03 from sta.
WF-006118 R02Z00-C021-JVC-03-XXX-SDW-GT-GT-01006C4 Latest Zone 03 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Sep-24 25-Sep-24 28-Sep-24 B Closed 17 Aconex
005671 1+020 to 1+260 incl ES09 and ES10 - Coordinates Sheet 2
Shop Drawing for Soil Improvement Works in Zone 03 from sta.
WF-006118 R02Z00-C021-JVC-03-XXX-SDW-GT-GT-01007C4 Latest Zone 03 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Sep-24 25-Sep-24 28-Sep-24 B Closed 17 Aconex
1+020 to 1+260 incl ES09 and ES10 - Coordinates Sheet 3
Shop Drawing for Soil Improvement Works in Zone 03 from sta.
WF-006118 R02Z00-C021-JVC-03-XXX-SDW-GT-GT-01008C4 Latest Zone 03 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Sep-24 25-Sep-24 28-Sep-24 B Closed 17 Aconex
1+020 to 1+260 incl ES09 and ES10 - Coordinates Sheet 4
Shop Drawing for Soil Improvement Works in Zone 03 from sta.
WF-006118 R02Z00-C021-JVC-03-XXX-SDW-GT-GT-01009C4 Latest Zone 03 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Sep-24 25-Sep-24 28-Sep-24 B Closed 17 Aconex
1+020 to 1+260 incl ES09 and ES10 - Coordinates Sheet 5
Shop Drawing for Soil Improvement Works in Zone 03 from sta.
WF-006118 R02Z00-C021-JVC-03-XXX-SDW-GT-GT-01010C4 Latest Zone 03 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Sep-24 25-Sep-24 28-Sep-24 B Closed 17 Aconex
1+020 to 1+260 incl ES09 and ES10 - Coordinates Sheet 6
Shop Drawing for Soil Improvement Works in Zone 03 from sta.
WF-006118 R02Z00-C021-JVC-03-XXX-SDW-GT-GT-01011C4 Latest Zone 03 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Sep-24 25-Sep-24 28-Sep-24 B Closed 17 Aconex
1+020 to 1+260 incl ES09 and ES10 - Coordinates Sheet 7
JVC-WTRAN- As-Built CMC Layout for Zone 05 from sta. 1+833.979 to
WF-005928 R02Z00-C021-JVC-05-XXX-ABD-GT-GT-01002 C0 Latest Zone 03 As Built Geotechnical Geotechnical Engr. Yaseen 4-Sep-24 18-Sep-24 12-Sep-24 B Closed 8 Aconex
005623 1+853.979 (Seg. J-Z05-05)
Shop Drawing for Indicative section of Material Backfilling at Zone-03
WF-006177 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07657 C0 re-s Zone 03 Shop Drawing Civil Civil Engr. Sunil 14-Sep-24 28-Sep-24 28-Sep-24 B Closed 14 Aconex
from Sta: 1+140 to 1+260
Shop Drawing for Indicative section of Material Backfilling at Zone-03
WF-006177 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07658 C0 re-s Zone 03 Shop Drawing Civil Civil Engr. Sunil 14-Sep-24 28-Sep-24 28-Sep-24 B Closed 14 Aconex
from Sta: 1+140 to 1+260
Shop Drawing for Indicative section of Material Backfilling at Zone-03
WF-006177 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07659 C0 re-s Zone 03 Shop Drawing Civil Civil Engr. Sunil 14-Sep-24 28-Sep-24 28-Sep-24 B Closed 14 Aconex
from Sta: 1+140 to 1+260
JVC-WTRAN- Shop Drawing for Indicative section of Material Backfilling at Zone-03
WF-006177 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07660 C0 re-s Zone 03 Shop Drawing Civil Civil Engr. Sunil 14-Sep-24 28-Sep-24 28-Sep-24 B Closed 14 Aconex
005861 from Sta: 1+140 to 1+260
Shop Drawing for Indicative section of Material Backfilling at Zone-03
WF-006177 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07661 C0 re-s Zone 03 Shop Drawing Civil Civil Engr. Sunil 14-Sep-24 28-Sep-24 28-Sep-24 B Closed 14 Aconex
from Sta: 1+140 to 1+260
Latest Status
D 0 1242
JVC-WTRAN-
005861
Response
ACONEX
Workflow Shop Drawing for Indicative section of Material Backfilling at Zone-03 Total
Workflow Document JVC Planned 28-Sep-24
WSP Status
B Overdue Overdue Submittal
WF-006177 TransmittalR02Z00-C021-JVC-03-XXX-SDW-CL-CL-07662
Drawing No. Rev.
C0 Status
re-s
from Sta: 1+140 to 1+260 Description
Zone 03
Location Shop Drawing Civil
Discipline Civil
Sub-Discipline Engr. Sunilby 14-Sep-24
Submitted 28-Sep-24 Closed
Status 14
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawing for Indicative section of Material Backfilling at Zone-03 date
WF-006177 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07663 C0 re-s Zone 03 Shop Drawing Civil Civil Engr. Yaseen 14-Sep-24 28-Sep-24 28-Sep-24 B Closed Today
14 Aconex
from Sta: 1+140 to 1+260
Shop Drawing for Indicative Section of Material Backfilling at Zone-08
WF-006224 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07774 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 16-Sep-24 30-Sep-24 28-Sep-24 B Closed 12 Aconex
from Sta: 0+460-0+552.99
Shop Drawing for Indicative Section of Material Backfilling at Zone-08
WF-006224 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07775 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 16-Sep-24 30-Sep-24 28-Sep-24 B Closed 12 Aconex
from Sta: 0+460-0+552.99
Shop Drawing for Indicative Section of Material Backfilling at Zone-08
WF-006224 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07776 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 16-Sep-24 30-Sep-24 28-Sep-24 B Closed 12 Aconex
from Sta: 0+460-0+552.99
JVC-WTRAN- Shop Drawing for Indicative Section of Material Backfilling at Zone-08
WF-006224 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07777 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 16-Sep-24 30-Sep-24 28-Sep-24 B Closed 12 Aconex
005904 from Sta: 0+460-0+552.99
Shop Drawing for Indicative Section of Material Backfilling at Zone-08
WF-006224 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07778 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 16-Sep-24 30-Sep-24 28-Sep-24 B Closed 12 Aconex
from Sta: 0+460-0+552.99
Shop Drawing for Indicative Section of Material Backfilling at Zone-08
WF-006224 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07779 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 16-Sep-24 30-Sep-24 28-Sep-24 B Closed 12 Aconex
from Sta: 0+460-0+552.99
Shop Drawing for Indicative Section of Material Backfilling at Zone-08
WF-006224 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07780 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Yaseen 16-Sep-24 30-Sep-24 28-Sep-24 B Closed 12 Aconex
from Sta: 0+460-0+552.99
UT-Utilities & Sewerage
WF-006230 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01200C1 Latest Sewage Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing Engr. Fawzy 16-Sep-24 30-Sep-24 1-Oct-24 B Closed 15 Aconex
Infrastructure Effluent
UT-Utilities & Sewerage
WF-006230 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01201C1 Latest Sewage Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing Engr. Fawzy 16-Sep-24 30-Sep-24 1-Oct-24 B Closed 15 Aconex
Infrastructure Effluent
UT-Utilities & Sewerage
WF-006230 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01202C1 Latest Sewage Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing Engr. Fawzy 16-Sep-24 30-Sep-24 1-Oct-24 B Closed 15 Aconex
JVC-WTRAN- Infrastructure Effluent
005910 UT-Utilities & Sewerage
WF-006230 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01254C1 Latest Sewage Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing Engr. Fawzy 16-Sep-24 30-Sep-24 1-Oct-24 B Closed 15 Aconex
Infrastructure Effluent
UT-Utilities & Sewerage
WF-006230 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01255C1 Latest Sewage Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing Engr. Fawzy 16-Sep-24 30-Sep-24 1-Oct-24 B Closed 15 Aconex
Infrastructure Effluent
UT-Utilities & Sewerage
WF-006230 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01264C1 Latest Sewage Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing Engr. Fawzy 16-Sep-24 30-Sep-24 1-Oct-24 B Closed 15 Aconex
Infrastructure Effluent
JVC-WTRAN- As-Built CMC Layout for Zone 05 from Sta. 1+853.979 to 1+873.979
WF-006244 R02Z00-C021-JVC-05-XXX-ABD-GT-GT-01004 C0 Latest Zone 05 As Built Geotechnical Geotechnical Engr. Yaseen 17-Sep-24 1-Oct-24 28-Sep-24 B Closed 11 Aconex
005921 (Seg. J-Z05-06) incl. ES 19
JVC-WTRAN- As-Built CMC Layout for Zone 05 from Sta. 1+873.979 to 1+893.979
WF-006245 R02Z00-C021-JVC-05-XXX-ABD-GT-GT-01005 C0 Latest Zone 05 As Built Geotechnical Geotechnical Engr. Yaseen 17-Sep-24 1-Oct-24 28-Sep-24 B Closed 11 Aconex
005922 (Seg. J-Z05-07) incl. ES 20
Shop Drawings General Layout and Coordinates for Shoring works in
WF-006306 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-04007C0 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 18-Sep-24 2-Oct-24 5-Oct-24 B Closed 17 Aconex
JVC-WTRAN- Zone 01 Wet Utility Culvert from sta. 0+015 to 0+070
005979 Shop Drawings Cross-Sections for Shoring works in Zone 01 Wet
WF-006306 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-04008C0 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 18-Sep-24 2-Oct-24 5-Oct-24 B Closed 17 Aconex
Utility Culvert from sta. 0+015 to 0+070
JVC-WTRAN-
WF-006312 R02Z00-C021-JVC-00-XXX-SDW-ST-FO-00008 C0 Latest Shop Drawing for Telecom Handholes RAM-MIP Shop Drawing Structural Foundation Engr. Shaheen 19-Sep-24 3-Oct-24 1-Oct-24 C Open 125 Aconex
005984
Shop Drawing for Indicative Section of Material Backfilling at Zone-03
WF-006336 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07651 C0 re-s Zone 03 Shop Drawing Civil Civil Engr. Sunil 21-Sep-24 5-Oct-24 5-Oct-24 B Closed 14 Aconex
from Sta: 1+020-1+120
Shop Drawing for Indicative Section of Material Backfilling at Zone-03
WF-006336 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07652 C0 re-s Zone 03 Shop Drawing Civil Civil Engr. Sunil 21-Sep-24 5-Oct-24 5-Oct-24 B Closed 14 Aconex
from Sta: 1+020-1+120
Shop Drawing for Indicative Section of Material Backfilling at Zone-03
WF-006336 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07653 C0 re-s Zone 03 Shop Drawing Civil Civil Engr. Sunil 21-Sep-24 5-Oct-24 5-Oct-24 B Closed 14 Aconex
JVC-WTRAN- from Sta: 1+020-1+120
006008 Shop Drawing for Indicative Section of Material Backfilling at Zone-03
WF-006336 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07654 C0 re-s Zone 03 Shop Drawing Civil Civil Engr. Sunil 21-Sep-24 5-Oct-24 5-Oct-24 B Closed 14 Aconex
from Sta: 1+020-1+120
Shop Drawing for Indicative Section of Material Backfilling at Zone-03
WF-006336 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07655 C0 re-s Zone 03 Shop Drawing Civil Civil Engr. Sunil 21-Sep-24 5-Oct-24 5-Oct-24 B Closed 14 Aconex
from Sta: 1+020-1+120
Shop Drawing for Indicative Section of Material Backfilling at Zone-03
WF-006336 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07656 C0 re-s Zone 03 Shop Drawing Civil Civil Engr. Sunil 21-Sep-24 5-Oct-24 5-Oct-24 B Closed 14 Aconex
from Sta: 1+020-1+120
Shop Drawing for Indicative section of Material Backfilling at Zone-04
WF-006351 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07598 C0 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 21-Sep-24 5-Oct-24 5-Oct-24 B Closed 14 Aconex
from Sta: 1+280 to 1+320
JVC-WTRAN- Shop Drawing for Indicative section of Material Backfilling at Zone-04
WF-006351 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07599 C0 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 21-Sep-24 5-Oct-24 5-Oct-24 B Closed 14 Aconex
006023 from Sta: 1+280 to 1+320
Shop Drawing for Indicative section of Material Backfilling at Zone-04
WF-006351 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07600 C0 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 21-Sep-24 5-Oct-24 5-Oct-24 B Closed 14 Aconex
from Sta: 1+280 to 1+320
Shop drawings for Medium Voltage Network Plan, Profile, Cable duct
Power Medium
WF-006392 R02Z00-C021-JVC-10-XXX-SDW-EL-MV-01301C0 re-s schedules and manholes (SECTIONS AND DETAILS) at Tunnel 02- Zone 10 Shop Drawing Electrical Engr. Sherif 24-Sep-24 8-Oct-24 7-Oct-24 C Closed 13 Aconex
Voltage
Zone drawings
Shop 10 for Medium Voltage Network Plan, Profile, Cable duct
Power Medium
WF-006392 R02Z00-C021-JVC-10-XXX-SDW-EL-MV-01302C0 re-s schedules and manholes (SECTIONS AND DETAILS) at Tunnel 02- Zone 10 Shop Drawing Electrical Engr. Sherif 24-Sep-24 8-Oct-24 7-Oct-24 C Closed 13 Aconex
Voltage
Zone 10
Shop drawings for Medium Voltage Network Plan, Profile, Cable duct
Power Medium
WF-006392 R02Z00-C021-JVC-10-XXX-SDW-EL-MV-01303C0 re-s schedules and manholes (SECTIONS AND DETAILS) at Tunnel 02- Zone 10 Shop Drawing Electrical Engr. Sherif 24-Sep-24 8-Oct-24 7-Oct-24 C Closed 13 Aconex
Voltage
Zone drawings
Shop 10 for Medium Voltage Network Plan, Profile, Cable duct
JVC-WTRAN- Power Medium
WF-006392 R02Z00-C021-JVC-10-XXX-SDW-EL-MV-01304C0 re-s schedules and manholes (SECTIONS AND DETAILS) at Tunnel 02- Zone 10 Shop Drawing Electrical Engr. Sherif 24-Sep-24 8-Oct-24 7-Oct-24 C Closed 13 Aconex
006063 Voltage
Zone drawings
Shop 10 for Medium Voltage Network Plan, Profile, Cable duct
Power Medium
WF-006392 R02Z00-C021-JVC-10-XXX-SDW-EL-MV-01305C0 re-s schedules and manholes (SECTIONS AND DETAILS) at Tunnel 02- Zone 10 Shop Drawing Electrical Engr. Sherif 24-Sep-24 8-Oct-24 7-Oct-24 C Closed 13 Aconex
Voltage
Zone 10
Shop drawings for Medium Voltage Network Plan, Profile, Cable duct
Power Medium
WF-006392 R02Z00-C021-JVC-10-XXX-SDW-EL-MV-01306C0 re-s schedules and manholes (SECTIONS AND DETAILS) at Tunnel 02- Zone 10 Shop Drawing Electrical Engr. Sherif 24-Sep-24 8-Oct-24 7-Oct-24 C Closed 13 Aconex
Voltage
Zone drawings
Shop 10 for Medium Voltage Network Plan, Profile, Cable duct
Power Medium
WF-006392 R02Z00-C021-JVC-10-XXX-SDW-EL-MV-01307C0 re-s schedules and manholes (SECTIONS AND DETAILS) at Tunnel 02- Zone 10 Shop Drawing Electrical Engr. Sherif 24-Sep-24 8-Oct-24 7-Oct-24 C Closed 13 Aconex
Voltage
Zone 10
Shop Drawing for Indicative section of Material Backfilling at Zone-04
WF-006460 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07613-C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone-04
WF-006460 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07614-C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone-04
WF-006460 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07615-C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone-04
WF-006460 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07616-C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone-04
WF-006460 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07617-C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone-04
WF-006460 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07618-C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 1+520 to 1+760
JVC-WTRAN- As per Engr.
006129 Nahell
Latest Status
D 0 1242
Response
ACONEX
Workflow
JVC-WTRAN- Shop Drawing for Indicative section of Material Backfilling at Zone-04 Total As per Engr.
Workflow Document JVC Planned 10-Oct-24
WSP Status Terminated Overdue Overdue Submittal
WF-006460 Transmittal
006129 Drawing No. Rev. Latest
R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07619-C0 Status from Sta: 1+520 to 1+760 Description Zone 04
Location Shop Drawing Civil
Discipline Civil
Sub-Discipline Engr. Sunilby 26-Sep-24
Submitted 10-Oct-24 Status Duration Aconex
Ref.
Alternative Ref. #
Nahell Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawing for Indicative section of Material Backfilling at Zone-04 date
WF-006460 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07620-C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Today Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone-04
WF-006460 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07621-C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone-04
WF-006460 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07622-C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone-04
WF-006460 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07623-C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone-04
WF-006460 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07624-C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone-04
WF-006460 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07625-C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006462 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07664-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+520 to 0+700
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006462 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07665-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+520 to 0+700
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006462 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07666-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+520 to 0+700
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006462 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07667-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+520 to 0+700
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006462 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07668-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+520 to 0+700
JVC-WTRAN- Shop Drawing for Indicative section of Material Backfilling at Zone-02 As per Engr.
WF-006462 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07669-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
006130 from Sta: 0+520 to 0+700 Nahell
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006462 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07670-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+520 to 0+700
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006462 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07671-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+520 to 0+700
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006462 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07672-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+520 to 0+700
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006462 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07673-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+520 to 0+700
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006462 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07674-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+520 to 0+700
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006463 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07675-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+720 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006463 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07676-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+720 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006463 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07677-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+720 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006463 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07678-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+720 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006463 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07679-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
JVC-WTRAN- from Sta: 0+720 to 0+900 As per Engr.
006131 Shop Drawing for Indicative section of Material Backfilling at Zone-02 Nahell
WF-006463 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07680-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+720 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006463 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07681-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+720 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006463 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07682-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+720 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006463 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07683-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+720 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006463 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07684-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+720 to 0+900
Transportation Transportation &
WF-006498 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06212 C0 Latest Cross section for kaar tunnel from st 0+000 to St 0+135.13 Zone 08 Shop Drawing Engr. Khalid 28-Sep-24 12-Oct-24 5-Oct-24 A Closed 7 Aconex
& Road Road
Transportation Transportation &
WF-006498 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06213 C0 Latest Cross section for kaar tunnel from st 0+000 to St 0+135.13 Zone 08 Shop Drawing Engr. Khalid 28-Sep-24 12-Oct-24 5-Oct-24 A Closed 7 Aconex
JVC-WTRAN- & Road Road
006165 Transportation Transportation &
WF-006498 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06214 C0 Latest Cross section for kaar tunnel from st 0+000 to St 0+135.13 Zone 08 Shop Drawing Engr. Khalid 28-Sep-24 12-Oct-24 5-Oct-24 A Closed 7 Aconex
& Road Road
Transportation Transportation &
WF-006498 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06215 C0 Latest Cross section for kaar tunnel from st 0+000 to St 0+135.13 Zone 08 Shop Drawing Engr. Khalid 28-Sep-24 12-Oct-24 5-Oct-24 A Closed 7 Aconex
& Road Road
UT-Utilities & UT-Utilities &
WF-006547 R02Z00-C021-JVC-08-XXX-SDW-UT-UT-00227 C0 Latest Combined Plan at KAAR-Zone 08 Zone 08 Shop Drawing Engr. Fawzy 29-Sep-24 13-Oct-24 6-Oct-24 B Closed 7 Aconex
JVC-WTRAN- Infrastructure Infrastructure
006171 UT-Utilities & UT-Utilities &
WF-006547 R02Z00-C021-JVC-08-XXX-SDW-UT-UT-00228 C0 Latest Combined Plan at KAAR-Zone 08 Zone 08 Shop Drawing Engr. Fawzy 29-Sep-24 13-Oct-24 6-Oct-24 B Closed 7 Aconex
Infrastructure Infrastructure
JVC-WTRAN- As-Built CMC Layout for Zone 05 from Sta. 1+893.979 to 1+968.979
WF-006617 R02Z00-C021-JVC-05-XXX-ABD-GT-GT-01003 C0 Latest Zone 08 As Built Geotechnical Geotechnical Engr. Yaseen 1-Oct-24 15-Oct-24 3-Oct-24 B Closed 2 Aconex
006278 (Seg. J-Z05-08 to 11) [partially]
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006630 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02001C4 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 2-Oct-24 16-Oct-24 8-Oct-24 C Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 1
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006630 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02002C4 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 2-Oct-24 16-Oct-24 8-Oct-24 C Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006630 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02003C4 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 2-Oct-24 16-Oct-24 8-Oct-24 C Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006630 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02004C4 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 2-Oct-24 16-Oct-24 8-Oct-24 C Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Cross-Sections
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006630 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02005C4 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 2-Oct-24 16-Oct-24 8-Oct-24 C Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 1
JVC-WTRAN- Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006630 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02006C4 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 2-Oct-24 16-Oct-24 8-Oct-24 C Closed 6 Aconex
006290 from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006630 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02007C4 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 2-Oct-24 16-Oct-24 8-Oct-24 C Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 3
Latest Status
D 0 1242
JVC-WTRAN-
006290
Response
ACONEX
Workflow Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09 Total
Workflow Document JVC Planned WSP Status
C Overdue Overdue Submittal
WF-006630 Transmittal Drawing No. Rev. Status
R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02008C4 re-s Description
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 4
Zone 09
Location Shop Drawing Geotechnical
Discipline Geotechnical Submitted
Sub-Discipline Engr. Yaseen
by 2-Oct-24 16-Oct-24 8-Oct-24 Closed
Status 6
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09 date
WF-006630 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02009C4 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 2-Oct-24 16-Oct-24 8-Oct-24 C Closed Today
6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 5
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006630 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02010C4 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 2-Oct-24 16-Oct-24 8-Oct-24 C Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 6
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006630 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02011C4 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 2-Oct-24 16-Oct-24 8-Oct-24 C Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 7
JVC-WTRAN- As Built CMC Layout for Zone 02 Intersection Jadat Al Haram Tunnel
WF-006699 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01020 C0 Latest Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 5-Oct-24 19-Oct-24 12-Oct-24 B Closed 7 Aconex
006345 and KAAR Tunnel from sta. 0+910.033 To 0+993.979 (INT-01)
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01400C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01403C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01404C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01405C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01406C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01408C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01409C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01412C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01413C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01419C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01420C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01421C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01422C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01423C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01424C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01425C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01426C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01427C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01428C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01429C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01430C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
JVC-WTRAN- 08 and 09) Infrastructure
006409 Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01431C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01432C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01433C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01434C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01435C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01451C1 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01453C1 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01454C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01455C1 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01456C1 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01457C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01458C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01459C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01460C2 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01461C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01462C2 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Latest Status
D 0 1242
Response
ACONEX
Workflow Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities & Total
Workflow Document JVC Planned 23-Oct-24
WSP Status
C Overdue Overdue Submittal
WF-006768 Transmittal Drawing No. Rev. Status
R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01463C1 re-s
08 and 09) Description RAM-MIP
Location Shop Drawing Discipline
Infrastructure
Storm Water Submitted
Sub-Discipline by 7-Oct-24
Engr. Fawzy 21-Oct-24 Closed
Status 16
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities & date
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01464C2 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed Today
16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01465C1 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01466C1 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01467C1 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
JVC-WTRAN- UT-Utilities &
WF-006792 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-05302C0 Latest Storm Water Network Precast Catch Basin Details RAM-MIP Shop Drawing Storm Water Engr. Fawzy 8-Oct-24 22-Oct-24 20-Oct-24 B Closed 12 Aconex
006431 Infrastructure
Proposed Storm Water Drainage Network Catch Basin Plan for Part UT-Utilities &
WF-006805 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01442C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 9-Oct-24 23-Oct-24 22-Oct-24 C Closed 13 Aconex
07 Infrastructure
Proposed Storm Water Drainage Network Catch Basin Plan for Part UT-Utilities &
WF-006805 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01468C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 9-Oct-24 23-Oct-24 22-Oct-24 C Closed 13 Aconex
07 Infrastructure
Proposed Storm Water Drainage Network Catch Basin Plan for Part UT-Utilities &
WF-006805 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01469C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 9-Oct-24 23-Oct-24 22-Oct-24 C Closed 13 Aconex
JVC-WTRAN- 07 Infrastructure
006444 Proposed Storm Water Drainage Network Catch Basin Plan for Part UT-Utilities &
WF-006805 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01470C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 9-Oct-24 23-Oct-24 22-Oct-24 C Closed 13 Aconex
07 Infrastructure
Proposed Storm Water Drainage Network Catch Basin Plan for Part UT-Utilities &
WF-006805 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01471C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 9-Oct-24 23-Oct-24 22-Oct-24 C Closed 13 Aconex
07 Infrastructure
Proposed Storm Water Drainage Network Catch Basin Plan for Part UT-Utilities &
WF-006805 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01472C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 9-Oct-24 23-Oct-24 22-Oct-24 C Closed 13 Aconex
07 Infrastructure
JVC-WTRAN- UT-Utilities &
WF-006825 R02Z00-C021-JVC-XX-XXX-SDW-UT-PW-08502C0 Latest Potable Water Network Thrust Block Details for Horizontal Bends RAM-MIP Shop Drawing Potable Water Engr. Fawzy 9-Oct-24 23-Oct-24 22-Oct-24 B Closed 13 Aconex
006464 Infrastructure
Shop drawings for STREET LIGHT NETWORK LAYOUT AND
WF-006830 R02Z00-C021-JVC-00-XXX-SDW-EL-LG-90001 C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 9-Oct-24 23-Oct-24 21-Oct-24 B Closed 12 Aconex
COORDINATES WALLS FOR KAAR TUNNEL ZONE-08
Shop drawings for STREET LIGHT NETWORK LAYOUT AND
WF-006830 R02Z00-C021-JVC-00-XXX-SDW-EL-LG-90002 C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 9-Oct-24 23-Oct-24 21-Oct-24 B Closed 12 Aconex
COORDINATES WALLS FOR KAAR TUNNEL ZONE-08
Shop drawings for STREET LIGHT NETWORK LAYOUT AND
WF-006830 R02Z00-C021-JVC-00-XXX-SDW-EL-LG-90003 C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 9-Oct-24 23-Oct-24 21-Oct-24 B Closed 12 Aconex
COORDINATES WALLS FOR KAAR TUNNEL ZONE-08
JVC-WTRAN- Shop drawings for STREET LIGHT NETWORK LAYOUT AND
WF-006830 R02Z00-C021-JVC-00-XXX-SDW-EL-LG-90004 C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 9-Oct-24 23-Oct-24 21-Oct-24 B Closed 12 Aconex
006469 COORDINATES WALLS FOR KAAR TUNNEL ZONE-08
Shop drawings for STREET LIGHT NETWORK LAYOUT AND
WF-006830 R02Z00-C021-JVC-00-XXX-SDW-EL-LG-90005 C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 9-Oct-24 23-Oct-24 21-Oct-24 B Closed 12 Aconex
COORDINATES WALLS FOR KAAR TUNNEL ZONE-08
Shop drawings for STREET LIGHT NETWORK LAYOUT AND
WF-006830 R02Z00-C021-JVC-00-XXX-SDW-EL-LG-90006 C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 9-Oct-24 23-Oct-24 21-Oct-24 B Closed 12 Aconex
COORDINATES WALLS FOR KAAR TUNNEL ZONE-08
Shop drawings for STREET LIGHT NETWORK LAYOUT AND
WF-006830 R02Z00-C021-JVC-00-XXX-SDW-EL-LG-90007 C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 9-Oct-24 23-Oct-24 21-Oct-24 B Closed 12 Aconex
COORDINATES WALLS FOR KAAR TUNNEL ZONE-08
Shop drawings for Medium Voltage Network Plan, Profile, Cable duct
Power Medium
WF-006842 R02Z00-C021-JVC-10-XXX-SDW-EL-MV-01301C1 Latest schedules and manholes (SECTIONS AND DETAILS) at Tunnel 02- Zone 10 Shop Drawing Electrical Engr. Sherif 10-Oct-24 24-Oct-24 23-Oct-24 B Closed 13 Aconex
Voltage
Zone drawings
Shop 10 for Medium Voltage Network Plan, Profile, Cable duct
Power Medium
WF-006842 R02Z00-C021-JVC-10-XXX-SDW-EL-MV-01302C1 Latest schedules and manholes (SECTIONS AND DETAILS) at Tunnel 02- Zone 10 Shop Drawing Electrical Engr. Sherif 10-Oct-24 24-Oct-24 23-Oct-24 B Closed 13 Aconex
Voltage
Zone drawings
Shop 10 for Medium Voltage Network Plan, Profile, Cable duct
Power Medium
WF-006842 R02Z00-C021-JVC-10-XXX-SDW-EL-MV-01303C1 Latest schedules and manholes (SECTIONS AND DETAILS) at Tunnel 02- Zone 10 Shop Drawing Electrical Engr. Sherif 10-Oct-24 24-Oct-24 23-Oct-24 B Closed 13 Aconex
Voltage
Zone 10
Shop drawings for Medium Voltage Network Plan, Profile, Cable duct
JVC-WTRAN- Power Medium
WF-006842 R02Z00-C021-JVC-10-XXX-SDW-EL-MV-01304C1 Latest schedules and manholes (SECTIONS AND DETAILS) at Tunnel 02- Zone 10 Shop Drawing Electrical Engr. Sherif 10-Oct-24 24-Oct-24 23-Oct-24 B Closed 13 Aconex
006478 Voltage
Zone drawings
Shop 10 for Medium Voltage Network Plan, Profile, Cable duct
Power Medium
WF-006842 R02Z00-C021-JVC-10-XXX-SDW-EL-MV-01305C1 Latest schedules and manholes (SECTIONS AND DETAILS) at Tunnel 02- Zone 10 Shop Drawing Electrical Engr. Sherif 10-Oct-24 24-Oct-24 23-Oct-24 B Closed 13 Aconex
Voltage
Zone drawings
Shop 10 for Medium Voltage Network Plan, Profile, Cable duct
Power Medium
WF-006842 R02Z00-C021-JVC-10-XXX-SDW-EL-MV-01306C1 Latest schedules and manholes (SECTIONS AND DETAILS) at Tunnel 02- Zone 10 Shop Drawing Electrical Engr. Sherif 10-Oct-24 24-Oct-24 23-Oct-24 B Closed 13 Aconex
Voltage
Zone 10
Shop drawings for Medium Voltage Network Plan, Profile, Cable duct
Power Medium
WF-006842 R02Z00-C021-JVC-10-XXX-SDW-EL-MV-01307C1 Latest schedules and manholes (SECTIONS AND DETAILS) at Tunnel 02- Zone 10 Shop Drawing Electrical Engr. Sherif 10-Oct-24 24-Oct-24 23-Oct-24 B Closed 13 Aconex
Voltage
Zone 10
Shop Drawings for Shoring Works at Zone 07 North from sta. 0+080
WF-006919 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-04010C0 re-s Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 13-Oct-24 27-Oct-24 21-Oct-24 B Closed 8 Aconex
to 0+143 - General Layout and Co-ordinates
Shop Drawings for Shoring Works at Zone 07 North from sta. 0+080
WF-006919 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-04011C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 13-Oct-24 27-Oct-24 21-Oct-24 B Closed 8 Aconex
to 0+143 - Cross-section Details Sheet 01
Shop Drawings for Shoring Works at Zone 07 North from sta. 0+080
WF-006919 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-04012C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 13-Oct-24 27-Oct-24 21-Oct-24 B Closed 8 Aconex
JVC-WTRAN- to 0+143 - Cross-section Details Sheet 02
006552 Shop Drawings for Shoring Works at Zone 07 North from sta. 0+080
WF-006919 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-04013C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 13-Oct-24 27-Oct-24 21-Oct-24 B Closed 8 Aconex
to 0+143 - Cross-section Details Sheet 03
Shop Drawings for Shoring Works at Zone 07 North from sta. 0+080
WF-006919 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-04014C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 13-Oct-24 27-Oct-24 21-Oct-24 B Closed 8 Aconex
to 0+143 - Cross-section Details Sheet 04
Shop Drawings for Shoring Works at Zone 07 North from sta. 0+080
WF-006919 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-04015C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 13-Oct-24 27-Oct-24 21-Oct-24 B Closed 8 Aconex
to 0+143 - Cross-section Details Sheet 05
Shop Drawings Layout for Soil Improvement Works in Zone 01 from
WF-006926 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02004C4 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 14-Oct-24 28-Oct-24 21-Oct-24 B Closed 7 Aconex
sta. 0+400 to 0+500 incl VTR 01 and LS 06
Shop Drawings Cross-Sections for Soil Improvement Works in Zone
WF-006926 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02005C4 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 14-Oct-24 28-Oct-24 21-Oct-24 B Closed 7 Aconex
JVC-WTRAN- 01 from sta. 0+400 to 0+500 incl VTR 01 and LS 07
006559 Shop Drawings Coordinates Sheet 1 for Soil Improvement Works in
WF-006926 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02006C4 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 14-Oct-24 28-Oct-24 21-Oct-24 B Closed 7 Aconex
Zone 01 from sta. 0+400 to 0+500 incl VTR 01 and LS 08
Shop Drawings Coordinates Sheet 2 for Soil Improvement Works in
WF-006926 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02007C4 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 14-Oct-24 28-Oct-24 21-Oct-24 B Closed 7 Aconex
Zone 01 from sta. 0+400 to 0+500 incl VTR 01 and LS 09
JVC-WTRAN- As Built CMC Layout from sta 0+993.979 to 1+013.979. (Seg. J-Z03-
WF-006927 R02Z00-C021-JVC-03-XXX-ABD-GT-GT-01005 C0 Latest Zone 03 As Built Geotechnical Geotechnical Engr. Yaseen 14-Oct-24 28-Oct-24 16-Oct-24 B Closed 2 Aconex
006560 01)
Shop Drawings for Soil Improvement Works in Zone 07 from sta.
WF-006964 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-01001C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 15-Oct-24 29-Oct-24 21-Oct-24 B Closed 6 Aconex
0+018 to 0+140 - General Layout Sheet 0
Shop Drawings for Soil Improvement Works in Zone 07 from sta.
WF-006964 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-01002C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 15-Oct-24 29-Oct-24 21-Oct-24 B Closed 6 Aconex
0+018 to 0+140 - General Layout Sheet 1
Shop Drawings for Soil Improvement Works in Zone 07 from sta.
WF-006964 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-01003C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 15-Oct-24 29-Oct-24 21-Oct-24 B Closed 6 Aconex
JVC-WTRAN- 0+018 to 0+140 - General Layout Sheet 2
006593 Shop Drawings for Soil Improvement Works in Zone 07 from sta.
WF-006964 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-01004C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 15-Oct-24 29-Oct-24 21-Oct-24 B Closed 6 Aconex
0+018 to 0+140 - Cross-Section Sheet 01
Latest Status
D 0 1242
JVC-WTRAN-
006593
Response
ACONEX
Workflow Shop Drawings for Soil Improvement Works in Zone 07 from sta. Total
Workflow Document JVC Planned 21-Oct-24
WSP Status
B Overdue Overdue Submittal
WF-006964 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-07-XXX-SDW-GT-GT-01005C0 Status 0+018 to 0+140 - Coordinates
Description
Sheet 1
Zone 07
Location Shop Drawing Geotechnical
Discipline Geotechnical Submitted
Sub-Discipline by 15-Oct-24
Engr. Yaseen 29-Oct-24 Closed
Status 6
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawings for Soil Improvement Works in Zone 07 from sta. date
WF-006964 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-01006C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 15-Oct-24 29-Oct-24 21-Oct-24 B Closed Today
6 Aconex
0+018 to 0+140 - Coordinates Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006990 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02001C5 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Oct-24 30-Oct-24 22-Oct-24 B Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 1
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006990 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02002C5 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Oct-24 30-Oct-24 22-Oct-24 B Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006990 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02003C5 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Oct-24 30-Oct-24 22-Oct-24 B Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006990 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02004C5 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Oct-24 30-Oct-24 22-Oct-24 B Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Cross-Sections
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006990 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02005C5 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Oct-24 30-Oct-24 22-Oct-24 B Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 1
JVC-WTRAN- Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006990 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02006C5 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Oct-24 30-Oct-24 22-Oct-24 B Closed 6 Aconex
006593 from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006990 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02007C5 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Oct-24 30-Oct-24 22-Oct-24 B Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006990 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02008C5 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Oct-24 30-Oct-24 22-Oct-24 B Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 4
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006990 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02009C5 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Oct-24 30-Oct-24 22-Oct-24 B Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 5
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006990 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02010C5 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Oct-24 30-Oct-24 22-Oct-24 B Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 6
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006990 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02011C5 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Oct-24 30-Oct-24 22-Oct-24 B Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 7
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00131C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00132C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00133C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00134C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00135C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00136C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00146C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00147C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00148C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00149C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00150C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00151C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00152C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00153C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00154C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00155C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00156C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00157C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00158C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00159C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00160C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00161C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00162C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00163C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00164C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00165C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00166C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00167C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00168C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
JVC-WTRAN-
006674
Latest Status
D 0 1242
Response
ACONEX
Workflow UT-Utilities & UT-Utilities & Total
Workflow Document JVC Planned WSP Status
B Overdue Overdue Submittal
WF-007052 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00169C2 Status Combined Utility Plan for Roads 12 & 13 - D09
Description D09
Location Shop Drawing Discipline
Infrastructure Sub-Discipline Engr. Fawzy 19-Oct-24
Infrastructure Submitted by Submitted
2-Nov-24 4-Nov-24 Closed
Status 16
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Reply Response Code from WSP from JVC
No. as of
JVC-WTRAN- UT-Utilities & UT-Utilities & date
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00170C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed Today
16 Aconex
006674 Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00171C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00172C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00173C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00174C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00175C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00176C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00177C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00178C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00179C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00180C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00181C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00182C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00183C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00184C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00185C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00186C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00187C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00188C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00189C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00190C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00191C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00192C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00193C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00194C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00195C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00196C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00197C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00198C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00199C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00200C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
Shop drawings for Soil Improvement for Zone 4 Including LS05
MIP-JVC-SHD-GEO-
WF-007094 R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01001C5 Latest VTR 06 and ES13, 14, 17 & 18 from sta. 1+260 to sta. 1+773 - Zone 04 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 28-Oct-24 B Closed 8 Aconex
000021-04-B
Layout
Shop Sheet 1 for Soil Improvement for Zone 4 Including LS05
drawings
MIP-JVC-SHD-GEO-
WF-007094 R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01002C5 Latest VTR 06 and ES13, 14, 17 & 18 from sta. 1+260 to sta. 1+774 - Zone 04 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 28-Oct-24 B Closed 8 Aconex
000021-04-B
Layout Sheet 2 for Soil Improvement for Zone 4 Including LS05
Shop drawings
MIP-JVC-SHD-GEO-
WF-007094 R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01003C5 Latest VTR 06 and ES13, 14, 17 & 18 from sta. 1+260 to sta. 1+774 - Zone 04 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 28-Oct-24 B Closed 8 Aconex
000021-04-B
Layout
Shop Sheet 3 for Soil Improvement for Zone 4 Including LS05
drawings
MIP-JVC-SHD-GEO-
WF-007094 R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01004C5 Latest VTR 06 and ES13, 14, 17 & 18 from sta. 1+260 to sta. 1+774 - Cross- Zone 04 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 28-Oct-24 B Closed 8 Aconex
000021-04-B
section Sheet 1for Soil Improvement for Zone 4 Including LS05
Shop drawings
MIP-JVC-SHD-GEO-
WF-007094 R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01005C5 Latest VTR 06 and ES13, 14, 17 & 18 from sta. 1+260 to sta. 1+774 - Cross- Zone 04 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 28-Oct-24 B Closed 8 Aconex
000021-04-B
section
Shop Sheet 2for Soil Improvement for Zone 4 Including PS 03 VTR
drawings
MIP-JVC-SHD-GEO-
WF-007094 R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01006C5 Latest 06 and ES 13, 14, 17 & 18 from sta. 1+260 to sta. 1+773 - Co- Zone 04 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 28-Oct-24 B Closed 8 Aconex
000021-04-B
ordinate
Shop Sheet for
drawings 1 Soil Improvement for Zone 4 Including PS 03 VTR
MIP-JVC-SHD-GEO-
WF-007094 R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01007C5 Latest 06 and ES 13, 14, 17 & 18 from sta. 1+260 to sta. 1+773 - Co- Zone 04 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 28-Oct-24 B Closed 8 Aconex
000021-04-B
ordinate Sheet 2 Soil Improvement for Zone 4 Including PS 03 VTR
Shop drawings for
JVC-WTRAN- MIP-JVC-SHD-GEO-
WF-007094 R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01008C5 Latest 06 and ES 13, 14, 17 & 18 from sta. 1+260 to sta. 1+773 - Co- Zone 04 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 28-Oct-24 B Closed 8 Aconex
006716 000021-04-B
ordinate
Shop Sheet for
drawings 3 Soil Improvement for Zone 4 Including PS 03 VTR
MIP-JVC-SHD-GEO-
WF-007094 R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01009C5 Latest 06 and ES 13, 14, 17 & 18 from sta. 1+260 to sta. 1+773 - Co- Zone 04 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 28-Oct-24 B Closed 8 Aconex
000021-04-B
ordinate Sheet 4 Soil Improvement for Zone 4 Including PS 03 VTR
Shop drawings for
MIP-JVC-SHD-GEO-
WF-007094 R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01010C5 Latest 06 and ES 13, 14, 17 & 18 from sta. 1+260 to sta. 1+773 - Co- Zone 04 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 28-Oct-24 B Closed 8 Aconex
000021-04-B
ordinate Sheet 5
Latest Status
D 0 1242
JVC-WTRAN-
006716
Shop Drawing Submittals E 0 247 Terminated
Response
Shop drawings for Soil Improvement for Zone 4 Including PS 03 VTR ACONEX
Workflow Total MIP-JVC-SHD-GEO-
Workflow Document JVC Planned WSP Status
B Overdue Overdue Submittal
WF-007094 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01011C5 Status 06 and ES 13, 14, 17 & 18 from sta. 1+260 to sta. 1+773 - Co-
Description Zone 04
Location Shop Drawing Geotechnical
Discipline Geotechnical Submitted
Sub-Discipline by 20-Oct-24
Engr. Yaseen 3-Nov-24 28-Oct-24 Closed
Status 8
Duration Aconex
Ref.
Alternative Ref. #
000021-04-B Remarks
Ref. No. ordinate Sheet for
6 Soil Improvement for Zone 4 Including PS 03 VTR Type Submitted Reply Response Code from WSP from JVC
No. Shop drawings as of
date MIP-JVC-SHD-GEO-
WF-007094 R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01012C5 Latest 06 and ES 13, 14, 17 & 18 from sta. 1+260 to sta. 1+773 - Co- Zone 04 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 28-Oct-24 B Closed Today
8 Aconex
000021-04-B
ordinate Sheet for
Shop drawings 7 Soil Improvement for Zone 4 Including PS 03 VTR
MIP-JVC-SHD-GEO-
WF-007094 R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01013C5 Latest 06 and ES 13, 14, 17 & 18 from sta. 1+260 to sta. 1+773 - Co- Zone 04 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 28-Oct-24 B Closed 8 Aconex
000021-04-B
ordinate
Shop Sheet for
drawings 8 Soil Improvement for Zone 4 Including PS 03 VTR
MIP-JVC-SHD-GEO-
WF-007094 R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01014C5 Latest 06 and ES 13, 14, 17 & 18 from sta. 1+260 to sta. 1+773 - Co- Zone 04 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 28-Oct-24 B Closed 8 Aconex
000021-04-B
ordinate Sheet 9 Soil Improvement for Zone 4 Including PS 03 VTR
Shop drawings for
MIP-JVC-SHD-GEO-
WF-007094 R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01015C6 Latest 06 and ES 13, 14, 17 & 18 from sta. 1+260 to sta. 1+773 - Co- Zone 04 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 28-Oct-24 B Closed 8 Aconex
000021-04-B
ordinate Sheet 10
Shop Drawing for Shoring Works in Zone 07 South (Airport) from sta.
WF-007085 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-04006C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 22-Oct-24 B Closed 2 Aconex
JVC-WTRAN- 0+045 to 0+175 - Elevation Sheet 1
006707 Shop Drawing for Shoring Works in Zone 07 South (Airport) from sta.
WF-007085 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-04007C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 22-Oct-24 B Closed 2 Aconex
0+045 to 0+175 - Elevation Sheet 2
UT-Utilities & UT-Utilities &
WF-007147 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00229C0 Latest Combined utility plan for road 14 Road 14 Shop Drawing Engr. Fawzy 22-Oct-24 5-Nov-24 6-Nov-24 B Closed 15 Aconex
Infrastructure Infrastructure
JVC-WTRAN- UT-Utilities & UT-Utilities &
WF-007147 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00230C0 Latest Combined utility plan for road 14 Road 14 Shop Drawing Engr. Fawzy 22-Oct-24 5-Nov-24 6-Nov-24 B Closed 15 Aconex
006765 Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007147 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00231C0 Latest Combined utility plan for road 14 Road 14 Shop Drawing Engr. Fawzy 22-Oct-24 5-Nov-24 6-Nov-24 B Closed 15 Aconex
Infrastructure Infrastructure
JVC-WTRAN- As-Built CMC layout for Tunnel 01 (Zone 09) from
WF-007148 R02Z00-C021-JVC-09-XXX-ABD-GT-GT-02007 C0 re-s Zone 09 As Built Geotechnical Geotechnical Engr. Yaseen 22-Oct-24 5-Nov-24 23-Oct-24 B Closed 1 Aconex
006766 station 0+235 to 0+281
Shop drawings for unit substation 500kva with ring main unit details
WF-007191 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02001C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 24-Oct-24 7-Nov-24 4-Nov-24 C Closed 11 Aconex
foundation and earthing system
Shop drawings for unit substation 500kva with ring main unit details
WF-007191 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02002C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 24-Oct-24 7-Nov-24 4-Nov-24 C Closed 11 Aconex
foundation and earthing system
Shop drawings for unit substation 500kva with ring main unit details
WF-007191 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02003C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 24-Oct-24 7-Nov-24 4-Nov-24 C Closed 11 Aconex
foundation and earthing system
Shop drawings for unit substation 500kva with ring main unit details
WF-007191 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02004C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 24-Oct-24 7-Nov-24 4-Nov-24 C Closed 11 Aconex
foundation and earthing system
JVC-WTRAN- Shop drawings for unit substation 500kva with ring main unit details
WF-007191 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02005C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 24-Oct-24 7-Nov-24 4-Nov-24 C Closed 11 Aconex
006766 foundation and earthing system
Shop drawings for unit substation 500kva with ring main unit details
WF-007191 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02006C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 24-Oct-24 7-Nov-24 4-Nov-24 C Closed 11 Aconex
foundation and earthing system
Shop drawings for unit substation 500kva with ring main unit details
WF-007191 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02007C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 24-Oct-24 7-Nov-24 4-Nov-24 C Closed 11 Aconex
foundation and earthing system
Shop drawings for unit substation 500kva with ring main unit details
WF-007191 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02008C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 24-Oct-24 7-Nov-24 4-Nov-24 C Closed 11 Aconex
foundation and earthing system
Shop drawings for unit substation 500kva with ring main unit details
WF-007191 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02009C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 24-Oct-24 7-Nov-24 4-Nov-24 C Closed 11 Aconex
foundation and earthing system
Shop Drawings for Soil Improvement works for Zone 06 from sta.
WF-007194 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-02004C0 re-s Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 24-Oct-24 7-Nov-24 28-Oct-24 B Closed 4 Aconex
2+200 to 2+320 incl LS 02 - General Layout
Shop Drawings for Soil Improvement works for Zone 06 from sta.
WF-007194 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-02005C0 re-s Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 24-Oct-24 7-Nov-24 28-Oct-24 B Closed 4 Aconex
JVC-WTRAN- 2+200 to 2+320 incl LS 02 - Cross Sections
006805 Shop Drawings for Soil Improvement works for Zone 06 from sta.
WF-007194 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-02006C0 re-s Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 24-Oct-24 7-Nov-24 28-Oct-24 B Closed 4 Aconex
2+200 to 2+320 incl LS 02 - Co-ordinates Sheet 1
Shop Drawings for Soil Improvement works for Zone 06 from sta.
WF-007194 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-02007C0 re-s Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 24-Oct-24 7-Nov-24 28-Oct-24 B Closed 4 Aconex
2+200 to 2+320 incl LS 02 - Co-ordinates Sheet 2
Shop drawings for unit substation 1000kva with ring main unit details
WF-007206 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02101C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 26-Oct-24 9-Nov-24 6-Nov-24 C Closed 11 Aconex
foundation and earthing system
Shop drawings for unit substation 1000kva with ring main unit details
WF-007206 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02102C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 26-Oct-24 9-Nov-24 6-Nov-24 C Closed 11 Aconex
foundation and earthing system
Shop drawings for unit substation 1000kva with ring main unit details
WF-007206 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02103C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 26-Oct-24 9-Nov-24 6-Nov-24 C Closed 11 Aconex
foundation and earthing system
Shop drawings for unit substation 1000kva with ring main unit details
WF-007206 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02104C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 26-Oct-24 9-Nov-24 6-Nov-24 C Closed 11 Aconex
foundation and earthing system
JVC-WTRAN- Shop drawings for unit substation 1000kva with ring main unit details
WF-007206 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02105C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 26-Oct-24 9-Nov-24 6-Nov-24 C Closed 11 Aconex
006817 foundation and earthing system
Shop drawings for unit substation 1000kva with ring main unit details
WF-007206 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02106C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 26-Oct-24 9-Nov-24 6-Nov-24 C Closed 11 Aconex
foundation and earthing system
Shop drawings for unit substation 1000kva with ring main unit details
WF-007206 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02107C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 26-Oct-24 9-Nov-24 6-Nov-24 C Closed 11 Aconex
foundation and earthing system
Shop drawings for unit substation 1000kva with ring main unit details
WF-007206 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02108C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 26-Oct-24 9-Nov-24 6-Nov-24 C Closed 11 Aconex
foundation and earthing system
Shop drawings for unit substation 1000kva with ring main unit details
WF-007206 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02109C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 26-Oct-24 9-Nov-24 6-Nov-24 C Closed 11 Aconex
foundation and earthing system
Shop Drawing for Soil Improvement Works at Zone 05 from sta.
WF-007220 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01023-C0 Latest 1+953 to 2+053 and Zone 07 from sta. 0+018 to 0+060 - General Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 26-Oct-24 9-Nov-24 27-Oct-24 Terminated Aconex
Layout
Shop Drawing for Soil Improvement Works at Zone 05 from sta.
WF-007220 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01024-C0 Latest 1+953 to 2+053 and Zone 07 from sta. 0+018 to 0+060 - Co- Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 26-Oct-24 9-Nov-24 27-Oct-24 Terminated Aconex
ordinates
Shop Sheet
Drawing for01
Soil Improvement Works at Zone 05 from sta.
WF-007220 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01025-C0 Latest 1+953 to 2+053 and Zone 07 from sta. 0+018 to 0+060 - Co- Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 26-Oct-24 9-Nov-24 27-Oct-24 Terminated Aconex
ordinates Sheet 02
Shop Drawing for Soil Improvement Works at Zone 05 from sta.
JVC-WTRAN- As per Engr.
WF-007220 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01026-C0 Latest 1+953 to 2+053 and Zone 07 from sta. 0+018 to 0+060 - Co- Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 26-Oct-24 9-Nov-24 27-Oct-24 Terminated Aconex
006831 Yaseen
ordinates
Shop Sheet
Drawing for03
Soil Improvement Works at Zone 05 from sta.
WF-007220 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01027-C0 Latest 1+953 to 2+053 and Zone 07 from sta. 0+018 to 0+060 - Co- Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 26-Oct-24 9-Nov-24 27-Oct-24 Terminated Aconex
ordinates
Shop Sheet
Drawing for04
Soil Improvement Works at Zone 05 from sta.
WF-007220 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01028-C0 Latest 1+953 to 2+053 and Zone 07 from sta. 0+018 to 0+060 - Co- Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 26-Oct-24 9-Nov-24 27-Oct-24 Terminated Aconex
ordinates Sheet 05
Shop Drawing for Soil Improvement Works at Zone 05 from sta.
WF-007220 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01029-C0 Latest 1+953 to 2+053 and Zone 07 from sta. 0+018 to 0+060 - Cross- Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 26-Oct-24 9-Nov-24 27-Oct-24 Terminated Aconex
Section
JVC-WTRAN- Transportation Transportation & MIP-JVC-SHD-
WF-007230 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06123-C0 Latest Plan & Profile for Kaar at grade -03 Zone 08 Shop Drawing Engr. Sunil 27-Oct-24 10-Nov-24 28-Oct-24 Terminated Aconex
006841 & Road Road RDW-000027-00
JVC-WTRAN- Transportation Transportation & MIP-JVC-SHD-
WF-007231 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06124-C0 Latest Shop drawing Plan & Profile for Kaar at grade - 04 Zone 08 Shop Drawing Engr. Sunil 27-Oct-24 10-Nov-24 28-Oct-24 Terminated Aconex
006842 & Road Road RDW-000034-01
Latest Status
D 0 1242
Response
ACONEX
Workflow Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation & Total
Workflow Document JVC Planned 28-Oct-24
WSP Status Terminated Overdue Overdue Submittal
WF-007232 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06216-C0 Status grade road 03 & 04 Description Zone 08
Location Shop Drawing Discipline
& Road Sub-Discipline
Road
Engr. Sunilby 27-Oct-24
Submitted 10-Nov-24 Status Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. JVC-WTRAN- Type Submitted Reply Response Code from WSP from JVC
No. as of
006843 Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation & date
WF-007232 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06217-C0 Latest Zone 08 Shop Drawing Engr. Sunil 27-Oct-24 10-Nov-24 28-Oct-24 Terminated Today Aconex
grade road 03 & 04 & Road Road
Shop Drawing for Indicative section of Material Backfilling at Zone
WF-007235 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07650 C1 Latest Zone 03 Shop Drawing Civil Civil Engr. Sunil 27-Oct-24 10-Nov-24 31-Oct-24 B Closed 4 Aconex
03 from Sta. 1+000 to 1+260
Shop Drawing for Indicative section of Material Backfilling at Zone
WF-007235 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07651 C1 Latest Zone 03 Shop Drawing Civil Civil Engr. Sunil 27-Oct-24 10-Nov-24 31-Oct-24 B Closed 4 Aconex
03 from Sta. 1+000 to 1+260
Shop Drawing for Indicative section of Material Backfilling at Zone
WF-007235 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07652 C1 Latest Zone 03 Shop Drawing Civil Civil Engr. Sunil 27-Oct-24 10-Nov-24 31-Oct-24 B Closed 4 Aconex
03 from Sta. 1+000 to 1+260
Shop Drawing for Indicative section of Material Backfilling at Zone
WF-007235 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07653 C1 Latest Zone 03 Shop Drawing Civil Civil Engr. Sunil 27-Oct-24 10-Nov-24 31-Oct-24 B Closed 4 Aconex
03 from Sta. 1+000 to 1+260
Shop Drawing for Indicative section of Material Backfilling at Zone
WF-007235 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07654 C1 Latest Zone 03 Shop Drawing Civil Civil Engr. Sunil 27-Oct-24 10-Nov-24 31-Oct-24 B Closed 4 Aconex
03 from Sta. 1+000 to 1+260
Shop Drawing for Indicative section of Material Backfilling at Zone
WF-007235 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07655 C1 Latest Zone 03 Shop Drawing Civil Civil Engr. Sunil 27-Oct-24 10-Nov-24 31-Oct-24 B Closed 4 Aconex
03 from Sta. 1+000 to 1+260
Shop Drawing for Indicative section of Material Backfilling at Zone
WF-007235 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07656 C1 Latest Zone 03 Shop Drawing Civil Civil Engr. Sunil 27-Oct-24 10-Nov-24 31-Oct-24 B Closed 4 Aconex
JVC-WTRAN- 03 from Sta. 1+000 to 1+260
006846 Shop Drawing for Indicative section of Material Backfilling at Zone
WF-007235 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07657 C1 Latest Zone 03 Shop Drawing Civil Civil Engr. Sunil 27-Oct-24 10-Nov-24 31-Oct-24 B Closed 4 Aconex
03 from Sta. 1+000 to 1+260
Shop Drawing for Indicative section of Material Backfilling at Zone
WF-007235 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07658 C1 Latest Zone 03 Shop Drawing Civil Civil Engr. Sunil 27-Oct-24 10-Nov-24 31-Oct-24 B Closed 4 Aconex
03 from Sta. 1+000 to 1+260
Shop Drawing for Indicative section of Material Backfilling at Zone
WF-007235 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07659 C1 Latest Zone 03 Shop Drawing Civil Civil Engr. Sunil 27-Oct-24 10-Nov-24 31-Oct-24 B Closed 4 Aconex
03 from Sta. 1+000 to 1+260
Shop Drawing for Indicative section of Material Backfilling at Zone
WF-007235 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07660 C1 Latest Zone 03 Shop Drawing Civil Civil Engr. Sunil 27-Oct-24 10-Nov-24 31-Oct-24 B Closed 4 Aconex
03 from Sta. 1+000 to 1+260
Shop Drawing for Indicative section of Material Backfilling at Zone
WF-007235 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07661 C1 Latest Zone 03 Shop Drawing Civil Civil Engr. Sunil 27-Oct-24 10-Nov-24 31-Oct-24 B Closed 4 Aconex
03 from Sta. 1+000 to 1+260
Shop Drawing for Indicative section of Material Backfilling at Zone
WF-007235 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07662 C1 Latest Zone 03 Shop Drawing Civil Civil Engr. Sunil 27-Oct-24 10-Nov-24 31-Oct-24 B Closed 4 Aconex
03 from Sta. 1+000 to 1+260
Shop Drawing for Indicative section of Material Backfilling at Zone
WF-007235 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07663 C1 Latest Zone 03 Shop Drawing Civil Civil Engr. Sunil 27-Oct-24 10-Nov-24 31-Oct-24 B Closed 4 Aconex
03 from Sta. 1+000 to 1+260
Shop Drawing for Soil Improvement at Tunnel 03 from Sta. 0+310 to
WF-007248 R02Z00-C021-JVC-11-XXX-SDW-GT-GT-02001C5 Latest Zone 11 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 27-Oct-24 10-Nov-24 4-Nov-24 B Closed 8 Aconex
0+434, Staircase 15, 16 and Room 12A - General Layout
Shop Drawing for Soil Improvement at Tunnel 03 from Sta. 0+310 to
WF-007248 R02Z00-C021-JVC-11-XXX-SDW-GT-GT-02002C5 Latest Zone 11 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 27-Oct-24 10-Nov-24 4-Nov-24 B Closed 8 Aconex
0+434, Staircase 15, 16 and Room 12A - Cross Sections
Shop Drawing for Soil Improvement at Tunnel 03 from Sta. 0+310 to
WF-007248 R02Z00-C021-JVC-11-XXX-SDW-GT-GT-02003C5 Latest Zone 11 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 27-Oct-24 10-Nov-24 4-Nov-24 B Closed 8 Aconex
JVC-WTRAN- 0+434, Staircase 15, 16 and Room 12A - Coordinates Sheet 1
006857 Shop Drawing for Soil Improvement at Tunnel 03 from Sta. 0+310 to
WF-007248 R02Z00-C021-JVC-11-XXX-SDW-GT-GT-02004C5 Latest Zone 11 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 27-Oct-24 10-Nov-24 4-Nov-24 B Closed 8 Aconex
0+434, Staircase 15, 16 and Room 12A - Coordinates Sheet 2
Shop Drawing for Soil Improvement at Tunnel 03 from Sta. 0+310 to
WF-007248 R02Z00-C021-JVC-11-XXX-SDW-GT-GT-02005C5 Latest Zone 11 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 27-Oct-24 10-Nov-24 4-Nov-24 B Closed 8 Aconex
0+434, Staircase 15, 16 and Room 12A - Coordinates Sheet 3
Shop Drawing for Soil Improvement at Tunnel 03 from Sta. 0+310 to
WF-007248 R02Z00-C021-JVC-11-XXX-SDW-GT-GT-02006C5 Latest Zone 11 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 27-Oct-24 10-Nov-24 4-Nov-24 B Closed 8 Aconex
0+434, Staircase 15, 16 and Room 12A - Coordinates Sheet 4
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07664 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07665 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07666 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07667 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07668 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07669 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07670 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07671 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07672 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07673 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
JVC-WTRAN- Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07674 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
006862 from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07675 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07676 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07677 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07678 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07679 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07680 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07681 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07682 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07683 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
JVC-WTRAN-
006862
Latest Status
D 0 1242
Response
ACONEX
Workflow Shop Drawing for Indicative section of Material Backfilling at Zone 02 Total
Workflow Document JVC Planned 31-Oct-24
WSP Status
B Overdue Overdue Submittal
WF-007256 TransmittalR02Z00-C021-JVC-02-XXX-SDW-CL-CL-07684
Drawing No. Rev. Status from Sta: 0+520 to 0+900 Description
C0 Latest Zone 02
Location Shop Drawing Civil
Discipline Civil
Sub-Discipline Engr. Sunilby 28-Oct-24
Submitted 11-Nov-24 Closed
Status 3
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. Shop Drawing for Soil Improvement Works at Zone 05 from sta. as of
date
WF-007271 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01023C0 Latest 1+953 to 2+053 and Zone 07 from sta. 0+018 to 0+060 - General Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 28-Oct-24 11-Nov-24 3-Nov-24 B Closed Today
6 Aconex
Layout
Shop Drawing for Soil Improvement Works at Zone 05 from sta.
WF-007271 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01024C0 Latest 1+953 to 2+053 and Zone 07 from sta. 0+018 to 0+060 - Co- Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 28-Oct-24 11-Nov-24 3-Nov-24 B Closed 6 Aconex
ordinates
Shop Sheet
Drawing for01
Soil Improvement Works at Zone 05 from sta.
WF-007271 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01025C0 Latest 1+953 to 2+053 and Zone 07 from sta. 0+018 to 0+060 - Co- Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 28-Oct-24 11-Nov-24 3-Nov-24 B Closed 6 Aconex
ordinates Sheet 02
Shop Drawing for Soil Improvement Works at Zone 05 from sta.
JVC-WTRAN-
WF-007271 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01026C0 Latest 1+953 to 2+053 and Zone 07 from sta. 0+018 to 0+060 - Co- Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 28-Oct-24 11-Nov-24 3-Nov-24 B Closed 6 Aconex
006877
ordinates Sheet
Shop Drawing for03
Soil Improvement Works at Zone 05 from sta.
WF-007271 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01027C0 Latest 1+953 to 2+053 and Zone 07 from sta. 0+018 to 0+060 - Co- Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 28-Oct-24 11-Nov-24 3-Nov-24 B Closed 6 Aconex
ordinates
Shop Sheet
Drawing for04
Soil Improvement Works at Zone 05 from sta.
WF-007271 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01028C0 Latest 1+953 to 2+053 and Zone 07 from sta. 0+018 to 0+060 - Co- Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 28-Oct-24 11-Nov-24 3-Nov-24 B Closed 6 Aconex
ordinates Sheet 05
Shop Drawing for Soil Improvement Works at Zone 05 from sta.
WF-007271 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01029C0 Latest 1+953 to 2+053 and Zone 07 from sta. 0+018 to 0+060 - Cross- Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 28-Oct-24 11-Nov-24 3-Nov-24 B Closed 6 Aconex
Section
Excavation Cross section for Shoring Zone 01 at Sta
WF-007285 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05352 C2 re Zone 01 Shop Drawing Civil Civil Engr. Sunil 29-Oct-24 12-Nov-24 4-Nov-24 C Closed 6 Aconex
0+103.88 to 0+160
Excavation Cross section for Shoring Zone 01 at Sta
WF-007285 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05353 C2 re-s Zone 01 Shop Drawing Civil Civil Engr. Sunil 29-Oct-24 12-Nov-24 4-Nov-24 C Closed 6 Aconex
JVC-WTRAN- 0+103.88 to 0+160
006890 Excavation Cross section for Shoring Zone 01 at Sta
WF-007285 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05354 C2 re-s Zone 01 Shop Drawing Civil Civil Engr. Sunil 29-Oct-24 12-Nov-24 4-Nov-24 C Closed 6 Aconex
0+103.88 to 0+160
Excavation Cross section for Shoring Zone 01 at Sta
WF-007285 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05374 C0 re-s Zone 01 Shop Drawing Civil Civil Engr. Sunil 29-Oct-24 12-Nov-24 4-Nov-24 C Closed 6 Aconex
0+103.88 to 0+160
Shop Drawings Layout for Soil Improvement Works in Zone 10 from
WF-007323 R02Z00-C021-JVC-10-XXX-SDW-GT-GT-02001C1 Latest Zone 10 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 30-Oct-24 13-Nov-24 31-Oct-24 C Open 84 Aconex
sta. 0+342 to 0+402 incl. VTR 11
JVC-WTRAN- Shop Drawings Cross Section for Soil Improvement Works in Zone 10
WF-007323 R02Z00-C021-JVC-10-XXX-SDW-GT-GT-02002C1 Latest Zone 10 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 30-Oct-24 13-Nov-24 31-Oct-24 C Open 84 Aconex
006919 from sta. 0+342 to 0+402 incl. VTR 11
Shop Drawings Coordinates for Soil Improvement Works in Zone 10
WF-007323 R02Z00-C021-JVC-10-XXX-SDW-GT-GT-02003C1 Latest Zone 10 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 30-Oct-24 13-Nov-24 31-Oct-24 C Open 84 Aconex
from sta. 0+342 to 0+402 incl. VTR 11
JVC-WTRAN- As-Built CMC layout for Tunnel 01 (Zone 09) VTR 3A from
WF-007324 R02Z00-C021-JVC-09-XXX-ABD-GT-GT-02008 C0 Latest Zone 09 As Built Geotechnical Geotechnical Engr. Yaseen 30-Oct-24 13-Nov-24 3-Nov-24 B Closed 4 Aconex
006920 station 0+241 to 0+274
JVC-WTRAN- Transportation Transportation &
WF-007342 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06123-.C1 Latest Plan & Profile for Kaar at grade -03 Zone 08 Shop Drawing Engr. Sunil 30-Oct-24 13-Nov-24 5-Nov-24 Terminated Aconex
006936 & Road Road
JVC-WTRAN- Transportation Transportation &
WF-007343 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06124-.C2 Latest Shop drawing Plan & Profile for Kaar at grade - 04 Zone 08 Shop Drawing Engr. Sunil 30-Oct-24 13-Nov-24 5-Nov-24 Terminated Aconex
006937 & Road Road
Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation &
WF-007346 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06216-.C0 Latest Zone 08 Shop Drawing Engr. Sunil 30-Oct-24 13-Nov-24 5-Nov-24 Terminated Aconex
grade road 03 & 04 & Road Road
Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation &
WF-007346 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06217-.C0 Latest Zone 08 Shop Drawing Engr. Sunil 30-Oct-24 13-Nov-24 5-Nov-24 Terminated Aconex
grade road 03 & 04 & Road Road
JVC-WTRAN- Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation &
WF-007346 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06218-C0 Latest Zone 08 Shop Drawing Engr. Sunil 30-Oct-24 13-Nov-24 5-Nov-24 Terminated Aconex
006940 grade road 03 & 04 & Road Road
Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation &
WF-007346 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06219-C0 Latest Zone 08 Shop Drawing Engr. Sunil 30-Oct-24 13-Nov-24 5-Nov-24 Terminated Aconex
grade road 03 & 04 & Road Road
Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation &
WF-007346 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06220-C0 Latest Zone 08 Shop Drawing Engr. Sunil 30-Oct-24 13-Nov-24 5-Nov-24 Terminated Aconex
grade road 03 & 04 & Road Road
JVC-WTRAN- Shop Drawings for Shoring Works at Zone 07 North from sta. 0+080
WF-007372 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-04010C1 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 31-Oct-24 14-Nov-24 4-Nov-24 B Closed 4 Aconex
006965 to 0+143 - General Layout and Co-ordinates
Shop drawings for street light network layout and coordinates walls
WF-007411 R02Z00-C021-JVC-07-XXX-SDW-EL-LG-91001 C0 re-s Zone 07 Shop Drawing Electrical Lighting Engr. Sherif 3-Nov-24 17-Nov-24 19-Nov-24 C Closed 16 Aconex
for airport road tunnel zone-07
Shop drawings for street light network layout and coordinates walls
WF-007411 R02Z00-C021-JVC-07-XXX-SDW-EL-LG-91002 C0 re-s Zone 07 Shop Drawing Electrical Lighting Engr. Sherif 3-Nov-24 17-Nov-24 19-Nov-24 C Closed 16 Aconex
for airport road tunnel zone-07
Shop drawings for street light network layout and coordinates walls
WF-007411 R02Z00-C021-JVC-07-XXX-SDW-EL-LG-91003 C0 re-s Zone 07 Shop Drawing Electrical Lighting Engr. Sherif 3-Nov-24 17-Nov-24 19-Nov-24 C Closed 16 Aconex
JVC-WTRAN- for airport road tunnel zone-07
007003 Shop drawings for street light network layout and coordinates walls
WF-007411 R02Z00-C021-JVC-07-XXX-SDW-EL-LG-91004 C0 re-s Zone 07 Shop Drawing Electrical Lighting Engr. Sherif 3-Nov-24 17-Nov-24 19-Nov-24 C Closed 16 Aconex
for airport road tunnel zone-07
Shop drawings for street light network layout and coordinates walls
WF-007411 R02Z00-C021-JVC-07-XXX-SDW-EL-LG-91005 C0 re-s Zone 07 Shop Drawing Electrical Lighting Engr. Sherif 3-Nov-24 17-Nov-24 19-Nov-24 C Closed 16 Aconex
for airport road tunnel zone-07
Shop drawings for street light network layout and coordinates walls
WF-007411 R02Z00-C021-JVC-07-XXX-SDW-EL-LG-91006 C0 re-s Zone 07 Shop Drawing Electrical Lighting Engr. Sherif 3-Nov-24 17-Nov-24 19-Nov-24 C Closed 16 Aconex
for airport road tunnel zone-07
UT-Utilities &
WF-007432 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01442C1 Latest Proposed Storm Water Drainage Network Catch Basin Plan for Part 07 Zone 07 Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 19-Nov-24 B Closed 16 Aconex
Infrastructure
UT-Utilities &
WF-007432 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01468C1 Latest Proposed Storm Water Drainage Network Catch Basin Plan for Part 07 Zone 07 Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 19-Nov-24 B Closed 16 Aconex
Infrastructure
UT-Utilities &
WF-007432 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01469C1 Latest Proposed Storm Water Drainage Network Catch Basin Plan for Part 07 Zone 07 Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 19-Nov-24 B Closed 16 Aconex
JVC-WTRAN- Infrastructure
007022 UT-Utilities &
WF-007432 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01470C1 Latest Proposed Storm Water Drainage Network Catch Basin Plan for Part 07 Zone 07 Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 19-Nov-24 B Closed 16 Aconex
Infrastructure
UT-Utilities &
WF-007432 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01471C1 Latest Proposed Storm Water Drainage Network Catch Basin Plan for Part 07 Zone 07 Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 19-Nov-24 B Closed 16 Aconex
Infrastructure
UT-Utilities &
WF-007432 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01472C1 Latest Proposed Storm Water Drainage Network Catch Basin Plan for Part 07 Zone 07 Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 19-Nov-24 B Closed 16 Aconex
Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01400C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01403C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01404C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01405C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01406C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01408C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Latest Status
D 0 1242
Response
ACONEX
Workflow Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities & Total
Workflow Document JVC Planned WSP Status
B Overdue Overdue Submittal
WF-007440 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01409C1 Status 08 and 09) Description RAM-MIP
Location Shop Drawing Discipline
Infrastructure
Storm Water Submitted
Sub-Discipline by 3-Nov-24 17-Nov-24 20-Nov-24
Engr. Fawzy Closed
Status 17
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities & date
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01412C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed Today
17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01413C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01419C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01420C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01421C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01422C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01423C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01424C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01425C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01426C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01427C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01428C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01429C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01430C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
JVC-WTRAN- Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01431C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
007030 08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01432C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01433C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01434C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01435C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01451C2 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01452C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01453C2 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01454C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01455C2 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01456C2 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01457C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01458C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01459C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01460C3 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01461C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01462C3 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01463C2 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01464C3 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01465C2 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01466C2 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01467C2 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Shop drawings for street light network layout and coordinates walls
WF-007452 R02Z00-C021-JVC-06-XXX-SDW-EL-LG-92001 C0 re-s Zone 06 Shop Drawing Electrical Lighting Engr. Sherif 4-Nov-24 18-Nov-24 19-Nov-24 C Closed 15 Aconex
for jadat al haram unnel zone-06
Shop drawings for street light network layout and coordinates walls
WF-007452 R02Z00-C021-JVC-06-XXX-SDW-EL-LG-92002 C0 re-s Zone 06 Shop Drawing Electrical Lighting Engr. Sherif 4-Nov-24 18-Nov-24 19-Nov-24 C Closed 15 Aconex
for jadat al haram unnel zone-06
Shop drawings for street light network layout and coordinates walls
WF-007452 R02Z00-C021-JVC-06-XXX-SDW-EL-LG-92003 C0 re-s Zone 06 Shop Drawing Electrical Lighting Engr. Sherif 4-Nov-24 18-Nov-24 19-Nov-24 C Closed 15 Aconex
JVC-WTRAN- for jadat al haram unnel zone-06
007042 Shop drawings for street light network layout and coordinates walls
WF-007452 R02Z00-C021-JVC-06-XXX-SDW-EL-LG-92004 C0 re-s Zone 06 Shop Drawing Electrical Lighting Engr. Sherif 4-Nov-24 18-Nov-24 19-Nov-24 C Closed 15 Aconex
for jadat al haram unnel zone-06
Shop drawings for street light network layout and coordinates walls
WF-007452 R02Z00-C021-JVC-06-XXX-SDW-EL-LG-92005 C0 re-s Zone 06 Shop Drawing Electrical Lighting Engr. Sherif 4-Nov-24 18-Nov-24 19-Nov-24 C Closed 15 Aconex
for jadat al haram unnel zone-06
Latest Status
D 0 1242
JVC-WTRAN-
Shop Drawing Submittals E 0 247 Terminated
007042
Response
ACONEX
Workflow Shop drawings for street light network layout and coordinates walls Total
Workflow Document JVC Planned 19-Nov-24
WSP Status
C Overdue Overdue Submittal
WF-007452 TransmittalR02Z00-C021-JVC-06-XXX-SDW-EL-LG-92006
Drawing No. Rev.
C0 Status
re-s Description
for jadat al haram unnel zone-06
Zone 06
Location Shop Drawing Electrical
Discipline Lighting
Sub-Discipline Engr. Sherif
Submitted by 4-Nov-24 18-Nov-24 Closed
Status 15
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
JVC-WTRAN- Transportation Transportation & date
WF-007493 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06123 C1 re-s Plan & Profile for Kaar at grade -03 Zone 08 Shop Drawing Engr. Sunil 5-Nov-24 19-Nov-24 7-Nov-24 B Closed Today
2 Aconex
007081 & Road Road
JVC-WTRAN- Transportation Transportation &
WF-007494 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06124 C2 Latest Shop drawing Plan & Profile for Kaar at grade - 04 Zone 08 Shop Drawing Engr. Sunil 5-Nov-24 19-Nov-24 7-Nov-24 B Closed 2 Aconex
007082 & Road Road
Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation &
WF-007495 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06216 C0 re-s Zone 08 Shop Drawing Engr. Sunil 5-Nov-24 19-Nov-24 11-Nov-24 B Closed 6 Aconex
grade road 03 & 04 & Road Road
Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation &
WF-007495 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06217 C0 re-s Zone 08 Shop Drawing Engr. Sunil 5-Nov-24 19-Nov-24 11-Nov-24 B Closed 6 Aconex
grade road 03 & 04 & Road Road
JVC-WTRAN- Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation &
WF-007495 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06218 C0 re-s Zone 08 Shop Drawing Engr. Sunil 5-Nov-24 19-Nov-24 11-Nov-24 B Closed 6 Aconex
007083 grade road 03 & 04 & Road Road
Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation &
WF-007495 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06219 C0 re-s Zone 08 Shop Drawing Engr. Sunil 5-Nov-24 19-Nov-24 11-Nov-24 B Closed 6 Aconex
grade road 03 & 04 & Road Road
Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation &
WF-007495 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06220 C0 Latest Zone 08 Shop Drawing Engr. Sunil 5-Nov-24 19-Nov-24 11-Nov-24 B Closed 6 Aconex
grade road 03 & 04 & Road Road
Excavation Cross section for Shoring Zone 01 at Sta
WF-007586 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05350 C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 9-Nov-24 23-Nov-24 21-Nov-24 C Open 74 Aconex
0+100 to 0+171.49
Excavation Cross section for Shoring Zone 01 at Sta
WF-007586 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05352 C3 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 9-Nov-24 23-Nov-24 21-Nov-24 C Open 74 Aconex
0+100 to 0+171.49
Excavation Cross section for Shoring Zone 01 at Sta
WF-007586 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05353 C3 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 9-Nov-24 23-Nov-24 21-Nov-24 C Open 74 Aconex
0+100 to 0+171.49
Excavation Cross section for Shoring Zone 01 at Sta
WF-007586 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05354 C3 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 9-Nov-24 23-Nov-24 21-Nov-24 C Open 74 Aconex
0+100 to 0+171.49
JVC-WTRAN- Excavation Cross section for Shoring Zone 01 at Sta
WF-007586 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05374 C1 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 9-Nov-24 23-Nov-24 21-Nov-24 C Open 74 Aconex
007169 0+100 to 0+171.49
Excavation Cross section for Shoring Zone 01 at Sta
WF-007586 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05375 C0 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 9-Nov-24 23-Nov-24 21-Nov-24 C Open 74 Aconex
0+100 to 0+171.49
Excavation Cross section for Shoring Zone 01 at Sta
WF-007586 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05376 C0 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 9-Nov-24 23-Nov-24 21-Nov-24 C Open 74 Aconex
0+100 to 0+171.49
Excavation Cross section for Shoring Zone 01 at Sta
WF-007586 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05377 C0 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 9-Nov-24 23-Nov-24 21-Nov-24 C Open 74 Aconex
0+100 to 0+171.49
Excavation Cross section for Shoring Zone 01 at Sta
WF-007586 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05378 C0 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 9-Nov-24 23-Nov-24 21-Nov-24 C Open 74 Aconex
0+100 to 0+171.49
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007610 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02001C6 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Nov-24 24-Nov-24 12-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 1
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007610 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02002C6 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Nov-24 24-Nov-24 12-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007610 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02003C6 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Nov-24 24-Nov-24 12-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007610 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02004C6 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Nov-24 24-Nov-24 12-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Cross-Sections
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007610 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02005C6 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Nov-24 24-Nov-24 12-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 1
JVC-WTRAN- Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007610 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02006C6 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Nov-24 24-Nov-24 12-Nov-24 B Closed 2 Aconex
007193 from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007610 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02007C6 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Nov-24 24-Nov-24 12-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007610 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02008C6 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Nov-24 24-Nov-24 12-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 4
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007610 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02009C6 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Nov-24 24-Nov-24 12-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 5
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007610 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02010C6 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Nov-24 24-Nov-24 12-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 6
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007610 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02011C6 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Nov-24 24-Nov-24 12-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 7
Shop Drawings for Soil Improvement works for Zone 06 from sta.
WF-007611 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-02004C1 Latest Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Nov-24 24-Nov-24 23-Nov-24 B Closed 13 Aconex
2+200 to 2+320 incl LS 02 - General Layout
Shop Drawings for Soil Improvement works for Zone 06 from sta.
WF-007611 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-02005C1 Latest Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Nov-24 24-Nov-24 23-Nov-24 B Closed 13 Aconex
JVC-WTRAN- 2+200 to 2+320 incl LS 02 - Cross Sections
007194 Shop Drawings for Soil Improvement works for Zone 06 from sta.
WF-007611 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-02006C1 Latest Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Nov-24 24-Nov-24 23-Nov-24 B Closed 13 Aconex
2+200 to 2+320 incl LS 02 - Co-ordinates Sheet 1
Shop Drawings for Soil Improvement works for Zone 06 from sta.
WF-007611 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-02007C1 Latest Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Nov-24 24-Nov-24 23-Nov-24 B Closed 13 Aconex
2+200 to 2+320 incl LS 02 - Co-ordinates Sheet 2
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007675 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07806 C0 Latest D09 Shop Drawing Civil Civil Engr. Sunil 13-Nov-24 27-Nov-24 25-Nov-24 B Closed 12 Aconex
D9-1 from Sta: 0+000 to 0+162.02
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007675 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07807 C0 Latest D09 Shop Drawing Civil Civil Engr. Sunil 13-Nov-24 27-Nov-24 25-Nov-24 B Closed 12 Aconex
D9-1 from Sta: 0+000 to 0+162.02
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007675 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07808 C0 Latest D09 Shop Drawing Civil Civil Engr. Sunil 13-Nov-24 27-Nov-24 25-Nov-24 B Closed 12 Aconex
D9-1 from Sta: 0+000 to 0+162.02
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007675 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07809 C0 Latest D09 Shop Drawing Civil Civil Engr. Sunil 13-Nov-24 27-Nov-24 25-Nov-24 B Closed 12 Aconex
D9-1 from Sta: 0+000 to 0+162.02
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007675 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07810 C0 Latest D09 Shop Drawing Civil Civil Engr. Sunil 13-Nov-24 27-Nov-24 25-Nov-24 B Closed 12 Aconex
D9-1 from Sta: 0+000 to 0+162.02
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007675 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07811 C0 Latest D09 Shop Drawing Civil Civil Engr. Sunil 13-Nov-24 27-Nov-24 25-Nov-24 B Closed 12 Aconex
D9-1 from Sta: 0+000 to 0+162.02
JVC-WTRAN- Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007675 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07812 C0 Latest D09 Shop Drawing Civil Civil Engr. Sunil 13-Nov-24 27-Nov-24 25-Nov-24 B Closed 12 Aconex
007242 D9-1 from Sta: 0+000 to 0+162.02
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007675 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07813 C0 Latest D09 Shop Drawing Civil Civil Engr. Sunil 13-Nov-24 27-Nov-24 25-Nov-24 B Closed 12 Aconex
D9-1 from Sta: 0+000 to 0+162.02
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007675 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07814 C0 Latest D09 Shop Drawing Civil Civil Engr. Sunil 13-Nov-24 27-Nov-24 25-Nov-24 B Closed 12 Aconex
D9-1 from Sta: 0+000 to 0+162.02
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007675 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07815 C0 Latest D09 Shop Drawing Civil Civil Engr. Sunil 13-Nov-24 27-Nov-24 25-Nov-24 B Closed 12 Aconex
D9-1 from Sta: 0+000 to 0+162.02
Latest Status
Response
ACONEX
Workflow Shop Drawing for Indicative section of Material Backfilling at Culvert Total
Workflow Document JVC Planned 25-Nov-24
WSP Status
B Overdue Overdue Submittal
WF-007675 TransmittalR02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07816
Drawing No. Rev. Status D9-1 from Sta: 0+000 to 0+162.02
C0 Latest Description D09
Location Shop Drawing Civil
Discipline Civil
Sub-Discipline Engr. Sunilby 13-Nov-24
Submitted 27-Nov-24 Closed
Status 12
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawing for Indicative section of Material Backfilling at Culvert date
WF-007675 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07817 C0 Latest D09 Shop Drawing Civil Civil Engr. Sunil 13-Nov-24 27-Nov-24 25-Nov-24 B Closed Today
12 Aconex
D9-1 from Sta: 0+000 to 0+162.02
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007675 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07818 C0 Latest D09 Shop Drawing Civil Civil Engr. Sunil 13-Nov-24 27-Nov-24 25-Nov-24 B Closed 12 Aconex
D9-1 from Sta: 0+000 to 0+162.02
Shop drawings for unit substation 500kva with ring main unit details
WF-007681 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02001C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Nov-24 27-Nov-24 30-Nov-24 C Open 70 Aconex
foundation and earthing system
Shop drawings for unit substation 500kva with ring main unit details
WF-007681 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02002C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Nov-24 27-Nov-24 30-Nov-24 C Open 70 Aconex
foundation and earthing system
Shop drawings for unit substation 500kva with ring main unit details
WF-007681 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02003C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Nov-24 27-Nov-24 30-Nov-24 C Open 70 Aconex
foundation and earthing system
Shop drawings for unit substation 500kva with ring main unit details
WF-007681 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02004C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Nov-24 27-Nov-24 30-Nov-24 C Open 70 Aconex
foundation and earthing system
JVC-WTRAN- Shop drawings for unit substation 500kva with ring main unit details
WF-007681 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02005C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Nov-24 27-Nov-24 30-Nov-24 C Open 70 Aconex
007247 foundation and earthing system
Shop drawings for unit substation 500kva with ring main unit details
WF-007681 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02006C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Nov-24 27-Nov-24 30-Nov-24 C Open 70 Aconex
foundation and earthing system
Shop drawings for unit substation 500kva with ring main unit details
WF-007681 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02007C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Nov-24 27-Nov-24 30-Nov-24 C Open 70 Aconex
foundation and earthing system
Shop drawings for unit substation 500kva with ring main unit details
WF-007681 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02008C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Nov-24 27-Nov-24 30-Nov-24 C Open 70 Aconex
foundation and earthing system
Shop drawings for unit substation 500kva with ring main unit details
WF-007681 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02009C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Nov-24 27-Nov-24 30-Nov-24 C Open 70 Aconex
foundation and earthing system
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007768 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07821 C0 Latest D9-2 Shop Drawing Civil Civil Engr. Sunil 16-Nov-24 30-Nov-24 26-Nov-24 B Closed 10 Aconex
D9-2 from Sta: 0+020 to 0+191.45
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007768 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07822 C0 Latest D9-2 Shop Drawing Civil Civil Engr. Sunil 16-Nov-24 30-Nov-24 26-Nov-24 B Closed 10 Aconex
D9-2 from Sta: 0+020 to 0+191.45
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007768 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07823 C0 Latest D9-2 Shop Drawing Civil Civil Engr. Sunil 16-Nov-24 30-Nov-24 26-Nov-24 B Closed 10 Aconex
D9-2 from Sta: 0+020 to 0+191.45
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007768 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07824 C0 Latest D9-2 Shop Drawing Civil Civil Engr. Sunil 16-Nov-24 30-Nov-24 26-Nov-24 B Closed 10 Aconex
D9-2 from Sta: 0+020 to 0+191.45
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007768 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07825 C0 Latest D9-2 Shop Drawing Civil Civil Engr. Sunil 16-Nov-24 30-Nov-24 26-Nov-24 B Closed 10 Aconex
D9-2 from Sta: 0+020 to 0+191.45
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007768 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07826 C0 Latest D9-2 Shop Drawing Civil Civil Engr. Sunil 16-Nov-24 30-Nov-24 26-Nov-24 B Closed 10 Aconex
D9-2 from Sta: 0+020 to 0+191.45
JVC-WTRAN- Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007768 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07827 C0 Latest D9-2 Shop Drawing Civil Civil Engr. Sunil 16-Nov-24 30-Nov-24 26-Nov-24 B Closed 10 Aconex
007313 D9-2 from Sta: 0+020 to 0+191.45
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007768 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07828 C0 Latest D9-2 Shop Drawing Civil Civil Engr. Sunil 16-Nov-24 30-Nov-24 26-Nov-24 B Closed 10 Aconex
D9-2 from Sta: 0+020 to 0+191.45
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007768 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07829 C0 Latest D9-2 Shop Drawing Civil Civil Engr. Sunil 16-Nov-24 30-Nov-24 26-Nov-24 B Closed 10 Aconex
D9-2 from Sta: 0+020 to 0+191.45
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007768 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07830 C0 Latest D9-2 Shop Drawing Civil Civil Engr. Sunil 16-Nov-24 30-Nov-24 26-Nov-24 B Closed 10 Aconex
D9-2 from Sta: 0+020 to 0+191.45
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007768 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07831 C0 Latest D9-2 Shop Drawing Civil Civil Engr. Sunil 16-Nov-24 30-Nov-24 26-Nov-24 B Closed 10 Aconex
D9-2 from Sta: 0+020 to 0+191.45
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007768 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07832 C0 Latest D9-2 Shop Drawing Civil Civil Engr. Sunil 16-Nov-24 30-Nov-24 26-Nov-24 B Closed 10 Aconex
D9-2 from Sta: 0+020 to 0+191.45
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007768 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07833 C0 Latest D9-2 Shop Drawing Civil Civil Engr. Sunil 16-Nov-24 30-Nov-24 26-Nov-24 B Closed 10 Aconex
D9-2 from Sta: 0+020 to 0+191.45
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007788 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02001C7 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 17-Nov-24 1-Dec-24 19-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 1
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007788 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02002C7 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 17-Nov-24 1-Dec-24 19-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007788 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02003C7 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 17-Nov-24 1-Dec-24 19-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007788 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02004C7 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 17-Nov-24 1-Dec-24 19-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Cross-Sections
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007788 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02005C7 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 17-Nov-24 1-Dec-24 19-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 1
JVC-WTRAN- Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007788 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02006C7 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 17-Nov-24 1-Dec-24 19-Nov-24 B Closed 2 Aconex
007332 from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007788 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02007C7 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 17-Nov-24 1-Dec-24 19-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007788 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02008C7 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 17-Nov-24 1-Dec-24 19-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 4
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007788 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02009C7 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 17-Nov-24 1-Dec-24 19-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 5
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007788 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02010C7 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 17-Nov-24 1-Dec-24 19-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 6
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007788 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02011C7 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 17-Nov-24 1-Dec-24 19-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 7
Shop drawings for unit substation 1000kva with ring main unit details
WF-007856 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02101C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Nov-24 3-Dec-24 5-Dec-24 C Open 64 Aconex
foundation and earthing system
Shop drawings for unit substation 1000kva with ring main unit details
WF-007856 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02102C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Nov-24 3-Dec-24 5-Dec-24 C Open 64 Aconex
foundation and earthing system
Shop drawings for unit substation 1000kva with ring main unit details
WF-007856 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02103C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Nov-24 3-Dec-24 5-Dec-24 C Open 64 Aconex
foundation and earthing system
Shop drawings for unit substation 1000kva with ring main unit details
WF-007856 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02104C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Nov-24 3-Dec-24 5-Dec-24 C Open 64 Aconex
foundation and earthing system
JVC-WTRAN- Shop drawings for unit substation 1000kva with ring main unit details
WF-007856 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02105C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Nov-24 3-Dec-24 5-Dec-24 C Open 64 Aconex
007395 foundation and earthing system
Shop drawings for unit substation 1000kva with ring main unit details
WF-007856 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02106C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Nov-24 3-Dec-24 5-Dec-24 C Open 64 Aconex
foundation and earthing system
Latest Status
D 0 1242
JVC-WTRAN-
007395
Response
ACONEX
Workflow Shop drawings for unit substation 1000kva with ring main unit details Total
Workflow Document JVC Planned WSP Status
C Overdue Overdue Submittal
WF-007856 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02107C1 Status foundation and earthing system
Description RAM-MIP
Location Shop Drawing Electrical
Discipline Medium Voltage Submitted
Sub-Discipline by 19-Nov-24 3-Dec-24
Engr. Sherif 5-Dec-24 Open
Status 64
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop drawings for unit substation 1000kva with ring main unit details date
WF-007856 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02108C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Nov-24 3-Dec-24 5-Dec-24 C Open Today
64 Aconex
foundation and earthing system
Shop drawings for unit substation 1000kva with ring main unit details
WF-007856 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02109C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Nov-24 3-Dec-24 5-Dec-24 C Open 64 Aconex
foundation and earthing system
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007857 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02001C8 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 19-Nov-24 3-Dec-24 20-Nov-24 B Closed 1 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 1
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007857 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02002C8 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 19-Nov-24 3-Dec-24 20-Nov-24 B Closed 1 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007857 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02003C8 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 19-Nov-24 3-Dec-24 20-Nov-24 B Closed 1 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007857 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02004C8 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 19-Nov-24 3-Dec-24 20-Nov-24 B Closed 1 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Cross-Sections
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007857 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02005C8 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 19-Nov-24 3-Dec-24 20-Nov-24 B Closed 1 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 1
JVC-WTRAN- Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007857 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02006C8 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 19-Nov-24 3-Dec-24 20-Nov-24 B Closed 1 Aconex
007396 from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007857 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02007C8 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 19-Nov-24 3-Dec-24 20-Nov-24 B Closed 1 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007857 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02008C8 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 19-Nov-24 3-Dec-24 20-Nov-24 B Closed 1 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 4
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007857 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02009C8 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 19-Nov-24 3-Dec-24 20-Nov-24 B Closed 1 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 5
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007857 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02010C8 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 19-Nov-24 3-Dec-24 20-Nov-24 B Closed 1 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 6
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007857 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02011C8 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 19-Nov-24 3-Dec-24 20-Nov-24 B Closed 1 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 7
JVC-WTRAN- As-Built CMC layout for Tunnel 01 (Zone 09) from
WF-007904 R02Z00-C021-JVC-09-XXX-ABD-GT-GT-02007 C1 Latest Zone 09 As Built Geotechnical Geotechnical Engr. Muragan 20-Nov-24 4-Dec-24 26-Nov-24 B Closed 6 Aconex
007442 station 0+235 to 0+281
WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00102C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex
WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00103C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex
WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00104C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex
WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00105C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex
WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00106C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex
WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00107C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex
WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00108C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex
WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00109C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex
WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00110C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex
WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00111C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex
WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00112C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex
JVC-WTRAN-
007495
WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00113C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex
WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00114C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex
WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00115C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex
WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00116C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex
WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00117C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex
WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00118C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex
WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00119C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex
WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00120C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex
WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00121C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex
WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00122C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex
WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00123C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex
D 0 1242
Response
ACONEX
Workflow Shop Drawing for Indicative section of Material Backfilling at Zoneb Total
Workflow Document JVC Planned WSP Status
C Overdue Overdue Submittal
WF-007963 TransmittalR02Z00-C021-JVC-06-XXX-SDW-CL-CL-07526
Drawing No. Rev.
C0 Status
re-s
06 from Sta: 2+200 to 2+660 Description Zone 06
Location Shop Drawing Civil
Discipline Civil
Sub-Discipline Engr. Sunilby 24-Nov-24
Submitted 8-Dec-24 8-Dec-24 Closed
Status 14
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawing for Indicative section of Material Backfilling at Zoneb date
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07527 C0 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed Today
14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07528 C0 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07529 C0 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07530 C0 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07531 C0 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07532 C0 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07533 C2 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
JVC-WTRAN- 06 from Sta: 2+200 to 2+660
007496 Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07534 C2 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07535 C2 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07536 C2 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07537 C2 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07538 C2 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07539 C2 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07540 C2 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07541 C2 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07542 C0 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07543 C0 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07544 C0 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07545 C0 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07546 C0 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07548 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07549 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07550 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07551 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07552 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07553 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07554 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07555 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07556 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
JVC-WTRAN- from Sta: 2+680 to 3+020
007527 Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07557 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07558 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07559 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07560 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07561 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07562 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07563 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07564 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07565 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop drawings for street light network layout and coordinates above
WF-008014 R02Z00-C021-JVC-00-XXX-SDW-EL-LG-93001-C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 25-Nov-24 9-Dec-24 9-Dec-24 Terminated Aconex
grade for kaar tunnel zone-08
Shop drawings for street light network layout and coordinates above
WF-008014 R02Z00-C021-JVC-00-XXX-SDW-EL-LG-93002-C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 25-Nov-24 9-Dec-24 9-Dec-24 Terminated Aconex
JVC-WTRAN- grade for kaar tunnel zone-08
007543 Shop drawings for street light network layout and coordinates above
WF-008014 R02Z00-C021-JVC-00-XXX-SDW-EL-LG-93003-C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 25-Nov-24 9-Dec-24 9-Dec-24 Terminated Aconex
grade for kaar tunnel zone-08
Latest Status
D 0 1242
JVC-WTRAN-
007543
Response
ACONEX
Workflow Shop drawings for street light network layout and coordinates above Total
Workflow Document JVC Planned WSP Status Terminated Overdue Overdue Submittal
WF-008014 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-00-XXX-SDW-EL-LG-93004-C0 Status grade for kaar tunnel zone-08
Description Zone 08
Location Shop Drawing Electrical
Discipline Lighting
Sub-Discipline Submitted by 25-Nov-24
Engr. Sherif 9-Dec-24 9-Dec-24 Status Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawing for Indicative section of Material Backfilling at Zone 04 date
WF-008045 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07613 C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed Today
9 Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008045 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07614 C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008045 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07615 C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008045 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07616 C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008045 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07617 C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008045 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07618 C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+520 to 1+760
JVC-WTRAN- Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008045 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07619 C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
007574 from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008045 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07620 C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008045 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07621 C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008045 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07622 C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008045 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07623 C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008045 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07624 C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008045 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07625 C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008046 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07598 C1 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+280 to 1+500
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008046 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07599 C1 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+280 to 1+500
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008046 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07600 C1 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+280 to 1+500
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008046 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07601 C2 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+280 to 1+500
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008046 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07602 C2 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+280 to 1+500
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008046 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07603 C2 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+280 to 1+500
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008046 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07604 C2 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+280 to 1+500
JVC-WTRAN- Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008046 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07605 C2 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
007575 from Sta: 1+280 to 1+500
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008046 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07606 C2 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+280 to 1+500
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008046 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07607 C2 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+280 to 1+500
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008046 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07608 C2 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+280 to 1+500
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008046 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07609 C2 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+280 to 1+500
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008046 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07610 C2 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+280 to 1+500
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008046 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07611 C2 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+280 to 1+500
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008046 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07612 C2 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+280 to 1+500
JVC-WTRAN- As-Built CMC layout for Tunnel 01 (Zone 09) from
WF-008066 R02Z00-C021-JVC-09-XXX-ABD-GT-GT-02009 C0 Latest Zone 09 As Built Geotechnical Geotechnical Engr. Muragan 27-Nov-24 11-Dec-24 5-Dec-24 B Closed 8 Aconex
007594 station 0+261 to 0+281 (Including VTR-3A
Shop drawings for telecom network stc and mobily plan and tie-in UT-Utilities &
WF-008215 R02Z00-C021-JVC-08-XXX-SDW-UT-IS-08001 C0 Latest Zone 08 Shop Drawing ICT Engr. Sherif 3-Dec-24 17-Dec-24 16-Dec-24 B Closed 13 Aconex
point at kaar-amida road zone 08 Infrastructure
Shop drawings for telecom network stc and mobily plan and tie-in UT-Utilities &
WF-008215 R02Z00-C021-JVC-08-XXX-SDW-UT-IS-08002 C0 Latest Zone 08 Shop Drawing ICT Engr. Sherif 3-Dec-24 17-Dec-24 16-Dec-24 B Closed 13 Aconex
point at kaar-amida road zone 08 Infrastructure
Shop drawings for telecom network stc and mobily plan and tie-in UT-Utilities &
WF-008215 R02Z00-C021-JVC-08-XXX-SDW-UT-IS-08003 C0 Latest Zone 08 Shop Drawing ICT Engr. Sherif 3-Dec-24 17-Dec-24 16-Dec-24 B Closed 13 Aconex
JVC-WTRAN- point at kaar-amida road zone 08 Infrastructure
007737 Shop drawings for telecom network stc and mobily plan and tie-in UT-Utilities &
WF-008215 R02Z00-C021-JVC-08-XXX-SDW-UT-IS-08004 C0 Latest Zone 08 Shop Drawing ICT Engr. Sherif 3-Dec-24 17-Dec-24 16-Dec-24 B Closed 13 Aconex
point at kaar-amida road zone 08 Infrastructure
Shop drawings for telecom network stc and mobily plan and tie-in UT-Utilities &
WF-008215 R02Z00-C021-JVC-08-XXX-SDW-UT-IS-08005 C0 Latest Zone 08 Shop Drawing ICT Engr. Sherif 3-Dec-24 17-Dec-24 16-Dec-24 B Closed 13 Aconex
point at kaar-amida road zone 08 Infrastructure
Shop drawings for telecom network stc and mobily plan and tie-in UT-Utilities &
WF-008215 R02Z00-C021-JVC-08-XXX-SDW-UT-IS-08006 C0 Latest Zone 08 Shop Drawing ICT Engr. Sherif 3-Dec-24 17-Dec-24 16-Dec-24 B Closed 13 Aconex
point at kaar-amida road zone 08 Infrastructure
Shop drawings for extra low voltage network above grade plan, UT-Utilities &
WF-008221 R02Z00-C021-JVC-08-XXX-SDW-UT-IS-07211 C0 Latest Zone 08 Shop Drawing ICT Engr. Sherif 4-Dec-24 18-Dec-24 16-Dec-24 B Closed 12 Aconex
profile and manhole details for kaar road zone 08. Infrastructure
Shop drawings for extra low voltage network above grade plan, UT-Utilities &
WF-008221 R02Z00-C021-JVC-08-XXX-SDW-UT-IS-07212 C0 Latest Zone 08 Shop Drawing ICT Engr. Sherif 4-Dec-24 18-Dec-24 16-Dec-24 B Closed 12 Aconex
JVC-WTRAN- profile and manhole details for kaar road zone 08. Infrastructure
007743 Shop drawings for extra low voltage network above grade plan, UT-Utilities &
WF-008221 R02Z00-C021-JVC-08-XXX-SDW-UT-IS-07213 C0 Latest Zone 08 Shop Drawing ICT Engr. Sherif 4-Dec-24 18-Dec-24 16-Dec-24 B Closed 12 Aconex
profile and manhole details for kaar road zone 08. Infrastructure
Shop drawings for extra low voltage network above grade plan, UT-Utilities &
WF-008221 R02Z00-C021-JVC-08-XXX-SDW-UT-IS-07214 C0 Latest Zone 08 Shop Drawing ICT Engr. Sherif 4-Dec-24 18-Dec-24 16-Dec-24 B Closed 12 Aconex
profile and manhole details for kaar road zone 08. Infrastructure
JVC-WTRAN- UT-Utilities & Sewerage
WF-008222 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01207C2 Latest Sewage Network Plan for Part 07 RAM-MIP Shop Drawing Engr. Fawzy 4-Dec-24 18-Dec-24 16-Dec-24 B Closed 12 Aconex
007744 Infrastructure Effluent
WF-008263 R02Z00-C021-JVC-00-XXX-SDW-ST-FO-00001 C2 Latest Foundation Details for Street Light Poles RAM-MIP Shop Drawing Structural Foundation Engr. Sherif 5-Dec-24 19-Dec-24 10-Dec-24 B Closed 5 Aconex
JVC-WTRAN-
007785
Latest Status
D 0 1242
JVC-WTRAN- Response
ACONEX
Workflow
007785 Total
Workflow Document JVC Planned 10-Dec-24
WSP Status
B Overdue Overdue Submittal
WF-008263 TransmittalR02Z00-C021-JVC-00-XXX-SDW-ST-FO-00002
Drawing No. Rev. Status Foundation Details for Street
C2 Latest Light Poles
Description RAM-MIP
Location Shop Drawing Structural
Discipline Foundation
Sub-Discipline Engr. Sherif
Submitted by 5-Dec-24 19-Dec-24 Closed
Status 5
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation & date
WF-008321 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06216 C1 Latest Zone 08 Shop Drawing Engr. Sunil 8-Dec-24 22-Dec-24 19-Dec-24 B Closed Today
11 Aconex
grade road 03 & Road Road
Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation &
WF-008321 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06217 C1 Latest Zone 08 Shop Drawing Engr. Sunil 8-Dec-24 22-Dec-24 19-Dec-24 B Closed 11 Aconex
grade road 03 & Road Road
Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation &
WF-008321 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06218 C1 Latest Zone 08 Shop Drawing Engr. Sunil 8-Dec-24 22-Dec-24 19-Dec-24 B Closed 11 Aconex
JVC-WTRAN- grade road 03 & Road Road
007836 Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation &
WF-008321 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06219 C1 Latest Zone 08 Shop Drawing Engr. Sunil 8-Dec-24 22-Dec-24 19-Dec-24 B Closed 11 Aconex
grade road 03 & Road Road
Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation &
WF-008321 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06220 C1 Latest Zone 08 Shop Drawing Engr. Sunil 8-Dec-24 22-Dec-24 19-Dec-24 B Closed 11 Aconex
grade road 03 & Road Road
Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation &
WF-008321 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06221 C0 Latest Zone 08 Shop Drawing Engr. Sunil 8-Dec-24 22-Dec-24 19-Dec-24 B Closed 11 Aconex
grade road 03 & Road Road
Transportation Transportation &
WF-008332 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06123 C2 Re-S Plan & Profile for Kaar at grade -03 Zone 08 Shop Drawing Engr. Sunil 9-Dec-24 23-Dec-24 16-Dec-24 C Closed 7 Aconex
& Road Road
Shop drawings for street light network layout and coordinates above
WF-008342 R02Z00-C021-JVC-00-XXX-SDW-EL-LG-93001 C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 9-Dec-24 23-Dec-24 12-Dec-24 Terminated Aconex
grade for kaar tunnel zone-08
Shop drawings for street light network layout and coordinates above
WF-008342 R02Z00-C021-JVC-00-XXX-SDW-EL-LG-93002 C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 9-Dec-24 23-Dec-24 12-Dec-24 Terminated Aconex
JVC-WTRAN- grade for kaar tunnel zone-08
007856 Shop drawings for street light network layout and coordinates above
WF-008342 R02Z00-C021-JVC-00-XXX-SDW-EL-LG-93003 C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 9-Dec-24 23-Dec-24 12-Dec-24 Terminated Aconex
grade for kaar tunnel zone-08
Shop drawings for street light network layout and coordinates above
WF-008342 R02Z00-C021-JVC-00-XXX-SDW-EL-LG-93004 C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 9-Dec-24 23-Dec-24 12-Dec-24 Terminated Aconex
grade for kaar tunnel zone-08
UT-Utilities & Sewerage
WF-008380 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-04031C1 Latest Structure sewage network manhole details internal dia.4000mm RAM-MIP Shop Drawing Engr. Fawzy 10-Dec-24 24-Dec-24 18-Dec-24 B Closed 8 Aconex
JVC-WTRAN- Infrastructure Effluent
007893 UT-Utilities & Sewerage
WF-008380 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-04032C1 Latest Structure sewage network manhole details internal dia.4000mm RAM-MIP Shop Drawing Engr. Fawzy 10-Dec-24 24-Dec-24 18-Dec-24 B Closed 8 Aconex
Infrastructure Effluent
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07521 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07522 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07523 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07524 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07525 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07526 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07527 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07528 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07529 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07530 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07531 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07532 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07533 C3 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
JVC-WTRAN- from Sta: 2+200 to 2+660
007948 Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07534 C3 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07535 C3 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07536 C3 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07537 C3 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07538 C3 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07539 C3 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07540 C3 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07541 C3 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07542 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07543 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07544 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07545 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07546 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop drawings for street light network layout and coordinates above
WF-008441 R02Z00-C021-JVC-08-XXX-SDW-EL-LG-93001-C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 12-Dec-24 26-Dec-24 18-Dec-24 Terminated Aconex
grade for kaar tunnel zone-08
Shop drawings for street light network layout and coordinates above
WF-008441 R02Z00-C021-JVC-08-XXX-SDW-EL-LG-93002-C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 12-Dec-24 26-Dec-24 18-Dec-24 Terminated Aconex
grade for kaar tunnel zone-08
JVC-WTRAN-
007951
Latest Status
D 0 1242
Response
ACONEX
Workflow Shop drawings for street light network layout and coordinates above Total
Workflow Document JVC Planned WSP Status Terminated Overdue Overdue Submittal
WF-008441 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-08-XXX-SDW-EL-LG-93003-C0 Status grade for kaar tunnel zone-08
Description Zone 08
Location Shop Drawing Electrical
Discipline Lighting
Sub-Discipline Submitted by 12-Dec-24 26-Dec-24 18-Dec-24
Engr. Sherif Status Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. JVC-WTRAN- Type Submitted Reply Response Code from WSP from JVC
No. as of
007951 Shop drawings for street light network layout and coordinates above date
WF-008441 R02Z00-C021-JVC-08-XXX-SDW-EL-LG-93004-C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 12-Dec-24 26-Dec-24 18-Dec-24 Terminated Today Aconex
grade for kaar tunnel zone-08
Shop drawings for street light network layout and coordinates above
WF-008441 R02Z00-C021-JVC-08-XXX-SDW-EL-LG-93005-C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 12-Dec-24 26-Dec-24 18-Dec-24 Terminated Aconex
grade for kaar tunnel zone-08
Shop drawings for street light network layout and coordinates above
WF-008441 R02Z00-C021-JVC-08-XXX-SDW-EL-LG-93006-C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 12-Dec-24 26-Dec-24 18-Dec-24 Terminated Aconex
grade for kaar tunnel zone-08
WF-008529 R02Z00-C021-JVC-00-XXX-ABD-CL-CL-11269 C0 Latest As built side slope cross section for D9-1 at sta 0+040 to 0+140 D9-1 As Built Civil Civil Engr. Sunil 17-Dec-24 31-Dec-24 O Pending 36 Aconex
WF-008529 R02Z00-C021-JVC-00-XXX-ABD-CL-CL-11270 C0 Latest As built side slope cross section for D9-1 at sta 0+040 to 0+140 D9-1 As Built Civil Civil Engr. Sunil 17-Dec-24 31-Dec-24 O Pending 36 Aconex
WF-008529 R02Z00-C021-JVC-00-XXX-ABD-CL-CL-11271 C0 Latest As built side slope cross section for D9-1 at sta 0+040 to 0+140 D9-1 As Built Civil Civil Engr. Sunil 17-Dec-24 31-Dec-24 O Pending 36 Aconex
JVC-WTRAN-
008034
WF-008529 R02Z00-C021-JVC-00-XXX-ABD-CL-CL-11272 C0 Latest As built side slope cross section for D9-1 at sta 0+040 to 0+140 D9-1 As Built Civil Civil Engr. Sunil 17-Dec-24 31-Dec-24 O Pending 36 Aconex
WF-008529 R02Z00-C021-JVC-00-XXX-ABD-CL-CL-11273 C0 Latest As built side slope cross section for D9-1 at sta 0+040 to 0+140 D9-1 As Built Civil Civil Engr. Sunil 17-Dec-24 31-Dec-24 O Pending 36 Aconex
WF-008529 R02Z00-C021-JVC-00-XXX-ABD-CL-CL-11274 C0 Latest As built side slope cross section for D9-1 at sta 0+040 to 0+140 D9-1 As Built Civil Civil Engr. Sunil 17-Dec-24 31-Dec-24 O Pending 36 Aconex
WF-008612 R02Z00-C021-JVC-07-XXX-ABD-CL-CL-11268 C0 Latest As built side slope cross section for Zone-07 at sta 0+220 to 0+240 Zone 07 As Built Civil Civil Engr. Sunil 19-Dec-24 2-Jan-25 22-Dec-24 A Closed 3 Aconex
JVC-WTRAN-
008109
WF-008612 R02Z00-C021-JVC-07-XXX-ABD-CL-CL-11275 C0 Latest As built side slope cross section for Zone-07 at sta 0+220 to 0+240 Zone 07 As Built Civil Civil Engr. Sunil 19-Dec-24 2-Jan-25 22-Dec-24 A Closed 3 Aconex
Shop drawings for street light network layout and coordinates walls
WF-008629 R02Z00-C021-JVC-06-XXX-SDW-EL-LG-92001 C1 Latest Zone 06 Shop Drawing Electrical Lighting Engr. Sherif 21-Dec-24 4-Jan-25 O Pending 32 Aconex
for jadat al haram unnel zone-06
Shop drawings for street light network layout and coordinates walls
WF-008629 R02Z00-C021-JVC-06-XXX-SDW-EL-LG-92002 C1 Latest Zone 06 Shop Drawing Electrical Lighting Engr. Sherif 21-Dec-24 4-Jan-25 O Pending 32 Aconex
for jadat al haram unnel zone-06
Shop drawings for street light network layout and coordinates walls
WF-008629 R02Z00-C021-JVC-06-XXX-SDW-EL-LG-92003 C1 Latest Zone 06 Shop Drawing Electrical Lighting Engr. Sherif 21-Dec-24 4-Jan-25 O Pending 32 Aconex
JVC-WTRAN- for jadat al haram unnel zone-06
008109 Shop drawings for street light network layout and coordinates walls
WF-008629 R02Z00-C021-JVC-06-XXX-SDW-EL-LG-92004 C1 Latest Zone 06 Shop Drawing Electrical Lighting Engr. Sherif 21-Dec-24 4-Jan-25 O Pending 32 Aconex
for jadat al haram unnel zone-06
Shop drawings for street light network layout and coordinates walls
WF-008629 R02Z00-C021-JVC-06-XXX-SDW-EL-LG-92005 C1 Latest Zone 06 Shop Drawing Electrical Lighting Engr. Sherif 21-Dec-24 4-Jan-25 O Pending 32 Aconex
for jadat al haram unnel zone-06
Shop drawings for street light network layout and coordinates walls
WF-008629 R02Z00-C021-JVC-06-XXX-SDW-EL-LG-92006 C1 Latest Zone 06 Shop Drawing Electrical Lighting Engr. Sherif 21-Dec-24 4-Jan-25 O Pending 32 Aconex
for jadat al haram unnel zone-06
JVC-WTRAN- Shop Drawing for Indicative section of Material Backfilling at Zone-
WF-008706 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-07702 C0 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 24-Dec-24 7-Jan-25 O Pending 29 Aconex
008199 01 from Sta: 0+400
JVC-WTRAN- Transportation Transportation &
WF-008738 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06123 C3 Latest Plan & Profile for Kaar at grade -03 Zone 08 Shop Drawing Engr. Sunil 25-Dec-24 8-Jan-25 29-Dec-24 B Closed 4 Aconex
008227 & Road Road