0% found this document useful (0 votes)
815 views54 pages

Aconex Shop Drawing Log

Uploaded by

Erickson Malicsi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
815 views54 pages

Aconex Shop Drawing Log

Uploaded by

Erickson Malicsi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 54

Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow Total
Workflow Document JVC Planned WSP Status Overdue Overdue Submittal
Transmittal Drawing No. Rev. Status Description Location Discipline Sub-Discipline Submitted by Status Duration
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
date
Today
JVC-WTRAN- R02Z00-C021-JVC-01-XXX-SDW-UT-SM- Shop Drawing for Tie-in Point Connection with AIP Package from MH- UT-Utilities &
WF-000142 C0 Latest Zone 01 Shop Drawing Storm Water Engr. Fawzy 2-Jan-24 16-Jan-24 18-Jan-24 B Closed 16 Aconex
000120 01410 EP-5 to MH3-1 at Zone 01 Infrastructure
R02Z00-C021-JVC-01-XXX-ABD-GT-GT-
WF-000181 C0 Latest As-Built CMC Layout for Zone 01 VTR 01 from sta 0+450 to 0+500 Zone 01 As Built Geotechnical Geotechnical Engr. Yaseen 4-Jan-24 18-Jan-24 15-Jan-24 B Closed 11 Aconex
JVC-WTRAN- 02001
000159 R02Z00-C021-JVC-01-XXX-ABD-GT-GT-
WF-000181 C0 Latest As-Built CMC Layout for Zone 01 VTR 01 from sta 0+450 to 0+500 Zone 01 As Built Geotechnical Geotechnical Engr. Yaseen 4-Jan-24 18-Jan-24 15-Jan-24 B Closed 11 Aconex
02002
Shop Drawing for Excavation Cross sections of Junction At Zone-
R02Z00-C021-JVC-02-XXX-SDW-CL-CL- Zone 02, Zone
WF-000185 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
07500 08 and 09
0+584.23)
Shop & Zone
Drawing 09(From sta:0+012.85
for Excavation toof
Cross sections 0+041.02
Junction At Zone-
R02Z00-C021-JVC-02-XXX-SDW-CL-CL- Zone 02, Zone
WF-000185 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
07501 08 and 09
0+584.23) & Zone 09(From sta:0+012.85 to 0+041.02
Shop Drawing for Excavation Cross sections of Junction At Zone-
R02Z00-C021-JVC-02-XXX-SDW-CL-CL- Zone 02, Zone
WF-000185 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
07502 08 and 09
0+584.23)
Shop & Zone
Drawing 09(From sta:0+012.85
for Excavation toof
Cross sections 0+041.02
Junction At Zone-
R02Z00-C021-JVC-02-XXX-SDW-CL-CL- Zone 02, Zone
WF-000185 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
07503 08 and 09
0+584.23) & Zone 09(From sta:0+012.85 to 0+041.02
Shop Drawing for Excavation Cross sections of Junction At Zone-
R02Z00-C021-JVC-02-XXX-SDW-CL-CL- Zone 02, Zone
WF-000185 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
07504 08 and 09
0+584.23)
Shop & Zone
Drawing 09(From sta:0+012.85
for Excavation toof
Cross sections 0+041.02
Junction At Zone-
R02Z00-C021-JVC-02-XXX-SDW-CL-CL- Zone 02, Zone
WF-000185 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
07505 08 and 09
0+584.23)
Shop & Zone
Drawing 09(From sta:0+012.85
for Excavation toof
Cross sections 0+041.02
Junction At Zone-
R02Z00-C021-JVC-02-XXX-SDW-CL-CL- Zone 02, Zone
WF-000185 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
07506 08 and 09
0+584.23) & Zone 09(From sta:0+012.85 to 0+041.02
Shop Drawing for Excavation Cross sections of Junction At Zone-
R02Z00-C021-JVC-08-XXX-SDW-CL-CL- Zone 02, Zone
WF-000185 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
07507 08 and 09
0+584.23)
Shop & Zone
Drawing 09(From sta:0+012.85
for Excavation toof
Cross sections 0+041.02
Junction At Zone-
R02Z00-C021-JVC-08-XXX-SDW-CL-CL- Zone 02, Zone
WF-000185 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
07508 08 and 09
0+584.23)
Shop & Zone
Drawing 09(From sta:0+012.85
for Excavation toof
Cross sections 0+041.02
Junction At Zone-
R02Z00-C021-JVC-08-XXX-SDW-CL-CL- Zone 02, Zone
WF-000185 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
JVC-WTRAN- 07509 08 and 09
0+584.23) & Zone 09(From sta:0+012.85 to 0+041.02
Shop Drawing for Excavation Cross sections of Junction At Zone-
000163 R02Z00-C021-JVC-08-XXX-SDW-CL-CL- Zone 02, Zone
WF-000185 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
07510 08 and 09
0+584.23)
Shop & Zone
Drawing 09(From sta:0+012.85
for Excavation toof
Cross sections 0+041.02
Junction At Zone-
Zone 02, Zone
WF-000185 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07511 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
08 and 09
0+584.23) & Zone 09(From sta:0+012.85 to 0+041.02
Shop Drawing for Excavation Cross sections of Junction At Zone-
Zone 02, Zone
WF-000185 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07512 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
08 and 09
0+584.23)
Shop & Zone
Drawing 09(From sta:0+012.85
for Excavation toof
Cross sections 0+041.02
Junction At Zone-
Zone 02, Zone
WF-000185 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07513 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
08 and 09
0+584.23)
Shop & Zone
Drawing 09(From sta:0+012.85
for Excavation toof
Cross sections 0+041.02
Junction At Zone-
Zone 02, Zone
WF-000185 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07514 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
08 and 09
0+584.23) & Zone 09(From sta:0+012.85 to 0+041.02
Shop Drawing for Excavation Cross sections of Junction At Zone-
Zone 02, Zone
WF-000185 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07515 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
08 and 09
0+584.23)
Shop & Zone
Drawing 09(From sta:0+012.85
for Excavation toof
Cross sections 0+041.02
Junction At Zone-
Zone 02, Zone
WF-000185 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07516 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
08 and 09
0+584.23) & Zone 09(From sta:0+012.85 to 0+041.02
Shop Drawing for Excavation Cross sections of Junction At Zone-
Zone 02, Zone
WF-000185 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07517 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
08 and 09
0+584.23)
Shop Drawing& Zone 09(From sta:0+012.85
for Excavation toof
Cross sections 0+041.02
Junction At Zone-
Zone 02, Zone
WF-000185 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07518 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
08 and 09
0+584.23)
Shop & Zone
Drawing 09(From sta:0+012.85
for Excavation toof
Cross sections 0+041.02
Junction At Zone-
Zone 02, Zone
WF-000185 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07519 C0 Latest 02(From sta: 0+910.04 to 0+993.88),Zone-08(From sta:0+553.01 to Shop Drawing Civil Civil Engr. Sunil 4-Jan-24 18-Jan-24 16-Jan-24 B Closed 12 Aconex
08 and 09
0+584.23) & Zone 09(From sta:0+012.85 to 0+041.02 Zone 01, 02
R02Z00-C021-JVC-XX-XXX-SDW-GT-GT- Shop Drawing CMC Layout for Soil Improvement Levels at
WF-000193 C1 Latest and KAAR Shop Drawing Geotechnical Geotechnical Engr. Yaseen 6-Jan-24 20-Jan-24 10-Jan-24 B Closed 4 Aconex
01001 Intersection 01 at Zone 02 and KAAR Tunnel
Tunnel
Zone 01, 02
Shop Drawing CMC Cross Section for Soil Improvement Levels at
WF-000193 R02Z00-C021-JVC-XX-XXX-SDW-GT-GT-01002C1 Latest and KAAR Shop Drawing Geotechnical Geotechnical Engr. Yaseen 6-Jan-24 20-Jan-24 10-Jan-24 B Closed 4 Aconex
Intersection 01 at Zone 02 and KAAR Tunnel
Tunnel
Zone 01, 02
Shop Drawing Coordinates for Soil Improvement Levels at
WF-000193 R02Z00-C021-JVC-XX-XXX-SDW-GT-GT-01003C1 Latest and KAAR Shop Drawing Geotechnical Geotechnical Engr. Yaseen 6-Jan-24 20-Jan-24 10-Jan-24 B Closed 4 Aconex
Intersection 01 at Zone 02 and KAAR Tunnel Sheet 1
Tunnel
Zone 01, 02
Shop Drawing Coordinates for Soil Improvement Levels at
WF-000193 R02Z00-C021-JVC-XX-XXX-SDW-GT-GT-01004C1 Latest and KAAR Shop Drawing Geotechnical Geotechnical Engr. Yaseen 6-Jan-24 20-Jan-24 10-Jan-24 B Closed 4 Aconex
Intersection 01 at Zone 02 and KAAR Tunnel Sheet 2
Tunnel
Zone 01, 02
Shop Drawing Coordinates for Soil Improvement Levels at
WF-000193 R02Z00-C021-JVC-XX-XXX-SDW-GT-GT-01005C1 Latest and KAAR Shop Drawing Geotechnical Geotechnical Engr. Yaseen 6-Jan-24 20-Jan-24 10-Jan-24 B Closed 4 Aconex
Intersection 01 at Zone 02 and KAAR Tunnel Sheet 3
Tunnel
Zone 01, 02
JVC-WTRAN- Shop Drawing Coordinates for Soil Improvement Levels at
WF-000193 R02Z00-C021-JVC-XX-XXX-SDW-GT-GT-01006C1 Latest and KAAR Shop Drawing Geotechnical Geotechnical Engr. Yaseen 6-Jan-24 20-Jan-24 10-Jan-24 B Closed 4 Aconex
000171 Intersection 01 at Zone 02 and KAAR Tunnel Sheet 4
Tunnel
Zone 01, 02
Shop Drawing Coordinates for Soil Improvement Levels at
WF-000193 R02Z00-C021-JVC-XX-XXX-SDW-GT-GT-01007C1 Latest and KAAR Shop Drawing Geotechnical Geotechnical Engr. Yaseen 6-Jan-24 20-Jan-24 10-Jan-24 B Closed 4 Aconex
Intersection 01 at Zone 02 and KAAR Tunnel Sheet 5
Tunnel
Zone 01, 02
Shop Drawing Coordinates for Soil Improvement Levels at
WF-000193 R02Z00-C021-JVC-XX-XXX-SDW-GT-GT-01008C1 Latest and KAAR Shop Drawing Geotechnical Geotechnical Engr. Yaseen 6-Jan-24 20-Jan-24 10-Jan-24 B Closed 4 Aconex
Intersection 01 at Zone 02 and KAAR Tunnel Sheet 6
Tunnel
Zone 01, 02
Shop Drawing Coordinates for Soil Improvement Levels at
WF-000193 R02Z00-C021-JVC-XX-XXX-SDW-GT-GT-01009C1 Latest and KAAR Shop Drawing Geotechnical Geotechnical Engr. Yaseen 6-Jan-24 20-Jan-24 10-Jan-24 B Closed 4 Aconex
Intersection 01 at Zone 02 and KAAR Tunnel Sheet 7
Tunnel
Zone 01, 02
Shop Drawing Coordinates for Soil Improvement Levels at
WF-000193 R02Z00-C021-JVC-XX-XXX-SDW-GT-GT-01010C1 Latest and KAAR Shop Drawing Geotechnical Geotechnical Engr. Yaseen 6-Jan-24 20-Jan-24 10-Jan-24 B Closed 4 Aconex
Intersection 01 at Zone 02 and KAAR Tunnel Sheet 8
Tunnel
Zone 01, 02
Shop Drawing Coordinates for Soil Improvement Levels at
WF-000209 R02Z00-C021-JVC-XX-XXX-SDW-GT-GT-01011C1 Latest and KAAR Shop Drawing Geotechnical Geotechnical Engr. Yaseen 6-Jan-24 20-Jan-24 10-Jan-24 B Closed 4 Aconex
Intersection 01 at Zone 02 and KAAR Tunnel Sheet 9
Tunnel
Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to
WF-000249 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04001C0 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Jan-24 21-Jan-24 10-Jan-24 B Closed 3 Aconex
1+980 - Layout Sheet 01
Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to
WF-000249 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04002C0 Re-S Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Jan-24 21-Jan-24 10-Jan-24 B Closed 3 Aconex
1+980 - Layout Sheet 02
Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to
WF-000249 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04003C0 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Jan-24 21-Jan-24 10-Jan-24 B Closed 3 Aconex
1+980 - Layout Sheet 03
Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to
WF-000249 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04004C0 Re-S Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Jan-24 21-Jan-24 10-Jan-24 B Closed 3 Aconex
1+980 - Layout Sheet 04
JVC-WTRAN- Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to
WF-000249 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04005C0 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Jan-24 21-Jan-24 10-Jan-24 B Closed 3 Aconex
000227 1+980 - Cross Section
Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to
WF-000249 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04006C0 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Jan-24 21-Jan-24 10-Jan-24 B Closed 3 Aconex
1+980 - Reinforcement Details
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

JVC-WTRAN-
000227

Response
ACONEX
Workflow Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to Total
Workflow Document JVC Planned 10-Jan-24
WSP Status
B Overdue Overdue Submittal
WF-000249 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04007C0 Status 1+980 - Elevation Sheet 1 Description Zone 05
Location Shop Drawing Geotechnical
Discipline Geotechnical Submitted
Sub-Discipline Engr. Yaseen
by 7-Jan-24 21-Jan-24 Closed
Status 3
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to date
WF-000249 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04008C0 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Jan-24 21-Jan-24 10-Jan-24 B Closed Today
3 Aconex
1+980 - Elevation Sheet 2
Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to
WF-000249 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04009C0 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Jan-24 21-Jan-24 10-Jan-24 B Closed 3 Aconex
1+980 - Anchor Schedule
UT-Utilities &
WF-000285 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01401C0 Latest Storm Water Network Plan and Profile For (Part 01 and 02) No Zone Shop Drawing Storm Water Engr. Fawzy 8-Jan-24 22-Jan-24 23-Jan-24 B Closed 15 Aconex
Infrastructure
UT-Utilities &
WF-000285 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01402C0 Latest Storm Water Network Plan and Profile For (Part 01 and 02) No Zone Shop Drawing Storm Water Engr. Fawzy 8-Jan-24 22-Jan-24 23-Jan-24 B Closed 15 Aconex
Infrastructure
UT-Utilities &
WF-000285 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01451C0 Re-S Storm Water Network Plan and Profile For (Part 01 and 02) No Zone Shop Drawing Storm Water Engr. Fawzy 8-Jan-24 22-Jan-24 23-Jan-24 B Closed 15 Aconex
Infrastructure
UT-Utilities &
WF-000285 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01452C0 Latest Storm Water Network Plan and Profile For (Part 01 and 02) No Zone Shop Drawing Storm Water Engr. Fawzy 8-Jan-24 22-Jan-24 23-Jan-24 B Closed 15 Aconex
Infrastructure
JVC-WTRAN- UT-Utilities &
WF-000285 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01453C0 Re-S Storm Water Network Plan and Profile For (Part 01 and 02) No Zone Shop Drawing Storm Water Engr. Fawzy 8-Jan-24 22-Jan-24 23-Jan-24 B Closed 15 Aconex
000263 Infrastructure
UT-Utilities &
WF-000285 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01455C0 Re-S Storm Water Network Plan and Profile For (Part 01 and 02) No Zone Shop Drawing Storm Water Engr. Fawzy 8-Jan-24 22-Jan-24 23-Jan-24 B Closed 15 Aconex
Infrastructure
UT-Utilities &
WF-000285 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01456C0 Re-S Storm Water Network Plan and Profile For (Part 01 and 02) No Zone Shop Drawing Storm Water Engr. Fawzy 8-Jan-24 22-Jan-24 23-Jan-24 B Closed 15 Aconex
Infrastructure
UT-Utilities &
WF-000285 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01464C0 Re-S Storm Water Network Plan and Profile For (Part 01 and 02) No Zone Shop Drawing Storm Water Engr. Fawzy 8-Jan-24 22-Jan-24 23-Jan-24 B Closed 15 Aconex
Infrastructure
UT-Utilities &
WF-000285 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01467C0 Re-S Storm Water Network Plan and Profile For (Part 01 and 02) No Zone Shop Drawing Storm Water Engr. Fawzy 8-Jan-24 22-Jan-24 23-Jan-24 B Closed 15 Aconex
Infrastructure
Shop Drawings Layout and Anchor Schedule for Shoring Works at
WF-000307 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-01001C3 Latest Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 9-Jan-24 23-Jan-24 18-Jan-24 B Closed 9 Aconex
Zone 6B from 2+380 to 2+720 Sheet 1
Shop Drawings Layout and Anchor Schedule for Shoring Works at
WF-000307 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-01002C3 Latest Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 9-Jan-24 23-Jan-24 18-Jan-24 B Closed 9 Aconex
Zone 6B from 2+380 to 2+720 Sheet 2
Shop Drawings Layout and Anchor Schedule for Shoring Works at
WF-000307 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-01003C3 Latest Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 9-Jan-24 23-Jan-24 18-Jan-24 B Closed 9 Aconex
Zone 6B from 2+380 to 2+720 Sheet 3
Shop Drawings Pile Sections and BBS for Shoring Works at Zone 6B
WF-000307 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-01004C3 Latest Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 9-Jan-24 23-Jan-24 18-Jan-24 B Closed 9 Aconex
from 2+380 to 2+720
Shop Drawings Capping Beam Layout for Shoring Works at Zone 6B
WF-000307 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-01005C3 Latest Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 9-Jan-24 23-Jan-24 18-Jan-24 B Closed 9 Aconex
from 2+380 to 2+720
JVC-WTRAN- Shop Drawings Anchor Cross Sections for Shoring Works at Zone 6B
WF-000307 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-01006C3 Latest Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 9-Jan-24 23-Jan-24 18-Jan-24 B Closed 9 Aconex
000285 from 2+380 to 2+720 Sheet 1
Shop Drawings Anchor Layout for Shoring Works at Zone 6B from
WF-000307 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-01007C3 Latest Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 9-Jan-24 23-Jan-24 18-Jan-24 B Closed 9 Aconex
2+380 to 2+720
Shop Drawings Anchor Cross Sections for Shoring Works for Zone 6B
WF-000307 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-01008C3 Latest Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 9-Jan-24 23-Jan-24 18-Jan-24 B Closed 9 Aconex
from 2+380 to 2+720 Sheet 2
Shop Drawings Anchor Cross Sections for Shoring Works for Zone 6B
WF-000307 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-01009C3 Latest Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 9-Jan-24 23-Jan-24 18-Jan-24 B Closed 9 Aconex
from 2+380 to 2+720 Sheet 3
Shop Drawings Summary of Anchor Forces for Shoring Works for
WF-000307 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-01010C3 Latest Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 9-Jan-24 23-Jan-24 18-Jan-24 B Closed 9 Aconex
Zone 6B from 2+380 to 2+720
Shop Drawings Anchor Cross Sections for Shoring Works at Zone 6B
WF-000307 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-01011C3 Latest Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 9-Jan-24 23-Jan-24 18-Jan-24 B Closed 9 Aconex
from 2+380 to 2+720 Sheet 4
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00100C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00101C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00103C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00104C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00105C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00106C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00107C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00108C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00109C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00110C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00111C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00112C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00113C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
JVC-WTRAN- details) in D02, D09 and D10 000145-02
000369 Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00114C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00115C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00116C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00117C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00118C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00119C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Latest Status

Closed WSP JVC


JVC-WTRAN- Pending Open
000369
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow Shop drawings for Medium Voltage Manholes and Ducts (sections & Total MIP-JVC-SHD-ELE-
Workflow Document JVC Planned WSP Status
B Overdue Overdue Submittal
WF-000801 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00120C2 Status details) in D02, D09 and D10
Description No Zone
Location Shop Drawing Electrical
Discipline Medium Voltage Submitted
Sub-Discipline by 13-Jan-24 27-Jan-24 31-Jan-24
Engr. Sherif Closed
Status 18
Duration Aconex
Ref.
Alternative Ref. #
000145-02 Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop drawings for Medium Voltage Manholes and Ducts (sections & date MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00121C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed Today
18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00122C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00123C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00124C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00125C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop drawings for Medium Voltage Manholes and Ducts (sections & MIP-JVC-SHD-ELE-
WF-000801 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00126C2 Latest No Zone Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Jan-24 27-Jan-24 31-Jan-24 B Closed 18 Aconex
details) in D02, D09 and D10 000145-02
Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000376 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07520 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Jan-24 27-Jan-24 24-Jan-24 C Closed 11 Aconex
Sta: 2+400 to 2+560
Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000376 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07533 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Jan-24 27-Jan-24 24-Jan-24 C Closed 11 Aconex
Sta: 2+400 to 2+560
Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000376 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07534 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Jan-24 27-Jan-24 24-Jan-24 C Closed 11 Aconex
Sta: 2+400 to 2+560
Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000376 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07535 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Jan-24 27-Jan-24 24-Jan-24 C Closed 11 Aconex
Sta: 2+400 to 2+560
Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000376 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07536 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Jan-24 27-Jan-24 24-Jan-24 C Closed 11 Aconex
JVC-WTRAN- Sta: 2+400 to 2+560
000252 Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000376 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07537 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Jan-24 27-Jan-24 24-Jan-24 C Closed 11 Aconex
Sta: 2+400 to 2+560
Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000376 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07538 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Jan-24 27-Jan-24 24-Jan-24 C Closed 11 Aconex
Sta: 2+400 to 2+560
Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000376 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07539 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Jan-24 27-Jan-24 24-Jan-24 C Closed 11 Aconex
Sta: 2+400 to 2+560
Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000376 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07540 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Jan-24 27-Jan-24 24-Jan-24 C Closed 11 Aconex
Sta: 2+400 to 2+560
Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000376 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07541 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Jan-24 27-Jan-24 24-Jan-24 C Closed 11 Aconex
Sta: 2+400 to 2+560
Shop Drawings Shoring Piles Layout for Shoring Works at Zone 08 MIP-JVC-SHD-GEO-
WF-000403 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-03001C4 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 14-Jan-24 28-Jan-24 21-Jan-24 B Closed 7 Aconex
KAAR Tunnel from sta. 0+100 to 0+200 000037-04
Shop Drawings Anchor Side A 1st Row Layout for Shoring Works at MIP-JVC-SHD-GEO-
WF-000403 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-03002C4 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 14-Jan-24 28-Jan-24 21-Jan-24 B Closed 7 Aconex
Zone 08 KAAR Tunnel from sta. 0+100 to 0+201 000037-04
Shop Drawings Anchor Side B 1st Row Layout for Shoring Works at MIP-JVC-SHD-GEO-
WF-000403 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-03003C4 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 14-Jan-24 28-Jan-24 21-Jan-24 B Closed 7 Aconex
Zone 08 KAAR Tunnel from sta. 0+100 to 0+204 000037-04
Shop Drawings Anchor Side A 2nd Row Layout for Shoring Works at MIP-JVC-SHD-GEO-
WF-000403 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-03004C4 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 14-Jan-24 28-Jan-24 21-Jan-24 B Closed 7 Aconex
Zone 08 KAAR Tunnel from sta. 0+100 to 0+202 000037-04
JVC-WTRAN- Shop Drawings Anchor Side B 2nd Row Layout for Shoring Works at MIP-JVC-SHD-GEO-
WF-000403 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-03005C4 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 14-Jan-24 28-Jan-24 21-Jan-24 B Closed 7 Aconex
000379 Zone 08 KAAR Tunnel from sta. 0+100 to 0+203 000037-04
Shop Drawings Side A Elevation for Shoring Works at Zone 08 KAAR MIP-JVC-SHD-GEO-
WF-000403 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-03006C4 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 14-Jan-24 28-Jan-24 21-Jan-24 B Closed 7 Aconex
Tunnel from sta. 0+100 to 0+204 000037-04
Shop Drawings Side B Elevation for Shoring Works at Zone 08 KAAR MIP-JVC-SHD-GEO-
WF-000403 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-03007C4 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 14-Jan-24 28-Jan-24 21-Jan-24 B Closed 7 Aconex
Tunnel from sta. 0+100 to 0+205 000037-04
Shop Drawings Side A Cross Section for Shoring Works at Zone 08 MIP-JVC-SHD-GEO-
WF-000403 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-03008C4 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 14-Jan-24 28-Jan-24 21-Jan-24 B Closed 7 Aconex
KAAR Tunnel from sta. 0+100 to 0+206 000037-04
Shop Drawings Side B Cross Section for Shoring Works at Zone 08 MIP-JVC-SHD-GEO-
WF-000403 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-03009C4 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 14-Jan-24 28-Jan-24 21-Jan-24 B Closed 7 Aconex
KAAR Tunnel from sta. 0+100 to 0+207 000037-04
JVC-WTRAN- As-Built CMC Layout for Zone 05 from sta. 1+793 to 1+833 (Seg 78
WF-000423 R02Z00-C021-JVC-05-XXX-ABD-GT-GT-01001 C0 Re-S Zone 05 As Built Geotechnical Geotechnical Engr. Yaseen 15-Jan-24 29-Jan-24 17-Jan-24 B Closed 2 Aconex
000399 & 79)
Shop Drawing for Excavation at Kaar Tunnel Zone-08 Sta: 0+480
WF-000466 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-05419 C0 Re-S Zone 08 Shop Drawing Civil Civil Engr. Sunil 16-Jan-24 30-Jan-24 28-Jan-24 C Closed 12 Aconex
to0+552.99
Shop Drawing for Excavation at Kaar Tunnel Zone-08 Sta: 0+480
WF-000466 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-05420 C0 Re-S Zone 08 Shop Drawing Civil Civil Engr. Sunil 16-Jan-24 30-Jan-24 28-Jan-24 C Closed 12 Aconex
to0+552.99
Shop Drawing for Excavation at Kaar Tunnel Zone-08 Sta: 0+480
WF-000466 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-05421 C0 Re-S Zone 08 Shop Drawing Civil Civil Engr. Sunil 16-Jan-24 30-Jan-24 28-Jan-24 C Closed 12 Aconex
to0+552.99
JVC-WTRAN- Shop Drawing for Excavation at Kaar Tunnel Zone-08 Sta: 0+480
WF-000466 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-05422 C0 Re-S Zone 08 Shop Drawing Civil Civil Engr. Sunil 16-Jan-24 30-Jan-24 28-Jan-24 C Closed 12 Aconex
000442 to0+552.99
Shop Drawing for Excavation at Kaar Tunnel Zone-08 Sta: 0+480
WF-000466 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-05423 C0 Re-S Zone 08 Shop Drawing Civil Civil Engr. Sunil 16-Jan-24 30-Jan-24 28-Jan-24 C Closed 12 Aconex
to0+552.99
Shop Drawing for Excavation at Kaar Tunnel Zone-08 Sta: 0+480
WF-000466 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-05424 C0 Re-S Zone 08 Shop Drawing Civil Civil Engr. Sunil 16-Jan-24 30-Jan-24 28-Jan-24 C Closed 12 Aconex
to0+552.99
Shop Drawing for Excavation at Kaar Tunnel Zone-08 Sta: 0+480
WF-000466 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-05425 C0 Re-S Zone 08 Shop Drawing Civil Civil Engr. Sunil 16-Jan-24 30-Jan-24 28-Jan-24 C Closed 12 Aconex
to0+552.99
Shop Drawings General layout Sheet 1 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01001C0 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings General layout Sheet 2 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01002C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 1+953 incl. ES 19, 20 000079-00
Shop Drawings General layout Sheet 3 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01003C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+953 to 2+200 incl. ES 21, 22 and VTR 10 000079-00
Shop Drawings Cross Section for Soil Improvement Works in Zone 05 MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01004C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings Cordinates Sheet 1 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01005C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings Cordinates Sheet 2 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01006C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings Cordinates Sheet 3 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01007C1 Re-S Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings Cordinates Sheet 4 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01008C1 Re-S Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00

JVC-WTRAN-
000445
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow Shop Drawings Cordinates Sheet 5 for Soil Improvement Works in Total MIP-JVC-SHD-GEO-
Workflow Document JVC Planned 24-Jan-24
WSP Status
B Overdue Overdue Submittal
WF-000469 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01009C1 Status Zone 05 from sta. 1+773 toDescription
2+200 incl. ES 19, 20, 21, 22 and VTR 10
Zone 05
Location Shop Drawing Geotechnical
Discipline Geotechnical Submitted
Sub-Discipline by 16-Jan-24
Engr. Yaseen 30-Jan-24 Closed
Status 8
Duration Aconex
Ref.
Alternative Ref. #
000079-00 Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawings Cordinates Sheet 6 for Soil Improvement Works in date MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01010C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed Today
8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings Cordinates Sheet 7 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01011C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
JVC-WTRAN- Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
000445 Shop Drawings Cordinates Sheet 8 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01012C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings Cordinates Sheet 9 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01013C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings Cordinates Sheet 10 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01014C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings Cordinates Sheet 11 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01015C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings Cordinates Sheet 12 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01016C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings Cordinates Sheet 13 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01017C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings Cordinates Sheet 14 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01018C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings Cordinates Sheet 15 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01019C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings Cordinates Sheet 16 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01020C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings Cordinates Sheet 17 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01021C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
Shop Drawings Cordinates Sheet 18 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-000469 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01022C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Jan-24 30-Jan-24 24-Jan-24 B Closed 8 Aconex
Zone 05 from sta. 1+773 to 2+200 incl. ES 19, 20, 21, 22 and VTR 10 000079-00
UT-Utilities &
WF-000473 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03601C0 Latest Grey water collection Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing Grey Water Engr. Fawzy 16-Jan-24 30-Jan-24 25-Jan-24 B Closed 9 Aconex
Infrastructure
UT-Utilities &
WF-000473 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03602C0 Latest Grey water collection Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing Grey Water Engr. Fawzy 16-Jan-24 30-Jan-24 25-Jan-24 B Closed 9 Aconex
Infrastructure
UT-Utilities &
WF-000473 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03610C0 Latest Grey water collection Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing Grey Water Engr. Fawzy 16-Jan-24 30-Jan-24 25-Jan-24 B Closed 9 Aconex
Infrastructure
JVC-WTRAN- UT-Utilities &
WF-000473 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03659C0 Latest Grey water collection Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing Grey Water Engr. Fawzy 16-Jan-24 30-Jan-24 25-Jan-24 B Closed 9 Aconex
000449 Infrastructure
UT-Utilities &
WF-000473 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03660C0 Latest Grey water collection Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing Grey Water Engr. Fawzy 16-Jan-24 30-Jan-24 25-Jan-24 B Closed 9 Aconex
Infrastructure
UT-Utilities &
WF-000473 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03681C0 Latest Grey water collection Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing Grey Water Engr. Fawzy 16-Jan-24 30-Jan-24 25-Jan-24 B Closed 9 Aconex
Infrastructure
UT-Utilities &
WF-000473 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03682C0 Latest Grey water collection Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing Grey Water Engr. Fawzy 16-Jan-24 30-Jan-24 25-Jan-24 B Closed 9 Aconex
Infrastructure
Shop Drawing for Excavation Cross section of Tunnel-02- Zone-10 at MIP-JVC-SHD-CIV-
WF-000516 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05219 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 18-Jan-24 1-Feb-24 28-Jan-24 C Open 370 Aconex
Sta: 0+020.35 to 0+032.87 000026-02
Shop Drawing for Excavation Cross section of Tunnel-02- Zone-10 at MIP-JVC-SHD-CIV-
WF-000516 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05220 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 18-Jan-24 1-Feb-24 28-Jan-24 C Open 370 Aconex
Sta: 0+020.35 to 0+032.87 000026-02
Shop Drawing for Excavation Cross section of Tunnel-02- Zone-10 at MIP-JVC-SHD-CIV-
WF-000516 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05221 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 18-Jan-24 1-Feb-24 28-Jan-24 C Open 370 Aconex
JVC-WTRAN- Sta: 0+020.35 to 0+032.87 000026-02
000490 Shop Drawing for Excavation Cross section of Tunnel-02- Zone-10 at MIP-JVC-SHD-CIV-
WF-000516 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05222 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 18-Jan-24 1-Feb-24 28-Jan-24 C Open 370 Aconex
Sta: 0+020.35 to 0+032.87 000026-02
Shop Drawing for Excavation Cross section of Tunnel-02- Zone-10 at MIP-JVC-SHD-CIV-
WF-000516 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05223 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 18-Jan-24 1-Feb-24 28-Jan-24 C Open 370 Aconex
Sta: 0+020.35 to 0+032.87 000026-02
Shop Drawing for Excavation Cross section of Tunnel-02- Zone-10 at MIP-JVC-SHD-CIV-
WF-000516 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05224 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 18-Jan-24 1-Feb-24 28-Jan-24 C Open 370 Aconex
Sta: 0+020.35 to 0+032.87 000026-02
JVC-WTRAN- Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to As per Engr.
WF-000556 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04001-C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Jan-24 23-Jan-24 Terminated Aconex
000529 1+980 - Layout Sheet 01 Yaseen
JVC-WTRAN- Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to
WF-000558 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04004C1 Re-S Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Jan-24 3-Feb-24 28-Jan-24 C Closed 8 Aconex
000531 1+980 - Layout Sheet 04
JVC-WTRAN- UT-Utilities &
WF-000587 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-05052C0 Latest Grey Water Collection Network Pipe Trench Details RAM-MIP Shop Drawing Grey Water Engr. Fawzy 21-Jan-24 4-Feb-24 29-Jan-24 B Closed 8 Aconex
000556 Infrastructure
JVC-WTRAN- Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to
WF-000635 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04002C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 22-Jan-24 5-Feb-24 28-Jan-24 C Open 366 Aconex
000601 1+980 - Layout Sheet 02
JVC-WTRAN- As-built CMC Layout for Zone 02 Int. 01 from sta. 0+910 to 0+932
WF-000640 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01001 C0 Latest Zone 05 As Built Geotechnical Geotechnical Engr. Yaseen 23-Jan-24 6-Feb-24 24-Jan-24 B Closed 1 Aconex
000606 (Area 01) [partially]
JVC-WTRAN- Facilities Facilities
WF-000644 R02Z00-C021-JVC-XX-XXX-SDW-FM-FM-00001C0 Latest Proposed gate barrier new location Zone 05 Shop Drawing Engr. Elfeky 23-Jan-24 6-Feb-24 31-Jan-24 A Closed 8 Aconex
000610 Management Management
JVC-WTRAN- As-built CMC Layout for Zone 02 Int. 01 from sta. 0+932 to 0+972
WF-000672 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01002 C0 Latest Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 24-Jan-24 7-Feb-24 3-Feb-24 B Closed 10 Aconex
000637 (Area 04) [partially]
Shop Drawings Shoring Layout and Co-ordinates Sheet 1 for Shoring
WF-000689 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-03001C2 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 24-Jan-24 7-Feb-24 6-Feb-24 C Closed 13 Aconex
Works at Zone 07 Airport Tunnel from sta. 0+080 to 0+150
Shop Drawings Shoring Layout and Co-ordinates Sheet 2 for Shoring
WF-000689 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-03002C2 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 24-Jan-24 7-Feb-24 6-Feb-24 C Closed 13 Aconex
Works at Zone 07 Airport Tunnel from sta. 0+080 to 0+150
Shop Drawings Anchoring Layout and Co-ordinates Sheet 1 for
WF-000689 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-03003C2 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Fawzy 24-Jan-24 7-Feb-24 6-Feb-24 C Closed 13 Aconex
Shoring Works at Zone 07 Airport Tunnel from sta. 0+080 to 0+150
JVC-WTRAN- Shop Drawings Anchoring Layout and Co-ordinates Sheet 2 for
WF-000689 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-03004C2 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 24-Jan-24 7-Feb-24 6-Feb-24 C Closed 13 Aconex
000654 Shoring Works at Zone 07 Airport Tunnel from sta. 0+080 to 0+150
Shop Drawings Elelvation for Shoring Works at Zone 07 Airport
WF-000689 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-03005C2 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 24-Jan-24 7-Feb-24 6-Feb-24 C Closed 13 Aconex
Tunnel from sta. 0+080 to 0+150
Shop Drawings Cross Sections Sheet 1 for Shoring Works at Zone 07
WF-000689 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-03006C2 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Elfeky 24-Jan-24 7-Feb-24 6-Feb-24 C Closed 13 Aconex
Airport Tunnel from sta. 0+080 to 0+150
Shop Drawings Cross Sections Sheet 2 for Shoring Works at Zone 07
WF-000689 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-03007C2 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 24-Jan-24 7-Feb-24 6-Feb-24 C Closed 13 Aconex
Airport Tunnel from sta. 0+080 to 0+150
Sewerage
WF-000700 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01201C0 Re-S Sewage Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing
UT-Utilities & Infrastructure Engr. Fawzy 25-Jan-24 8-Feb-24 3-Feb-24 B Closed 9 Aconex
Effluent

JVC-WTRAN-
000665
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow Sewerage Total
Workflow Document JVC Planned WSP Status
B Overdue Overdue Submittal
WF-000700 Transmittal Drawing No. Rev. Status
R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01202C0 Re-S Sewage Network Plan and Profile for (Part 01 and 02)
Description RAM-MIP
Location Shop Drawing
UT-Utilities & Infrastructure
Discipline Sub-Discipline
Effluent by 25-Jan-24
Engr. Fawzy
Submitted 8-Feb-24 3-Feb-24 Closed
Status 9
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Sewerage date
WF-000700 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01216C0 Re-S Sewage Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing
UT-Utilities & Infrastructure Engr. Fawzy 25-Jan-24 8-Feb-24 3-Feb-24 B Closed Today
9 Aconex
Effluent
JVC-WTRAN- Sewerage
WF-000700 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01217C0 Re-S Sewage Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing
UT-Utilities & Infrastructure Engr. Fawzy 25-Jan-24 8-Feb-24 3-Feb-24 B Closed 9 Aconex
000665 Effluent
Sewerage
WF-000700 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01254C0 Re-S Sewage Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing
UT-Utilities & Infrastructure Engr. Fawzy 25-Jan-24 8-Feb-24 3-Feb-24 B Closed 9 Aconex
Effluent
Sewerage
WF-000700 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01255C0 Re-S Sewage Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing
UT-Utilities & Infrastructure Engr. Fawzy 25-Jan-24 8-Feb-24 3-Feb-24 B Closed 9 Aconex
Effluent
Sewerage
WF-000700 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01264C0 Re-S Sewage Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing
UT-Utilities & Infrastructure Engr. Fawzy 25-Jan-24 8-Feb-24 3-Feb-24 B Closed 9 Aconex
Effluent
Shop Drawing Layout for Soil Improvement works in Zone 01 Dry As per Engr.
WF-000717 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02001-C0 Latest RAM-MIP Shop Drawing Geotechnical Geotechnical Engr. Yaseen 25-Jan-24 29-Jan-24 Terminated Aconex
Utility Culvert from sta. 0+140 to 0+210 Yaseen
JVC-WTRAN- Shop Drawing Cross-Sectionsfor Soil Improvement works in Zone 01 As per Engr.
WF-000717 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02002-C0 Latest RAM-MIP Shop Drawing Geotechnical Geotechnical Engr. Yaseen 25-Jan-24 29-Jan-24 Terminated Aconex
000681 Dry Utility Culvert from sta. 0+140 to 0+211 Yaseen
Shop Drawing Coordinates and Levels for Soil Improvement works in As per Engr.
WF-000717 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02003-C0 Latest RAM-MIP Shop Drawing Geotechnical Geotechnical Engr. Yaseen 25-Jan-24 29-Jan-24 Terminated Aconex
Zone 01 Dry Utility Culvert from sta. 0+140 to 0+212 Yaseen
Shop Drawing for Excavation Cross sections and Egress Stair 19 At MIP-JVC-SHD-CIV-
WF-000765 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05244 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 B Closed 14 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98 000118-01
Shop Drawing for Excavation Cross sections and Egress Stair 19 At MIP-JVC-SHD-CIV-
WF-000765 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05250 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 B Closed 14 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98 000118-01
Shop Drawing for Excavation Cross sections and Egress Stair 19 At MIP-JVC-SHD-CIV-
WF-000765 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05251 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 B Closed 14 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98 000118-01
Shop Drawing for Excavation Cross sections and Egress Stair 19 At MIP-JVC-SHD-CIV-
WF-000765 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05252 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 B Closed 14 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98 000118-01
Shop Drawing for Excavation Cross sections and Egress Stair 19 At MIP-JVC-SHD-CIV-
WF-000765 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05253 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 B Closed 14 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98 000118-01
Shop Drawing for Excavation Cross sections and Egress Stair 19 At MIP-JVC-SHD-CIV-
WF-000765 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05254 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 B Closed 14 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98 000118-01
JVC-WTRAN- Shop Drawing for Excavation Cross sections and Egress Stair 19 At MIP-JVC-SHD-CIV-
WF-000765 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05255 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 B Closed 14 Aconex
000729 Zone-05 from Sta: 1+855.48 to 1+961.98 000118-01
Shop Drawing for Excavation Cross sections and Egress Stair 19 At MIP-JVC-SHD-CIV-
WF-000765 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05256 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 B Closed 14 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98 000118-01
Shop Drawing for Excavation Cross sections and Egress Stair 19 At MIP-JVC-SHD-CIV-
WF-000765 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05257 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 B Closed 14 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98 000118-01
Shop Drawing for Excavation Cross sections and Egress Stair 19 At MIP-JVC-SHD-CIV-
WF-000765 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07090 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 B Closed 14 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98 000118-01
Shop Drawing for Excavation Cross sections and Egress Stair 19 At MIP-JVC-SHD-CIV-
WF-000765 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07091 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 B Closed 14 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98 000118-01
Shop Drawing for Excavation Cross sections and Egress Stair 19 At MIP-JVC-SHD-CIV-
WF-000765 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07092 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 B Closed 14 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98 000118-01
Shop Drawing for Excavation Cross sections and Egress Stair 19 At MIP-JVC-SHD-CIV-
WF-000765 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07093 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 B Closed 14 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98 000118-01
JVC-WTRAN- As-Built CMC Layout for Zone 05 from sta. 1+793 to 1+833 (Seg 78
WF-000771 R02Z00-C021-JVC-05-XXX-ABD-GT-GT-01001 C1 Re-S Zone 05 As Built Geotechnical Geotechnical Engr. Yaseen 28-Jan-24 11-Feb-24 11-Feb-24 C Closed 14 Aconex
000733 & 79)
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-000784 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05453-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 Terminated Aconex
to0+200 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-000784 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05454-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 Terminated Aconex
to0+200 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-000784 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05455-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 Terminated Aconex
to0+200 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-000784 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05456-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 Terminated Aconex
to0+200 000044-02 Withdraw by
JVC-WTRAN- Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV- Engr Nahell
WF-000784 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05457-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 Terminated Aconex
000746 to0+200 000044-02 dated 11-02-
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV- 2024
WF-000784 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05458-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 Terminated Aconex
to0+200 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-000784 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05459-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 Terminated Aconex
to0+200 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-000784 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05460-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 Terminated Aconex
to0+200 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-000784 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05461-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 Terminated Aconex
to0+200 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+280 MIP-JVC-SHD-CIV-
WF-000786 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05465-C1 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 Terminated Aconex
to0+360 000109-01
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+280 MIP-JVC-SHD-CIV-
WF-000786 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05466-C1 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 Terminated Aconex
to0+360 000109-01 Withdraw by
JVC-WTRAN- Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+280 MIP-JVC-SHD-CIV- Engr Nahell
WF-000786 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05467-C1 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 Terminated Aconex
000748 to0+360 000109-01 dated 11-02-
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+280 MIP-JVC-SHD-CIV- 2024
WF-000786 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05468-C1 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 Terminated Aconex
to0+360 000109-01
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+280 MIP-JVC-SHD-CIV-
WF-000786 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05469-C1 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 28-Jan-24 11-Feb-24 11-Feb-24 Terminated Aconex
to0+360 000109-01
Shop Drawing Layout for Soil Improvement works in Zone 01 Wet
WF-000799 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02001C0 Re-S Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 29-Jan-24 12-Feb-24 31-Jan-24 B Closed 2 Aconex
Utility Culvert from sta. 0+140 to 0+210
JVC-WTRAN- Shop Drawing Coordinates and Levels for Soil Improvement works in
WF-000799 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02002C0 Re-S Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 29-Jan-24 12-Feb-24 31-Jan-24 B Closed 2 Aconex
000760 Zone 01 Wet Utility Culvert from sta. 0+140 to 0+212
Shop Drawing Coordinates and Levels for Soil Improvement works in
WF-000799 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02003C0 Re-S Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 29-Jan-24 12-Feb-24 31-Jan-24 B Closed 2 Aconex
Zone 01 Wet Utility Culvert from sta. 0+140 to 0+212
Shop Drawing for As built & Design Excavation at D9-1 Near Zone-02 MIP-JVC-SHD-CIV-
WF-000913 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-09755-C4 Latest D9-1 Shop Drawing Civil Civil Engr. Sunil 1-Feb-24 15-Feb-24 11-Feb-24 Terminated Aconex
Sta: 0+000 to 0+020 000065-04 Withdraw by
JVC-WTRAN- Shop Drawing for As built & Design Excavation at D9-1 Near Zone-02 MIP-JVC-SHD-CIV- Engr Nahell
WF-000913 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-09756-C4 Latest D9-1 Shop Drawing Civil Civil Engr. Sunil 1-Feb-24 15-Feb-24 11-Feb-24 Terminated Aconex
000860 Sta: 0+000 to 0+020 000065-04 dated 11-02-
2024
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Withdraw by
JVC-WTRAN- Engr Nahell
000860 Response dated 11-02-
ACONEX
Workflow Shop Drawing for As built & Design Excavation at D9-1 Near Zone-02 Total MIP-JVC-SHD-CIV- 2024
Workflow Document JVC Planned 11-Feb-24
WSP Status Terminated Overdue Overdue Submittal
WF-000913 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-09759-C4 Status Sta: 0+000 to 0+020 Description D9-1
Location Shop Drawing Civil
Discipline Civil
Sub-Discipline Engr. Sunilby 1-Feb-24
Submitted 15-Feb-24 Status Duration Aconex
Ref.
Alternative Ref. #
000065-04 Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
JVC-WTRAN- Transportation Transportation & date MIP-JVC-SHD-
WF-000895 R02Z00-C021-JVC-11-XXX-SDW-TR-TR-06168 C4 Latest Shop Drawing Plan & Profile for Tunnel 03 D9-1 Shop Drawing Engr. Khalid 1-Feb-24 15-Feb-24 13-Feb-24 B Closed Today
12 Aconex
000849 & Road Road RDW-000053-01
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05110 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05111 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05112 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05113 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05114 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05115 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05116 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05117 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05118 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05119 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05120 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05121 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05122 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05123 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
JVC-WTRAN- Sta: 2+200 to 2+660 000004-02
000877 Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05124 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05125 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05126 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05127 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05128 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05129 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05130 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05131 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05132 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05133 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05134 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05135 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05136 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Excavation Cross section at Haram Tunnel Zone-06 MIP-JVC-SHD-CIV-
WF-000930 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05137 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 18-Feb-24 B Closed 15 Aconex
Sta: 2+200 to 2+660 000004-02
Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000931 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07520-C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 12-Feb-24 Terminated Aconex
JVC-WTRAN- Sta: 2+400 to 2+560
000878 Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000931 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07533-C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 12-Feb-24 Terminated Aconex
Sta: 2+400 to 2+560
Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000937 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07534-C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 12-Feb-24 Terminated Aconex
Sta: 2+400 to 2+560
Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000937 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07535-C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 12-Feb-24 Terminated Aconex
JVC-WTRAN- Sta: 2+400 to 2+560
000884 Shop Drawing for Backfilling Cross sections At Zone-06 from Withdraw by
WF-000937 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07536-C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 12-Feb-24 Terminated Aconex
Sta: 2+400 to 2+560 Engr Nahell
Shop Drawing for Backfilling Cross sections At Zone-06 from dated 11-02-
WF-000937 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07537-C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 12-Feb-24 Terminated Aconex 2024
Sta: 2+400 to 2+560
Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000931 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07538-C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 12-Feb-24 Terminated Aconex
Sta: 2+400 to 2+560
Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000931 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07539-C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 12-Feb-24 Terminated Aconex
JVC-WTRAN- Sta: 2+400 to 2+560
000878 Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000931 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07540-C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 12-Feb-24 Terminated Aconex
Sta: 2+400 to 2+560
Shop Drawing for Backfilling Cross sections At Zone-06 from
WF-000931 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07541-C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 3-Feb-24 17-Feb-24 12-Feb-24 Terminated Aconex
Sta: 2+400 to 2+560
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00109C1 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00110C1 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow UT-Utilities & UT-Utilities & Total MIP-JVC-SHD-INF-
Workflow Document JVC Planned 15-Feb-24
WSP Status
B Overdue Overdue Submittal
WF-000939 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00111C1 Status Combined Utility Plan for Road 11-D09
Description Road 11-D09
Location Shop Drawing Discipline
Infrastructure Sub-Discipline Engr. Fawzy 3-Feb-24
Infrastructure Submitted by Submitted
17-Feb-24 Closed
Status 12
Duration Aconex
Ref.
Alternative Ref. #
000022-01 Remarks
Ref. No. Type Reply Response Code from WSP from JVC
No. as of
UT-Utilities & UT-Utilities & date MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00112C1 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed Today
12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00113C1 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00114C1 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00115C1 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00116C1 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00117C1 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00118C1 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00119C1 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
JVC-WTRAN- Infrastructure Infrastructure 000022-01
000886 UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00120C1 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00121C1 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00122C1 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00123C0 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00124C0 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00125C0 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00126C0 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00127C0 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00128C0 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00129C0 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
UT-Utilities & UT-Utilities & MIP-JVC-SHD-INF-
WF-000939 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00130C0 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 3-Feb-24 17-Feb-24 15-Feb-24 B Closed 12 Aconex
Infrastructure Infrastructure 000022-01
JVC-WTRAN- Transportation Transportation &
WF-000950 R02Z00-C021-JVC-06-XXX-SDW-TR-TR-06156 C0 Latest Shop Drawing Plan & Profile for Existing Road 02 Road 02 Shop Drawing Engr. Khalid 3-Feb-24 17-Feb-24 11-Feb-24 B Closed 8 Aconex
000896 & Road Road
JVC-WTRAN- Transportation Transportation & MIP-JVC-SHD-
WF-001008 R02Z00-C021-JVC-10-XXX-SDW-TR-TR-06167 C0 Latest Shop Drawing Plan & Profile for Tunnel 02 Tunnel 02 Shop Drawing Engr. Khalid 5-Feb-24 19-Feb-24 18-Feb-24 B Closed 13 Aconex
000949 & Road Road RDW-000051-01
Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to
WF-001011 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04004C2 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 5-Feb-24 19-Feb-24 11-Feb-24 B Closed 6 Aconex
1+980 - Layout Sheet 04
Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to
WF-001011 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04005C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 5-Feb-24 19-Feb-24 11-Feb-24 B Closed 6 Aconex
JVC-WTRAN- 1+980 - Cross Section
000952 Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to
WF-001011 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04006C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 5-Feb-24 19-Feb-24 11-Feb-24 B Closed 6 Aconex
1+980 - Reinforcement Details
Shop Drawings for Shoring Works at Zone 05 from sta 1+860 to
WF-001011 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04008C1 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 5-Feb-24 19-Feb-24 11-Feb-24 B Closed 6 Aconex
1+980 - Elevation Sheet 2
JVC-WTRAN- As-Built CMC Layout for Zone 05 from sta. 1+793 to 1+833 (Seg 78
WF-001169 R02Z00-C021-JVC-05-XXX-ABD-GT-GT-01001 C2 Re-S Zone 05 As Built Geotechnical Geotechnical Engr. Yaseen 11-Feb-24 25-Feb-24 18-Feb-24 B Closed 7 Aconex
001101 & 79)
Shop Drawing Layout for Soil Improvement works in Zone 01 Wet
WF-001177 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02001C1 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Feb-24 25-Feb-24 21-Feb-24 B Closed 10 Aconex
Utility Culvert from sta. 0+140 to 0+210
JVC-WTRAN- Shop Drawing Coordinates and Levels for Soil Improvement works in
WF-001177 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02002C1 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Feb-24 25-Feb-24 21-Feb-24 B Closed 10 Aconex
001109 Zone 01 Wet Utility Culvert from sta. 0+140 to 0+212
Shop Drawing Coordinates and Levels for Soil Improvement works in
WF-001177 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02003C1 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Feb-24 25-Feb-24 21-Feb-24 B Closed 10 Aconex
Zone 01 Wet Utility Culvert from sta. 0+140 to 0+212
Shop Drawing for As built & Design Excavation at D9-1 Near Zone-02
WF-001184 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-09755 C4 Latest D9-1 Shop Drawing Civil Civil Engr. Sunil 12-Feb-24 26-Feb-24 15-Feb-24 B Closed 3 Aconex
Sta: 0+000 to 0+020
JVC-WTRAN- Shop Drawing for As built & Design Excavation at D9-1 Near Zone-02
WF-001184 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-09756 C4 Latest D9-1 Shop Drawing Civil Civil Engr. Sunil 12-Feb-24 26-Feb-24 15-Feb-24 B Closed 3 Aconex
001116 Sta: 0+000 to 0+020
Shop Drawing for As built & Design Excavation at D9-1 Near Zone-02
WF-001184 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-09759 C4 Latest D9-1 Shop Drawing Civil Civil Engr. Sunil 12-Feb-24 26-Feb-24 15-Feb-24 B Closed 3 Aconex
Sta: 0+000 to 0+020
Shop Drawing for Indicative section of material Backfilling At Zone-
WF-001239 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07520 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Feb-24 27-Feb-24 24-Feb-24 B Closed 11 Aconex
06(From Sta: 2+400 to 2+560)
Shop Drawing for Indicative section of material Backfilling At Zone-
WF-001239 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07533 C1 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Feb-24 27-Feb-24 24-Feb-24 B Closed 11 Aconex
06(From Sta: 2+400 to 2+560)
Shop Drawing for Indicative section of material Backfilling At Zone-
WF-001239 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07534 C1 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Feb-24 27-Feb-24 24-Feb-24 B Closed 11 Aconex
06(From Sta: 2+400 to 2+560)
Shop Drawing for Indicative section of material Backfilling At Zone-
WF-001239 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07535 C1 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Feb-24 27-Feb-24 24-Feb-24 B Closed 11 Aconex
06(From Sta: 2+400 to 2+560)
Shop Drawing for Indicative section of material Backfilling At Zone-
WF-001239 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07536 C1 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Feb-24 27-Feb-24 24-Feb-24 B Closed 11 Aconex
JVC-WTRAN- 06(From Sta: 2+400 to 2+560)
001170 Shop Drawing for Indicative section of material Backfilling At Zone-
WF-001239 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07537 C1 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Feb-24 27-Feb-24 24-Feb-24 B Closed 11 Aconex
06(From Sta: 2+400 to 2+560)
Shop Drawing for Indicative section of material Backfilling At Zone-
WF-001239 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07538 C1 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Feb-24 27-Feb-24 24-Feb-24 B Closed 11 Aconex
06(From Sta: 2+400 to 2+560)
Shop Drawing for Indicative section of material Backfilling At Zone-
WF-001239 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07539 C1 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Feb-24 27-Feb-24 24-Feb-24 B Closed 11 Aconex
06(From Sta: 2+400 to 2+560)
Shop Drawing for Indicative section of material Backfilling At Zone-
WF-001239 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07540 C1 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 13-Feb-24 27-Feb-24 24-Feb-24 B Closed 11 Aconex
06(From Sta: 2+400 to 2+560)
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals


JVC-WTRAN-
001170 D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow Shop Drawing for Indicative section of material Backfilling At Zone- Total
Workflow Document JVC Planned 24-Feb-24
WSP Status
B Overdue Overdue Submittal
WF-001239 TransmittalR02Z00-C021-JVC-06-XXX-SDW-CL-CL-07541
Drawing No. Rev.
C1 Status
Re-S
06(From Sta: 2+400 to 2+560) Description Zone 06
Location Shop Drawing Civil
Discipline Civil
Sub-Discipline Engr. Sunilby 13-Feb-24
Submitted 27-Feb-24 Closed
Status 11
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
JVC-WTRAN- As-built CMC Layout for Zone 02 Int. 01 from sta. 0+932 to 0+972 date
WF-001282 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01003 C0 Latest Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 15-Feb-24 29-Feb-24 19-Feb-24 B Closed Today
4 Aconex
001208 (Area 02 and 03) (partially)
JVC-WTRAN-
WF-001356 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01004 C0 Latest As-Built CMC Layout for Zone 02 from sta 0+570.033 to 0+590.033 Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 19-Feb-24 4-Mar-24 7-Mar-24 A Closed 17 Aconex
001278
As built Excavation Cross sections At Zone-06 from sta: 2+440 to
WF-001337 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11000 C0 Latest Zone 06 As Built Civil Civil Engr. Sunil 18-Feb-24 3-Mar-24 4-Mar-24 A Closed 15 Aconex
2+560
As built Excavation Cross sections At Zone-06 from sta: 2+440 to
WF-001337 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11001 C0 Re-S Zone 06 As Built Civil Civil Engr. Sunil 18-Feb-24 3-Mar-24 4-Mar-24 A Closed 15 Aconex
2+560
As built Excavation Cross sections At Zone-06 from sta: 2+440 to
WF-001337 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11002 C0 Re-S Zone 06 As Built Civil Civil Engr. Sunil 18-Feb-24 3-Mar-24 4-Mar-24 A Closed 15 Aconex
2+560
As built Excavation Cross sections At Zone-06 from sta: 2+440 to
WF-001337 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11003 C0 Re-S Zone 06 As Built Civil Civil Engr. Sunil 18-Feb-24 3-Mar-24 4-Mar-24 A Closed 15 Aconex
JVC-WTRAN- 2+560
001260 As built Excavation Cross sections At Zone-06 from sta: 2+440 to
WF-001337 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11004 C0 Re-S Zone 06 As Built Civil Civil Engr. Sunil 18-Feb-24 3-Mar-24 4-Mar-24 A Closed 15 Aconex
2+560
As built Excavation Cross sections At Zone-06 from sta: 2+440 to
WF-001337 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11005 C0 Re-S Zone 06 As Built Civil Civil Engr. Sunil 18-Feb-24 3-Mar-24 4-Mar-24 A Closed 15 Aconex
2+560
As built Excavation Cross sections At Zone-06 from sta: 2+440 to
WF-001337 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11006 C0 Re-S Zone 06 As Built Civil Civil Engr. Sunil 18-Feb-24 3-Mar-24 4-Mar-24 A Closed 15 Aconex
2+560
As built Excavation Cross sections At Zone-06 from sta: 2+440 to
WF-001337 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11007 C0 Re-S Zone 06 As Built Civil Civil Engr. Sunil 18-Feb-24 3-Mar-24 4-Mar-24 A Closed 15 Aconex
2+560
Shop Drawing for Cross Sections for Road and Drainage at Tunnel 02- Transportation Transportation &
WF-001481 R02Z00-C021-JVC-10-XXX-SDW-TR-TR-06200 C0 Latest Zone 10 Shop Drawing Engr. Khalid 25-Feb-24 10-Mar-24 5-Mar-24 B Closed 9 Aconex
Zone 10 & Road Road
Shop Drawing for Cross Sections for Road and Drainage at Tunnel 02- Transportation Transportation &
WF-001481 R02Z00-C021-JVC-10-XXX-SDW-TR-TR-06201 C0 Latest Zone 10 Shop Drawing Engr. Khalid 25-Feb-24 10-Mar-24 5-Mar-24 B Closed 9 Aconex
Zone 10 & Road Road
Shop Drawing for Cross Sections for Road and Drainage at Tunnel 02- Transportation Transportation &
WF-001481 R02Z00-C021-JVC-10-XXX-SDW-TR-TR-06202 C0 Latest Zone 10 Shop Drawing Engr. Khalid 25-Feb-24 10-Mar-24 5-Mar-24 B Closed 9 Aconex
JVC-WTRAN- Zone 10 & Road Road
001390 Shop Drawing for Cross Sections for Road and Drainage at Tunnel 02- Transportation Transportation &
WF-001481 R02Z00-C021-JVC-10-XXX-SDW-TR-TR-06203 C0 Latest Zone 10 Shop Drawing Engr. Khalid 25-Feb-24 10-Mar-24 5-Mar-24 B Closed 9 Aconex
Zone 10 & Road Road
Shop Drawing for Cross Sections for Road and Drainage at Tunnel 02- Transportation Transportation &
WF-001481 R02Z00-C021-JVC-10-XXX-SDW-TR-TR-06204 C0 Latest Zone 10 Shop Drawing Engr. Khalid 25-Feb-24 10-Mar-24 5-Mar-24 B Closed 9 Aconex
Zone 10 & Road Road
Shop Drawing for Cross Sections for Road and Drainage at Tunnel 02- Transportation Transportation &
WF-001481 R02Z00-C021-JVC-10-XXX-SDW-TR-TR-06205 C0 Latest Zone 10 Shop Drawing Engr. Khalid 25-Feb-24 10-Mar-24 5-Mar-24 B Closed 9 Aconex
Zone 10 & Road Road
Shop Drawings Layout for Soil Improvement Works in Zone 01 from MIP-JVC-SHD-GEO-
WF-001511 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02004C3 Re-S Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 25-Feb-24 10-Mar-24 4-Mar-24 B Closed 8 Aconex
sta. 0+400 to 0+500 incl VTR 01 and LS 06 000069-03
Shop Drawings Cross-Sections for Soil Improvement Works in Zone MIP-JVC-SHD-GEO-
WF-001511 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02005C3 Re-S Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 25-Feb-24 10-Mar-24 4-Mar-24 B Closed 8 Aconex
JVC-WTRAN- 01 from sta. 0+400 to 0+500 incl VTR 01 and LS 07 000069-03
001420 Shop Drawings Coordinates Sheet 1 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-001511 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02006C3 Re-S Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 25-Feb-24 10-Mar-24 4-Mar-24 B Closed 8 Aconex
Zone 01 from sta. 0+400 to 0+500 incl VTR 01 and LS 08 000069-03
Shop Drawings Coordinates Sheet 2 for Soil Improvement Works in MIP-JVC-SHD-GEO-
WF-001511 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02007C3 Re-S Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 25-Feb-24 10-Mar-24 4-Mar-24 B Closed 8 Aconex
Zone 01 from sta. 0+400 to 0+500 incl VTR 01 and LS 09 000069-03
JVC-WTRAN- As-Built CMC Layout for Zone 02 at Lift Station 01 from
WF-001514 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01005 C0 Re-S Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 25-Feb-24 10-Mar-24 28-Feb-24 C Closed 3 Aconex
001423 sta. 0+980 to 1+020
JVC-WTRAN- As-Built CMC Layout for Zone 01 Wet Culvert from sta. 0+140 to
WF-001527 R02Z00-C021-JVC-01-XXX-ABD-GT-GT-02003 C0 Latest Zone 01 As Built Geotechnical Geotechnical Engr. Yaseen 26-Feb-24 11-Mar-24 7-Mar-24 B Closed 10 Aconex
001436 0+210 incl MR 21
JVC-WTRAN-
WF-001581 R02Z00-C021-JVC-00-XXX-SDW-GT-GT-00001C0 Latest Shop Drawing for Ground Water Piezometers Layout RAM-MIP Shop Drawing Geotechnical Geotechnical Engr. Yaseen 28-Feb-24 13-Mar-24 7-Mar-24 B Closed 8 Aconex
001481
JVC-WTRAN- As-built CMC Layout for Zone 02 Int. 01 from sta. 0+972 to 1+000
WF-001624 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01011 C0 Latest RAM-MIP As Built Geotechnical Geotechnical Engr. Yaseen 29-Feb-24 14-Mar-24 7-Mar-24 B Closed 7 Aconex
001521 (Area 07) [partially]
Shop Drawings for Soil Improvement Works in Zone 08 from sta.
WF-001637 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-01001C0 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 29-Feb-24 14-Mar-24 13-Mar-24 B Closed 13 Aconex
0+370 to 0+582 - General Layout
Shop Drawings for Soil Improvement Works in Zone 08 from sta.
WF-001637 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-01002C0 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 29-Feb-24 14-Mar-24 13-Mar-24 B Closed 13 Aconex
0+370 to 0+480 - Part General Layout
Shop Drawings for Soil Improvement Works in Zone 08 from sta.
WF-001637 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-01003C0 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 29-Feb-24 14-Mar-24 13-Mar-24 B Closed 13 Aconex
0+480 to 0+582 - Part General Layout
Shop Drawings for Soil Improvement Works in Zone 08 from sta.
WF-001637 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-01004C0 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 29-Feb-24 14-Mar-24 13-Mar-24 B Closed 13 Aconex
0+370 to 0+582 - Cross Sections
Shop Drawings for Soil Improvement Works in Zone 08 from sta.
WF-001637 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-01005C0 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 29-Feb-24 14-Mar-24 13-Mar-24 B Closed 13 Aconex
JVC-WTRAN- 0+370 to 0+582 - Coordinates Sheet 1
001534 Shop Drawings for Soil Improvement Works in Zone 08 from sta.
WF-001637 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-01006C0 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 29-Feb-24 14-Mar-24 13-Mar-24 B Closed 13 Aconex
0+370 to 0+582 - Coordinates Sheet 2
Shop Drawings for Soil Improvement Works in Zone 08 from sta.
WF-001637 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-01007C0 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 29-Feb-24 14-Mar-24 13-Mar-24 B Closed 13 Aconex
0+370 to 0+582 - Coordinates Sheet 3
Shop Drawings for Soil Improvement Works in Zone 08 from sta.
WF-001637 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-01008C0 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 29-Feb-24 14-Mar-24 13-Mar-24 B Closed 13 Aconex
0+370 to 0+582 - Coordinates Sheet 4
Shop Drawings for Soil Improvement Works in Zone 08 from sta.
WF-001637 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-01009C0 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 29-Feb-24 14-Mar-24 13-Mar-24 B Closed 13 Aconex
0+370 to 0+582 - Coordinates Sheet 5
Shop Drawings for Soil Improvement Works in Zone 08 from sta.
WF-001637 R02Z00-C021-JVC-08-XXX-SDW-GT-GT-01010C0 Latest Zone 08 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 29-Feb-24 14-Mar-24 13-Mar-24 B Closed 13 Aconex
0+370 to 0+582 - Coordinates Sheet 6
Shop Drawing for Excavation at Kaar Tunnel Zone-08 Sta: 0+480
WF-001674 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-05419 C1 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 7-Mar-24 B Closed 5 Aconex
to0+552.99
Shop Drawing for Excavation at Kaar Tunnel Zone-08 Sta: 0+480
WF-001674 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-05420 C1 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 7-Mar-24 B Closed 5 Aconex
to0+552.99
Shop Drawing for Excavation at Kaar Tunnel Zone-08 Sta: 0+480
WF-001674 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-05421 C1 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 7-Mar-24 B Closed 5 Aconex
to0+552.99
JVC-WTRAN- Shop Drawing for Excavation at Kaar Tunnel Zone-08 Sta: 0+480
WF-001674 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-05422 C1 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 7-Mar-24 B Closed 5 Aconex
001569 to0+552.99
Shop Drawing for Excavation at Kaar Tunnel Zone-08 Sta: 0+480
WF-001674 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-05423 C1 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 7-Mar-24 B Closed 5 Aconex
to0+552.99
Shop Drawing for Excavation at Kaar Tunnel Zone-08 Sta: 0+480
WF-001674 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-05424 C1 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 7-Mar-24 B Closed 5 Aconex
to0+552.99
Shop Drawing for Excavation at Kaar Tunnel Zone-08 Sta: 0+480
WF-001674 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-05425 C1 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 7-Mar-24 B Closed 5 Aconex
to0+552.99
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01 Total
Workflow Document JVC Planned 14-Mar-24
WSP Status Terminated Overdue Overdue Submittal
WF-001690 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07116-C2 Status Sta: 0+041.04 to 0+300 Description Location
Zone 09
Shop Drawing Civil
Discipline Civil
Sub-Discipline Engr. Sunilby
Submitted 2-Mar-24 16-Mar-24 Status Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01 date
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07117-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Today Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07118-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07119-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05425-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05426-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05427-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05428-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05429-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05430-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05431-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05432-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05433-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05434-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05435-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
JVC-WTRAN- Sta: 0+041.04 to 0+300 Zone 09 Withdraw by
001585 Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01 Engr Nahell
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05436-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05437-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05438-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05439-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05440-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05441-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05442-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05443-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05444-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05445-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05446-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05447-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05448-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05449-C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross section at Tunnel 01 Zone 09 Tunnel 01
WF-001690 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05450 C2 Latest Shop Drawing Civil Civil Engr. Sunil 2-Mar-24 16-Mar-24 14-Mar-24 Terminated Aconex
Sta: 0+041.04 to 0+300 Zone 09
Shop Drawing for Excavation Cross sections of Junction At Haram
WF-001703 R02Z00-C021-JVC-00-XXX-SDW-CL-CL-07551 C0 Re-S Tunnel Zone-05(From sta: 1+968.99 to 2+032.098) & Airport Tunnel Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 3-Mar-24 17-Mar-24 14-Mar-24 C Closed 11 Aconex
Zone-07(From sta:0+020
Shop Drawing for to 0+040)
Excavation Cross sections of Junction At Haram
WF-001703 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07552 C0 Re-S Tunnel Zone-05(From sta: 1+968.99 to 2+032.098) & Airport Tunnel Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 3-Mar-24 17-Mar-24 14-Mar-24 C Closed 11 Aconex
Zone-07(From
Shop sta:0+020
Drawing for to 0+040)
Excavation Cross sections of Junction At Haram
WF-001703 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07553 C0 Re-S Tunnel Zone-05(From sta: 1+968.99 to 2+032.098) & Airport Tunnel Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 3-Mar-24 17-Mar-24 14-Mar-24 C Closed 11 Aconex
Zone-07(From
Shop sta:0+020
Drawing for to 0+040)
Excavation Cross sections of Junction At Haram
WF-001703 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07554 C0 Re-S Tunnel Zone-05(From sta: 1+968.99 to 2+032.098) & Airport Tunnel Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 3-Mar-24 17-Mar-24 14-Mar-24 C Closed 11 Aconex
Zone-07(From sta:0+020 to 0+040)
Shop Drawing for Excavation Cross sections of Junction At Haram
JVC-WTRAN-
WF-001703 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07555 C0 Re-S Tunnel Zone-05(From sta: 1+968.99 to 2+032.098) & Airport Tunnel Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 3-Mar-24 17-Mar-24 14-Mar-24 C Closed 11 Aconex
001598
Zone-07(From
Shop sta:0+020
Drawing for to 0+040)
Excavation Cross sections of Junction At Haram
WF-001703 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07556 C0 Re-S Tunnel Zone-05(From sta: 1+968.99 to 2+032.098) & Airport Tunnel Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 3-Mar-24 17-Mar-24 14-Mar-24 C Closed 11 Aconex
Zone-07(From sta:0+020 to 0+040)
Shop Drawing for Excavation Cross sections of Junction At Haram
WF-001703 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-07557 C0 Re-S Tunnel Zone-05(From sta: 1+968.99 to 2+032.098) & Airport Tunnel Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 3-Mar-24 17-Mar-24 14-Mar-24 C Closed 11 Aconex
Zone-07(From
Shop sta:0+020
Drawing for to 0+040)
Excavation Cross sections of Junction At Haram
WF-001703 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-07558 C0 Re-S Tunnel Zone-05(From sta: 1+968.99 to 2+032.098) & Airport Tunnel Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 3-Mar-24 17-Mar-24 14-Mar-24 C Closed 11 Aconex
Zone-07(From
Shop sta:0+020
Drawing for to 0+040)
Excavation Cross sections of Junction At Haram
WF-001703 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-07559 C0 Re-S Tunnel Zone-05(From sta: 1+968.99 to 2+032.098) & Airport Tunnel Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 3-Mar-24 17-Mar-24 14-Mar-24 C Closed 11 Aconex
Zone-07(From sta:0+020 to 0+040)
As-Built Drawing for Shoring Works in Zone 02 from sta. 0+750 to
WF-001725 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01006 C0 Latest Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 3-Mar-24 17-Mar-24 17-Mar-24 A Closed 14 Aconex
0+870 - Anchor Layout and Details
As-Built Drawing for Shoring Works in Zone 02 from sta. 0+750 to
WF-001725 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01007 C0 Latest Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 3-Mar-24 17-Mar-24 17-Mar-24 A Closed 14 Aconex
0+870 - Anchor Layout and Details Sheet 2
As-Built Drawing for Shoring Works in Zone 02 from sta. 0+750 to
WF-001725 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01008 C0 Latest Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 3-Mar-24 17-Mar-24 17-Mar-24 A Closed 14 Aconex
JVC-WTRAN- 0+870 - Piles Layout and Co-ordinates
001620
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

JVC-WTRAN- Response
ACONEX
Workflow
001620 As-Built Drawing for Shoring Works in Zone 02 from sta. 0+750 to Total
Workflow Document JVC Planned 17-Mar-24
WSP Status
A Overdue Overdue Submittal
WF-001725 TransmittalR02Z00-C021-JVC-02-XXX-ABD-GT-GT-01009
Drawing No. Rev. Status 0+870 - Piles Layout and Details
C0 Latest Description Zone 02
Location As Built Geotechnical
Discipline Geotechnical Submitted
Sub-Discipline Engr. Yaseen
by 3-Mar-24 17-Mar-24 Closed
Status 14
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
As-Built Drawing for Shoring Works in Zone 02 from sta. 0+750 to date
WF-001725 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01010 C0 Latest Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 3-Mar-24 17-Mar-24 17-Mar-24 A Closed Today
14 Aconex
0+870 - Anchor Co-ordinates
As-Built Drawing for Shoring Works in Zone 02 from sta. 0+750 to
WF-001725 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01012 C0 Latest Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 3-Mar-24 17-Mar-24 17-Mar-24 A Closed 14 Aconex
0+870 - Pile Reinforcement Details
Shop Drawing for soil improvement works in Zone 02 from Sta 0+500
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01012C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
CMC
Shop Layout
Drawing for soil improvement works in Zone 02 from Sta 0+500
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01013C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
CMC Layout
Shop Drawing Sheet 2 improvement works in Zone 02 from Sta 0+500
for soil
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01014C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
Cross Drawing
Shop Sectionsfor soil improvement works in Zone 02 from Sta 0+500
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01015C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
Coordinates
Shop Drawing Sheet 01 improvement works in Zone 02 from Sta 0+500
for soil
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01016C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
Coordinates
Shop DrawingSheet 02 improvement works in Zone 02 from Sta 0+500
for soil
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01017C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
Coordinates
Shop DrawingSheet 03 improvement works in Zone 02 from Sta 0+500
for soil
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01018C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
Coordinates Sheet 04 improvement works in Zone 02 from Sta 0+500
Shop Drawing for soil
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01019C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
Coordinates
Shop DrawingSheet 05 improvement works in Zone 02 from Sta 0+500
for soil
JVC-WTRAN- MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01020C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
001657 000040-05
Coordinates Sheet 06 improvement works in Zone 02 from Sta 0+500
Shop Drawing for soil
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01021C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
Coordinates
Shop Drawing Sheet 07 improvement works in Zone 02 from Sta 0+500
for soil
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01022C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
Coordinates
Shop DrawingSheet 08 improvement works in Zone 02 from Sta 0+500
for soil
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01023C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
Coordinates Sheet 09 improvement works in Zone 02 from Sta 0+500
Shop Drawing for soil
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01024C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
Coordinates
Shop DrawingSheet 10 improvement works in Zone 02 from Sta 0+500
for soil
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01025C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
Coordinates
Shop DrawingSheet 11 improvement works in Zone 02 from Sta 0+500
for soil
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01026C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
CMC Layout Sheet 3
Shop Drawing for soil improvement works in Zone 02 from Sta 0+500
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01027C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
Coordinates
Shop DrawingSheet 11 improvement works in Zone 02 from Sta 0+500
for soil
MIP-JVC-SHD-GEO-
WF-001762 R02Z00-C021-JVC-02-XXX-SDW-GT-GT-01028C0 Latest to 1+020 including ES 02, 03, 04 and LS 02 (Structure No. LS01) - Zone 02 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Mar-24 18-Mar-24 7-Mar-24 B Closed 3 Aconex
000040-05
Coordinates Sheet 12
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-001831 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02001C0 Re-S Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Mar-24 21-Mar-24 19-Mar-24 B Closed 12 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 1
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-001831 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02002C0 Re-S Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Mar-24 21-Mar-24 19-Mar-24 B Closed 12 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-001831 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02003C0 Re-S Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Mar-24 21-Mar-24 19-Mar-24 B Closed 12 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-001831 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02004C0 Re-S Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Mar-24 21-Mar-24 19-Mar-24 B Closed 12 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Cross-Sections
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-001831 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02005C0 Re-S Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Mar-24 21-Mar-24 19-Mar-24 B Closed 12 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 1
JVC-WTRAN- Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-001831 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02006C0 Re-S Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Mar-24 21-Mar-24 19-Mar-24 B Closed 12 Aconex
001723 from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-001831 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02007C0 Re-S Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Mar-24 21-Mar-24 19-Mar-24 B Closed 12 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-001831 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02008C0 Re-S Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Mar-24 21-Mar-24 19-Mar-24 B Closed 12 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 4
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-001831 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02009C0 Re-S Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Mar-24 21-Mar-24 19-Mar-24 B Closed 12 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 5
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-001831 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02010C0 Re-S Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Mar-24 21-Mar-24 19-Mar-24 B Closed 12 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 6
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-001831 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02011C0 Re-S Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 7-Mar-24 21-Mar-24 19-Mar-24 B Closed 12 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 7
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-001859 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05453-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 Terminated Aconex
to0+200 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-001859 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05454-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 Terminated Aconex
to0+200 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-001859 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05455-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 Terminated Aconex
to0+200 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-001859 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05456-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 Terminated Aconex
to0+200 000044-02
JVC-WTRAN- Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-001859 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05457-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 Terminated Aconex
001750 to0+200 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-001859 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05458-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 Terminated Aconex
to0+200 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-001859 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05459-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 Terminated Aconex
to0+200 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-001859 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05460-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 Terminated Aconex
to0+200 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-001859 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05461-C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 Terminated Aconex
to0+200 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+280 MIP-JVC-SHD-CIV-
WF-001866 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05465 C1 Re-S Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 C Closed 15 Aconex
to0+360 000109-01
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+280 MIP-JVC-SHD-CIV-
WF-001866 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05466 C1 Re-S Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 C Closed 15 Aconex
to0+360 000109-01
JVC-WTRAN-
001757
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow
JVC-WTRAN- Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+280 Total MIP-JVC-SHD-CIV-
Workflow Document JVC Planned 24-Mar-24
WSP Status
C Overdue Overdue Submittal
WF-001866 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05467
Transmittal
001757 Drawing No. Rev.
C1 Status
Re-S
to0+360 Description Zone 07
Location Shop Drawing Civil
Discipline Civil
Sub-Discipline Engr. Sunilby
Submitted 9-Mar-24 23-Mar-24 Closed
Status 15
Duration Aconex
Ref.
Alternative Ref. #
000109-01 Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+280 date MIP-JVC-SHD-CIV-
WF-001866 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05468 C1 Re-S Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 C Closed Today
15 Aconex
to0+360 000109-01
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+280 MIP-JVC-SHD-CIV-
WF-001866 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05469 C1 Re-S Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 C Closed 15 Aconex
to0+360 000109-01
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta 0+220 to MIP-JVC-SHD-CIV-
WF-001868 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05462-C1 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 Terminated Aconex
0+260 000116-01
JVC-WTRAN- Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta 0+220 to MIP-JVC-SHD-CIV-
WF-001868 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05463-C1 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 Terminated Aconex
001759 0+260 000116-01
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta 0+220 to MIP-JVC-SHD-CIV-
WF-001868 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05464 C1 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 9-Mar-24 23-Mar-24 24-Mar-24 Terminated Aconex
0+260 000116-01
JVC-WTRAN- As-Built CMC Layout for Zone 02 at Lift Station 01 from
WF-001877 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01005 C1 Latest Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 10-Mar-24 24-Mar-24 19-Mar-24 B Closed 9 Aconex
001768 sta. 0+980 to 1+020
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07116 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07117 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07118 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07119 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05425 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05426 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05427 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05428 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05429 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05430 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05431 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05432 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05433 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05434 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
JVC-WTRAN- Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05435 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
002013 from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05436 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05437 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05438 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05439 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05440 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05441 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05442 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05443 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05444 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05445 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05446 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05447 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05448 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 MIP-JVC-SHD-CIV-
WF-002128 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05449 C2 Re-S Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
from sta. 0+046 to sta.0+280 Zone 09 000040-02
Shop Drawing for Excavation Cross Sections at Haram tunnel-Zone MIP-JVC-SHD-CIV-
WF-002127 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-05054 C4 Latest Zone 03 Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
03 sta. 1+000 and sta.1+040 000028-04
JVC-WTRAN- Shop Drawing for Excavation Cross Sections at Haram tunnel-Zone MIP-JVC-SHD-CIV-
WF-002127 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-05299 C4 Latest Zone 03 Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
002012 03 sta. 1+000 and sta.1+040 000028-04
Shop Drawing for Excavation Cross Sections at Haram tunnel-Zone MIP-JVC-SHD-CIV-
WF-002127 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-05301 C4 Latest Zone 03 Shop Drawing Civil Civil Engr. Khalid 21-Mar-24 4-Apr-24 2-Apr-24 B Closed 12 Aconex
03 sta. 1+000 and sta.1+040 000028-04
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-002190 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05453 C2 Re-S Zone 07 Shop Drawing Civil Civil Engr. Khalid 25-Mar-24 8-Apr-24 8-Apr-24 B Closed 14 Aconex
to0+240 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-002190 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05454 C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Khalid 25-Mar-24 8-Apr-24 8-Apr-24 B Closed 14 Aconex
to0+240 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-002190 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05455 C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Khalid 25-Mar-24 8-Apr-24 8-Apr-24 B Closed 14 Aconex
to0+240 000044-02

JVC-WTRAN-
002074
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 Total MIP-JVC-SHD-CIV-
Workflow Document JVC Planned WSP Status
B Overdue Overdue Submittal
WF-002190 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-07-XXX-SDW-CL-CL-054566C2 Status to0+240 Description Zone 07
Location Shop Drawing Civil
Discipline Civil
Sub-Discipline by 25-Mar-24
Engr. Khalid
Submitted 8-Apr-24 8-Apr-24 Closed
Status 14
Duration Aconex
Ref.
Alternative Ref. #
000044-02 Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 date MIP-JVC-SHD-CIV-
WF-002190 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05457 C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Khalid 25-Mar-24 8-Apr-24 8-Apr-24 B Closed Today
14 Aconex
to0+240 000044-02
JVC-WTRAN- Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-002190 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05458 C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Khalid 25-Mar-24 8-Apr-24 8-Apr-24 B Closed 14 Aconex
002074 to0+240 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-002190 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05459 C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Khalid 25-Mar-24 8-Apr-24 8-Apr-24 B Closed 14 Aconex
to0+240 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-002190 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05460 C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Khalid 25-Mar-24 8-Apr-24 8-Apr-24 B Closed 14 Aconex
to0+240 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-002190 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05461 C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Khalid 25-Mar-24 8-Apr-24 8-Apr-24 B Closed 14 Aconex
to0+240 000044-02
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-002190 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05462 C1 Latest Zone 07 Shop Drawing Civil Civil Engr. Khalid 25-Mar-24 8-Apr-24 8-Apr-24 B Closed 14 Aconex
to0+240 000116-01
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+060 MIP-JVC-SHD-CIV-
WF-002190 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05463 C1 Latest Zone 07 Shop Drawing Civil Civil Engr. Khalid 25-Mar-24 8-Apr-24 8-Apr-24 B Closed 14 Aconex
to0+240 000116-01
Shop Drawings Shoring Layout and Co-ordinates Sheet 1 for Shoring
WF-002222 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-03001C3 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 26-Mar-24 9-Apr-24 15-Apr-24 B Closed 20 Aconex
Works at Zone 07 Airport Tunnel from sta. 0+080 to 0+150
Shop Drawings Shoring Layout and Co-ordinates Sheet 2 for Shoring
WF-002222 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-03002C3 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 26-Mar-24 9-Apr-24 15-Apr-24 B Closed 20 Aconex
Works at Zone 07 Airport Tunnel from sta. 0+080 to 0+150
Shop Drawings Anchoring Layout and Co-ordinates Sheet 1 for
WF-002222 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-03003C3 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Fawzy 26-Mar-24 9-Apr-24 15-Apr-24 B Closed 20 Aconex
Shoring Works at Zone 07 Airport Tunnel from sta. 0+080 to 0+150
JVC-WTRAN- Shop Drawings Anchoring Layout and Co-ordinates Sheet 2 for
WF-002222 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-03004C3 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 26-Mar-24 9-Apr-24 15-Apr-24 B Closed 20 Aconex
002105 Shoring Works at Zone 07 Airport Tunnel from sta. 0+080 to 0+150
Shop Drawings Elelvation for Shoring Works at Zone 07 Airport
WF-002222 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-03005C3 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 26-Mar-24 9-Apr-24 15-Apr-24 B Closed 20 Aconex
Tunnel from sta. 0+080 to 0+150
Shop Drawings Cross Sections Sheet 1 for Shoring Works at Zone 07
WF-002222 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-03006C3 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 26-Mar-24 9-Apr-24 15-Apr-24 B Closed 20 Aconex
Airport Tunnel from sta. 0+080 to 0+150
Shop Drawings Cross Sections Sheet 2 for Shoring Works at Zone 07
WF-002222 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-03007C3 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 26-Mar-24 9-Apr-24 15-Apr-24 B Closed 20 Aconex
Airport Tunnel from sta. 0+080 to 0+150
Shop Drawings Shoring Layout for Shoring Works at Zone 09 Tunnel
WF-002255 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-04001C0 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 27-Mar-24 10-Apr-24 30-Mar-24 B Closed 3 Aconex
01 from sta. 0+130 to 0+300
Shop Drawings Shoring Layout for Shoring Works at Zone 09 Tunnel
WF-002255 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-04002C0 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 27-Mar-24 10-Apr-24 30-Mar-24 B Closed 3 Aconex
01 from sta. 0+130 to 0+300 Partial Sheet 1
JVC-WTRAN- Shop Drawings Shoring Layout for Shoring Works at Zone 09 Tunnel
WF-002255 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-04003C0 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 27-Mar-24 10-Apr-24 30-Mar-24 B Closed 3 Aconex
002137 01 from sta. 0+130 to 0+300 Partial Sheet 2
Shop Drawings Shoring Layout for Shoring Works at Zone 09 Tunnel
WF-002255 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-04004C0 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 27-Mar-24 10-Apr-24 30-Mar-24 B Closed 3 Aconex
01 from sta. 0+130 to 0+300 Partial Sheet 3
Shop Drawings Shoring Layout for Shoring Works at Zone 09 Tunnel
WF-002255 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-04005C0 Latest 01 from sta. 0+130 to 0+300 Steel Reinforcement, Coordinates and Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 27-Mar-24 10-Apr-24 30-Mar-24 B Closed 3 Aconex
Anchor Details
Shop Drawing for Excavation Cross section Zone-01 at Sta: 0+240
WF-002237 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05056 C1 Re-S Zone 01 Shop Drawing Civil Civil Engr. Khalid 27-Mar-24 10-Apr-24 8-Apr-24 B Closed 12 Aconex
to 0+260
JVC-WTRAN- Shop Drawing for Excavation Cross section Zone-01 at Sta: 0+240
WF-002237 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05358 C1 Re-S Zone 01 Shop Drawing Civil Civil Engr. Khalid 27-Mar-24 10-Apr-24 8-Apr-24 B Closed 12 Aconex
002119 to 0+260
Shop Drawing for Excavation Cross section Zone-01 at Sta: 0+240
WF-002237 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05359 C1 Re-S Zone 01 Shop Drawing Civil Civil Engr. Khalid 27-Mar-24 10-Apr-24 8-Apr-24 B Closed 12 Aconex
to 0+260
JVC-WTRAN-
WF-002269 R02Z00-C021-JVC-03-XXX-SDW-TR-TR-06169 C0 Re-S Shop drawing Plan and Profile For Road Haram Ra-01 Zone 03 Shop Drawing
Transportation &Transportation
Road & RoadEngr. Khalid 28-Mar-24 11-Apr-24 8-Apr-24 C Open 300 Aconex
002150
JVC-WTRAN-
WF-002278 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01013 C0 Latest As-Built CMC Layout for Zone 02 from sta 0+500.000 to 0+550.033 Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 28-Mar-24 11-Apr-24 8-Apr-24 A Closed 11 Aconex
002158
JVC-WTRAN- Terminated by
WF-002306 R02Z00-C021-JVC-03-XXX-SDW-TR-TR-06170-C0 Latest Shop drawing Plan and Profile for Road Haram Ra-2 Zone 03 Shop Drawing
Transportation &Transportation
Road & RoadEngr. Khalid 30-Mar-24 13-Apr-24 6-Apr-24 Terminated Aconex
002185 Engr Khalid
JVC-WTRAN- As-built CMC Layout for Zone 02 Int. 01 from sta. 0+932.746 to
WF-002414 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01034 C0 Latest Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 2-Apr-24 16-Apr-24 8-Apr-24 B Closed 6 Aconex
002281 0+972.746 (Area 05 and 06)
As-Built CMC Layout for Zone 02 from sta 0+550.033 to 0+570.033
WF-002445 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01014 C0 Latest Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 3-Apr-24 17-Apr-24 15-Apr-24 B Closed 12 Aconex
and 0+590.033 to 0+610.033

WF-002445 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01015 C0 Latest As-Built CMC Layout for Zone 02 from sta 0+610.033 to 0+670.033 Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 3-Apr-24 17-Apr-24 15-Apr-24 B Closed 12 Aconex

WF-002445 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01016 C0 Latest As-Built CMC Layout for Zone 02 from sta 0+670.033 to 0+730.033 Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 3-Apr-24 17-Apr-24 15-Apr-24 B Closed 12 Aconex
JVC-WTRAN-
002310 As-Built CMC Layout for Zone 02 from sta 0+730.033 to 0+790.033
WF-002445 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01017 C0 Latest Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 3-Apr-24 17-Apr-24 15-Apr-24 B Closed 12 Aconex
incl. ES 03
As-Built CMC Layout for Zone 02 from sta 0+790.000 to 0+850.033
WF-002445 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01019 C0 Latest Zone 02 As Built Geotechnical Geotechnical Engr. Khalid 3-Apr-24 17-Apr-24 15-Apr-24 B Closed 12 Aconex
incl. ES 04

WF-002445 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01018 C0 Latest As-Built CMC Layout for Zone 02 from sta 0+850.000 to 0+910.033 Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 3-Apr-24 17-Apr-24 15-Apr-24 B Closed 12 Aconex

JVC-WTRAN- MIP-JVC-SHD-CIV-
WF-002562 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-05275 C3 Latest Shop Drawing for Excavation cross section at Zone 04 Sta 1+360 Zone 04 Shop Drawing Civil Civil Engr. Khalid 14-Apr-24 28-Apr-24 30-Apr-24 B Closed 16 Aconex
002416 000038-03
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections MIP-JVC-SHD-CIV-
WF-002574 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05361 C2 Re-S Zone 01 Shop Drawing Civil Civil Engr. Khalid 14-Apr-24 28-Apr-24 30-Apr-24 C Closed 16 Aconex
from sta.0+300 to sta.0+340 at Zone 01 000031-02
JVC-WTRAN- Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections MIP-JVC-SHD-CIV-
WF-002574 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05362 C2 Re-S Zone 01 Shop Drawing Civil Civil Engr. Khalid 14-Apr-24 28-Apr-24 30-Apr-24 C Closed 16 Aconex
002428 from sta.0+300 to sta.0+340 at Zone 01 000031-02
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections MIP-JVC-SHD-CIV-
WF-002574 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05363 C2 Re-S Zone 01 Shop Drawing Civil Civil Engr. Khalid 14-Apr-24 28-Apr-24 30-Apr-24 C Closed 16 Aconex
from sta.0+300 to sta.0+340 at Zone 01 000031-02
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00131-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00132-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00133-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00134-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00135-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow UT-Utilities & UT-Utilities & Total
Workflow Document JVC Planned WSP Status Terminated Overdue Overdue Submittal
WF-002581 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00136-C0 Status Combined Utility Plan for Roads 12 & 13 - D09
Description D09
Location Shop Drawing Discipline
Infrastructure Sub-Discipline Engr. Fawzy 14-Apr-24
Infrastructure Submitted by Submitted
28-Apr-24 Status Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Reply Response Code from WSP from JVC
No. as of
UT-Utilities & UT-Utilities & date
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00137-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Today Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00138-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00139-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00140-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00141-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00142-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00143-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00144-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00145-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00146-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00147-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00148-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00149-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00150-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00151-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00152-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00153-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
JVC-WTRAN- UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00154-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
002435 Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00155-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00156-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00157-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00158-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00159-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00160-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00161-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00162-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00163-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00164-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00165-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00166-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00167-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00168-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00169-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00170-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00171-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00172-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00173-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00174-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00175-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00176-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002581 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00177-C0 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 14-Apr-24 28-Apr-24 Terminated Aconex
Infrastructure Infrastructure
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow
JVC-WTRAN- Total
Workflow Document JVC Planned WSP Status
B Overdue Overdue Submittal
WF-002598 R02Z00-C021-JVC-03-XXX-SDW-TR-TR-06169
Transmittal
002452 Drawing No. Rev. Status Shop drawing Plan and Profile
C1 Latest For Road Haram Ra-01
Description Zone 03
Location Shop DrawingTransportation
Discipline&Transportation
Road & Road
Sub-Discipline by 15-Apr-24 29-Apr-24 17-Apr-24
Engr. Khalid
Submitted Closed
Status 2
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
JVC-WTRAN- As-built CMC layout for zone 08 from sta 0+412.99 to 0+452.99 date
WF-002626 R02Z00-C021-JVC-08-XXX-ABD-GT-GT-01001 C0 Latest Zone 08 As Built Geotechnical Geotechnical Engr. Yaseen 16-Apr-24 30-Apr-24 22-Apr-24 B Closed Today
6 Aconex
002480 (Seg. KAR-20 & 21)
Shop Drawing for Shoring Works Layout and Elevation at Zone 01 for
WF-002664 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-04001C0 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 17-Apr-24 1-May-24 25-Apr-24 B Closed 8 Aconex
JVC-WTRAN- AIP Dry Culvert from sta.0+300 to 0+340
002518 Shop Drawing for Shoring Works Cross Section and Reinforcement
WF-002664 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-04002C0 Re-S Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 17-Apr-24 1-May-24 25-Apr-24 B Closed 8 Aconex
Details at Zone 01 for AIP Dry Culvert from sta.0+300 to 0+340
JVC-WTRAN-
WF-002675 R02Z00-C021-JVC-03-XXX-SDW-TR-TR-06170 C0 Latest Shop drawing Plan and Profile for Road Haram Ra-2 Zone 03 Shop Drawing
Transportation &Transportation
Road & RoadEngr. Khalid 18-Apr-24 2-May-24 22-Apr-24 B Closed 4 Aconex
002529
JVC-WTRAN- As-Built CMC Layout for Zone 08 from Sta 0+392.99 To 0+412.99
WF-002790 R02Z00-C021-JVC-08-XXX-ABD-GT-GT-01002 C0 Latest Zone 08 As Built Geotechnical Geotechnical Engr. Yaseen 22-Apr-24 6-May-24 30-Apr-24 B Closed 8 Aconex
002642 (Seg. KAR-Z08-19)
JVC-WTRAN- As-Built CMC Layout for Zone 08 from Sta 0+452.99 to 0+492.99
WF-002798 R02Z00-C021-JVC-08-XXX-ABD-GT-GT-01003 C0 Latest Zone 08 As Built Geotechnical Geotechnical Engr. Yaseen 22-Apr-24 6-May-24 30-Apr-24 B Closed 8 Aconex
002650 (Seg. KAR-Z08-22 & 23)
JVC-WTRAN- As-Built CMC Layout for Zone 08 from Sta 0+492.99 to 0+512.99
WF-002830 R02Z00-C021-JVC-08-XXX-ABD-GT-GT-01004 C0 Latest Zone 08 As Built Geotechnical Geotechnical Engr. Yaseen 24-Apr-24 8-May-24 30-Apr-24 B Closed 6 Aconex
002679 (seg. KAR-Z08-24) [partially]
JVC-WTRAN-
WF-002802 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05138 C0 Re-S Shop drawing for Excavation Cross Section at Zone 06A St 2+550.43 Zone 06a Shop Drawing Civil Civil Engr. Khalid 24-Apr-24 8-May-24 9-May-24 C Closed 15 Aconex
002654
JVC-WTRAN- As-Built CMC Layout for Zone 05 from Sta. 1+773.979 to 1+833.979
WF-002832 R02Z00-C021-JVC-05-XXX-ABD-GT-GT-01001 C3 Latest Zone 05 As Built Geotechnical Geotechnical Engr. Yaseen 24-Apr-24 8-May-24 30-Apr-24 B Closed 6 Aconex
002681 (Seg. 02, 03 & 04)
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00208C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00209C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00210C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00211C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00212C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00213C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00214C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00215C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00216C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00131C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00132C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00133C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00134C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00135C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00136C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00137C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00138C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00139C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00140C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00141C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00142C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00143C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00144C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00145C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00146C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00147C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00148C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00149C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00150C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00151C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00152C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00153C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow UT-Utilities & UT-Utilities & Total
Workflow Document JVC Planned 6-May-24
WSP Status
C Overdue Overdue Submittal
WF-002864 Transmittal Drawing No. Rev. Status
R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00154C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09
Description D09
Location Shop Drawing Discipline
Infrastructure Sub-Discipline Engr. Fawzy 27-Apr-24
Infrastructure Submitted by Submitted
11-May-24 Closed
Status 9
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Reply Response Code from WSP from JVC
No. as of
UT-Utilities & UT-Utilities & date
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00155C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed Today
9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00156C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00157C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00158C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00159C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00160C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00161C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00162C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00163C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00164C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
JVC-WTRAN- Infrastructure Infrastructure
002708 UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00165C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00166C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00167C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00168C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00169C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00170C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00171C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00172C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00173C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00174C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00175C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00176C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00177C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00178C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00179C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00180C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00181C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00182C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00183C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00184C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00185C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00186C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00187C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00188C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00189C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00190C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00191C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00192C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00193C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00194C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00195C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow UT-Utilities & UT-Utilities & Total
Workflow Document JVC Planned 6-May-24
WSP Status
C Overdue Overdue Submittal
WF-002864 Transmittal Drawing No. Rev. Status
R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00196C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09
Description D09
Location Shop Drawing Discipline
Infrastructure Sub-Discipline Engr. Fawzy 27-Apr-24
Infrastructure Submitted by Submitted
11-May-24 Closed
Status 9
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Reply Response Code from WSP from JVC
No. as of
UT-Utilities & UT-Utilities & date
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00197C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed Today
9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00198C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00199C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00200C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00201C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00202C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00203C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00204C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00205C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00206C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-002864 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00207C0 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 27-Apr-24 11-May-24 6-May-24 C Closed 9 Aconex
Infrastructure Infrastructure

WF-002887 R02Z00-C021-JVC-00-XXX-SDW-ST-FO-00001 C0 Re-S Foundation Details for Street Light Poles RAM-MIP Shop Drawing Structural Foundation Engr. Shaheen 28-Apr-24 12-May-24 14-May-24 C Closed 16 Aconex
JVC-WTRAN-
002731
WF-002887 R02Z00-C021-JVC-00-XXX-SDW-ST-FO-00002 C0 Re-S Foundation Details for Street Light Poles RAM-MIP Shop Drawing Structural Foundation Engr. Shaheen 28-Apr-24 12-May-24 14-May-24 C Closed 16 Aconex

Shop Drawing for Excavation cross section for long section at tunnel
WF-002923 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07120 C0 Latest Tunnel 01 Shop Drawing Civil Civil Engr. Khalid 29-Apr-24 13-May-24 4-May-24 C Open 268 Aconex
JVC-WTRAN- 01 sta.0+301.03
002766 Shop Drawing for Excavation cross section for long section at tunnel
WF-002923 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07121 C0 Latest Tunnel 01 Shop Drawing Civil Civil Engr. Khalid 29-Apr-24 13-May-24 4-May-24 C Open 268 Aconex
01 sta.0+301.03
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections
WF-002948 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05361 C3 Re-S Zone 01 Shop Drawing Civil Civil Engr. Khalid 30-Apr-24 14-May-24 14-May-24 B Closed 14 Aconex
from sta.0+300 to sta.0+340 at Zone 01
JVC-WTRAN- Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections
WF-002948 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05362 C3 Re-S Zone 01 Shop Drawing Civil Civil Engr. Khalid 30-Apr-24 14-May-24 14-May-24 B Closed 14 Aconex
002791 from sta.0+300 to sta.0+340 at Zone 01
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections
WF-002948 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05363 C3 Re-S Zone 01 Shop Drawing Civil Civil Engr. Khalid 30-Apr-24 14-May-24 14-May-24 B Closed 14 Aconex
from sta.0+300 to sta.0+340 at Zone 01
Shop Drawing for Excavation cross section for long section at tunnel
WF-002991 R02Z00-C021-JVC-11-XXX-SDW-CL-CL-07159 C0 Latest Tunnel 03 Shop Drawing Civil Civil Engr. Khalid 2-May-24 16-May-24 4-May-24 B Closed 2 Aconex
JVC-WTRAN- 03 sta.0+434.07
002831 Shop Drawing for Excavation cross section for long section at tunnel
WF-002991 R02Z00-C021-JVC-11-XXX-SDW-CL-CL-07160 C0 Latest Tunnel 03 Shop Drawing Civil Civil Engr. Khalid 2-May-24 16-May-24 4-May-24 B Closed 2 Aconex
03 sta.0+434.07
JVC-WTRAN-
WF-003003 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05465 C2 Re-S Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+280 Zone 07 Shop Drawing Civil Civil Engr. Khalid 2-May-24 16-May-24 4-May-24 C Closed 2 Aconex
002842
Shop Drawings Shoring Layout for Shoring Works at Zone 09 Tunnel
WF-003030 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-04001C1 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-May-24 18-May-24 2-Jun-24 C Open 263 Aconex
01 from sta. 0+130 to 0+300
Shop Drawings Shoring Layout for Shoring Works at Zone 09 Tunnel
WF-003030 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-04002C1 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-May-24 18-May-24 2-Jun-24 C Open 263 Aconex
01 from sta. 0+130 to 0+300 Partial Sheet 1
Shop Drawings Shoring Layout for Shoring Works at Zone 09 Tunnel
WF-003030 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-04003C1 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-May-24 18-May-24 2-Jun-24 C Open 263 Aconex
JVC-WTRAN- 01 from sta. 0+130 to 0+300 Partial Sheet 2
002869 Shop Drawings Shoring Layout for Shoring Works at Zone 09 Tunnel
WF-003030 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-04004C1 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-May-24 18-May-24 2-Jun-24 C Open 263 Aconex
01 from sta. 0+130 to 0+300 Partial Sheet 3
Shop Drawings Shoring Layout for Shoring Works at Zone 09 Tunnel
WF-003030 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-04005C1 Latest 01 from sta. 0+130 to 0+300 Steel Reinforcement, Coordinates and Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-May-24 18-May-24 2-Jun-24 C Open 263 Aconex
Anchor Details
Shop Drawings Shoring Layout for Shoring Works at Zone 09 Tunnel
WF-003030 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-04006C0 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-May-24 18-May-24 2-Jun-24 C Open 263 Aconex
01 from sta. 0+130 to 0+300 Elevation and Anchor Layout
Shop Drawings Layout for Soil Improvement Works in Zone 10 from
WF-003058 R02Z00-C021-JVC-10-XXX-SDW-GT-GT-02001C0 Re-S Zone 10 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 5-May-24 19-May-24 21-May-24 C Closed 16 Aconex
sta. 0+342 to 0+402 incl. VTR 11
JVC-WTRAN- Shop Drawings Cross Section for Soil Improvement Works in Zone 10
WF-003058 R02Z00-C021-JVC-10-XXX-SDW-GT-GT-02002C0 Re-S Zone 10 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 5-May-24 19-May-24 21-May-24 C Closed 16 Aconex
002897 from sta. 0+342 to 0+402 incl. VTR 11
Shop Drawings Coordinates for Soil Improvement Works in Zone 10
WF-003058 R02Z00-C021-JVC-10-XXX-SDW-GT-GT-02003C0 Re-S Zone 10 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 5-May-24 19-May-24 21-May-24 C Closed 16 Aconex
from sta. 0+342 to 0+402 incl. VTR 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003133 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11200- C0 Latest Tunnel 03 As Built Civil Civil Engr. Khalid 7-May-24 21-May-24 Terminated Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003133 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11201- C0 Latest Tunnel 03 As Built Civil Civil Engr. Khalid 7-May-24 21-May-24 Terminated Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003133 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11202- C0 Latest Tunnel 03 As Built Civil Civil Engr. Khalid 7-May-24 21-May-24 Terminated Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003133 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11203- C0 Latest Tunnel 03 As Built Civil Civil Engr. Khalid 7-May-24 21-May-24 Terminated Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003133 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11204- C0 Latest Tunnel 03 As Built Civil Civil Engr. Khalid 7-May-24 21-May-24 Terminated Aconex
JVC-WTRAN- Tunnel 03-Zone 11
002869 As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003133 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11205- C0 Latest Tunnel 03 As Built Civil Civil Engr. Khalid 7-May-24 21-May-24 Terminated Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003133 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11206- C0 Latest Tunnel 03 As Built Civil Civil Engr. Khalid 7-May-24 21-May-24 Terminated Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003133 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11207- C0 Latest Tunnel 03 As Built Civil Civil Engr. Khalid 7-May-24 21-May-24 Terminated Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003133 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11208- C0 Latest Tunnel 03 As Built Civil Civil Engr. Khalid 7-May-24 21-May-24 Terminated Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003133 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11209- C0 Latest Tunnel 03 As Built Civil Civil Engr. Khalid 7-May-24 21-May-24 Terminated Aconex
Tunnel 03-Zone 11
JVC-WTRAN-
WF-003160 R02Z00-C021-JVC-08-XXX-ABD-GT-GT-01005 C0 Latest As-Built CMC layout for zone 08 from STA. 0+512.99 to 0+552.9 Zone 08 As Built Geotechnical Geotechnical Engr. Yaseen 8-May-24 22-May-24 4-May-24 B Closed -4 Aconex
002999
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow
JVC-WTRAN- Total
Workflow Document JVC Planned 16-May-24
WSP Status
C Overdue Overdue Submittal
WF-003161 R02Z00-C021-JVC-00-XXX-SDW-ST-FO-00003
Transmittal
003000 Drawing No. Rev.
C0 Status
Re-S Shop Drawing for MV Manholes
Description RAM-MIP
Location Shop Drawing Structural
Discipline Foundation
Sub-Discipline Engr. by 9-May-24
Shaheen
Submitted 23-May-24 Closed
Status 7
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities & date
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00109C2 Re-S Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed Today
11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00110C2 Latest Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00111C2 Latest Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00112C2 Latest Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00113C2 Latest Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00114C2 Latest Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00115C2 Latest Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00116C2 Latest Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00117C2 Re-S Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00118C2 Re-S Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00119C2 Re-S Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
JVC-WTRAN- EI-00046 Infrastructure Infrastructure
003008 Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00120C2 Re-S Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00121C2 Re-S Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00122C2 Re-S Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00123C2 Re-S Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00124C2 Re-S Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00125C2 Re-S Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00126C2 Re-S Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00127C2 Re-S Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00128C2 Re-S Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00129C2 Re-S Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Updated combined Utility Plan for Road 11-D09 Rev.002 according to UT-Utilities & UT-Utilities &
WF-003169 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00130C2 Re-S Road 11-D09 Shop Drawing Engr. Fawzy 9-May-24 23-May-24 20-May-24 B Closed 11 Aconex
EI-00046 Infrastructure Infrastructure
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01203C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01204C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01205C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01206C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01207C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01208C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01209C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01210C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01211C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01218C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01219C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01220C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01221C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01222C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01223C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01224C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01225C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01226C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01227C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent

JVC-WTRAN-
003063
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage Total
Workflow Document JVC Planned WSP Status
C Overdue Overdue Submittal
WF-003225 Transmittal Drawing No. Rev. Status
R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01228C0 Re-S
08 and 09) Description RAM-MIP
Location Shop Drawing Discipline
Infrastructure Sub-Discipline
Effluent Submitted by 12-May-24 26-May-24 25-May-24
Engr. Fawzy Closed
Status 13
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage date
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01229C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed Today
13 Aconex
JVC-WTRAN- 08 and 09) Infrastructure Effluent
003063 Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01230C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01231C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01232C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01233C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01234C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01235C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01236C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01237C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01251C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01252C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01253C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01256C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01257C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01258C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01259C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01260C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01261C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01262C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01263C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01265C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-003225 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01266C0 Re-S RAM-MIP Shop Drawing Engr. Fawzy 12-May-24 26-May-24 25-May-24 C Closed 13 Aconex
08 and 09) Infrastructure Effluent
Shop Drawing for Shoring Works Layout and Elevation at Zone 01 for
WF-003227 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-04001C1 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 12-May-24 26-May-24 28-May-24 B Closed 16 Aconex
JVC-WTRAN- AIP Dry Culvert from sta.0+300 to 0+340
003065 Shop Drawing for Shoring Works Cross Section and Reinforcement
WF-003227 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-04002C1 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 12-May-24 26-May-24 28-May-24 B Closed 16 Aconex
Details at Zone 01 for AIP Dry Culvert from sta.0+300 to 0+340
JVC-WTRAN- As-Built CMC Layout for Zone 06 Dry Utility Culvert from sta.
WF-003243 R02Z00-C021-JVC-06-XXX-ABD-GT-GT-02001 C0 Latest Zone 06 As Built Geotechnical Geotechnical Engr. Yaseen 12-May-24 26-May-24 21-May-24 B Closed 9 Aconex
003081 2+594 to 2+664
Shop drawings for Soil Improvement for Zone 4 Including PS 03 VTR
JVC-WTRAN-
WF-003257 R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01015C5 Re-S 06 and ES 13, 14, 17 & 18 from sta. 1+260 to sta. 1+773 - Co- Zone 04 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 13-May-24 27-May-24 21-May-24 B Closed 8 Aconex
003095
ordinate Sheet 10
WF-003327 R02Z00-C021-JVC-04-XXX-ABD-GT-GT-01001 C0 Latest As-Built CMC Layout for Zone 02 from sta 1+260 to 1+313.979 Zone 04 As Built Geotechnical Geotechnical Engr. Yaseen 14-May-24 28-May-24 28-May-24 A Closed 14 Aconex

As-Built CMC Layout for Zone 02 from sta 1+313.979 to 1+353.979


WF-003327 R02Z00-C021-JVC-04-XXX-ABD-GT-GT-01002 C0 Latest Zone 04 As Built Geotechnical Geotechnical Engr. Yaseen 14-May-24 28-May-24 28-May-24 A Closed 14 Aconex
incl. ES 13

WF-003327 R02Z00-C021-JVC-04-XXX-ABD-GT-GT-01003 C0 Latest As-Built CMC Layout for Zone 02 from sta 1+373.979 to 1+433.979 Zone 04 As Built Geotechnical Geotechnical Engr. Yaseen 14-May-24 28-May-24 28-May-24 C Open 253 Aconex

WF-003327 R02Z00-C021-JVC-04-XXX-ABD-GT-GT-01004 C0 Latest As-Built CMC Layout for Zone 02 from sta 1+433.979 to 1+493.979 Zone 04 As Built Geotechnical Geotechnical Engr. Yaseen 14-May-24 28-May-24 28-May-24 A Closed 14 Aconex

JVC-WTRAN-
WF-003327 R02Z00-C021-JVC-04-XXX-ABD-GT-GT-01005 C0 Latest As-Built CMC Layout for Zone 02 from sta 1+493.979 to 1+553.979 Zone 04 As Built Geotechnical Geotechnical Engr. Yaseen 14-May-24 28-May-24 28-May-24 A Closed 14 Aconex
003163

WF-003327 R02Z00-C021-JVC-04-XXX-ABD-GT-GT-01006 C0 Latest As-Built CMC Layout for Zone 02 from sta 1+553.979 to 1+613.979 Zone 04 As Built Geotechnical Geotechnical Engr. Yaseen 14-May-24 28-May-24 28-May-24 A Closed 14 Aconex

As-Built CMC Layout for Zone 02 from sta 1+613.979 to 1+673.979


WF-003327 R02Z00-C021-JVC-04-XXX-ABD-GT-GT-01007 C0 Latest Zone 04 As Built Geotechnical Geotechnical Engr. Yaseen 14-May-24 28-May-24 28-May-24 A Closed 14 Aconex
incl. ES 17 & 18

WF-003327 R02Z00-C021-JVC-04-XXX-ABD-GT-GT-01008 C0 Latest As-Built CMC Layout for Zone 02 from sta 1+673.979 to 1+733.979 Zone 04 As Built Geotechnical Geotechnical Engr. Yaseen 14-May-24 28-May-24 28-May-24 A Closed 14 Aconex

WF-003327 R02Z00-C021-JVC-04-XXX-ABD-GT-GT-01009 C0 Latest As-Built CMC Layout for Zone 02 from sta 1+733.979 to 1+773.979 Zone 04 As Built Geotechnical Geotechnical Engr. Yaseen 14-May-24 28-May-24 28-May-24 A Closed 14 Aconex

As-Built CMC Layout for Zone 03 from sta 1+020 to 1+073.979 incl.
WF-003335 R02Z00-C021-JVC-03-XXX-ABD-GT-GT-01001 C0 Latest Zone 03 As Built Geotechnical Geotechnical Engr. Yaseen 15-May-24 29-May-24 28-May-24 A Closed 13 Aconex
ES 10

WF-003335 R02Z00-C021-JVC-03-XXX-ABD-GT-GT-01002 C0 Latest As-Built CMC Layout for Zone 03 from sta 1+073.979 to 1+133.979 Zone 03 As Built Geotechnical Geotechnical Engr. Yaseen 15-May-24 29-May-24 28-May-24 A Closed 13 Aconex
JVC-WTRAN-
003171
WF-003335 R02Z00-C021-JVC-03-XXX-ABD-GT-GT-01003 C0 Latest As-Built CMC Layout for Zone 03 from sta 1+133.979 to 1+193.979 Zone 03 As Built Geotechnical Geotechnical Engr. Yaseen 15-May-24 29-May-24 28-May-24 A Closed 13 Aconex

WF-003335 R02Z00-C021-JVC-03-XXX-ABD-GT-GT-01004 C0 Latest As-Built CMC Layout for Zone 03 from sta 1+193.979 to 1+260 Zone 03 As Built Geotechnical Geotechnical Engr. Yaseen 15-May-24 29-May-24 28-May-24 A Closed 13 Aconex

JVC-WTRAN- As-Built CMC layout for zone 04 Lift Station 03 (old PS


WF-003337 R02Z00-C021-JVC-04-XXX-ABD-GT-GT-01010 C0 Latest Zone 04 As Built Geotechnical Geotechnical Engr. Yaseen 15-May-24 29-May-24 28-May-24 B Closed 13 Aconex
003173 03) at Sta. 1+360
Shop Drawings Layout for Shoring Works at Zone 01 LS06 from
WF-003364 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-04003C0 Re-S Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 15-May-24 29-May-24 30-May-24 B Closed 15 Aconex
sta. 0+470 to 0+500
JVC-WTRAN-
003198
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow
JVC-WTRAN- Shop Drawings Sections, Reinforcements and Details for Shoring Total
Workflow Document JVC Planned WSP Status
B Overdue Overdue Submittal
WF-003364 Transmittal
003198 Drawing No. Rev. Status
R02Z00-C021-JVC-01-XXX-SDW-GT-GT-04004C0 Re-S
Works at Zone 01 LS06 fromDescription
sta. 0+470 to 0+500 Sheet 1
Zone 01
Location Shop Drawing Geotechnical
Discipline Geotechnical Submitted
Sub-Discipline by 15-May-24 29-May-24 30-May-24
Engr. Yaseen Closed
Status 15
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type SubmittedReply Response Code from WSP from JVC
No. as of
Shop Drawings Sections, Reinforcements and Details for Shoring date
WF-003364 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-04005C0 Re-S Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 15-May-24 29-May-24 30-May-24 B Closed Today
15 Aconex
Works at Zone 01 LS06 from sta. 0+470 to 0+500 Sheet 2
Shop Drawing for Excavation Cross section Zone 01 (vehicular Room As per Engr.
WF-003422 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05056-C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Khalid 18-May-24 1-Jun-24 3-Jun-24 Terminated Aconex
-01) from St 0+407.06 to 0+500 Nahell
Shop Drawing for Excavation Cross section Zone 01 (vehicular Room As per Engr.
WF-003422 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05367-C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Khalid 18-May-24 1-Jun-24 3-Jun-24 Terminated Aconex
-01) from St 0+407.06 to 0+500 Nahell
Shop Drawing for Excavation Cross section Zone 01 (vehicular Room As per Engr.
WF-003422 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05368-C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Khalid 18-May-24 1-Jun-24 3-Jun-24 Terminated Aconex
-01) from St 0+407.06 to 0+500 Nahell
JVC-WTRAN- Shop Drawing for Excavation Cross section Zone 01 (vehicular Room As per Engr.
WF-003422 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05369-C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Khalid 18-May-24 1-Jun-24 3-Jun-24 Terminated Aconex
003255 -01) from St 0+407.06 to 0+500 Nahell
Shop Drawing for Excavation Cross section Zone 01 (vehicular Room As per Engr.
WF-003422 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05370-C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Khalid 18-May-24 1-Jun-24 3-Jun-24 Terminated Aconex
-01) from St 0+407.06 to 0+500 Nahell
Shop Drawing for Excavation Cross section Zone 01 (vehicular Room As per Engr.
WF-003422 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05371-C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Khalid 18-May-24 1-Jun-24 3-Jun-24 Terminated Aconex
-01) from St 0+407.06 to 0+500 Nahell
Shop Drawing for Excavation Cross section Zone 01 (vehicular Room As per Engr.
WF-003422 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05372-C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Khalid 18-May-24 1-Jun-24 3-Jun-24 Terminated Aconex
-01) from St 0+407.06 to 0+500 Nahell

WF-003492 R02Z00-C021-JVC-00-XXX-SDW-ST-FO-00001 C1 Re-S Foundation Details for Street Light Poles RAM-MIP Shop Drawing Structural Foundation Engr. Shaheen 21-May-24 4-Jun-24 1-Jun-24 B Closed 11 Aconex
JVC-WTRAN-
003324
WF-003492 R02Z00-C021-JVC-00-XXX-SDW-ST-FO-00002 C1 re-s Foundation Details for Street Light Poles RAM-MIP Shop Drawing Structural Foundation Engr. Shaheen 21-May-24 4-Jun-24 1-Jun-24 B Closed 11 Aconex

JVC-WTRAN-
WF-003494 R02Z00-C021-JVC-00-XXX-SDW-ST-FO-00003 C1 Latest Structural Details of MV Manholes RAM-MIP Shop Drawing Structural Foundation Engr. Shaheen 21-May-24 4-Jun-24 1-Jun-24 B Closed 11 Aconex
003326

WF-003506 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05000C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 09 D9 Shop Drawing Electrical Medium Voltage Engr. Sherif 21-May-24 4-Jun-24 2-Jun-24 C Open 246 Aconex

WF-003506 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05001C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 09 D9 Shop Drawing Electrical Medium Voltage Engr. Sherif 21-May-24 4-Jun-24 2-Jun-24 C Open 246 Aconex

WF-003506 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05002C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 09 D9 Shop Drawing Electrical Medium Voltage Engr. Sherif 21-May-24 4-Jun-24 2-Jun-24 C Open 246 Aconex

JVC-WTRAN-
WF-003506 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05003C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 09 D9 Shop Drawing Electrical Medium Voltage Engr. Sherif 21-May-24 4-Jun-24 2-Jun-24 C Open 246 Aconex
003338

WF-003506 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05004C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 09 D9 Shop Drawing Electrical Medium Voltage Engr. Sherif 21-May-24 4-Jun-24 2-Jun-24 C Open 246 Aconex

WF-003506 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05005C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 09 D9 Shop Drawing Electrical Medium Voltage Engr. Sherif 21-May-24 4-Jun-24 2-Jun-24 C Open 246 Aconex

WF-003506 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05006C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 09 D9 Shop Drawing Electrical Medium Voltage Engr. Sherif 21-May-24 4-Jun-24 2-Jun-24 C Open 246 Aconex

WF-003649 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05007C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 10 D10 Shop Drawing Electrical Medium Voltage Engr. Sherif 26-May-24 9-Jun-24 10-Jun-24 C Open 241 Aconex

WF-003649 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05008C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 10 D10 Shop Drawing Electrical Medium Voltage Engr. Sherif 26-May-24 9-Jun-24 10-Jun-24 C Open 241 Aconex

WF-003649 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05009C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 10 D10 Shop Drawing Electrical Medium Voltage Engr. Sherif 26-May-24 9-Jun-24 10-Jun-24 C Open 241 Aconex

WF-003649 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05010C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 10 D10 Shop Drawing Electrical Medium Voltage Engr. Sherif 26-May-24 9-Jun-24 10-Jun-24 C Open 241 Aconex

WF-003649 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05011C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 10 D10 Shop Drawing Electrical Medium Voltage Engr. Sherif 26-May-24 9-Jun-24 10-Jun-24 C Open 241 Aconex

WF-003649 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05012C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 10 D10 Shop Drawing Electrical Medium Voltage Engr. Sherif 26-May-24 9-Jun-24 10-Jun-24 C Open 241 Aconex
JVC-WTRAN-
003476
WF-003649 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05013C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 10 D10 Shop Drawing Electrical Medium Voltage Engr. Sherif 26-May-24 9-Jun-24 10-Jun-24 C Open 241 Aconex

WF-003649 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05014C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 10 D10 Shop Drawing Electrical Medium Voltage Engr. Sherif 26-May-24 9-Jun-24 10-Jun-24 C Open 241 Aconex

WF-003649 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05015C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 10 D10 Shop Drawing Electrical Medium Voltage Engr. Sherif 26-May-24 9-Jun-24 10-Jun-24 C Open 241 Aconex

WF-003649 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05016C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 10 D10 Shop Drawing Electrical Medium Voltage Engr. Sherif 26-May-24 9-Jun-24 10-Jun-24 C Open 241 Aconex

WF-003649 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05017C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 10 D10 Shop Drawing Electrical Medium Voltage Engr. Sherif 26-May-24 9-Jun-24 10-Jun-24 C Open 241 Aconex

WF-003649 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-05018C0 Latest Shop drawings for Medium Voltage Cable Profile in District – 10 D10 Shop Drawing Electrical Medium Voltage Engr. Sherif 26-May-24 9-Jun-24 10-Jun-24 C Open 241 Aconex

JVC-WTRAN-
WF-003671 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05465 C3 Re-S Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+280 Zone 07 Shop Drawing Civil Civil Engr. Khalid 27-May-24 10-Jun-24 10-Jun-24 C Closed 14 Aconex
003496
JVC-WTRAN-
WF-003677 R02Z00-C021-JVC-00-XXX-SDW-ST-FO-00004 C0 Latest ELV Manhole Structural Details RAM-MIP Shop Drawing Structural Foundation Engr. Shaheen 27-May-24 10-Jun-24 12-Jun-24 B Closed 16 Aconex
003501
Shop Drawing for Potable Water Network Plan and Profile for part 07 UT-Utilities &
WF-003689 R02Z00-C021-JVC-XX-XXX-SDW-UT-PW-01607C0 Latest D09 Shop Drawing Potable Water Engr. Elsayed 28-May-24 11-Jun-24 12-Jun-24 C Open 239 Aconex
(D-09 area) Infrastructure
Shop Drawing for Potable Water Network Plan and Profile for part 07 UT-Utilities &
WF-003689 R02Z00-C021-JVC-XX-XXX-SDW-UT-PW-01610C0 Latest D09 Shop Drawing Potable Water Engr. Elsayed 28-May-24 11-Jun-24 12-Jun-24 C Open 239 Aconex
(D-09 area) Infrastructure
Shop Drawing for Potable Water Network Plan and Profile for part 07 UT-Utilities &
WF-003689 R02Z00-C021-JVC-XX-XXX-SDW-UT-PW-01611C0 Latest D09 Shop Drawing Potable Water Engr. Elsayed 28-May-24 11-Jun-24 12-Jun-24 C Open 239 Aconex
(D-09 area) Infrastructure
JVC-WTRAN- Shop Drawing for Potable Water Network Plan and Profile for part 07 UT-Utilities &
WF-003689 R02Z00-C021-JVC-XX-XXX-SDW-UT-PW-01612C0 Latest D09 Shop Drawing Potable Water Engr. Elsayed 28-May-24 11-Jun-24 12-Jun-24 C Open 239 Aconex
003513 (D-09 area) Infrastructure
Shop Drawing for Potable Water Network Plan and Profile for part 07 UT-Utilities &
WF-003689 R02Z00-C021-JVC-XX-XXX-SDW-UT-PW-01613C0 Latest D09 Shop Drawing Potable Water Engr. Elsayed 28-May-24 11-Jun-24 12-Jun-24 C Open 239 Aconex
(D-09 area) Infrastructure
Shop Drawing for Potable Water Network Plan and Profile for part 07 UT-Utilities &
WF-003689 R02Z00-C021-JVC-XX-XXX-SDW-UT-PW-01614C0 Latest D09 Shop Drawing Potable Water Engr. Elsayed 28-May-24 11-Jun-24 12-Jun-24 C Open 239 Aconex
(D-09 area) Infrastructure
Shop Drawing for Potable Water Network Plan and Profile for part 07 UT-Utilities &
WF-003689 R02Z00-C021-JVC-XX-XXX-SDW-UT-PW-01615C0 Latest D09 Shop Drawing Potable Water Engr. Elsayed 28-May-24 11-Jun-24 12-Jun-24 C Open 239 Aconex
(D-09 area) Infrastructure
Shop Drawing for Gray Water Distribution Network Plan and Profile UT-Utilities &
WF-003707 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03617C0 Latest D09 Shop Drawing Gray Water Engr. Elsayed 28-May-24 11-Jun-24 12-Jun-24 C Closed 15 Aconex
for part 07 (D-09 area) Infrastructure
Shop Drawing for Gray Water Distribution Network Plan and Profile UT-Utilities &
WF-003707 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03620C0 Latest D09 Shop Drawing Gray Water Engr. Elsayed 28-May-24 11-Jun-24 12-Jun-24 C Closed 15 Aconex
for part 07 (D-09 area) Infrastructure

JVC-WTRAN-
003528
Superseded
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow Shop Drawing for Gray Water Distribution Network Plan and Profile UT-Utilities & Total
Workflow Document JVC Planned WSP Status
C Overdue Overdue Submittal
WF-003707 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03621C0 Status for part 07 (D-09 area) Description D09
Location Shop Drawing Discipline
Infrastructure
Gray Water
Sub-Discipline Submitted by 28-May-24 11-Jun-24 12-Jun-24
Engr. Elsayed Closed
Status 15
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
JVC-WTRAN- Shop Drawing for Gray Water Distribution Network Plan and Profile UT-Utilities & date
WF-003707 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03622C0 Latest D09 Shop Drawing Gray Water Engr. Elsayed 28-May-24 11-Jun-24 12-Jun-24 C Closed Today
15 Aconex
003528 for part 07 (D-09 area) Infrastructure
Superseded
Shop Drawing for Gray Water Distribution Network Plan and Profile UT-Utilities &
WF-003707 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03623C0 Latest D09 Shop Drawing Gray Water Engr. Elsayed 28-May-24 11-Jun-24 12-Jun-24 C Closed 15 Aconex
for part 07 (D-09 area) Infrastructure
Shop Drawing for Gray Water Distribution Network Plan and Profile UT-Utilities &
WF-003707 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03624C1 Latest D09 Shop Drawing Gray Water Engr. Elsayed 28-May-24 11-Jun-24 12-Jun-24 C Closed 15 Aconex
for part 07 (D-09 area) Infrastructure
Shop Drawing for Gray Water Distribution Network Plan and Profile UT-Utilities &
WF-003707 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03625C1 Latest D09 Shop Drawing Gray Water Engr. Elsayed 28-May-24 11-Jun-24 12-Jun-24 C Closed 15 Aconex
for part 07 (D-09 area) Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00131C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00132C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00133C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00134C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00135C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00136C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00137C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00138C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00139C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00140C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00141C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00142C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00143C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00144C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00145C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00146C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00147C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00148C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00149C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00150C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00151C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00152C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00153C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00154C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00155C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00156C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00157C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00158C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00159C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00160C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00161C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00162C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00163C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00164C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00165C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00166C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00167C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow UT-Utilities & Total
Workflow Document JVC Planned WSP Status
C Overdue Overdue Submittal
WF-003719 Transmittal Drawing No. Rev. Status
R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00168C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09
Description D09
Location Shop Drawing UT-Utilities
Discipline
Infrastructure
& Infrastructure
Sub-Discipline Submitted by 29-May-24 12-Jun-24 19-Jun-24
Engr. Fawzy Closed
Status 21
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
UT-Utilities & date
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00169C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24
UT-Utilities & Infrastructure C Closed Today
21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00170C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00171C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00172C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00173C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
JVC-WTRAN- Infrastructure
003540 UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00174C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00175C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00176C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00177C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00178C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00179C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00180C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00181C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00182C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00183C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00184C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00185C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00186C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00187C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00188C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00189C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00190C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00191C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00192C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00193C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00194C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00195C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00196C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00197C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00198C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00199C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00200C1 Re-S Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Closed 21 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00201C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00202C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00203C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00204C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00205C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00206C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00207C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00208C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00209C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow UT-Utilities & Total
Workflow Document JVC Planned WSP Status
C Overdue Overdue Submittal
WF-003719 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00210C1 Status Combined Utility Plan for Roads 12 & 13 - D09
Description D09
Location Shop Drawing UT-Utilities
Discipline
Infrastructure
& Infrastructure
Sub-Discipline Submitted by 29-May-24 12-Jun-24 19-Jun-24
Engr. Fawzy Open
Status 238
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
UT-Utilities & date
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00211C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24
UT-Utilities & Infrastructure C Open Today
238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00212C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00213C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00214C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00215C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
UT-Utilities &
WF-003719 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00216C1 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing UT-Utilities & Infrastructure
Engr. Fawzy 29-May-24 12-Jun-24 19-Jun-24 C Open 238 Aconex
Infrastructure
As built Excavation Cross sections from sta. 0+060 to 0+220 at
WF-003719 R02Z00-C021-JVC-10-XXX-ABD-CL-CL-06200 C0 Latest Zone 10 As Built Civil Civil Engr. Khalid 30-May-24 13-Jun-24 19-Jun-24 C Open 237 Aconex
Tunnel 02-Zone 10
As built Excavation Cross sections from sta. 0+060 to 0+220 at
WF-003746 R02Z00-C021-JVC-10-XXX-ABD-CL-CL-06203 C0 Latest Zone 10 As Built Civil Civil Engr. Khalid 30-May-24 13-Jun-24 13-Jun-24 C Open 237 Aconex
Tunnel 02-Zone 10
As built Excavation Cross sections from sta. 0+060 to 0+220 at
WF-003746 R02Z00-C021-JVC-10-XXX-ABD-CL-CL-06204 C0 Latest Zone 10 As Built Civil Civil Engr. Khalid 30-May-24 13-Jun-24 13-Jun-24 C Open 237 Aconex
Tunnel 02-Zone 10
As built Excavation Cross sections from sta. 0+060 to 0+220 at
WF-003746 R02Z00-C021-JVC-10-XXX-ABD-CL-CL-06205 C0 Latest Zone 10 As Built Civil Civil Engr. Khalid 30-May-24 13-Jun-24 13-Jun-24 C Open 237 Aconex
Tunnel 02-Zone 10
As built Excavation Cross sections from sta. 0+060 to 0+220 at
WF-003746 R02Z00-C021-JVC-10-XXX-ABD-CL-CL-06206 C0 Latest Zone 10 As Built Civil Civil Engr. Khalid 30-May-24 13-Jun-24 13-Jun-24 C Open 237 Aconex
Tunnel 02-Zone 10
As built Excavation Cross sections from sta. 0+060 to 0+220 at
WF-003746 R02Z00-C021-JVC-10-XXX-ABD-CL-CL-06207 C0 Latest Zone 10 As Built Civil Civil Engr. Khalid 30-May-24 13-Jun-24 13-Jun-24 C Open 237 Aconex
JVC-WTRAN- Tunnel 02-Zone 10
003566 As built Excavation Cross sections from sta. 0+060 to 0+220 at
WF-003746 R02Z00-C021-JVC-10-XXX-ABD-CL-CL-06208 C0 Latest Zone 10 As Built Civil Civil Engr. Khalid 30-May-24 13-Jun-24 13-Jun-24 C Open 237 Aconex
Tunnel 02-Zone 10
As built Excavation Cross sections from sta. 0+060 to 0+220 at
WF-003746 R02Z00-C021-JVC-10-XXX-ABD-CL-CL-06209 C0 Latest Zone 10 As Built Civil Civil Engr. Khalid 30-May-24 13-Jun-24 13-Jun-24 C Open 237 Aconex
Tunnel 02-Zone 10
As built Excavation Cross sections from sta. 0+060 to 0+220 at
WF-003746 R02Z00-C021-JVC-10-XXX-ABD-CL-CL-06210 C0 Latest Zone 10 As Built Civil Civil Engr. Khalid 30-May-24 13-Jun-24 13-Jun-24 C Open 237 Aconex
Tunnel 02-Zone 10
As built Excavation Cross sections from sta. 0+060 to 0+220 at
WF-003746 R02Z00-C021-JVC-10-XXX-ABD-CL-CL-06211 C0 Latest Zone 10 As Built Civil Civil Engr. Khalid 30-May-24 13-Jun-24 13-Jun-24 C Open 237 Aconex
Tunnel 02-Zone 10
As built Excavation Cross sections from sta. 0+060 to 0+220 at
WF-003746 R02Z00-C021-JVC-10-XXX-ABD-CL-CL-06212 C0 Latest Zone 10 As Built Civil Civil Engr. Khalid 30-May-24 13-Jun-24 13-Jun-24 C Open 237 Aconex
Tunnel 02-Zone 10
JVC-WTRAN- As-Built CMC layout for Tunnel 01 (Zone 09) from station 0+41 to 0
WF-003764 R02Z00-C021-JVC-09-XXX-ABD-GT-GT-02001 C0 Latest Zone 09 As Built Geotechnical Geotechnical Engr. Yaseen 30-May-24 13-Jun-24 11-Jun-24 B Closed 12 Aconex
003584 104 incl. ES 05
JVC-WTRAN- As-Built CMC Layout for Zone 06 Dry Utility Culvert from
WF-003769 R02Z00-C021-JVC-06-XXX-ABD-GT-GT-02002 C0 Latest Zone 06 As Built Geotechnical Geotechnical Engr. Yaseen 1-Jun-24 15-Jun-24 5-Jun-24 B Closed 4 Aconex
003589 sta. 2+394 to 2+500
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-003796 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00127C0 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 2-Jun-24 16-Jun-24 12-Jun-24 C Closed 10 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-003796 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00128C0 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 2-Jun-24 16-Jun-24 12-Jun-24 C Closed 10 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-003796 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00129C0 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 2-Jun-24 16-Jun-24 12-Jun-24 C Closed 10 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-003796 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00130C0 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 2-Jun-24 16-Jun-24 12-Jun-24 C Closed 10 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-003796 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00131C0 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 2-Jun-24 16-Jun-24 12-Jun-24 C Closed 10 Aconex
JVC-WTRAN- details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
003616 Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-003796 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00132C0 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 2-Jun-24 16-Jun-24 12-Jun-24 C Closed 10 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-003796 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00133C0 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 2-Jun-24 16-Jun-24 12-Jun-24 C Closed 10 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-003796 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00134C0 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 2-Jun-24 16-Jun-24 12-Jun-24 C Closed 10 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-003796 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00135C0 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 2-Jun-24 16-Jun-24 12-Jun-24 C Closed 10 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-003796 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00136C0 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 2-Jun-24 16-Jun-24 12-Jun-24 C Closed 10 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Shop Drawing for Shoring Works in Zone 07 from sta. 0+045 to
WF-003835 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-04001C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Jun-24 17-Jun-24 11-Jun-24 B Closed 8 Aconex
0+175 - General Layout
Shop Drawing for Shoring Works in Zone 07 from sta. 0+045 to
WF-003835 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-04002C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Jun-24 17-Jun-24 11-Jun-24 B Closed 8 Aconex
0+175 - Cross-Sections Sheet 1
JVC-WTRAN- Shop Drawing for Shoring Works in Zone 07 from sta. 0+045 to
WF-003835 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-04003C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Jun-24 17-Jun-24 11-Jun-24 B Closed 8 Aconex
003653 0+175 - Cross-Sections Sheet 2
Shop Drawing for Shoring Works in Zone 07 from sta. 0+045 to
WF-003835 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-04004C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Jun-24 17-Jun-24 11-Jun-24 B Closed 8 Aconex
0+175 - Reinforcement Details
Shop Drawing for Shoring Works in Zone 07 from sta. 0+045 to
WF-003835 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-04005C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Jun-24 17-Jun-24 11-Jun-24 B Closed 8 Aconex
0+175 - Coordinates and Levels
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-003836 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02001C1 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Jun-24 17-Jun-24 12-Jun-24 B Closed 9 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 1
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-003836 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02002C1 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Jun-24 17-Jun-24 12-Jun-24 B Closed 9 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-003836 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02003C1 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Jun-24 17-Jun-24 12-Jun-24 B Closed 9 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-003836 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02004C1 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Jun-24 17-Jun-24 12-Jun-24 B Closed 9 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Cross-Sections
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-003836 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02005C1 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Jun-24 17-Jun-24 12-Jun-24 B Closed 9 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 1
JVC-WTRAN- Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-003836 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02006C1 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Jun-24 17-Jun-24 12-Jun-24 B Closed 9 Aconex
003654 from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-003836 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02007C1 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Jun-24 17-Jun-24 12-Jun-24 B Closed 9 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 3
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

JVC-WTRAN-
003654

Response
ACONEX
Workflow Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09 Total
Workflow Document JVC Planned 12-Jun-24
WSP Status
B Overdue Overdue Submittal
WF-003836 Transmittal Drawing No. Rev. Status
R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02008C1 re-s Description
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 4
Zone 09
Location Shop Drawing Geotechnical
Discipline Geotechnical Submitted
Sub-Discipline Engr. Yaseen
by 3-Jun-24 17-Jun-24 Closed
Status 9
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09 date
WF-003836 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02009C1 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Jun-24 17-Jun-24 12-Jun-24 B Closed Today
9 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 5
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-003836 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02010C1 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Jun-24 17-Jun-24 12-Jun-24 B Closed 9 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 6
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-003836 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02011C1 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Jun-24 17-Jun-24 12-Jun-24 B Closed 9 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 7
Shop Drawing Layout for Soil Improvement works in Zone 01 from
WF-003846 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02008C0 re-s Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Jun-24 18-Jun-24 12-Jun-24 B Closed 8 Aconex
sta. 0+293 to 0+350
JVC-WTRAN- Shop Drawing Cross-Section for Soil Improvement works in Zone 01
WF-003846 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02009C0 re-s Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Jun-24 18-Jun-24 12-Jun-24 B Closed 8 Aconex
003664 from sta. 0+293 to 0+350
Shop Drawing Coordinates and Levels for Soil Improvement works in
WF-003846 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02010C0 re-s Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 4-Jun-24 18-Jun-24 12-Jun-24 B Closed 8 Aconex
Zone 01 from sta. 0+293 to 0+350
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003868 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11200 C0 re-s Tunnel 03 As Built Civil Civil Engr. Khalid 4-Jun-24 18-Jun-24 13-Jun-24 C Closed 9 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003868 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11201 C0 re-s Tunnel 03 As Built Civil Civil Engr. Khalid 4-Jun-24 18-Jun-24 13-Jun-24 C Closed 9 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003868 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11202 C0 re-s Tunnel 03 As Built Civil Civil Engr. Khalid 4-Jun-24 18-Jun-24 13-Jun-24 C Closed 9 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003868 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11203 C0 re-s Tunnel 03 As Built Civil Civil Engr. Khalid 4-Jun-24 18-Jun-24 13-Jun-24 C Closed 9 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003868 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11204 C0 re-s Tunnel 03 As Built Civil Civil Engr. Khalid 4-Jun-24 18-Jun-24 13-Jun-24 C Closed 9 Aconex
JVC-WTRAN- Tunnel 03-Zone 11
003666 As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003868 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11205 C0 re-s Tunnel 03 As Built Civil Civil Engr. Khalid 4-Jun-24 18-Jun-24 13-Jun-24 C Closed 9 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003868 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11206 C0 re-s Tunnel 03 As Built Civil Civil Engr. Khalid 4-Jun-24 18-Jun-24 13-Jun-24 C Closed 9 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003868 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11207 C0 re-s Tunnel 03 As Built Civil Civil Engr. Khalid 4-Jun-24 18-Jun-24 13-Jun-24 C Closed 9 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003868 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11208 C0 re-s Tunnel 03 As Built Civil Civil Engr. Khalid 4-Jun-24 18-Jun-24 13-Jun-24 C Closed 9 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-003868 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11209 C0 re-s Tunnel 03 As Built Civil Civil Engr. Khalid 4-Jun-24 18-Jun-24 13-Jun-24 C Closed 9 Aconex
Tunnel 03-Zone 11
Shop Drawing for Shotcrete Works in Zone 03 for Egress Staircase 10
WF-003972 R02Z00-C021-JVC-03-XXX-SDW-GT-GT-08001C0 re-s Zone 03 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Jun-24 24-Jun-24 24-Jun-24 C Closed 14 Aconex
JVC-WTRAN- from sta. 1+040 to 1+080 - General Layout
003785 Shop Drawing for Shotcrete Works in Zone 03 for Egress Staircase 10
WF-003972 R02Z00-C021-JVC-03-XXX-SDW-GT-GT-08002C0 re-s Zone 03 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Jun-24 24-Jun-24 24-Jun-24 C Closed 14 Aconex
from sta. 1+040 to 1+080 - Coordinates and Cross-section
Shop Drawing for Indicative section of material Backfilling at Tunnel
WF-004004 R02Z00-C021-JVC-11-XXX-SDW-CL-CL-07576 C0 Latest Tunnel 03 Shop Drawing Civil Civil Engr. Sunil 11-Jun-24 25-Jun-24 13-Jun-24 B Closed 2 Aconex
03 from Sta: 0+160 to 0+320
Shop Drawing for Indicative section of material Backfilling at Tunnel
WF-004004 R02Z00-C021-JVC-11-XXX-SDW-CL-CL-07577 C0 Latest Tunnel 03 Shop Drawing Civil Civil Engr. Sunil 11-Jun-24 25-Jun-24 13-Jun-24 B Closed 2 Aconex
03 from Sta: 0+160 to 0+320
Shop Drawing for Indicative section of material Backfilling at Tunnel
WF-004004 R02Z00-C021-JVC-11-XXX-SDW-CL-CL-07578 C0 Latest Tunnel 03 Shop Drawing Civil Civil Engr. Sunil 11-Jun-24 25-Jun-24 13-Jun-24 B Closed 2 Aconex
03 from Sta: 0+160 to 0+320
Shop Drawing for Indicative section of material Backfilling at Tunnel
WF-004004 R02Z00-C021-JVC-11-XXX-SDW-CL-CL-07579 C0 Latest Tunnel 03 Shop Drawing Civil Civil Engr. Sunil 11-Jun-24 25-Jun-24 13-Jun-24 B Closed 2 Aconex
03 from Sta: 0+160 to 0+320
Shop Drawing for Indicative section of material Backfilling at Tunnel
WF-004004 R02Z00-C021-JVC-11-XXX-SDW-CL-CL-07580 C0 Latest Tunnel 03 Shop Drawing Civil Civil Engr. Sunil 11-Jun-24 25-Jun-24 13-Jun-24 B Closed 2 Aconex
JVC-WTRAN- 03 from Sta: 0+160 to 0+320
003814 Shop Drawing for Indicative section of material Backfilling at Tunnel
WF-004004 R02Z00-C021-JVC-11-XXX-SDW-CL-CL-07581 C0 Latest Tunnel 03 Shop Drawing Civil Civil Engr. Sunil 11-Jun-24 25-Jun-24 13-Jun-24 B Closed 2 Aconex
03 from Sta: 0+160 to 0+320
Shop Drawing for Indicative section of material Backfilling at Tunnel
WF-004004 R02Z00-C021-JVC-11-XXX-SDW-CL-CL-07582 C0 Latest Tunnel 03 Shop Drawing Civil Civil Engr. Sunil 11-Jun-24 25-Jun-24 13-Jun-24 B Closed 2 Aconex
03 from Sta: 0+160 to 0+320
Shop Drawing for Indicative section of material Backfilling at Tunnel
WF-004004 R02Z00-C021-JVC-11-XXX-SDW-CL-CL-07583 C0 Latest Tunnel 03 Shop Drawing Civil Civil Engr. Sunil 11-Jun-24 25-Jun-24 13-Jun-24 B Closed 2 Aconex
03 from Sta: 0+160 to 0+320
Shop Drawing for Indicative section of material Backfilling at Tunnel
WF-004004 R02Z00-C021-JVC-11-XXX-SDW-CL-CL-07584 C0 Latest Tunnel 03 Shop Drawing Civil Civil Engr. Sunil 11-Jun-24 25-Jun-24 13-Jun-24 B Closed 2 Aconex
03 from Sta: 0+160 to 0+320
Shop Drawing for Indicative section of material Backfilling at Tunnel
WF-004004 R02Z00-C021-JVC-11-XXX-SDW-CL-CL-07585 C0 Latest Tunnel 03 Shop Drawing Civil Civil Engr. Sunil 11-Jun-24 25-Jun-24 13-Jun-24 B Closed 2 Aconex
03 from Sta: 0+160 to 0+320
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03604C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
08-09) Infrastructure Infrastructure
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03605C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
08-09) Infrastructure Infrastructure
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03606C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
08-09) Infrastructure Infrastructure
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03607C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
08-09) Infrastructure Infrastructure
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03608C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
08-09) Infrastructure Infrastructure
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03609C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
08-09) Infrastructure Infrastructure
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03611C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
08-09) Infrastructure Infrastructure
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03612C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
08-09) Infrastructure Infrastructure
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03613C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
JVC-WTRAN- 08-09) Infrastructure Infrastructure
003817 Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03651C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
08-09) Infrastructure Infrastructure
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03652C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
08-09) Infrastructure Infrastructure
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03653C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
08-09) Infrastructure Infrastructure
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03654C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
08-09) Infrastructure Infrastructure
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals


JVC-WTRAN-
003817 D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities & Total
Workflow Document JVC Planned 26-Jun-24
WSP Status
C Overdue Overdue Submittal
WF-004007 Transmittal Drawing No. Rev. Status
R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03655C0 re-s
08-09) Description RAM-MIP
Location Shop Drawing Discipline
Infrastructure Sub-Discipline Engr. Tarek 11-Jun-24
Infrastructure Submitted by Submitted
25-Jun-24 Closed
Status 15
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Reply Response Code from WSP from JVC
No. as of
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities & date
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03656C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed Today
15 Aconex
08-09) Infrastructure Infrastructure
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03657C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
08-09) Infrastructure Infrastructure
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03658C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
08-09) Infrastructure Infrastructure
Grey water collection Network Plan and Profile for (Part 04-05-06-07- UT-Utilities & UT-Utilities &
WF-004007 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03663C0 re-s RAM-MIP Shop Drawing Engr. Tarek 11-Jun-24 25-Jun-24 26-Jun-24 C Closed 15 Aconex
08-09) Infrastructure Infrastructure
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004031 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07610 C0 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 12-Jun-24 26-Jun-24 13-Jun-24 C Closed 1 Aconex
from Sta: 1+460 to 1+500
JVC-WTRAN- Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004031 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07611 C0 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 12-Jun-24 26-Jun-24 13-Jun-24 C Closed 1 Aconex
003840 from Sta: 1+460 to 1+500
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004031 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07612 C0 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 12-Jun-24 26-Jun-24 13-Jun-24 C Closed 1 Aconex
from Sta: 1+460 to 1+500
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004119 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07610 C1 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 22-Jun-24 6-Jul-24 6-Jul-24 C Open 214 Aconex
from Sta: 1+460 to 1+500
JVC-WTRAN- Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004119 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07611 C1 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 22-Jun-24 6-Jul-24 6-Jul-24 C Open 214 Aconex
003922 from Sta: 1+460 to 1+500
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004119 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07612 C1 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 22-Jun-24 6-Jul-24 6-Jul-24 C Open 214 Aconex
from Sta: 1+460 to 1+500
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004171 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07628 C0 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 24-Jun-24 8-Jul-24 7-Jul-24 C Closed 13 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004171 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07629 C0 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 24-Jun-24 8-Jul-24 7-Jul-24 C Closed 13 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004171 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07630 C0 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 24-Jun-24 8-Jul-24 7-Jul-24 C Closed 13 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004171 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07631 C0 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 24-Jun-24 8-Jul-24 7-Jul-24 C Closed 13 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004171 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07632 C0 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 24-Jun-24 8-Jul-24 7-Jul-24 C Closed 13 Aconex
from Sta: 0+060 to 0+240
JVC-WTRAN- Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004171 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07633 C0 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 24-Jun-24 8-Jul-24 7-Jul-24 C Closed 13 Aconex
003974 from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004171 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07634 C0 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 24-Jun-24 8-Jul-24 7-Jul-24 C Closed 13 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004171 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07635 C0 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 24-Jun-24 8-Jul-24 7-Jul-24 C Closed 13 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004171 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07636 C0 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 24-Jun-24 8-Jul-24 7-Jul-24 C Closed 13 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004171 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07637 C0 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 24-Jun-24 8-Jul-24 7-Jul-24 C Closed 13 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004171 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07638 C0 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 24-Jun-24 8-Jul-24 7-Jul-24 C Closed 13 Aconex
from Sta: 0+060 to 0+240

WF-004179 R02Z00-C021-JVC-04-XXX-ABD-CL-CL-11210 C0 Latest As built Side Slope Cross Section Zone-04 Sta: 1+460 to 1+500 Zone 04 As Built Civil Civil Engr. Sunil 25-Jun-24 9-Jul-24 11-Jul-24 B Closed 16 Aconex

JVC-WTRAN-
WF-004179 R02Z00-C021-JVC-04-XXX-ABD-CL-CL-11211 C0 Latest As built Side Slope Cross Section Zone-04 Sta: 1+460 to 1+500 Zone 04 As Built Civil Civil Engr. Sunil 25-Jun-24 9-Jul-24 11-Jul-24 B Closed 16 Aconex
003982

WF-004179 R02Z00-C021-JVC-04-XXX-ABD-CL-CL-11212 C0 Latest As built Side Slope Cross Section Zone-04 Sta: 1+460 to 1+500 Zone 04 As Built Civil Civil Engr. Sunil 25-Jun-24 9-Jul-24 11-Jul-24 B Closed 16 Aconex

JVC-WTRAN- As-Built CMC Layout for Zone 06 Dry Utility Culvert VTR 02 from
WF-004208 R02Z00-C021-JVC-06-XXX-ABD-GT-GT-02003 C0 re-s Zone 06 As Built Geotechnical Geotechnical Engr. Yaseen 26-Jun-24 10-Jul-24 3-Jul-24 B Closed 7 Aconex
004011 sta. 2+510 To 2+560

WF-004249 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11216 C0 Latest As built Side Slope Cross Section at Zone06 Sta. 2+720 to 2+820 Zone 06 As Built Civil Civil Engr. Sunil 29-Jun-24 13-Jul-24 11-Jul-24 B Closed 12 Aconex

WF-004249 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11217 C0 Latest As built Side Slope Cross Section at Zone06 Sta. 2+720 to 2+820 Zone 06 As Built Civil Civil Engr. Sunil 29-Jun-24 13-Jul-24 11-Jul-24 B Closed 12 Aconex

WF-004249 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11218 C0 Latest As built Side Slope Cross Section at Zone06 Sta. 2+720 to 2+820 Zone 06 As Built Civil Civil Engr. Sunil 29-Jun-24 13-Jul-24 11-Jul-24 B Closed 12 Aconex
JVC-WTRAN-
004050
WF-004249 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11219 C0 Latest As built Side Slope Cross Section at Zone06 Sta. 2+720 to 2+820 Zone 06 As Built Civil Civil Engr. Sunil 29-Jun-24 13-Jul-24 11-Jul-24 B Closed 12 Aconex

WF-004249 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11220 C0 Latest As built Side Slope Cross Section at Zone06 Sta. 2+720 to 2+820 Zone 06 As Built Civil Civil Engr. Sunil 29-Jun-24 13-Jul-24 11-Jul-24 B Closed 12 Aconex

WF-004249 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11221 C0 Latest As built Side Slope Cross Section at Zone06 Sta. 2+720 to 2+820 Zone 06 As Built Civil Civil Engr. Sunil 29-Jun-24 13-Jul-24 11-Jul-24 B Closed 12 Aconex

Shop Drawing for Indicative section of material Backfilling at Zone 06


WF-004250 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07550 C0 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 29-Jun-24 13-Jul-24 17-Jul-24 C Closed 18 Aconex
from Sta : 2+720 to 2+820
Shop Drawing for Indicative section of material Backfilling at Zone 06
WF-004250 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07551 C0 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 29-Jun-24 13-Jul-24 17-Jul-24 C Closed 18 Aconex
from Sta : 2+720 to 2+820
Shop Drawing for Indicative section of material Backfilling at Zone 06
WF-004250 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07552 C0 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 29-Jun-24 13-Jul-24 17-Jul-24 C Closed 18 Aconex
JVC-WTRAN- from Sta : 2+720 to 2+820
004051 Shop Drawing for Indicative section of material Backfilling at Zone 06
WF-004250 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07553 C0 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 29-Jun-24 13-Jul-24 17-Jul-24 C Closed 18 Aconex
from Sta : 2+720 to 2+820
Shop Drawing for Indicative section of material Backfilling at Zone 06
WF-004250 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07554 C0 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 29-Jun-24 13-Jul-24 17-Jul-24 C Closed 18 Aconex
from Sta : 2+720 to 2+820
Shop Drawing for Indicative section of material Backfilling at Zone 06
WF-004250 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07555 C0 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 29-Jun-24 13-Jul-24 17-Jul-24 C Closed 18 Aconex
from Sta : 2+720 to 2+820
As built Side Slope Cross Section at Zone 04 from Sta:
WF-004292 R02Z00-C021-JVC-04-XXX-ABD-CL-CL-11222 C0 Latest Zone 04 As Built Civil Civil Engr. Sunil 30-Jun-24 14-Jul-24 9-Jul-24 C Closed 9 Aconex
1+340 to 1+440
As built Side Slope Cross Section at Zone 04 from Sta:
WF-004292 R02Z00-C021-JVC-04-XXX-ABD-CL-CL-11223 C0 Latest Zone 04 As Built Civil Civil Engr. Sunil 30-Jun-24 14-Jul-24 9-Jul-24 C Closed 9 Aconex
1+340 to 1+440
As built Side Slope Cross Section at Zone 04 from Sta:
WF-004292 R02Z00-C021-JVC-04-XXX-ABD-CL-CL-11224 C0 Latest Zone 04 As Built Civil Civil Engr. Sunil 30-Jun-24 14-Jul-24 9-Jul-24 C Closed 9 Aconex
JVC-WTRAN- 1+340 to 1+440
004092 As built Side Slope Cross Section at Zone 04 from Sta:
WF-004292 R02Z00-C021-JVC-04-XXX-ABD-CL-CL-11225 C0 Latest Zone 04 As Built Civil Civil Engr. Sunil 30-Jun-24 14-Jul-24 9-Jul-24 C Closed 9 Aconex
1+340 to 1+440
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

JVC-WTRAN-
004092
Response
ACONEX
Workflow As built Side Slope Cross Section at Zone 04 from Sta: Total
Workflow Document JVC Planned WSP Status
C Overdue Overdue Submittal
WF-004292 TransmittalR02Z00-C021-JVC-04-XXX-ABD-CL-CL-11226
Drawing No. Rev. Status 1+340 to 1+440
C0 Latest Description Zone 04
Location As Built Civil
Discipline Civil
Sub-Discipline Engr. Sunilby 30-Jun-24
Submitted 14-Jul-24 9-Jul-24 Closed
Status 9
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
As built Side Slope Cross Section at Zone 04 from Sta: date
WF-004292 R02Z00-C021-JVC-04-XXX-ABD-CL-CL-11227 C0 Latest Zone 04 As Built Civil Civil Engr. Sunil 30-Jun-24 14-Jul-24 9-Jul-24 C Closed Today
9 Aconex
1+340 to 1+440
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004330 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07601 C0 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 2-Jul-24 16-Jul-24 16-Jul-24 C Closed 14 Aconex
from Sta : 1+340 to 1+440
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004330 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07602 C0 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 2-Jul-24 16-Jul-24 16-Jul-24 C Closed 14 Aconex
from Sta : 1+340 to 1+440
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004330 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07603 C0 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 2-Jul-24 16-Jul-24 16-Jul-24 C Closed 14 Aconex
from Sta : 1+340 to 1+440
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004330 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07604 C0 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 2-Jul-24 16-Jul-24 16-Jul-24 C Closed 14 Aconex
from Sta : 1+340 to 1+440
JVC-WTRAN- Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004330 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07605 C0 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 2-Jul-24 16-Jul-24 16-Jul-24 C Closed 14 Aconex
004129 from Sta : 1+340 to 1+440
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004330 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07606 C0 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 2-Jul-24 16-Jul-24 16-Jul-24 C Closed 14 Aconex
from Sta : 1+340 to 1+440
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004330 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07607 C0 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 2-Jul-24 16-Jul-24 16-Jul-24 C Closed 14 Aconex
from Sta : 1+340 to 1+440
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004330 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07608 C0 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 2-Jul-24 16-Jul-24 16-Jul-24 C Closed 14 Aconex
from Sta : 1+340 to 1+440
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004330 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07609 C0 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 2-Jul-24 16-Jul-24 16-Jul-24 C Closed 14 Aconex
from Sta : 1+340 to 1+440
As per Engr.
WF-004380 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11228- C0 Latest As built Side Slope Cross Section Zone 06 Sta: 2+880 to 2+960 Zone 06 As Built Civil Civil Engr. Sunil 4-Jul-24 18-Jul-24 6-Jul-24 Terminated Aconex
Nahell
As per Engr.
WF-004380 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-01122- C0 Latest As built Side Slope Cross Section Zone 06 Sta: 2+880 to 2+960 Zone 06 As Built Civil Civil Engr. Sunil 4-Jul-24 18-Jul-24 6-Jul-24 Terminated Aconex
Nahell
JVC-WTRAN- As per Engr.
WF-004380 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11230- C0 Latest As built Side Slope Cross Section Zone 06 Sta: 2+880 to 2+960 Zone 06 As Built Civil Civil Engr. Sunil 4-Jul-24 18-Jul-24 6-Jul-24 Terminated Aconex
004177 Nahell
As per Engr.
WF-004380 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11231- C0 Latest As built Side Slope Cross Section Zone 06 Sta: 2+880 to 2+960 Zone 06 As Built Civil Civil Engr. Sunil 4-Jul-24 18-Jul-24 6-Jul-24 Terminated Aconex
Nahell
As per Engr.
WF-004380 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11232- C0 Latest As built Side Slope Cross Section Zone 06 Sta: 2+880 to 2+960 Zone 06 As Built Civil Civil Engr. Sunil 4-Jul-24 18-Jul-24 6-Jul-24 Terminated Aconex
Nahell
Shop Drawing Layout for Soil Improvement works in Zone 01 from
WF-004399 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02008C1 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 6-Jul-24 20-Jul-24 16-Jul-24 B Closed 10 Aconex
sta. 0+293 to 0+350
JVC-WTRAN- Shop Drawing Cross-Section for Soil Improvement works in Zone 01
WF-004399 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02009C1 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 6-Jul-24 20-Jul-24 16-Jul-24 B Closed 10 Aconex
004195 from sta. 0+293 to 0+350
Shop Drawing Coordinates and Levels for Soil Improvement works in
WF-004399 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02010C1 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 6-Jul-24 20-Jul-24 16-Jul-24 B Closed 10 Aconex
Zone 01 from sta. 0+293 to 0+350
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta 0+220 to
WF-004408 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05464 C1 re-s Zone 01 Shop Drawing Civil Civil Engr. Sunil 6-Jul-24 20-Jul-24 16-Jul-24 C Closed 10 Aconex
0+260
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta 0+220 to
WF-004408 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05465 C4 re-s Zone 07 Shop Drawing Civil Civil Engr. Sunil 6-Jul-24 20-Jul-24 16-Jul-24 C Closed 10 Aconex
0+260
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta 0+220 to
WF-004408 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05466 C2 re-s Zone 07 Shop Drawing Civil Civil Engr. Sunil 6-Jul-24 20-Jul-24 16-Jul-24 C Closed 10 Aconex
JVC-WTRAN- 0+260
004204 Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta 0+220 to
WF-004408 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05467 C1 re-s Zone 01 Shop Drawing Civil Civil Engr. Sunil 6-Jul-24 20-Jul-24 16-Jul-24 C Closed 10 Aconex
0+260
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta 0+220 to
WF-004408 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05468 C1 re-s Zone 01 Shop Drawing Civil Civil Engr. Sunil 6-Jul-24 20-Jul-24 16-Jul-24 C Closed 10 Aconex
0+260
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta 0+220 to
WF-004408 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05469 C1 re-s Zone 01 Shop Drawing Civil Civil Engr. Sunil 6-Jul-24 20-Jul-24 16-Jul-24 C Closed 10 Aconex
0+260

WF-004418 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11228 C0 Latest As built Side Slope Cross Section Zone 06 Sta: 2+880 to 2+960 Zone 06 As Built Civil Civil Engr. Sunil 7-Jul-24 21-Jul-24 21-Jul-24 A Closed 14 Aconex

WF-004418 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11229 C0 Latest As built Side Slope Cross Section Zone 06 Sta: 2+880 to 2+960 Zone 06 As Built Civil Civil Engr. Sunil 7-Jul-24 21-Jul-24 21-Jul-24 A Closed 14 Aconex

JVC-WTRAN-
WF-004418 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11230 C0 Latest As built Side Slope Cross Section Zone 06 Sta: 2+880 to 2+960 Zone 06 As Built Civil Civil Engr. Sunil 7-Jul-24 21-Jul-24 21-Jul-24 A Closed 14 Aconex
004214

WF-004418 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11231 C0 Latest As built Side Slope Cross Section Zone 06 Sta: 2+880 to 2+960 Zone 06 As Built Civil Civil Engr. Sunil 7-Jul-24 21-Jul-24 21-Jul-24 A Closed 14 Aconex

WF-004418 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11232 C0 Latest As built Side Slope Cross Section Zone 06 Sta: 2+880 to 2+960 Zone 06 As Built Civil Civil Engr. Sunil 7-Jul-24 21-Jul-24 21-Jul-24 A Closed 14 Aconex

Shop Drawing for Indicative section of material Backfilling at Zone 10


WF-004478 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07628 C1 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 9-Jul-24 23-Jul-24 21-Jul-24 C Closed 12 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004478 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07629 C1 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 9-Jul-24 23-Jul-24 21-Jul-24 C Closed 12 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004478 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07630 C1 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 9-Jul-24 23-Jul-24 21-Jul-24 C Closed 12 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004478 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07631 C1 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 9-Jul-24 23-Jul-24 21-Jul-24 C Closed 12 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004478 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07632 C1 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 9-Jul-24 23-Jul-24 21-Jul-24 C Closed 12 Aconex
from Sta: 0+060 to 0+240
JVC-WTRAN- Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004478 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07633 C1 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 9-Jul-24 23-Jul-24 21-Jul-24 C Closed 12 Aconex
004270 from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004478 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07634 C1 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 9-Jul-24 23-Jul-24 21-Jul-24 C Closed 12 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004478 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07635 C1 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 9-Jul-24 23-Jul-24 21-Jul-24 C Closed 12 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004478 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07636 C1 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 9-Jul-24 23-Jul-24 21-Jul-24 C Closed 12 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004478 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07637 C1 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 9-Jul-24 23-Jul-24 21-Jul-24 C Closed 12 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-004478 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07638 C1 re-s Zone 10 Shop Drawing Civil Civil Engr. Sunil 9-Jul-24 23-Jul-24 21-Jul-24 C Closed 12 Aconex
from Sta: 0+060 to 0+240
As built Side Slope Cross Section at Zone 04 from Sta:
WF-004482 R02Z00-C021-JVC-04-XXX-ABD-CL-CL-11222 C1 Latest Zone 04 As Built Civil Civil Engr. Sunil 9-Jul-24 23-Jul-24 20-Jul-24 A Closed 11 Aconex
1+340 to 1+440

JVC-WTRAN-
004273
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow As built Side Slope Cross Section at Zone 04 from Sta: Total
Workflow Document JVC Planned WSP Status
A Overdue Overdue Submittal
WF-004482 TransmittalR02Z00-C021-JVC-04-XXX-ABD-CL-CL-11223
Drawing No. Rev. Status 1+340 to 1+440
C1 Latest Description Zone 04
Location As Built Civil
Discipline Civil
Sub-Discipline Engr. Sunilby
Submitted 9-Jul-24 23-Jul-24 20-Jul-24 Closed
Status 11
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
As built Side Slope Cross Section at Zone 04 from Sta: date
WF-004482 R02Z00-C021-JVC-04-XXX-ABD-CL-CL-11224 C1 Latest Zone 04 As Built Civil Civil Engr. Sunil 9-Jul-24 23-Jul-24 20-Jul-24 A Closed Today
11 Aconex
JVC-WTRAN- 1+340 to 1+440
004273 As built Side Slope Cross Section at Zone 04 from Sta:
WF-004482 R02Z00-C021-JVC-04-XXX-ABD-CL-CL-11225 C1 Latest Zone 04 As Built Civil Civil Engr. Sunil 9-Jul-24 23-Jul-24 20-Jul-24 A Closed 11 Aconex
1+340 to 1+440
As built Side Slope Cross Section at Zone 04 from Sta:
WF-004482 R02Z00-C021-JVC-04-XXX-ABD-CL-CL-11226 C1 Latest Zone 04 As Built Civil Civil Engr. Sunil 9-Jul-24 23-Jul-24 20-Jul-24 A Closed 11 Aconex
1+340 to 1+440
As built Side Slope Cross Section at Zone 04 from Sta:
WF-004482 R02Z00-C021-JVC-04-XXX-ABD-CL-CL-11227 C1 Latest Zone 04 As Built Civil Civil Engr. Sunil 9-Jul-24 23-Jul-24 20-Jul-24 A Closed 11 Aconex
1+340 to 1+440
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-004504 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11200 C1 Latest Tunnel 03 As Built Civil Civil Engr. Sunil 10-Jul-24 24-Jul-24 18-Jul-24 C Open 196 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-004504 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11201 C1 Latest Tunnel 03 As Built Civil Civil Engr. Sunil 10-Jul-24 24-Jul-24 18-Jul-24 C Open 196 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-004504 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11202 C1 Latest Tunnel 03 As Built Civil Civil Engr. Sunil 10-Jul-24 24-Jul-24 18-Jul-24 C Open 196 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-004504 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11203 C1 Latest Tunnel 03 As Built Civil Civil Engr. Sunil 10-Jul-24 24-Jul-24 18-Jul-24 C Open 196 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-004504 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11204 C1 Latest Tunnel 03 As Built Civil Civil Engr. Sunil 10-Jul-24 24-Jul-24 18-Jul-24 C Open 196 Aconex
JVC-WTRAN- Tunnel 03-Zone 11
004294 As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-004504 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11205 C1 Latest Tunnel 03 As Built Civil Civil Engr. Sunil 10-Jul-24 24-Jul-24 18-Jul-24 C Open 196 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-004504 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11206 C1 Latest Tunnel 03 As Built Civil Civil Engr. Sunil 10-Jul-24 24-Jul-24 18-Jul-24 C Open 196 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-004504 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11207 C1 Latest Tunnel 03 As Built Civil Civil Engr. Sunil 10-Jul-24 24-Jul-24 18-Jul-24 C Open 196 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-004504 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11208 C1 Latest Tunnel 03 As Built Civil Civil Engr. Sunil 10-Jul-24 24-Jul-24 18-Jul-24 C Open 196 Aconex
Tunnel 03-Zone 11
As built Excavation Cross sections from sta: 0+160 to 0+320 at
WF-004504 R02Z00-C021-JVC-11-XXX-ABD-CL-CL-11209 C1 Latest Tunnel 03 As Built Civil Civil Engr. Sunil 10-Jul-24 24-Jul-24 18-Jul-24 C Open 196 Aconex
Tunnel 03-Zone 11
JVC-WTRAN-
WF-004520 R02Z00-C021-JVC-00-XXX-SDW-ST-FO-00005 C0 re-s LV Network Typical Detail for Manholes RAM-MIP Shop Drawing Structural Foundation Engr. Shaheen 10-Jul-24 24-Jul-24 16-Jul-24 C Closed 6 Aconex
004309
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-004530 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02001C2 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Jul-24 25-Jul-24 21-Jul-24 B Closed 10 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 1
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-004530 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02002C2 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Jul-24 25-Jul-24 21-Jul-24 B Closed 10 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-004530 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02003C2 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Jul-24 25-Jul-24 21-Jul-24 B Closed 10 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-004530 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02004C2 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Jul-24 25-Jul-24 21-Jul-24 B Closed 10 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Cross-Sections
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-004530 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02005C2 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Jul-24 25-Jul-24 21-Jul-24 B Closed 10 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 1
JVC-WTRAN- Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-004530 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02006C2 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Jul-24 25-Jul-24 21-Jul-24 B Closed 10 Aconex
004319 from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-004530 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02007C2 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Jul-24 25-Jul-24 21-Jul-24 B Closed 10 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-004530 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02008C2 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Jul-24 25-Jul-24 21-Jul-24 B Closed 10 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 4
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-004530 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02009C2 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Jul-24 25-Jul-24 21-Jul-24 B Closed 10 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 5
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-004530 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02010C2 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Jul-24 25-Jul-24 21-Jul-24 B Closed 10 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 6
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-004530 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02011C2 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Jul-24 25-Jul-24 21-Jul-24 B Closed 10 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 7
As-Built CMC layout for Tunnel 01 (Zone 09) from
WF-004536 R02Z00-C021-JVC-09-XXX-ABD-GT-GT-02002-C0 Latest Zone 09 As Built Geotechnical Geotechnical Engr. Yaseen 11-Jul-24 25-Jul-24 15-Jul-24 Terminated Aconex
station 0+104 to 0+161 (Partially)
JVC-WTRAN- As-Built CMC layout for Tunnel 01 (Zone 09) from
WF-004536 R02Z00-C021-JVC-09-XXX-ABD-GT-GT-02003-C0 Latest Zone 09 As Built Geotechnical Geotechnical Engr. Yaseen 11-Jul-24 25-Jul-24 15-Jul-24 Terminated Aconex
004325 station 0+161 to 0+200 (Partially)
As-Built CMC layout for Tunnel 01 (Zone 09) from
WF-004536 R02Z00-C021-JVC-09-XXX-ABD-GT-GT-02004-C0 Latest Zone 09 As Built Geotechnical Geotechnical Engr. Yaseen 11-Jul-24 25-Jul-24 15-Jul-24 Terminated Aconex
station 0+201 to 0+236 (Partially)
JVC-WTRAN-
WF-004543 R02Z00-C021-JVC-00-XXX-SDW-ST-FO-00006 C0 re-s LV Network Typical Detail for Manholes (1700x1500) RAM-MIP Shop Drawing Structural Foundation Engr. Shaheen 11-Jul-24 25-Jul-24 20-Jul-24 C Closed 9 Aconex
004330
JVC-WTRAN-
WF-004553 R02Z00-C021-JVC-01-XXX-ABD-GT-GT-02004 C0 Latest As-Built CMC layout for Zone 01 from station 0+300 to 0+350 Zone 09 As Built Geotechnical Geotechnical Engr. Yaseen 11-Jul-24 25-Jul-24 18-Jul-24 B Closed 7 Aconex
004340
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01200C0 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01203C1 re-s RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01204C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01205C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01206C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01207C1 re-s RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01208C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01209C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01210C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01211C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage Total
Workflow Document JVC Planned WSP Status
B Overdue Overdue Submittal
WF-004561 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01218C1 Status 08 and 09) Description RAM-MIP
Location Shop Drawing Discipline
Infrastructure Sub-Discipline
Effluent Submitted by 11-Jul-24
Engr. Fawzy 25-Jul-24 28-Jul-24 Closed
Status 17
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage date
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01219C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed Today
17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01220C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01221C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01222C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01223C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01224C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01225C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01226C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01227C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01228C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
JVC-WTRAN- Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01229C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
004347 08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01230C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01231C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01232C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01233C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01234C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01235C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01236C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01237C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01251C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01252C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01253C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01256C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01257C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01258C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01259C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01260C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01261C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01262C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01263C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01265C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
Sewage Network Plan and Profile for (Part 03 & 04 & 05 & 06 & 07 & UT-Utilities & Sewerage
WF-004561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01266C1 Latest RAM-MIP Shop Drawing Engr. Fawzy 11-Jul-24 25-Jul-24 28-Jul-24 B Closed 17 Aconex
08 and 09) Infrastructure Effluent
As built Side Slope Cross Section at Zone 06 from Sta:
WF-004576 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11001 C1 Latest Zone 06 As Built Civil Civil Engr. Sunil 13-Jul-24 27-Jul-24 20-Jul-24 C Open 193 Aconex
2+440 to 2+620
As built Side Slope Cross Section at Zone 06 from Sta:
WF-004576 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11002 C1 Latest Zone 06 As Built Civil Civil Engr. Sunil 13-Jul-24 27-Jul-24 20-Jul-24 C Open 193 Aconex
2+440 to 2+620
As built Side Slope Cross Section at Zone 06 from Sta:
WF-004576 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11003 C1 Latest Zone 06 As Built Civil Civil Engr. Sunil 13-Jul-24 27-Jul-24 20-Jul-24 C Open 193 Aconex
2+440 to 2+620
As built Side Slope Cross Section at Zone 06 from Sta:
WF-004576 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11004 C1 Latest Zone 06 As Built Civil Civil Engr. Sunil 13-Jul-24 27-Jul-24 20-Jul-24 C Open 193 Aconex
2+440 to 2+620
As built Side Slope Cross Section at Zone 06 from Sta:
WF-004576 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11005 C1 Latest Zone 06 As Built Civil Civil Engr. Sunil 13-Jul-24 27-Jul-24 20-Jul-24 C Open 193 Aconex
JVC-WTRAN- 2+440 to 2+620
004362 As built Side Slope Cross Section at Zone 06 from Sta:
WF-004576 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11006 C1 Latest Zone 06 As Built Civil Civil Engr. Sunil 13-Jul-24 27-Jul-24 20-Jul-24 C Open 193 Aconex
2+440 to 2+620
As built Side Slope Cross Section at Zone 06 from Sta:
WF-004576 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11007 C1 Latest Zone 06 As Built Civil Civil Engr. Sunil 13-Jul-24 27-Jul-24 20-Jul-24 C Open 193 Aconex
2+440 to 2+620
As built Side Slope Cross Section at Zone 06 from Sta:
WF-004576 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11008 C0 Latest Zone 06 As Built Civil Civil Engr. Sunil 13-Jul-24 27-Jul-24 20-Jul-24 C Open 193 Aconex
2+440 to 2+620
As built Side Slope Cross Section at Zone 06 from Sta:
WF-004576 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11009 C0 Latest Zone 06 As Built Civil Civil Engr. Sunil 13-Jul-24 27-Jul-24 20-Jul-24 C Open 193 Aconex
2+440 to 2+620
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals


JVC-WTRAN-
004362 D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow As built Side Slope Cross Section at Zone 06 from Sta: Total
Workflow Document JVC Planned WSP Status
C Overdue Overdue Submittal
WF-004576 TransmittalR02Z00-C021-JVC-06-XXX-ABD-CL-CL-11010
Drawing No. Rev. Status 2+440 to 2+620
C0 Latest Description Zone 06
Location As Built Civil
Discipline Civil
Sub-Discipline Engr. Sunilby
Submitted 13-Jul-24 27-Jul-24 20-Jul-24 Open
Status 193
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Transportation Transportation & date
WF-004621 R02Z00-C021-JVC-00-XXX-SDW-TR-TR-06300 C0 re-s Typical Kerb details (3/3) RAM-MIP Shop Drawing Engr. Khalid 14-Jul-24 28-Jul-24 22-Jul-24 C Closed Today
8 Aconex
& Road Road
JVC-WTRAN- Transportation Transportation &
WF-004621 R02Z00-C021-JVC-00-XXX-SDW-TR-TR-06301 C0 re-s Typical Kerb details (3/3) RAM-MIP As Built Engr. Khalid 14-Jul-24 28-Jul-24 22-Jul-24 C Closed 8 Aconex
004405 & Road Road
Transportation Transportation &
WF-004621 R02Z00-C021-JVC-00-XXX-SDW-TR-TR-06302 C0 re-s Typical Kerb details (3/3) RAM-MIP As Built Engr. Khalid 14-Jul-24 28-Jul-24 22-Jul-24 C Closed 8 Aconex
& Road Road
Shop Drawings Layout for Shoring Works at Zone 01 LS06 from
WF-004631 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-04003C1 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 15-Jul-24 29-Jul-24 18-Jul-24 B Closed 3 Aconex
sta. 0+470 to 0+500
Shop Drawings Sections, Reinforcements and Details for Shoring
WF-004631 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-04004C1 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 15-Jul-24 29-Jul-24 18-Jul-24 B Closed 3 Aconex
Works at Zone 01 LS06 from sta. 0+470 to 0+500 Sheet 1
JVC-WTRAN-004415
Shop Drawings Sections, Reinforcements and Details for Shoring
WF-004631 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-04005C1 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 15-Jul-24 29-Jul-24 18-Jul-24 B Closed 3 Aconex
Works at Zone 01 LS06 from sta. 0+470 to 0+500 Sheet 2
Shop Drawings Capping Beam Sections, Reinforcements and Details
WF-004631 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-04006C0 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 15-Jul-24 29-Jul-24 18-Jul-24 B Closed 3 Aconex
for Shoring Works at Zone 01 LS06 from sta. 0+470 to 0+500
JVC-WTRAN- Transportation Transportation &
WF-004644 R02Z00-C021-JVC-00-XXX-SDW-TR-TR-06303 C0 re-s Typical Sign Board Details RAM-MIP Shop Drawing Engr. Khalid 15-Jul-24 29-Jul-24 22-Jul-24 C Closed 7 Aconex
004428 & Road Road
JVC-WTRAN- Transportation Transportation &
WF-004641 R02Z00-C021-JVC-00-XXX-SDW-TR-TR-06304 C0 Latest Shop Drawing for Marking Details RAM-MIP Shop Drawing Engr. Khalid 15-Jul-24 29-Jul-24 22-Jul-24 B Closed 7 Aconex
004425 & Road Road
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05244 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05250 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05251 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05252 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05253 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05254 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05255 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05256 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-05257 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
JVC-WTRAN- Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07090 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
004428 Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07091 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07092 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07093 C1 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07094 C0 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07095 C0 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07096 C0 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07097 C0 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07098 C0 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
Shop Drawing for Excavation Cross sections and Egress Stair 19 At
WF-004645 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07099 C0 Latest Zone 05 Shop Drawing Civil Civil Engr. Sunil 15-Jul-24 29-Jul-24 28-Jul-24 B Closed 13 Aconex
Zone-05 from Sta: 1+855.48 to 1+961.98
UT-Utilities & Sewerage
WF-004646 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-04031C0 re-s Sewage Network Manhole Details for GRP Pipe 2400mm RAM-MIP Shop Drawing Engr. Fawzy 15-Jul-24 29-Jul-24 22-Jul-24 C Closed 7 Aconex
JVC-WTRAN- Infrastructure Effluent
004430 UT-Utilities & Sewerage
WF-004646 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-04032C0 re-s Sewage Network Manhole Details for GRP Pipe 2400mm RAM-MIP Shop Drawing Engr. Fawzy 15-Jul-24 29-Jul-24 22-Jul-24 C Closed 7 Aconex
Infrastructure Effluent
JVC-WTRAN-
WF-004649 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05138 C1 Latest Shop drawing for Excavation Cross Section at Zone 06A St 2+550.43 Zone 06a Shop Drawing Civil Civil Engr. Khalid 15-Jul-24 29-Jul-24 30-Jul-24 C Open 191 Aconex
004433

WF-004666 R02Z00-C021-JVC-00-XXX-SDW-CL-CL-05490 C0 Latest Plan & Excavation Cross Section for North Pump Station RAM-MIP Shop Drawing Civil Civil Engr. Sunil 16-Jul-24 30-Jul-24 31-Jul-24 B Closed 15 Aconex
JVC-WTRAN-
004447
WF-004666 R02Z00-C021-JVC-00-XXX-SDW-CL-CL-05491 C0 Latest Plan & Excavation Cross Section for North Pump Station Zone 06a Shop Drawing Civil Civil Engr. Sunil 16-Jul-24 30-Jul-24 31-Jul-24 B Closed 15 Aconex

As-Built CMC layout for Tunnel 01 (Zone 09) from


WF-004709 R02Z00-C021-JVC-09-XXX-ABD-GT-GT-02002 C0 Latest Zone 09 As Built Geotechnical Geotechnical Engr. Yaseen 17-Jul-24 31-Jul-24 18-Jul-24 B Closed 1 Aconex
station 0+104 to 0+141
JVC-WTRAN- As-Built CMC layout for Tunnel 01 (Zone 09) from
WF-004709 R02Z00-C021-JVC-09-XXX-ABD-GT-GT-02003 C0 Latest Zone 09 As Built Geotechnical Geotechnical Engr. Yaseen 17-Jul-24 31-Jul-24 18-Jul-24 B Closed 1 Aconex
004483 station 0+141 to 0+201
As-Built CMC layout for Tunnel 01 (Zone 09) from
WF-004709 R02Z00-C021-JVC-09-XXX-ABD-GT-GT-02004 C0 Latest Zone 09 As Built Geotechnical Geotechnical Engr. Yaseen 17-Jul-24 31-Jul-24 18-Jul-24 B Closed 1 Aconex
station 0+201 to 0+235
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+280
WF-004736 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05467 C3 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 18-Jul-24 1-Aug-24 31-Jul-24 B Closed 13 Aconex
to0+360
JVC-WTRAN- Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+280
WF-004736 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05468 C3 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 18-Jul-24 1-Aug-24 31-Jul-24 B Closed 13 Aconex
004509 to0+360
Shop Drawing for Excavation at Airport Tunnel Zone-07 Sta: 0+280
WF-004736 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05469 C3 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 18-Jul-24 1-Aug-24 31-Jul-24 B Closed 13 Aconex
to0+360
JVC-WTRAN- UT-Utilities & UT-Utilities &
WF-004724 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-01000C0 Latest Wet Utility Culvert Typical Installation Details Double Puddle Flange RAM-MIP Shop Drawing Engr. Shaheen 18-Jul-24 1-Aug-24 20-Jul-24 B Closed 2 Aconex
004498 Infrastructure Infrastructure
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004744 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07601 C1 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 18-Jul-24 1-Aug-24 3-Aug-24 B Closed 16 Aconex
from Sta : 1+340 to 1+440

JVC-WTRAN-
004515
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow Shop Drawing for Indicative section of material Backfilling at Zone 04 Total
Workflow Document JVC Planned WSP Status
B Overdue Overdue Submittal
WF-004744 TransmittalR02Z00-C021-JVC-04-XXX-SDW-CL-CL-07602
Drawing No. Rev.
C1 Status
re-s
from Sta : 1+340 to 1+440 Description
Zone 04
Location Shop Drawing Civil
Discipline Civil
Sub-Discipline Engr. Sunilby
Submitted 18-Jul-24 1-Aug-24 3-Aug-24 Closed
Status 16
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawing for Indicative section of material Backfilling at Zone 04 date
WF-004744 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07603 C1 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 18-Jul-24 1-Aug-24 3-Aug-24 B Closed Today
16 Aconex
from Sta : 1+340 to 1+440
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004744 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07604 C1 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 18-Jul-24 1-Aug-24 3-Aug-24 B Closed 16 Aconex
from Sta : 1+340 to 1+440
JVC-WTRAN- Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004744 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07605 C1 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 18-Jul-24 1-Aug-24 3-Aug-24 B Closed 16 Aconex
004515 from Sta : 1+340 to 1+440
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004744 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07606 C1 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 18-Jul-24 1-Aug-24 3-Aug-24 B Closed 16 Aconex
from Sta : 1+340 to 1+440
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004744 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07607 C1 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 18-Jul-24 1-Aug-24 3-Aug-24 B Closed 16 Aconex
from Sta : 1+340 to 1+440
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004744 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07608 C1 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 18-Jul-24 1-Aug-24 3-Aug-24 B Closed 16 Aconex
from Sta : 1+340 to 1+440
Shop Drawing for Indicative section of material Backfilling at Zone 04
WF-004744 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07609 C1 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 18-Jul-24 1-Aug-24 3-Aug-24 B Closed 16 Aconex
from Sta : 1+340 to 1+440

WF-004763 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11216 C1 re-s As built Side Slope Cross Section at Zone 06 Sta. 2+720 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex

WF-004763 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11217 C1 re-s As built Side Slope Cross Section at Zone 06 Sta. 2+720 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex

WF-004763 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11218 C1 re-s As built Side Slope Cross Section at Zone 06 Sta. 2+720 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex

WF-004763 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11219 C1 re-s As built Side Slope Cross Section at Zone 06 Sta. 2+720 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
JVC-WTRAN-
004532
WF-004763 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11220 C1 re-s As built Side Slope Cross Section at Zone 06 Sta. 2+720 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex

WF-004763 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11221 C1 re-s As built Side Slope Cross Section at Zone 06 Sta. 2+720 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex

WF-004763 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11222 C0 re-s As built Side Slope Cross Section at Zone 06 Sta. 2+720 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex

WF-004763 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11223 C0 re-s As built Side Slope Cross Section at Zone 06 Sta. 2+720 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex

Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03600C0 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03603C0 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03604C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03605C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03606C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03607C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03608C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03609C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03624C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03625C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03626C0 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03627C0 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03628C0 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03629C0 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03630C0 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
JVC-WTRAN- 07-08 and 09) Infrastructure
004538 Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03631C0 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03632C0 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03633C0 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03634C0 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03635C0 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03636C0 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03651C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03652C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03653C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03654C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03655C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
JVC-WTRAN-
004538

Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities & Total
Workflow Document JVC Planned WSP Status
C Overdue Overdue Submittal
WF-004769 Transmittal Drawing No. Rev. Status
R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03656C1 re-s
07-08 and 09) Description RAM-MIP
Location Shop Drawing Discipline
Infrastructure
Grey Water
Sub-Discipline Submitted by 20-Jul-24
Engr. Fawzy 3-Aug-24 1-Aug-24 Closed
Status 12
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities & date
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03657C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed Today
12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03658C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-004769 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03659C1 re-s RAM-MIP Shop Drawing Grey Water Engr. Fawzy 20-Jul-24 3-Aug-24 1-Aug-24 C Closed 12 Aconex
07-08 and 09) Infrastructure
Shop Drawing for Indicative section of material Backfilling at Zone 06
WF-004803 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07558 C0 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 21-Jul-24 4-Aug-24 5-Aug-24 B Closed 15 Aconex
from Sta : 2+880 to 2+960
Shop Drawing for Indicative section of material Backfilling at Zone 06
WF-004803 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07559 C0 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 21-Jul-24 4-Aug-24 5-Aug-24 B Closed 15 Aconex
from Sta : 2+880 to 2+960
JVC-WTRAN- Shop Drawing for Indicative section of material Backfilling at Zone 06
WF-004803 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07560 C0 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 21-Jul-24 4-Aug-24 5-Aug-24 B Closed 15 Aconex
004572 from Sta : 2+880 to 2+960
Shop Drawing for Indicative section of material Backfilling at Zone 06
WF-004803 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07561 C0 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 21-Jul-24 4-Aug-24 5-Aug-24 B Closed 15 Aconex
from Sta : 2+880 to 2+960
Shop Drawing for Indicative section of material Backfilling at Zone 06
WF-004803 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07562 C0 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 21-Jul-24 4-Aug-24 5-Aug-24 B Closed 15 Aconex
from Sta : 2+880 to 2+960
JVC-WTRAN-
WF-004836 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11233 C0 Latest As built Side Slope Cross Section Zone-06 Sta. 2+980 Zone 06 As Built Civil Civil Engr. Sunil 23-Jul-24 6-Aug-24 5-Aug-24 C Open 183 Aconex
004603
Shop Drawing for Proposed Storm Water Drainage Network - KAAR UT-Utilities &
WF-004846 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01410C0 re-s Zone 08 Shop Drawing Storm Water Engr. Fawzy 23-Jul-24 6-Aug-24 6-Aug-24 B Closed 14 Aconex
(Zone 08) Infrastructure
Shop Drawing for Proposed Storm Water Drainage Network - KAAR UT-Utilities &
WF-004846 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01411C0 re-s Zone 08 Shop Drawing Storm Water Engr. Fawzy 23-Jul-24 6-Aug-24 6-Aug-24 B Closed 14 Aconex
(Zone 08) Infrastructure
Shop Drawing for Proposed Storm Water Drainage Network - KAAR UT-Utilities &
WF-004846 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01414C0 Latest Zone 08 Shop Drawing Storm Water Engr. Fawzy 23-Jul-24 6-Aug-24 6-Aug-24 B Closed 14 Aconex
(Zone 08) Infrastructure
Shop Drawing for Proposed Storm Water Drainage Network - KAAR UT-Utilities &
WF-004846 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01415C0 Latest Zone 08 Shop Drawing Storm Water Engr. Fawzy 23-Jul-24 6-Aug-24 6-Aug-24 B Closed 14 Aconex
(Zone 08) Infrastructure
JVC-WTRAN- Shop Drawing for Proposed Storm Water Drainage Network - KAAR UT-Utilities &
WF-004846 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01416C0 Latest Zone 08 Shop Drawing Storm Water Engr. Fawzy 23-Jul-24 6-Aug-24 6-Aug-24 B Closed 14 Aconex
004613 (Zone 08) Infrastructure
Shop Drawing for Proposed Storm Water Drainage Network - KAAR UT-Utilities &
WF-004846 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01417C0 Latest Zone 08 Shop Drawing Storm Water Engr. Fawzy 23-Jul-24 6-Aug-24 6-Aug-24 B Closed 14 Aconex
(Zone 08) Infrastructure
Shop Drawing for Proposed Storm Water Drainage Network - KAAR UT-Utilities &
WF-004846 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01418C0 Latest Zone 08 Shop Drawing Storm Water Engr. Fawzy 23-Jul-24 6-Aug-24 6-Aug-24 B Closed 14 Aconex
(Zone 08) Infrastructure
Shop Drawing for Proposed Storm Water Drainage Network - KAAR UT-Utilities &
WF-004846 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01460C0 re-s Zone 08 Shop Drawing Storm Water Engr. Fawzy 23-Jul-24 6-Aug-24 6-Aug-24 B Closed 14 Aconex
(Zone 08) Infrastructure
Shop Drawing for Proposed Storm Water Drainage Network - KAAR UT-Utilities &
WF-004846 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01462C0 re-s Zone 08 Shop Drawing Storm Water Engr. Fawzy 23-Jul-24 6-Aug-24 6-Aug-24 B Closed 14 Aconex
(Zone 08) Infrastructure
JVC-WTRAN- Transportation Transportation &
WF-004898 R02Z00-C021-JVC-00-XXX-SDW-TR-TR-06303 C1 Latest Typical Sign Board Details Part 01 RAM-MIP Shop Drawing Engr. Khalid 25-Jul-24 8-Aug-24 31-Jul-24 B Closed 6 Aconex
004664 & Road Road
JVC-WTRAN- UT-Utilities &
WF-004916 R02Z00-C021-JVC-XX-XXX-SDW-UT-PW-08501C0 re-s Shop Drawing for Potable Water Network Pipe Trench Details RAM-MIP Shop Drawing Potable Water Engr. Fawzy 27-Jul-24 10-Aug-24 6-Aug-24 C Closed 10 Aconex
004681 Infrastructure
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-004918 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00127C1 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 27-Jul-24 10-Aug-24 3-Aug-24 C Closed 7 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-004918 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00128C1 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 27-Jul-24 10-Aug-24 3-Aug-24 C Closed 7 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-004918 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00129C1 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 27-Jul-24 10-Aug-24 3-Aug-24 C Closed 7 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-004918 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00130C1 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 27-Jul-24 10-Aug-24 3-Aug-24 C Closed 7 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-004918 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00131C1 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 27-Jul-24 10-Aug-24 3-Aug-24 C Closed 7 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-004918 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00132C1 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 27-Jul-24 10-Aug-24 3-Aug-24 C Closed 7 Aconex
JVC-WTRAN- details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
004683 Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-004918 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00133C1 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 27-Jul-24 10-Aug-24 3-Aug-24 C Closed 7 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-004918 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00134C1 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 27-Jul-24 10-Aug-24 3-Aug-24 C Closed 7 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-004918 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00135C1 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 27-Jul-24 10-Aug-24 3-Aug-24 C Closed 7 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-004918 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00136C1 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 27-Jul-24 10-Aug-24 3-Aug-24 C Closed 7 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-004918 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00137C0 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 27-Jul-24 10-Aug-24 3-Aug-24 C Closed 7 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-004918 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00138C0 re-s Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 27-Jul-24 10-Aug-24 3-Aug-24 C Closed 7 Aconex
details) ) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
JVC-WTRAN- Potable Water Network Valve Chamber Details for Single Gate Valve UT-Utilities &
WF-004929 R02Z00-C021-JVC-XX-XXX-SDW-UT-PW-08506C0 Latest RAM-MIP Shop Drawing Potable Water Engr. Fawzy 27-Jul-24 10-Aug-24 7-Aug-24 C Open 179 Aconex
004694 Type 01 Diameters 150mm to 250mm Infrastructure

WF-005031 R02Z00-C021-JVC-00-XXX-SDW-ST-FO-00005 C1 Latest LV Network Typical Detail for Manholes RAM-MIP Shop Drawing Structural Foundation Engr. Shaheen 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
JVC-WTRAN-
004790
WF-005031 R02Z00-C021-JVC-00-XXX-SDW-ST-FO-00006 C1 Latest LV Network Typical Detail for Manholes (1700x1500) RAM-MIP Shop Drawing Structural Foundation Engr. Shaheen 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex

Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01


WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07116 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07117 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07118 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-07119 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05425 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05426 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 Total
Workflow Document JVC Planned 14-Aug-24
WSP Status
B Overdue Overdue Submittal
WF-005037 TransmittalR02Z00-C021-JVC-09-XXX-SDW-CL-CL-05427
Drawing No. Rev. Status from sta. 0+046 to sta.0+280
C3 Latest Description Location
Zone 09
Shop Drawing Civil
Discipline Civil
Sub-Discipline Engr. Sunilby
Submitted 31-Jul-24 14-Aug-24 Closed
Status 14
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01 date
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05428 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed Today
14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05429 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05430 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05431 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05432 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05433 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05434 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
JVC-WTRAN- Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05435 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
004796 from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05436 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05437 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05438 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05439 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05440 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05441 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05442 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05443 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05444 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05445 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05446 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05447 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05448 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
Shop Drawing for Excavation Cross Sections at Tunnel 01-Zone 09 Tunnel 01
WF-005037 R02Z00-C021-JVC-09-XXX-SDW-CL-CL-05449 C3 Latest Shop Drawing Civil Civil Engr. Sunil 31-Jul-24 14-Aug-24 14-Aug-24 B Closed 14 Aconex
from sta. 0+046 to sta.0+280 Zone 09
JVC-WTRAN- As-Built CMC Layout for Zone 06 Dry Utility Culvert from
WF-005061 R02Z00-C021-JVC-06-XXX-ABD-GT-GT-02003 C1 Latest Zone 06 As Built Geotechnical Geotechnical Engr. Yaseen 1-Aug-24 15-Aug-24 13-Aug-24 B Closed 12 Aconex
004820 sta. 2+500 To 2+594 incl. VTR 02
As-Built CMC Layout for Zone 09 (Tunnel 01) VTR 03A from
WF-005068 R02Z00-C021-JVC-09-XXX-ABD-GT-GT-02005 C0 Latest Zone 09 As Built Geotechnical Geotechnical Engr. Yaseen 1-Aug-24 15-Aug-24 13-Aug-24 B Closed 12 Aconex
JVC-WTRAN- sta. 0+141.036 to 0+181.036
004826 As-Built CMC Layout for Zone 09 (Tunnel 01) VTR 03A from
WF-005068 R02Z00-C021-JVC-09-XXX-ABD-GT-GT-02006 C0 Latest Zone 09 As Built Geotechnical Geotechnical Engr. Yaseen 1-Aug-24 15-Aug-24 13-Aug-24 B Closed 12 Aconex
sta. 0+181.036 to 0+241.036
Transportation Transportation &
WF-005080 R02Z00-C021-JVC-00-XXX-SDW-TR-TR-06300 C1 Latest Typical Kerb details (3/3) RAM-MIP Shop Drawing Engr. Khalid 1-Aug-24 15-Aug-24 11-Aug-24 A Closed 10 Aconex
& Road Road
JVC-WTRAN- Transportation Transportation &
WF-005080 R02Z00-C021-JVC-00-XXX-SDW-TR-TR-06301 C1 Latest Typical Kerb details (3/3) RAM-MIP As Built Engr. Khalid 1-Aug-24 15-Aug-24 11-Aug-24 A Closed 10 Aconex
004838 & Road Road
Transportation Transportation &
WF-005080 R02Z00-C021-JVC-00-XXX-SDW-TR-TR-06302 C1 Latest Typical Kerb details (3/3) RAM-MIP As Built Engr. Khalid 1-Aug-24 15-Aug-24 11-Aug-24 A Closed 10 Aconex
& Road Road
UT-Utilities &
WF-005097 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01407C0 Latest Storm Water Network Plan and Profile for (Part 07) RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Aug-24 17-Aug-24 14-Aug-24 B Closed 11 Aconex
Infrastructure
UT-Utilities &
WF-005097 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01463C0 re-s Storm Water Network Plan and Profile for (Part 07) RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Aug-24 17-Aug-24 14-Aug-24 B Closed 11 Aconex
Infrastructure
JVC-WTRAN- UT-Utilities &
WF-005097 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01464C1 re-s Storm Water Network Plan and Profile for (Part 07) RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Aug-24 17-Aug-24 14-Aug-24 B Closed 11 Aconex
004855 Infrastructure
UT-Utilities &
WF-005097 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01465C0 re-s Storm Water Network Plan and Profile for (Part 07) RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Aug-24 17-Aug-24 14-Aug-24 B Closed 11 Aconex
Infrastructure
UT-Utilities &
WF-005097 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01466C0 re-s Storm Water Network Plan and Profile for (Part 07) RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Aug-24 17-Aug-24 14-Aug-24 B Closed 11 Aconex
Infrastructure
Shop Drawing for MV Network above Grade Plan, Profile and Manhole
WF-005099 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-07001C0 re-s Road 16 Shop Drawing Electrical Medium Voltage Engr. Hanzel 3-Aug-24 17-Aug-24 17-Aug-24 C Closed 14 Aconex
Details (MV MH-37 to 41) Road 16
JVC-WTRAN- Shop Drawing for MV Network above Grade Plan, Profile and Manhole
WF-005099 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-07002C0 re-s Road 16 Shop Drawing Electrical Medium Voltage Engr. Hanzel 3-Aug-24 17-Aug-24 17-Aug-24 C Closed 14 Aconex
004857 Details (MV MH-37 to 41) Road 16
Shop Drawing for MV Network above Grade Plan, Profile and Manhole
WF-005099 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-07003C0 re-s Road 16 Shop Drawing Electrical Medium Voltage Engr. Hanzel 3-Aug-24 17-Aug-24 17-Aug-24 C Closed 14 Aconex
Details (MV MH-37 to 41) Road 16
Shop Drawing for Shotcrete Works in Zone 03 for Egress Staircase 10
WF-005120 R02Z00-C021-JVC-03-XXX-SDW-GT-GT-08001C1 Latest Zone 03 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Aug-24 17-Aug-24 17-Aug-24 B Closed 14 Aconex
JVC-WTRAN- from sta. 1+040 to 1+080 - General Layout
004878 Shop Drawing for Shotcrete Works in Zone 03 for Egress Staircase 10
WF-005120 R02Z00-C021-JVC-03-XXX-SDW-GT-GT-08002C1 Latest Zone 03 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Aug-24 17-Aug-24 17-Aug-24 B Closed 14 Aconex
from sta. 1+040 to 1+080 - Coordinates and Cross-section
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03600C1 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03603C1 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03604C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities & Total
Workflow Document JVC Planned WSP Status
B Overdue Overdue Submittal
WF-005162 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03605C2 Status 07-08 and 09) Description RAM-MIP
Location Shop Drawing Discipline
Infrastructure
Grey Water
Sub-Discipline Submitted by 5-Aug-24 19-Aug-24 18-Aug-24
Engr. Fawzy Closed
Status 13
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities & date
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03606C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed Today
13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03607C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03608C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03609C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03624C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03625C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03626C1 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03627C1 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03628C1 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03629C1 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03630C1 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
JVC-WTRAN- 07-08 and 09) Infrastructure
004916 Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03631C1 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03632C1 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03633C1 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03634C1 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03635C1 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03636C1 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03651C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03652C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03653C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03654C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03655C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03656C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03657C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03658C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Grey water collection Network Plan and Profile for (Part 03-04-05-06- UT-Utilities &
WF-005162 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03659C2 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 18-Aug-24 B Closed 13 Aconex
07-08 and 09) Infrastructure
Shop Drawing for Gray Water Distribution Network Plan and Profile UT-Utilities &
WF-005169 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03617C1 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 20-Aug-24 B Closed 15 Aconex
for part 07 Infrastructure
Shop Drawing for Gray Water Distribution Network Plan and Profile UT-Utilities &
WF-005169 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03662C0 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 20-Aug-24 B Closed 15 Aconex
for part 07 Infrastructure
Shop Drawing for Gray Water Distribution Network Plan and Profile UT-Utilities &
WF-005169 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03667C0 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 20-Aug-24 B Closed 15 Aconex
for part 07 Infrastructure
JVC-WTRAN- Shop Drawing for Gray Water Distribution Network Plan and Profile UT-Utilities &
WF-005169 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03669C0 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 20-Aug-24 B Closed 15 Aconex
004923 for part 07 Infrastructure
Shop Drawing for Gray Water Distribution Network Plan and Profile UT-Utilities &
WF-005169 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03670C0 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 20-Aug-24 B Closed 15 Aconex
for part 07 Infrastructure
Shop Drawing for Gray Water Distribution Network Plan and Profile UT-Utilities &
WF-005169 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03671C0 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 20-Aug-24 B Closed 15 Aconex
for part 07 Infrastructure
Shop Drawing for Gray Water Distribution Network Plan and Profile UT-Utilities &
WF-005169 R02Z00-C021-JVC-XX-XXX-SDW-UT-GW-03673C0 Latest RAM-MIP Shop Drawing Grey Water Engr. Fawzy 5-Aug-24 19-Aug-24 20-Aug-24 B Closed 15 Aconex
for part 07 Infrastructure
Excavation Cross section of Pump station-07 Zone-06 at Sta
WF-005172 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05138 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 5-Aug-24 19-Aug-24 20-Aug-24 B Closed 15 Aconex
2+546.06 to 2+550.70
Excavation Cross section of Pump station-07 Zone-06 at Sta
WF-005172 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05139 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 5-Aug-24 19-Aug-24 20-Aug-24 B Closed 15 Aconex
JVC-WTRAN- 2+546.06 to 2+550.70
004926 Excavation Cross section of Pump station-07 Zone-06 at Sta
WF-005172 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05140 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 5-Aug-24 19-Aug-24 20-Aug-24 B Closed 15 Aconex
2+546.06 to 2+550.70
Excavation Cross section of Pump station-07 Zone-06 at Sta
WF-005172 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-05141 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 5-Aug-24 19-Aug-24 20-Aug-24 B Closed 15 Aconex
2+546.06 to 2+550.70
JVC-WTRAN- UT-Utilities &
WF-005221 R02Z00-C021-JVC-XX-XXX-SDW-UT-PW-08501C1 Latest Shop Drawing for Potable Water Network Pipe Trench Details RAM-MIP Shop Drawing Potable Water Engr. Fawzy 6-Aug-24 20-Aug-24 10-Aug-24 B Closed 4 Aconex
004973 Infrastructure
UT-Utilities & UT-Utilities &
WF-005249 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00217C0 Latest Combined Utility Plan at Road 15 D9 Road 15 D9 Shop Drawing Engr. Fawzy 7-Aug-24 21-Aug-24 22-Aug-24 B Closed 15 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-005249 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00218C0 Latest Combined Utility Plan at Road 15 D9 Road 15 D9 Shop Drawing Engr. Fawzy 7-Aug-24 21-Aug-24 22-Aug-24 B Closed 15 Aconex
Infrastructure Infrastructure
JVC-WTRAN- UT-Utilities & UT-Utilities &
WF-005249 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00219C0 Latest Combined Utility Plan at Road 15 D9 Road 15 D9 Shop Drawing Engr. Fawzy 7-Aug-24 21-Aug-24 22-Aug-24 B Closed 15 Aconex
004973 Infrastructure Infrastructure
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

JVC-WTRAN-
004973 Response
ACONEX
Workflow UT-Utilities & UT-Utilities & Total
Workflow Document JVC Planned 22-Aug-24
WSP Status
B Overdue Overdue Submittal
WF-005249 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00220C0 Status Combined Utility Plan at Road 15 D9
Description Road 15 D9
Location Shop Drawing Discipline
Infrastructure Sub-Discipline Engr. Fawzy 7-Aug-24
Infrastructure Submitted by Submitted
21-Aug-24 Closed
Status 15
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Reply Response Code from WSP from JVC
No. as of
UT-Utilities & UT-Utilities & date
WF-005249 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00221C0 Latest Combined Utility Plan at Road 15 D9 Road 15 D9 Shop Drawing Engr. Fawzy 7-Aug-24 21-Aug-24 22-Aug-24 B Closed Today
15 Aconex
Infrastructure Infrastructure

WF-005255 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11215 C0 Latest As built Side Slope Cross Section at Zone 06 Sta. 2+709.71 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 8-Aug-24 22-Aug-24 20-Aug-24 C Open 167 Aconex

WF-005255 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11216 C2 Latest As built Side Slope Cross Section at Zone 06 Sta. 2+709.71 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 8-Aug-24 22-Aug-24 20-Aug-24 C Open 167 Aconex

WF-005255 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11217 C2 Latest As built Side Slope Cross Section at Zone 06 Sta. 2+709.71 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 8-Aug-24 22-Aug-24 20-Aug-24 C Open 167 Aconex

WF-005255 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11218 C2 Latest As built Side Slope Cross Section at Zone 06 Sta. 2+709.71 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 8-Aug-24 22-Aug-24 20-Aug-24 C Open 167 Aconex

JVC-WTRAN-
WF-005255 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11219 C2 Latest As built Side Slope Cross Section at Zone 06 Sta. 2+709.71 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 8-Aug-24 22-Aug-24 20-Aug-24 C Open 167 Aconex
005005

WF-005255 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11220 C2 Latest As built Side Slope Cross Section at Zone 06 Sta. 2+709.71 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 8-Aug-24 22-Aug-24 20-Aug-24 C Open 167 Aconex

WF-005255 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11221 C2 Latest As built Side Slope Cross Section at Zone 06 Sta. 2+709.71 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 8-Aug-24 22-Aug-24 20-Aug-24 C Open 167 Aconex

WF-005255 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11222 C1 Latest As built Side Slope Cross Section at Zone 06 Sta. 2+709.71 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 8-Aug-24 22-Aug-24 20-Aug-24 C Open 167 Aconex

WF-005255 R02Z00-C021-JVC-06-XXX-ABD-CL-CL-11223 C1 Latest As built Side Slope Cross Section at Zone 06 Sta. 2+709.71 to 2+860 Zone 06 As Built Civil Civil Engr. Sunil 8-Aug-24 22-Aug-24 20-Aug-24 C Open 167 Aconex

Shop Drawing for Indicative section of material Backfilling at Zone 06


WF-005279 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07550 C1 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 10-Aug-24 24-Aug-24 17-Aug-24 B Closed 7 Aconex
from Sta : 2+720 to 2+860
Shop Drawing for Indicative section of material Backfilling at Zone 06
WF-005279 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07551 C1 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 10-Aug-24 24-Aug-24 17-Aug-24 B Closed 7 Aconex
from Sta : 2+720 to 2+860
Shop Drawing for Indicative section of material Backfilling at Zone 06
WF-005279 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07552 C1 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 10-Aug-24 24-Aug-24 17-Aug-24 B Closed 7 Aconex
from Sta : 2+720 to 2+860
Shop Drawing for Indicative section of material Backfilling at Zone 06
WF-005279 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07553 C1 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 10-Aug-24 24-Aug-24 17-Aug-24 B Closed 7 Aconex
JVC-WTRAN- from Sta : 2+720 to 2+860
005029 Shop Drawing for Indicative section of material Backfilling at Zone 06
WF-005279 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07554 C1 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 10-Aug-24 24-Aug-24 17-Aug-24 B Closed 7 Aconex
from Sta : 2+720 to 2+860
Shop Drawing for Indicative section of material Backfilling at Zone 06
WF-005279 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07555 C1 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 10-Aug-24 24-Aug-24 17-Aug-24 B Closed 7 Aconex
from Sta : 2+720 to 2+860
Shop Drawing for Indicative section of material Backfilling at Zone 06
WF-005279 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07556 C0 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 10-Aug-24 24-Aug-24 17-Aug-24 B Closed 7 Aconex
from Sta : 2+720 to 2+860
Shop Drawing for Indicative section of material Backfilling at Zone 06
WF-005279 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07557 C0 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 10-Aug-24 24-Aug-24 17-Aug-24 B Closed 7 Aconex
from Sta : 2+720 to 2+860
UT-Utilities & UT-Utilities &
WF-005297 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00109C3 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 10-Aug-24 24-Aug-24 22-Aug-24 B Closed 12 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-005297 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00117C3 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 10-Aug-24 24-Aug-24 22-Aug-24 B Closed 12 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-005297 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00118C3 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 10-Aug-24 24-Aug-24 22-Aug-24 B Closed 12 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-005297 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00119C3 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 10-Aug-24 24-Aug-24 22-Aug-24 B Closed 12 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-005297 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00120C3 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 10-Aug-24 24-Aug-24 22-Aug-24 B Closed 12 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-005297 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00121C3 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 10-Aug-24 24-Aug-24 22-Aug-24 B Closed 12 Aconex
Infrastructure Infrastructure
JVC-WTRAN- UT-Utilities & UT-Utilities &
WF-005297 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00122C3 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 10-Aug-24 24-Aug-24 22-Aug-24 B Closed 12 Aconex
005046 Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-005297 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00123C3 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 10-Aug-24 24-Aug-24 22-Aug-24 B Closed 12 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-005297 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00124C3 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 10-Aug-24 24-Aug-24 22-Aug-24 B Closed 12 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-005297 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00125C3 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 10-Aug-24 24-Aug-24 22-Aug-24 B Closed 12 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-005297 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00126C3 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 10-Aug-24 24-Aug-24 22-Aug-24 B Closed 12 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-005297 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00127C3 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 10-Aug-24 24-Aug-24 22-Aug-24 B Closed 12 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-005297 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00129C3 Latest Combined Utility Plan for Road 11-D09 Road 11-D09 Shop Drawing Engr. Fawzy 10-Aug-24 24-Aug-24 22-Aug-24 B Closed 12 Aconex
Infrastructure Infrastructure
JVC-WTRAN- Shop drawing for Road markings, Traffic signs and Curbstones Plan Transportation Transportation &
WF-005327 R02Z00-C021-JVC-00-XXX-SDW-TR-TR-06406 C0 Latest RAM-MIP Shop Drawing Engr. Khalid 11-Aug-24 25-Aug-24 22-Aug-24 B Closed 11 Aconex
005076 part 06 & Road Road
UT-Utilities & UT-Utilities &
WF-005366 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00222C0 Latest Combined Utility Plan for Road 16-D09 Road 16-D09 Shop Drawing Engr. Fawzy 13-Aug-24 27-Aug-24 24-Aug-24 B Closed 11 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-005366 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00223C0 Latest Combined Utility Plan for Road 16-D09 Road 16-D09 Shop Drawing Engr. Fawzy 13-Aug-24 27-Aug-24 24-Aug-24 B Closed 11 Aconex
Infrastructure Infrastructure
JVC-WTRAN- UT-Utilities & UT-Utilities &
WF-005366 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00224C0 Latest Combined Utility Plan for Road 16-D09 Road 16-D09 Shop Drawing Engr. Fawzy 13-Aug-24 27-Aug-24 24-Aug-24 B Closed 11 Aconex
005111 Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-005366 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00225C0 Latest Combined Utility Plan for Road 16-D09 Road 16-D09 Shop Drawing Engr. Fawzy 13-Aug-24 27-Aug-24 24-Aug-24 B Closed 11 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-005366 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00226C0 Latest Combined Utility Plan for Road 16-D09 Road 16-D09 Shop Drawing Engr. Fawzy 13-Aug-24 27-Aug-24 24-Aug-24 B Closed 11 Aconex
Infrastructure Infrastructure
Shop Drawing for MV Network above Grade Plan, Profile and Manhole
WF-005367 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-07011C0 Latest Road 15 Shop Drawing Electrical Medium Voltage Engr. Hanzel 13-Aug-24 27-Aug-24 26-Aug-24 B Closed 13 Aconex
Details (MV MH-27 to 31) Road 15
JVC-WTRAN- Shop Drawing for MV Network above Grade Plan, Profile and Manhole
WF-005367 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-07012C0 Latest Road 15 Shop Drawing Electrical Medium Voltage Engr. Hanzel 13-Aug-24 27-Aug-24 26-Aug-24 B Closed 13 Aconex
005112 Details (MV MH-27 to 31) Road 15
Shop Drawing for MV Network above Grade Plan, Profile and Manhole
WF-005367 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-07013C0 Latest Road 15 Shop Drawing Electrical Medium Voltage Engr. Hanzel 13-Aug-24 27-Aug-24 26-Aug-24 B Closed 13 Aconex
Details (MV MH-27 to 31) Road 15
Shop Drawings for Shotcrete Works at Zone 05 Egress Staircase 20
WF-005384 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04010C0 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 13-Aug-24 27-Aug-24 17-Aug-24 B Closed 4 Aconex
JVC-WTRAN- (3rd Side) at sta. 1+860 - General Layout
005128
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

JVC-WTRAN- Response
ACONEX
Workflow
005128 Shop Drawings for Shotcrete Works at Zone 05 Egress Staircase 20 Total
Workflow Document JVC Planned WSP Status
B Overdue Overdue Submittal
WF-005384 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-05-XXX-SDW-GT-GT-04011C0 Status (3rd Side) at sta. 1+860 - Long.
Description
Section
Zone 05
Location Shop Drawing Geotechnical
Discipline Geotechnical Submitted
Sub-Discipline by 13-Aug-24 27-Aug-24 17-Aug-24
Engr. Yaseen Closed
Status 4
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections date
WF-005408 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05056 C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 14-Aug-24 28-Aug-24 20-Aug-24 B Closed Today
6 Aconex
from sta.0+088 to sta.0+280 at Zone 01
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections
WF-005408 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05349 C1 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 14-Aug-24 28-Aug-24 20-Aug-24 B Closed 6 Aconex
from sta.0+088 to sta.0+280 at Zone 01
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections
WF-005408 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05350 C1 re-s Zone 01 Shop Drawing Civil Civil Engr. Sunil 14-Aug-24 28-Aug-24 20-Aug-24 B Closed 6 Aconex
from sta.0+088 to sta.0+280 at Zone 01
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections
WF-005408 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05351 C1 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 14-Aug-24 28-Aug-24 20-Aug-24 B Closed 6 Aconex
from sta.0+088 to sta.0+280 at Zone 01
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections
WF-005408 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05352 C1 re-s Zone 01 Shop Drawing Civil Civil Engr. Sunil 14-Aug-24 28-Aug-24 20-Aug-24 B Closed 6 Aconex
from sta.0+088 to sta.0+280 at Zone 01
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections
WF-005408 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05353 C1 re-s Zone 01 Shop Drawing Civil Civil Engr. Sunil 14-Aug-24 28-Aug-24 20-Aug-24 B Closed 6 Aconex
from sta.0+088 to sta.0+280 at Zone 01
JVC-WTRAN- Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections
WF-005408 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05354 C1 re-s Zone 01 Shop Drawing Civil Civil Engr. Sunil 14-Aug-24 28-Aug-24 20-Aug-24 B Closed 6 Aconex
005151 from sta.0+088 to sta.0+280 at Zone 01
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections
WF-005408 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05355 C1 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 14-Aug-24 28-Aug-24 20-Aug-24 B Closed 6 Aconex
from sta.0+088 to sta.0+280 at Zone 01
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections
WF-005408 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05356 C1 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 14-Aug-24 28-Aug-24 20-Aug-24 B Closed 6 Aconex
from sta.0+088 to sta.0+280 at Zone 01
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections
WF-005408 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05357 C1 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 14-Aug-24 28-Aug-24 20-Aug-24 B Closed 6 Aconex
from sta.0+088 to sta.0+280 at Zone 01
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections
WF-005408 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05358 C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 14-Aug-24 28-Aug-24 20-Aug-24 B Closed 6 Aconex
from sta.0+088 to sta.0+280 at Zone 01
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections
WF-005408 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05359 C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 14-Aug-24 28-Aug-24 20-Aug-24 B Closed 6 Aconex
from sta.0+088 to sta.0+280 at Zone 01
Shop Drawing for Jadat Al Haram Tunnel Excavation Cross Sections
WF-005408 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05360 C1 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 14-Aug-24 28-Aug-24 20-Aug-24 B Closed 6 Aconex
from sta.0+088 to sta.0+280 at Zone 01
As built side slope Excavation cross section zone-08(sta
WF-005423 R02Z00-C021-JVC-08-XXX-ABD-CL-CL-11239 C0 Latest Zone 08 As Built Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 27-Aug-24 A Closed 12 Aconex
0+040.13 to 0+080)
JVC-WTRAN- As built side slope Excavation cross section zone-08(sta
WF-005423 R02Z00-C021-JVC-08-XXX-ABD-CL-CL-11240 C0 Latest Zone 08 As Built Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 27-Aug-24 A Closed 12 Aconex
005167 0+040.13 to 0+080)
As built side slope Excavation cross section zone-08(sta
WF-005423 R02Z00-C021-JVC-08-XXX-ABD-CL-CL-11241 C0 Latest Zone 08 As Built Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 27-Aug-24 A Closed 12 Aconex
0+040.13 to 0+080)
Shop Drawing for Excavation Cross Sections from sta.0+300 to
WF-005429 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05361 C4 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 29-Aug-24 B Closed 14 Aconex
sta.0+500 at Zone 01
Shop Drawing for Excavation Cross Sections from sta.0+300 to
WF-005429 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05362 C4 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 29-Aug-24 B Closed 14 Aconex
sta.0+500 at Zone 01
Shop Drawing for Excavation Cross Sections from sta.0+300 to
WF-005429 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05363 C4 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 29-Aug-24 B Closed 14 Aconex
sta.0+500 at Zone 01
Shop Drawing for Excavation Cross Sections from sta.0+300 to MIP-JVC-SHD-CIV-
WF-005429 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05364 C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 29-Aug-24 B Closed 14 Aconex
sta.0+500 at Zone 01 000031-01
Shop Drawing for Excavation Cross Sections from sta.0+300 to MIP-JVC-SHD-CIV-
WF-005429 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05365 C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 29-Aug-24 B Closed 14 Aconex
sta.0+500 at Zone 01 000031-01
Shop Drawing for Excavation Cross Sections from sta.0+300 to MIP-JVC-SHD-CIV-
WF-005429 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05366 C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 29-Aug-24 B Closed 14 Aconex
sta.0+500 at Zone 01 000031-01
JVC-WTRAN- Shop Drawing for Excavation Cross Sections from sta.0+300 to MIP-JVC-SHD-CIV-
WF-005429 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05367 C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 29-Aug-24 B Closed 14 Aconex
005173 sta.0+500 at Zone 01 000031-01
Shop Drawing for Excavation Cross Sections from sta.0+300 to MIP-JVC-SHD-CIV-
WF-005429 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05368 C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 29-Aug-24 B Closed 14 Aconex
sta.0+500 at Zone 01 000031-01
Shop Drawing for Excavation Cross Sections from sta.0+300 to MIP-JVC-SHD-CIV-
WF-005429 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05369 C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 29-Aug-24 B Closed 14 Aconex
sta.0+500 at Zone 01 000031-01
Shop Drawing for Excavation Cross Sections from sta.0+300 to MIP-JVC-SHD-CIV-
WF-005429 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05370 C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 29-Aug-24 B Closed 14 Aconex
sta.0+500 at Zone 01 000031-01
Shop Drawing for Excavation Cross Sections from sta.0+300 to MIP-JVC-SHD-CIV-
WF-005429 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05371 C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 29-Aug-24 B Closed 14 Aconex
sta.0+500 at Zone 01 000031-01
Shop Drawing for Excavation Cross Sections from sta.0+300 to MIP-JVC-SHD-CIV-
WF-005429 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05372 C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 29-Aug-24 B Closed 14 Aconex
sta.0+500 at Zone 01 000031-01
Shop Drawing for Excavation Cross Sections from sta.0+300 to
WF-005429 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05373 C0 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 29-Aug-24 B Closed 14 Aconex
sta.0+500 at Zone 01
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005451 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07753 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 20-Aug-24 B Closed 5 Aconex
from Sta: 0+040.13 to 0+100
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005451 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07754 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 20-Aug-24 B Closed 5 Aconex
JVC-WTRAN- from Sta: 0+040.13 to 0+100
005192 Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005451 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07755 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 20-Aug-24 B Closed 5 Aconex
from Sta: 0+040.13 to 0+100
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005451 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07756 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 15-Aug-24 29-Aug-24 20-Aug-24 B Closed 5 Aconex
from Sta: 0+040.13 to 0+100
Transportation Transportation &
WF-005509 R02Z00-C021-JVC-07-XXX-SDW-TR-TR-06141 C0 Latest Shop Drawing for Plan and profile at Zone 07 Airport Tunnel Zone 07 Shop Drawing Engr. Khalid 19-Aug-24 2-Sep-24 1-Sep-24 B Closed 13 Aconex
JVC-WTRAN- & Road Road
005249 Transportation Transportation &
WF-005509 R02Z00-C021-JVC-07-XXX-SDW-TR-TR-06142 C0 Latest Shop Drawing for Plan and profile at Zone 07 Airport Tunnel Zone 07 Shop Drawing Engr. Khalid 19-Aug-24 2-Sep-24 1-Sep-24 B Closed 13 Aconex
& Road Road
Duct beside
JVC-WTRAN- Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-005532 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00127C2 Latest Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Aug-24 2-Sep-24 4-Sep-24 B Closed 16 Aconex
005271 details) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-005532 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00128C2 Latest Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Aug-24 2-Sep-24 4-Sep-24 B Closed 16 Aconex
details) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-005532 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00129C2 Latest Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Aug-24 2-Sep-24 4-Sep-24 B Closed 16 Aconex
details) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-005532 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00130C2 Latest Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Aug-24 2-Sep-24 4-Sep-24 B Closed 16 Aconex
details) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-005532 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00131C2 Latest Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Aug-24 2-Sep-24 4-Sep-24 B Closed 16 Aconex
details) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-005532 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00132C2 Latest Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Aug-24 2-Sep-24 4-Sep-24 B Closed 16 Aconex
details) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
Duct beside
ACONEX
Workflow Shop drawings for Medium Voltage Manholes and Ducts (sections & Total
Workflow Document JVC Planned WSP Status
B Overdue Overdue Submittal
WF-005532 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00133C2 Status details) for Duct beside Tunnel-01
Description
and Tunnel-02
Tunnel-01
Locationand Shop Drawing Electrical
Discipline Medium Voltage Submitted
Sub-Discipline by 19-Aug-24 2-Sep-24
Engr. Sherif 4-Sep-24 Closed
Status 16
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Tunnel-02 Type Submitted Reply Response Code from WSP from JVC
No. Duct beside as of
Shop drawings for Medium Voltage Manholes and Ducts (sections & date
WF-005532 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00134C2 Latest Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Aug-24 2-Sep-24 4-Sep-24 B Closed Today
16 Aconex
details) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-005532 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00135C2 Latest Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Aug-24 2-Sep-24 4-Sep-24 B Closed 16 Aconex
details) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-005532 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00136C2 Latest Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Aug-24 2-Sep-24 4-Sep-24 B Closed 16 Aconex
details) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-005532 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00137C2 Latest Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Aug-24 2-Sep-24 4-Sep-24 B Closed 16 Aconex
details) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Duct beside
Shop drawings for Medium Voltage Manholes and Ducts (sections &
WF-005532 R02Z00-C021-JVC-XX-XXX-SDW-EL-MV-00138C2 Latest Tunnel-01 and Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Aug-24 2-Sep-24 4-Sep-24 B Closed 16 Aconex
details) for Duct beside Tunnel-01 and Tunnel-02
Tunnel-02
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-005534 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07628 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 19-Aug-24 2-Sep-24 20-Aug-24 B Closed 1 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-005534 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07629 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 19-Aug-24 2-Sep-24 20-Aug-24 B Closed 1 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-005534 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07630 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 19-Aug-24 2-Sep-24 20-Aug-24 B Closed 1 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-005534 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07631 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 19-Aug-24 2-Sep-24 20-Aug-24 B Closed 1 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-005534 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07632 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 19-Aug-24 2-Sep-24 20-Aug-24 B Closed 1 Aconex
from Sta: 0+060 to 0+240
JVC-WTRAN- Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-005534 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07633 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 19-Aug-24 2-Sep-24 20-Aug-24 B Closed 1 Aconex
005273 from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-005534 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07634 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 19-Aug-24 2-Sep-24 20-Aug-24 B Closed 1 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-005534 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07635 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 19-Aug-24 2-Sep-24 20-Aug-24 B Closed 1 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-005534 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07636 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 19-Aug-24 2-Sep-24 20-Aug-24 B Closed 1 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-005534 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07637 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 19-Aug-24 2-Sep-24 20-Aug-24 B Closed 1 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of material Backfilling at Zone 10
WF-005534 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07638 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 19-Aug-24 2-Sep-24 20-Aug-24 B Closed 1 Aconex
from Sta: 0+060 to 0+240
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005548 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07757 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 20-Aug-24 3-Sep-24 4-Sep-24 B Closed 15 Aconex
from Sta: 0+120 to 0+300
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005548 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07758 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 20-Aug-24 3-Sep-24 4-Sep-24 B Closed 15 Aconex
from Sta: 0+120 to 0+300
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005548 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07759 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 20-Aug-24 3-Sep-24 4-Sep-24 B Closed 15 Aconex
from Sta: 0+120 to 0+300
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005548 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07760 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 20-Aug-24 3-Sep-24 4-Sep-24 B Closed 15 Aconex
from Sta: 0+120 to 0+300
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005548 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07761 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 20-Aug-24 3-Sep-24 4-Sep-24 B Closed 15 Aconex
JVC-WTRAN- from Sta: 0+120 to 0+300
005285 Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005548 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07762 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 20-Aug-24 3-Sep-24 4-Sep-24 B Closed 15 Aconex
from Sta: 0+120 to 0+300
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005548 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07763 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 20-Aug-24 3-Sep-24 4-Sep-24 B Closed 15 Aconex
from Sta: 0+120 to 0+300
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005548 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07764 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 20-Aug-24 3-Sep-24 4-Sep-24 B Closed 15 Aconex
from Sta: 0+120 to 0+300
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005548 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07765 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 20-Aug-24 3-Sep-24 4-Sep-24 B Closed 15 Aconex
from Sta: 0+120 to 0+300
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005548 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07766 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 20-Aug-24 3-Sep-24 4-Sep-24 B Closed 15 Aconex
from Sta: 0+120 to 0+300
JVC-WTRAN- Shop Drawing for Indicative section of Material Backfilling at Zone
WF-005567 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07650 C0 re-s Zone 03 Shop Drawing Civil Civil Engr. Sunil 20-Aug-24 3-Sep-24 4-Sep-24 B Closed 15 Aconex
005298 03 from Sta. 1+000
JVC-WTRAN-
WF-005568 R02Z00-C021-JVC-03-XXX-ABD-CL-CL-11042 C0 Latest As built side slope Excavation cross section at zone 03 (Sta 1+000) Zone 03 As Built Civil Civil Engr. Sunil 20-Aug-24 3-Sep-24 4-Sep-24 C Open 155 Aconex
005299
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-005574 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02001C3 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Aug-24 3-Sep-24 24-Aug-24 C Closed 4 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 1
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-005574 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02002C3 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Aug-24 3-Sep-24 24-Aug-24 C Closed 4 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-005574 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02003C3 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Aug-24 3-Sep-24 24-Aug-24 C Closed 4 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-005574 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02004C3 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Aug-24 3-Sep-24 24-Aug-24 C Closed 4 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Cross-Sections
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-005574 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02005C3 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Aug-24 3-Sep-24 24-Aug-24 C Closed 4 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 1
JVC-WTRAN- Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-005574 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02006C3 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Aug-24 3-Sep-24 24-Aug-24 C Closed 4 Aconex
005305 from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-005574 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02007C3 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Aug-24 3-Sep-24 24-Aug-24 C Closed 4 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-005574 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02008C3 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Aug-24 3-Sep-24 24-Aug-24 C Closed 4 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 4
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-005574 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02009C3 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Aug-24 3-Sep-24 24-Aug-24 C Closed 4 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 5
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-005574 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02010C3 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Aug-24 3-Sep-24 24-Aug-24 C Closed 4 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 6
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-005574 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02011C3 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Aug-24 3-Sep-24 24-Aug-24 C Closed 4 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 7
Shop Drawing for MV Network above Grade Plan, Profile and Manhole
WF-005577 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-07001C1 Latest Road 16 Shop Drawing Electrical Medium Voltage Engr. Sherif 20-Aug-24 3-Sep-24 4-Sep-24 B Closed 15 Aconex
Details (MV MH-37 to 41) Road 16
JVC-WTRAN- Shop Drawing for MV Network above Grade Plan, Profile and Manhole
WF-005577 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-07002C1 Latest Road 16 Shop Drawing Electrical Medium Voltage Engr. Sherif 20-Aug-24 3-Sep-24 4-Sep-24 B Closed 15 Aconex
005308 Details (MV MH-37 to 41) Road 16
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

JVC-WTRAN-
005308 Response
ACONEX
Workflow Shop Drawing for MV Network above Grade Plan, Profile and Manhole Total
Workflow Document JVC Planned WSP Status
B Overdue Overdue Submittal
WF-005577 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-00-XXX-SDW-EL-MV-07003C1 Status Details (MV MH-37 to 41) Road
Description
16
Road 16
Location Shop Drawing Electrical
Discipline Medium Voltage Submitted
Sub-Discipline by 20-Aug-24 3-Sep-24
Engr. Sherif 4-Sep-24 Closed
Status 15
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Excavation Shop Drawing Cross section at Zone 07 from sta.0+260 date
WF-005682 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05453 C3 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 25-Aug-24 8-Sep-24 5-Sep-24 B Closed Today
11 Aconex
to 0+300
Excavation Shop Drawing Cross section at Zone 07 from sta.0+260
WF-005682 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05464 C2 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 25-Aug-24 8-Sep-24 5-Sep-24 B Closed 11 Aconex
JVC-WTRAN- to 0+300
005406 Excavation Shop Drawing Cross section at Zone 07 from sta.0+260
WF-005682 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05465 C5 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 25-Aug-24 8-Sep-24 5-Sep-24 B Closed 11 Aconex
to 0+300
Excavation Shop Drawing Cross section at Zone 07 from sta.0+260
WF-005682 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-05466 C3 Latest Zone 07 Shop Drawing Civil Civil Engr. Sunil 25-Aug-24 8-Sep-24 5-Sep-24 B Closed 11 Aconex
to 0+300
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05065 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05225 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05226 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05227 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05228 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05229 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05230 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05231 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05232 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05233 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05234 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05235 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05236 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05237 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05238 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05239 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
JVC-WTRAN- Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48 As per Engr.
005428 Shop Drawing for Excavation Cross sections and Egress Stair 12 At Nahell
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05240 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05241 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05242 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05243 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05244 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05245 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05246 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05247 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05248 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-05249 C2 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07130 C1 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07131 C1 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07132 C1 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07133 C1 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07134 C1 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
Shop Drawing for Excavation Cross sections and Egress Stair 12 At
WF-005708 R02Z00-C021-JVC-10-XXX-SDW-CL-CL-07135 C1 Latest Zone 10 Shop Drawing Civil Civil Engr. Sunil 26-Aug-24 9-Sep-24 10-Sep-24 Terminated Aconex
Tunnel-02(Zone-10) from Sta: 0+040 to 0+402.48
JVC-WTRAN- As-Built Layout CMC Layout for Zone 05 From sta.
WF-005709 R02Z00-C021-JVC-05-XXX-ABD-GT-GT-01003-C0 Latest Zone 05 As Built Geotechnical Geotechnical Engr. Yaseen 26-Aug-24 9-Sep-24 4-Sep-24 Terminated Aconex
005429 1+933.979 To 1+953.979
As-Built Layout CMC Layout for Zone 05 From sta.
WF-005726 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01007C2 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 27-Aug-24 10-Sep-24 29-Aug-24 B Closed 2 Aconex
JVC-WTRAN- 1+933.979 To 1+953.979
005440 As-Built Layout CMC Layout for Zone 05 From sta.
WF-005726 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01008C2 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 27-Aug-24 10-Sep-24 29-Aug-24 B Closed 2 Aconex
1+933.979 To 1+953.979
JVC-WTRAN- Telecom Network Structural Details For at Grade Manhole
WF-005757 R02Z00-C021-JVC-00-XXX-SDW-ST-FO-00007 C0 Latest RAM-MIP Shop Drawing Structural Foundation Engr. Shaheen 28-Aug-24 11-Sep-24 9-Sep-24 B Closed 12 Aconex
005757 (1500X1500)
UT-Utilities &
WF-005791 R02Z00-C021-JVC-XX-XXX-SDW-UT-PW-01620C0 re-s Proposed Potable Water Network at KAAR zone 08 Plan and Profile Zone 08 Shop Drawing Potable Water Engr. Fawzy 29-Aug-24 12-Sep-24 4-Sep-24 B Closed 6 Aconex
JVC-WTRAN- Infrastructure
005491
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

JVC-WTRAN- Response
ACONEX
Workflow
005491 UT-Utilities & Total
Workflow Document JVC Planned WSP Status
B Overdue Overdue Submittal
WF-005791 Transmittal Drawing No. Rev. Status
R02Z00-C021-JVC-XX-XXX-SDW-UT-PW-01656C0 re-s Proposed Potable Water Network at KAAR zone 08 Plan and Profile
Description Zone 08
Location Shop Drawing Discipline
Infrastructure
Potable Water Submitted
Sub-Discipline by 29-Aug-24 12-Sep-24 4-Sep-24
Engr. Fawzy Closed
Status 6
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawing for Proposed Storm Water Drainage Network - KAAR UT-Utilities & date
WF-005836 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01410C1 Latest Zone 08 Shop Drawing Storm Water Engr. Fawzy 31-Aug-24 14-Sep-24 7-Sep-24 B Closed Today
7 Aconex
(Zone 08) Infrastructure
Shop Drawing for Proposed Storm Water Drainage Network - KAAR UT-Utilities &
WF-005836 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01411C1 Latest Zone 08 Shop Drawing Storm Water Engr. Fawzy 31-Aug-24 14-Sep-24 7-Sep-24 B Closed 7 Aconex
JVC-WTRAN- (Zone 08) Infrastructure
005535 Shop Drawing for Proposed Storm Water Drainage Network - KAAR UT-Utilities &
WF-005836 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01460C1 re-s Zone 08 Shop Drawing Storm Water Engr. Fawzy 31-Aug-24 14-Sep-24 7-Sep-24 B Closed 7 Aconex
(Zone 08) Infrastructure
Shop Drawing for Proposed Storm Water Drainage Network - KAAR UT-Utilities &
WF-005836 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01462C1 re-s Zone 08 Shop Drawing Storm Water Engr. Fawzy 31-Aug-24 14-Sep-24 7-Sep-24 B Closed 7 Aconex
(Zone 08) Infrastructure
Shop Drawings Layout for Dewatering Works for Lift Station 06 at
WF-005900 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-06001-C0 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Sep-24 17-Sep-24 15-Sep-24 Terminated Aconex
JVC-WTRAN- Zone 01
005596 Shop Drawings Cross-Section for Dewatering Works for Lift
WF-005900 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-06002-C0 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 3-Sep-24 17-Sep-24 15-Sep-24 Terminated Aconex
Station 06 at Zone 01
Excavation Cross section of Junction Haram & Airport Tunnel(Zone05
WF-005934 R02Z00-C021-JVC-00-XXX-SDW-CL-CL-07551 C1 Latest Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 4-Sep-24 18-Sep-24 21-Sep-24 B Closed 17 Aconex
& 07 at Sta 1+980 to 2+032.098, 0+020-0+040)
Excavation Cross section of Junction Haram & Airport Tunnel(Zone05
WF-005934 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07552 C1 Latest Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 4-Sep-24 18-Sep-24 21-Sep-24 B Closed 17 Aconex
& 07 at Sta 1+980 to 2+032.098, 0+020-0+040)
Excavation Cross section of Junction Haram & Airport Tunnel(Zone05
WF-005934 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07553 C1 Latest Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 4-Sep-24 18-Sep-24 21-Sep-24 B Closed 17 Aconex
& 07 at Sta 1+980 to 2+032.098, 0+020-0+040)
Excavation Cross section of Junction Haram & Airport Tunnel(Zone05
WF-005934 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07554 C1 Latest Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 4-Sep-24 18-Sep-24 21-Sep-24 B Closed 17 Aconex
& 07 at Sta 1+980 to 2+032.098, 0+020-0+040)
JVC-WTRAN- Excavation Cross section of Junction Haram & Airport Tunnel(Zone05
WF-005934 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07555 C1 Latest Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 4-Sep-24 18-Sep-24 21-Sep-24 B Closed 17 Aconex
005628 & 07 at Sta 1+980 to 2+032.098, 0+020-0+040)
Excavation Cross section of Junction Haram & Airport Tunnel(Zone05
WF-005934 R02Z00-C021-JVC-05-XXX-SDW-CL-CL-07556 C1 Latest Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 4-Sep-24 18-Sep-24 21-Sep-24 B Closed 17 Aconex
& 07 at Sta 1+980 to 2+032.098, 0+020-0+040)
Excavation Cross section of Junction Haram & Airport Tunnel(Zone05
WF-005934 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-07557 C1 Latest Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 4-Sep-24 18-Sep-24 21-Sep-24 B Closed 17 Aconex
& 07 at Sta 1+980 to 2+032.098, 0+020-0+040)
Excavation Cross section of Junction Haram & Airport Tunnel(Zone05
WF-005934 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-07558 C1 Latest Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 4-Sep-24 18-Sep-24 21-Sep-24 B Closed 17 Aconex
& 07 at Sta 1+980 to 2+032.098, 0+020-0+040)
Excavation Cross section of Junction Haram & Airport Tunnel(Zone05
WF-005934 R02Z00-C021-JVC-07-XXX-SDW-CL-CL-07559 C1 Latest Zone 05 & 07 Shop Drawing Civil Civil Engr. Sunil 4-Sep-24 18-Sep-24 21-Sep-24 B Closed 17 Aconex
& 07 at Sta 1+980 to 2+032.098, 0+020-0+040)
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005978 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07767 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 5-Sep-24 19-Sep-24 21-Sep-24 B Closed 16 Aconex
from Sta: 0+320 to 0+440
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005978 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07768 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 5-Sep-24 19-Sep-24 21-Sep-24 B Closed 16 Aconex
from Sta: 0+320 to 0+440
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005978 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07769 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 5-Sep-24 19-Sep-24 21-Sep-24 B Closed 16 Aconex
from Sta: 0+320 to 0+440
JVC-WTRAN- Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005978 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07770 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 5-Sep-24 19-Sep-24 21-Sep-24 B Closed 16 Aconex
005671 from Sta: 0+320 to 0+440
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005978 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07771 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 5-Sep-24 19-Sep-24 21-Sep-24 B Closed 16 Aconex
from Sta: 0+320 to 0+440
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005978 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07772 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 5-Sep-24 19-Sep-24 21-Sep-24 B Closed 16 Aconex
from Sta: 0+320 to 0+440
Shop Drawing for Indicative section of Material Backfilling at Zone-08
WF-005978 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07773 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 5-Sep-24 19-Sep-24 21-Sep-24 B Closed 16 Aconex
from Sta: 0+320 to 0+440
UT-Utilities &
WF-006097 R02Z00-C021-JVC-XX-XXX-SDW-UT-PW-01620C1 Latest Proposed Potable Water Network at KAAR zone 08 Plan and Profile Zone 08 Shop Drawing Potable Water Engr. Fawzy 10-Sep-24 24-Sep-24 21-Sep-24 B Closed 11 Aconex
JVC-WTRAN- Infrastructure
005787 UT-Utilities &
WF-006097 R02Z00-C021-JVC-XX-XXX-SDW-UT-PW-01656C1 Latest Proposed Potable Water Network at KAAR zone 08 Plan and Profile Zone 08 Shop Drawing Potable Water Engr. Fawzy 10-Sep-24 24-Sep-24 21-Sep-24 B Closed 11 Aconex
Infrastructure
Shop Drawing for Soil Improvement Works in Zone 03 from sta.
WF-006118 R02Z00-C021-JVC-03-XXX-SDW-GT-GT-01001C4 Latest Zone 03 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Sep-24 25-Sep-24 28-Sep-24 B Closed 17 Aconex
1+020 to 1+260 incl ES09 and ES10 - General Layout
Shop Drawing for Soil Improvement Works in Zone 03 from sta.
WF-006118 R02Z00-C021-JVC-03-XXX-SDW-GT-GT-01002C4 Latest Zone 03 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Sep-24 25-Sep-24 28-Sep-24 B Closed 17 Aconex
1+020 to 1+260 incl ES09 and ES10 - Detailed Layout for ES
Shop Drawing for Soil Improvement Works in Zone 03 from sta.
WF-006118 R02Z00-C021-JVC-03-XXX-SDW-GT-GT-01003C4 Latest Zone 03 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Sep-24 25-Sep-24 28-Sep-24 B Closed 17 Aconex
1+020 to 1+260 incl ES09 and ES10 - Detailed Layout
Shop Drawing for Soil Improvement Works in Zone 03 from sta.
WF-006118 R02Z00-C021-JVC-03-XXX-SDW-GT-GT-01004C4 Latest Zone 03 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Sep-24 25-Sep-24 28-Sep-24 B Closed 17 Aconex
1+020 to 1+260 incl ES09 and ES10 - Cross Sections
Shop Drawing for Soil Improvement Works in Zone 03 from sta.
WF-006118 R02Z00-C021-JVC-03-XXX-SDW-GT-GT-01005C4 Latest Zone 03 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Sep-24 25-Sep-24 28-Sep-24 B Closed 17 Aconex
1+020 to 1+260 incl ES09 and ES10 - Coordinates Sheet 1
JVC-WTRAN- Shop Drawing for Soil Improvement Works in Zone 03 from sta.
WF-006118 R02Z00-C021-JVC-03-XXX-SDW-GT-GT-01006C4 Latest Zone 03 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Sep-24 25-Sep-24 28-Sep-24 B Closed 17 Aconex
005671 1+020 to 1+260 incl ES09 and ES10 - Coordinates Sheet 2
Shop Drawing for Soil Improvement Works in Zone 03 from sta.
WF-006118 R02Z00-C021-JVC-03-XXX-SDW-GT-GT-01007C4 Latest Zone 03 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Sep-24 25-Sep-24 28-Sep-24 B Closed 17 Aconex
1+020 to 1+260 incl ES09 and ES10 - Coordinates Sheet 3
Shop Drawing for Soil Improvement Works in Zone 03 from sta.
WF-006118 R02Z00-C021-JVC-03-XXX-SDW-GT-GT-01008C4 Latest Zone 03 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Sep-24 25-Sep-24 28-Sep-24 B Closed 17 Aconex
1+020 to 1+260 incl ES09 and ES10 - Coordinates Sheet 4
Shop Drawing for Soil Improvement Works in Zone 03 from sta.
WF-006118 R02Z00-C021-JVC-03-XXX-SDW-GT-GT-01009C4 Latest Zone 03 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Sep-24 25-Sep-24 28-Sep-24 B Closed 17 Aconex
1+020 to 1+260 incl ES09 and ES10 - Coordinates Sheet 5
Shop Drawing for Soil Improvement Works in Zone 03 from sta.
WF-006118 R02Z00-C021-JVC-03-XXX-SDW-GT-GT-01010C4 Latest Zone 03 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Sep-24 25-Sep-24 28-Sep-24 B Closed 17 Aconex
1+020 to 1+260 incl ES09 and ES10 - Coordinates Sheet 6
Shop Drawing for Soil Improvement Works in Zone 03 from sta.
WF-006118 R02Z00-C021-JVC-03-XXX-SDW-GT-GT-01011C4 Latest Zone 03 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 11-Sep-24 25-Sep-24 28-Sep-24 B Closed 17 Aconex
1+020 to 1+260 incl ES09 and ES10 - Coordinates Sheet 7
JVC-WTRAN- As-Built CMC Layout for Zone 05 from sta. 1+833.979 to
WF-005928 R02Z00-C021-JVC-05-XXX-ABD-GT-GT-01002 C0 Latest Zone 03 As Built Geotechnical Geotechnical Engr. Yaseen 4-Sep-24 18-Sep-24 12-Sep-24 B Closed 8 Aconex
005623 1+853.979 (Seg. J-Z05-05)
Shop Drawing for Indicative section of Material Backfilling at Zone-03
WF-006177 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07657 C0 re-s Zone 03 Shop Drawing Civil Civil Engr. Sunil 14-Sep-24 28-Sep-24 28-Sep-24 B Closed 14 Aconex
from Sta: 1+140 to 1+260
Shop Drawing for Indicative section of Material Backfilling at Zone-03
WF-006177 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07658 C0 re-s Zone 03 Shop Drawing Civil Civil Engr. Sunil 14-Sep-24 28-Sep-24 28-Sep-24 B Closed 14 Aconex
from Sta: 1+140 to 1+260
Shop Drawing for Indicative section of Material Backfilling at Zone-03
WF-006177 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07659 C0 re-s Zone 03 Shop Drawing Civil Civil Engr. Sunil 14-Sep-24 28-Sep-24 28-Sep-24 B Closed 14 Aconex
from Sta: 1+140 to 1+260
JVC-WTRAN- Shop Drawing for Indicative section of Material Backfilling at Zone-03
WF-006177 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07660 C0 re-s Zone 03 Shop Drawing Civil Civil Engr. Sunil 14-Sep-24 28-Sep-24 28-Sep-24 B Closed 14 Aconex
005861 from Sta: 1+140 to 1+260
Shop Drawing for Indicative section of Material Backfilling at Zone-03
WF-006177 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07661 C0 re-s Zone 03 Shop Drawing Civil Civil Engr. Sunil 14-Sep-24 28-Sep-24 28-Sep-24 B Closed 14 Aconex
from Sta: 1+140 to 1+260
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

JVC-WTRAN-
005861

Response
ACONEX
Workflow Shop Drawing for Indicative section of Material Backfilling at Zone-03 Total
Workflow Document JVC Planned 28-Sep-24
WSP Status
B Overdue Overdue Submittal
WF-006177 TransmittalR02Z00-C021-JVC-03-XXX-SDW-CL-CL-07662
Drawing No. Rev.
C0 Status
re-s
from Sta: 1+140 to 1+260 Description
Zone 03
Location Shop Drawing Civil
Discipline Civil
Sub-Discipline Engr. Sunilby 14-Sep-24
Submitted 28-Sep-24 Closed
Status 14
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawing for Indicative section of Material Backfilling at Zone-03 date
WF-006177 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07663 C0 re-s Zone 03 Shop Drawing Civil Civil Engr. Yaseen 14-Sep-24 28-Sep-24 28-Sep-24 B Closed Today
14 Aconex
from Sta: 1+140 to 1+260
Shop Drawing for Indicative Section of Material Backfilling at Zone-08
WF-006224 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07774 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 16-Sep-24 30-Sep-24 28-Sep-24 B Closed 12 Aconex
from Sta: 0+460-0+552.99
Shop Drawing for Indicative Section of Material Backfilling at Zone-08
WF-006224 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07775 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 16-Sep-24 30-Sep-24 28-Sep-24 B Closed 12 Aconex
from Sta: 0+460-0+552.99
Shop Drawing for Indicative Section of Material Backfilling at Zone-08
WF-006224 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07776 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 16-Sep-24 30-Sep-24 28-Sep-24 B Closed 12 Aconex
from Sta: 0+460-0+552.99
JVC-WTRAN- Shop Drawing for Indicative Section of Material Backfilling at Zone-08
WF-006224 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07777 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 16-Sep-24 30-Sep-24 28-Sep-24 B Closed 12 Aconex
005904 from Sta: 0+460-0+552.99
Shop Drawing for Indicative Section of Material Backfilling at Zone-08
WF-006224 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07778 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 16-Sep-24 30-Sep-24 28-Sep-24 B Closed 12 Aconex
from Sta: 0+460-0+552.99
Shop Drawing for Indicative Section of Material Backfilling at Zone-08
WF-006224 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07779 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Sunil 16-Sep-24 30-Sep-24 28-Sep-24 B Closed 12 Aconex
from Sta: 0+460-0+552.99
Shop Drawing for Indicative Section of Material Backfilling at Zone-08
WF-006224 R02Z00-C021-JVC-08-XXX-SDW-CL-CL-07780 C0 Latest Zone 08 Shop Drawing Civil Civil Engr. Yaseen 16-Sep-24 30-Sep-24 28-Sep-24 B Closed 12 Aconex
from Sta: 0+460-0+552.99
UT-Utilities & Sewerage
WF-006230 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01200C1 Latest Sewage Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing Engr. Fawzy 16-Sep-24 30-Sep-24 1-Oct-24 B Closed 15 Aconex
Infrastructure Effluent
UT-Utilities & Sewerage
WF-006230 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01201C1 Latest Sewage Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing Engr. Fawzy 16-Sep-24 30-Sep-24 1-Oct-24 B Closed 15 Aconex
Infrastructure Effluent
UT-Utilities & Sewerage
WF-006230 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01202C1 Latest Sewage Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing Engr. Fawzy 16-Sep-24 30-Sep-24 1-Oct-24 B Closed 15 Aconex
JVC-WTRAN- Infrastructure Effluent
005910 UT-Utilities & Sewerage
WF-006230 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01254C1 Latest Sewage Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing Engr. Fawzy 16-Sep-24 30-Sep-24 1-Oct-24 B Closed 15 Aconex
Infrastructure Effluent
UT-Utilities & Sewerage
WF-006230 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01255C1 Latest Sewage Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing Engr. Fawzy 16-Sep-24 30-Sep-24 1-Oct-24 B Closed 15 Aconex
Infrastructure Effluent
UT-Utilities & Sewerage
WF-006230 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01264C1 Latest Sewage Network Plan and Profile for (Part 01 and 02) RAM-MIP Shop Drawing Engr. Fawzy 16-Sep-24 30-Sep-24 1-Oct-24 B Closed 15 Aconex
Infrastructure Effluent
JVC-WTRAN- As-Built CMC Layout for Zone 05 from Sta. 1+853.979 to 1+873.979
WF-006244 R02Z00-C021-JVC-05-XXX-ABD-GT-GT-01004 C0 Latest Zone 05 As Built Geotechnical Geotechnical Engr. Yaseen 17-Sep-24 1-Oct-24 28-Sep-24 B Closed 11 Aconex
005921 (Seg. J-Z05-06) incl. ES 19
JVC-WTRAN- As-Built CMC Layout for Zone 05 from Sta. 1+873.979 to 1+893.979
WF-006245 R02Z00-C021-JVC-05-XXX-ABD-GT-GT-01005 C0 Latest Zone 05 As Built Geotechnical Geotechnical Engr. Yaseen 17-Sep-24 1-Oct-24 28-Sep-24 B Closed 11 Aconex
005922 (Seg. J-Z05-07) incl. ES 20
Shop Drawings General Layout and Coordinates for Shoring works in
WF-006306 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-04007C0 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 18-Sep-24 2-Oct-24 5-Oct-24 B Closed 17 Aconex
JVC-WTRAN- Zone 01 Wet Utility Culvert from sta. 0+015 to 0+070
005979 Shop Drawings Cross-Sections for Shoring works in Zone 01 Wet
WF-006306 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-04008C0 Latest Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 18-Sep-24 2-Oct-24 5-Oct-24 B Closed 17 Aconex
Utility Culvert from sta. 0+015 to 0+070
JVC-WTRAN-
WF-006312 R02Z00-C021-JVC-00-XXX-SDW-ST-FO-00008 C0 Latest Shop Drawing for Telecom Handholes RAM-MIP Shop Drawing Structural Foundation Engr. Shaheen 19-Sep-24 3-Oct-24 1-Oct-24 C Open 125 Aconex
005984
Shop Drawing for Indicative Section of Material Backfilling at Zone-03
WF-006336 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07651 C0 re-s Zone 03 Shop Drawing Civil Civil Engr. Sunil 21-Sep-24 5-Oct-24 5-Oct-24 B Closed 14 Aconex
from Sta: 1+020-1+120
Shop Drawing for Indicative Section of Material Backfilling at Zone-03
WF-006336 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07652 C0 re-s Zone 03 Shop Drawing Civil Civil Engr. Sunil 21-Sep-24 5-Oct-24 5-Oct-24 B Closed 14 Aconex
from Sta: 1+020-1+120
Shop Drawing for Indicative Section of Material Backfilling at Zone-03
WF-006336 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07653 C0 re-s Zone 03 Shop Drawing Civil Civil Engr. Sunil 21-Sep-24 5-Oct-24 5-Oct-24 B Closed 14 Aconex
JVC-WTRAN- from Sta: 1+020-1+120
006008 Shop Drawing for Indicative Section of Material Backfilling at Zone-03
WF-006336 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07654 C0 re-s Zone 03 Shop Drawing Civil Civil Engr. Sunil 21-Sep-24 5-Oct-24 5-Oct-24 B Closed 14 Aconex
from Sta: 1+020-1+120
Shop Drawing for Indicative Section of Material Backfilling at Zone-03
WF-006336 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07655 C0 re-s Zone 03 Shop Drawing Civil Civil Engr. Sunil 21-Sep-24 5-Oct-24 5-Oct-24 B Closed 14 Aconex
from Sta: 1+020-1+120
Shop Drawing for Indicative Section of Material Backfilling at Zone-03
WF-006336 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07656 C0 re-s Zone 03 Shop Drawing Civil Civil Engr. Sunil 21-Sep-24 5-Oct-24 5-Oct-24 B Closed 14 Aconex
from Sta: 1+020-1+120
Shop Drawing for Indicative section of Material Backfilling at Zone-04
WF-006351 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07598 C0 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 21-Sep-24 5-Oct-24 5-Oct-24 B Closed 14 Aconex
from Sta: 1+280 to 1+320
JVC-WTRAN- Shop Drawing for Indicative section of Material Backfilling at Zone-04
WF-006351 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07599 C0 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 21-Sep-24 5-Oct-24 5-Oct-24 B Closed 14 Aconex
006023 from Sta: 1+280 to 1+320
Shop Drawing for Indicative section of Material Backfilling at Zone-04
WF-006351 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07600 C0 re-s Zone 04 Shop Drawing Civil Civil Engr. Sunil 21-Sep-24 5-Oct-24 5-Oct-24 B Closed 14 Aconex
from Sta: 1+280 to 1+320
Shop drawings for Medium Voltage Network Plan, Profile, Cable duct
Power Medium
WF-006392 R02Z00-C021-JVC-10-XXX-SDW-EL-MV-01301C0 re-s schedules and manholes (SECTIONS AND DETAILS) at Tunnel 02- Zone 10 Shop Drawing Electrical Engr. Sherif 24-Sep-24 8-Oct-24 7-Oct-24 C Closed 13 Aconex
Voltage
Zone drawings
Shop 10 for Medium Voltage Network Plan, Profile, Cable duct
Power Medium
WF-006392 R02Z00-C021-JVC-10-XXX-SDW-EL-MV-01302C0 re-s schedules and manholes (SECTIONS AND DETAILS) at Tunnel 02- Zone 10 Shop Drawing Electrical Engr. Sherif 24-Sep-24 8-Oct-24 7-Oct-24 C Closed 13 Aconex
Voltage
Zone 10
Shop drawings for Medium Voltage Network Plan, Profile, Cable duct
Power Medium
WF-006392 R02Z00-C021-JVC-10-XXX-SDW-EL-MV-01303C0 re-s schedules and manholes (SECTIONS AND DETAILS) at Tunnel 02- Zone 10 Shop Drawing Electrical Engr. Sherif 24-Sep-24 8-Oct-24 7-Oct-24 C Closed 13 Aconex
Voltage
Zone drawings
Shop 10 for Medium Voltage Network Plan, Profile, Cable duct
JVC-WTRAN- Power Medium
WF-006392 R02Z00-C021-JVC-10-XXX-SDW-EL-MV-01304C0 re-s schedules and manholes (SECTIONS AND DETAILS) at Tunnel 02- Zone 10 Shop Drawing Electrical Engr. Sherif 24-Sep-24 8-Oct-24 7-Oct-24 C Closed 13 Aconex
006063 Voltage
Zone drawings
Shop 10 for Medium Voltage Network Plan, Profile, Cable duct
Power Medium
WF-006392 R02Z00-C021-JVC-10-XXX-SDW-EL-MV-01305C0 re-s schedules and manholes (SECTIONS AND DETAILS) at Tunnel 02- Zone 10 Shop Drawing Electrical Engr. Sherif 24-Sep-24 8-Oct-24 7-Oct-24 C Closed 13 Aconex
Voltage
Zone 10
Shop drawings for Medium Voltage Network Plan, Profile, Cable duct
Power Medium
WF-006392 R02Z00-C021-JVC-10-XXX-SDW-EL-MV-01306C0 re-s schedules and manholes (SECTIONS AND DETAILS) at Tunnel 02- Zone 10 Shop Drawing Electrical Engr. Sherif 24-Sep-24 8-Oct-24 7-Oct-24 C Closed 13 Aconex
Voltage
Zone drawings
Shop 10 for Medium Voltage Network Plan, Profile, Cable duct
Power Medium
WF-006392 R02Z00-C021-JVC-10-XXX-SDW-EL-MV-01307C0 re-s schedules and manholes (SECTIONS AND DETAILS) at Tunnel 02- Zone 10 Shop Drawing Electrical Engr. Sherif 24-Sep-24 8-Oct-24 7-Oct-24 C Closed 13 Aconex
Voltage
Zone 10
Shop Drawing for Indicative section of Material Backfilling at Zone-04
WF-006460 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07613-C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone-04
WF-006460 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07614-C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone-04
WF-006460 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07615-C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone-04
WF-006460 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07616-C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone-04
WF-006460 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07617-C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone-04
WF-006460 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07618-C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 1+520 to 1+760
JVC-WTRAN- As per Engr.
006129 Nahell
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow
JVC-WTRAN- Shop Drawing for Indicative section of Material Backfilling at Zone-04 Total As per Engr.
Workflow Document JVC Planned 10-Oct-24
WSP Status Terminated Overdue Overdue Submittal
WF-006460 Transmittal
006129 Drawing No. Rev. Latest
R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07619-C0 Status from Sta: 1+520 to 1+760 Description Zone 04
Location Shop Drawing Civil
Discipline Civil
Sub-Discipline Engr. Sunilby 26-Sep-24
Submitted 10-Oct-24 Status Duration Aconex
Ref.
Alternative Ref. #
Nahell Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawing for Indicative section of Material Backfilling at Zone-04 date
WF-006460 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07620-C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Today Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone-04
WF-006460 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07621-C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone-04
WF-006460 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07622-C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone-04
WF-006460 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07623-C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone-04
WF-006460 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07624-C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone-04
WF-006460 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07625-C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006462 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07664-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+520 to 0+700
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006462 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07665-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+520 to 0+700
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006462 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07666-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+520 to 0+700
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006462 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07667-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+520 to 0+700
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006462 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07668-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+520 to 0+700
JVC-WTRAN- Shop Drawing for Indicative section of Material Backfilling at Zone-02 As per Engr.
WF-006462 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07669-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
006130 from Sta: 0+520 to 0+700 Nahell
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006462 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07670-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+520 to 0+700
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006462 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07671-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+520 to 0+700
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006462 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07672-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+520 to 0+700
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006462 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07673-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+520 to 0+700
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006462 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07674-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+520 to 0+700
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006463 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07675-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+720 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006463 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07676-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+720 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006463 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07677-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+720 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006463 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07678-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+720 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006463 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07679-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
JVC-WTRAN- from Sta: 0+720 to 0+900 As per Engr.
006131 Shop Drawing for Indicative section of Material Backfilling at Zone-02 Nahell
WF-006463 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07680-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+720 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006463 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07681-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+720 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006463 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07682-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+720 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006463 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07683-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+720 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone-02
WF-006463 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07684-C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 26-Sep-24 10-Oct-24 10-Oct-24 Terminated Aconex
from Sta: 0+720 to 0+900
Transportation Transportation &
WF-006498 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06212 C0 Latest Cross section for kaar tunnel from st 0+000 to St 0+135.13 Zone 08 Shop Drawing Engr. Khalid 28-Sep-24 12-Oct-24 5-Oct-24 A Closed 7 Aconex
& Road Road
Transportation Transportation &
WF-006498 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06213 C0 Latest Cross section for kaar tunnel from st 0+000 to St 0+135.13 Zone 08 Shop Drawing Engr. Khalid 28-Sep-24 12-Oct-24 5-Oct-24 A Closed 7 Aconex
JVC-WTRAN- & Road Road
006165 Transportation Transportation &
WF-006498 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06214 C0 Latest Cross section for kaar tunnel from st 0+000 to St 0+135.13 Zone 08 Shop Drawing Engr. Khalid 28-Sep-24 12-Oct-24 5-Oct-24 A Closed 7 Aconex
& Road Road
Transportation Transportation &
WF-006498 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06215 C0 Latest Cross section for kaar tunnel from st 0+000 to St 0+135.13 Zone 08 Shop Drawing Engr. Khalid 28-Sep-24 12-Oct-24 5-Oct-24 A Closed 7 Aconex
& Road Road
UT-Utilities & UT-Utilities &
WF-006547 R02Z00-C021-JVC-08-XXX-SDW-UT-UT-00227 C0 Latest Combined Plan at KAAR-Zone 08 Zone 08 Shop Drawing Engr. Fawzy 29-Sep-24 13-Oct-24 6-Oct-24 B Closed 7 Aconex
JVC-WTRAN- Infrastructure Infrastructure
006171 UT-Utilities & UT-Utilities &
WF-006547 R02Z00-C021-JVC-08-XXX-SDW-UT-UT-00228 C0 Latest Combined Plan at KAAR-Zone 08 Zone 08 Shop Drawing Engr. Fawzy 29-Sep-24 13-Oct-24 6-Oct-24 B Closed 7 Aconex
Infrastructure Infrastructure
JVC-WTRAN- As-Built CMC Layout for Zone 05 from Sta. 1+893.979 to 1+968.979
WF-006617 R02Z00-C021-JVC-05-XXX-ABD-GT-GT-01003 C0 Latest Zone 08 As Built Geotechnical Geotechnical Engr. Yaseen 1-Oct-24 15-Oct-24 3-Oct-24 B Closed 2 Aconex
006278 (Seg. J-Z05-08 to 11) [partially]
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006630 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02001C4 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 2-Oct-24 16-Oct-24 8-Oct-24 C Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 1
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006630 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02002C4 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 2-Oct-24 16-Oct-24 8-Oct-24 C Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006630 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02003C4 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 2-Oct-24 16-Oct-24 8-Oct-24 C Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006630 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02004C4 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 2-Oct-24 16-Oct-24 8-Oct-24 C Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Cross-Sections
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006630 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02005C4 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 2-Oct-24 16-Oct-24 8-Oct-24 C Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 1
JVC-WTRAN- Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006630 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02006C4 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 2-Oct-24 16-Oct-24 8-Oct-24 C Closed 6 Aconex
006290 from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006630 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02007C4 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 2-Oct-24 16-Oct-24 8-Oct-24 C Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 3
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

JVC-WTRAN-
006290

Response
ACONEX
Workflow Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09 Total
Workflow Document JVC Planned WSP Status
C Overdue Overdue Submittal
WF-006630 Transmittal Drawing No. Rev. Status
R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02008C4 re-s Description
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 4
Zone 09
Location Shop Drawing Geotechnical
Discipline Geotechnical Submitted
Sub-Discipline Engr. Yaseen
by 2-Oct-24 16-Oct-24 8-Oct-24 Closed
Status 6
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09 date
WF-006630 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02009C4 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 2-Oct-24 16-Oct-24 8-Oct-24 C Closed Today
6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 5
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006630 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02010C4 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 2-Oct-24 16-Oct-24 8-Oct-24 C Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 6
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006630 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02011C4 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 2-Oct-24 16-Oct-24 8-Oct-24 C Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 7
JVC-WTRAN- As Built CMC Layout for Zone 02 Intersection Jadat Al Haram Tunnel
WF-006699 R02Z00-C021-JVC-02-XXX-ABD-GT-GT-01020 C0 Latest Zone 02 As Built Geotechnical Geotechnical Engr. Yaseen 5-Oct-24 19-Oct-24 12-Oct-24 B Closed 7 Aconex
006345 and KAAR Tunnel from sta. 0+910.033 To 0+993.979 (INT-01)
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01400C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01403C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01404C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01405C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01406C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01408C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01409C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01412C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01413C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01419C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01420C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01421C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01422C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01423C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01424C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01425C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01426C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01427C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01428C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01429C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01430C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
JVC-WTRAN- 08 and 09) Infrastructure
006409 Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01431C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01432C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01433C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01434C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01435C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01451C1 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01453C1 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01454C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01455C1 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01456C1 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01457C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01458C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01459C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01460C2 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01461C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01462C2 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities & Total
Workflow Document JVC Planned 23-Oct-24
WSP Status
C Overdue Overdue Submittal
WF-006768 Transmittal Drawing No. Rev. Status
R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01463C1 re-s
08 and 09) Description RAM-MIP
Location Shop Drawing Discipline
Infrastructure
Storm Water Submitted
Sub-Discipline by 7-Oct-24
Engr. Fawzy 21-Oct-24 Closed
Status 16
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities & date
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01464C2 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed Today
16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01465C1 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01466C1 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-006768 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01467C1 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 7-Oct-24 21-Oct-24 23-Oct-24 C Closed 16 Aconex
08 and 09) Infrastructure
JVC-WTRAN- UT-Utilities &
WF-006792 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-05302C0 Latest Storm Water Network Precast Catch Basin Details RAM-MIP Shop Drawing Storm Water Engr. Fawzy 8-Oct-24 22-Oct-24 20-Oct-24 B Closed 12 Aconex
006431 Infrastructure
Proposed Storm Water Drainage Network Catch Basin Plan for Part UT-Utilities &
WF-006805 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01442C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 9-Oct-24 23-Oct-24 22-Oct-24 C Closed 13 Aconex
07 Infrastructure
Proposed Storm Water Drainage Network Catch Basin Plan for Part UT-Utilities &
WF-006805 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01468C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 9-Oct-24 23-Oct-24 22-Oct-24 C Closed 13 Aconex
07 Infrastructure
Proposed Storm Water Drainage Network Catch Basin Plan for Part UT-Utilities &
WF-006805 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01469C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 9-Oct-24 23-Oct-24 22-Oct-24 C Closed 13 Aconex
JVC-WTRAN- 07 Infrastructure
006444 Proposed Storm Water Drainage Network Catch Basin Plan for Part UT-Utilities &
WF-006805 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01470C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 9-Oct-24 23-Oct-24 22-Oct-24 C Closed 13 Aconex
07 Infrastructure
Proposed Storm Water Drainage Network Catch Basin Plan for Part UT-Utilities &
WF-006805 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01471C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 9-Oct-24 23-Oct-24 22-Oct-24 C Closed 13 Aconex
07 Infrastructure
Proposed Storm Water Drainage Network Catch Basin Plan for Part UT-Utilities &
WF-006805 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01472C0 re-s RAM-MIP Shop Drawing Storm Water Engr. Fawzy 9-Oct-24 23-Oct-24 22-Oct-24 C Closed 13 Aconex
07 Infrastructure
JVC-WTRAN- UT-Utilities &
WF-006825 R02Z00-C021-JVC-XX-XXX-SDW-UT-PW-08502C0 Latest Potable Water Network Thrust Block Details for Horizontal Bends RAM-MIP Shop Drawing Potable Water Engr. Fawzy 9-Oct-24 23-Oct-24 22-Oct-24 B Closed 13 Aconex
006464 Infrastructure
Shop drawings for STREET LIGHT NETWORK LAYOUT AND
WF-006830 R02Z00-C021-JVC-00-XXX-SDW-EL-LG-90001 C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 9-Oct-24 23-Oct-24 21-Oct-24 B Closed 12 Aconex
COORDINATES WALLS FOR KAAR TUNNEL ZONE-08
Shop drawings for STREET LIGHT NETWORK LAYOUT AND
WF-006830 R02Z00-C021-JVC-00-XXX-SDW-EL-LG-90002 C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 9-Oct-24 23-Oct-24 21-Oct-24 B Closed 12 Aconex
COORDINATES WALLS FOR KAAR TUNNEL ZONE-08
Shop drawings for STREET LIGHT NETWORK LAYOUT AND
WF-006830 R02Z00-C021-JVC-00-XXX-SDW-EL-LG-90003 C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 9-Oct-24 23-Oct-24 21-Oct-24 B Closed 12 Aconex
COORDINATES WALLS FOR KAAR TUNNEL ZONE-08
JVC-WTRAN- Shop drawings for STREET LIGHT NETWORK LAYOUT AND
WF-006830 R02Z00-C021-JVC-00-XXX-SDW-EL-LG-90004 C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 9-Oct-24 23-Oct-24 21-Oct-24 B Closed 12 Aconex
006469 COORDINATES WALLS FOR KAAR TUNNEL ZONE-08
Shop drawings for STREET LIGHT NETWORK LAYOUT AND
WF-006830 R02Z00-C021-JVC-00-XXX-SDW-EL-LG-90005 C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 9-Oct-24 23-Oct-24 21-Oct-24 B Closed 12 Aconex
COORDINATES WALLS FOR KAAR TUNNEL ZONE-08
Shop drawings for STREET LIGHT NETWORK LAYOUT AND
WF-006830 R02Z00-C021-JVC-00-XXX-SDW-EL-LG-90006 C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 9-Oct-24 23-Oct-24 21-Oct-24 B Closed 12 Aconex
COORDINATES WALLS FOR KAAR TUNNEL ZONE-08
Shop drawings for STREET LIGHT NETWORK LAYOUT AND
WF-006830 R02Z00-C021-JVC-00-XXX-SDW-EL-LG-90007 C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 9-Oct-24 23-Oct-24 21-Oct-24 B Closed 12 Aconex
COORDINATES WALLS FOR KAAR TUNNEL ZONE-08
Shop drawings for Medium Voltage Network Plan, Profile, Cable duct
Power Medium
WF-006842 R02Z00-C021-JVC-10-XXX-SDW-EL-MV-01301C1 Latest schedules and manholes (SECTIONS AND DETAILS) at Tunnel 02- Zone 10 Shop Drawing Electrical Engr. Sherif 10-Oct-24 24-Oct-24 23-Oct-24 B Closed 13 Aconex
Voltage
Zone drawings
Shop 10 for Medium Voltage Network Plan, Profile, Cable duct
Power Medium
WF-006842 R02Z00-C021-JVC-10-XXX-SDW-EL-MV-01302C1 Latest schedules and manholes (SECTIONS AND DETAILS) at Tunnel 02- Zone 10 Shop Drawing Electrical Engr. Sherif 10-Oct-24 24-Oct-24 23-Oct-24 B Closed 13 Aconex
Voltage
Zone drawings
Shop 10 for Medium Voltage Network Plan, Profile, Cable duct
Power Medium
WF-006842 R02Z00-C021-JVC-10-XXX-SDW-EL-MV-01303C1 Latest schedules and manholes (SECTIONS AND DETAILS) at Tunnel 02- Zone 10 Shop Drawing Electrical Engr. Sherif 10-Oct-24 24-Oct-24 23-Oct-24 B Closed 13 Aconex
Voltage
Zone 10
Shop drawings for Medium Voltage Network Plan, Profile, Cable duct
JVC-WTRAN- Power Medium
WF-006842 R02Z00-C021-JVC-10-XXX-SDW-EL-MV-01304C1 Latest schedules and manholes (SECTIONS AND DETAILS) at Tunnel 02- Zone 10 Shop Drawing Electrical Engr. Sherif 10-Oct-24 24-Oct-24 23-Oct-24 B Closed 13 Aconex
006478 Voltage
Zone drawings
Shop 10 for Medium Voltage Network Plan, Profile, Cable duct
Power Medium
WF-006842 R02Z00-C021-JVC-10-XXX-SDW-EL-MV-01305C1 Latest schedules and manholes (SECTIONS AND DETAILS) at Tunnel 02- Zone 10 Shop Drawing Electrical Engr. Sherif 10-Oct-24 24-Oct-24 23-Oct-24 B Closed 13 Aconex
Voltage
Zone drawings
Shop 10 for Medium Voltage Network Plan, Profile, Cable duct
Power Medium
WF-006842 R02Z00-C021-JVC-10-XXX-SDW-EL-MV-01306C1 Latest schedules and manholes (SECTIONS AND DETAILS) at Tunnel 02- Zone 10 Shop Drawing Electrical Engr. Sherif 10-Oct-24 24-Oct-24 23-Oct-24 B Closed 13 Aconex
Voltage
Zone 10
Shop drawings for Medium Voltage Network Plan, Profile, Cable duct
Power Medium
WF-006842 R02Z00-C021-JVC-10-XXX-SDW-EL-MV-01307C1 Latest schedules and manholes (SECTIONS AND DETAILS) at Tunnel 02- Zone 10 Shop Drawing Electrical Engr. Sherif 10-Oct-24 24-Oct-24 23-Oct-24 B Closed 13 Aconex
Voltage
Zone 10
Shop Drawings for Shoring Works at Zone 07 North from sta. 0+080
WF-006919 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-04010C0 re-s Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 13-Oct-24 27-Oct-24 21-Oct-24 B Closed 8 Aconex
to 0+143 - General Layout and Co-ordinates
Shop Drawings for Shoring Works at Zone 07 North from sta. 0+080
WF-006919 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-04011C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 13-Oct-24 27-Oct-24 21-Oct-24 B Closed 8 Aconex
to 0+143 - Cross-section Details Sheet 01
Shop Drawings for Shoring Works at Zone 07 North from sta. 0+080
WF-006919 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-04012C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 13-Oct-24 27-Oct-24 21-Oct-24 B Closed 8 Aconex
JVC-WTRAN- to 0+143 - Cross-section Details Sheet 02
006552 Shop Drawings for Shoring Works at Zone 07 North from sta. 0+080
WF-006919 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-04013C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 13-Oct-24 27-Oct-24 21-Oct-24 B Closed 8 Aconex
to 0+143 - Cross-section Details Sheet 03
Shop Drawings for Shoring Works at Zone 07 North from sta. 0+080
WF-006919 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-04014C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 13-Oct-24 27-Oct-24 21-Oct-24 B Closed 8 Aconex
to 0+143 - Cross-section Details Sheet 04
Shop Drawings for Shoring Works at Zone 07 North from sta. 0+080
WF-006919 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-04015C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 13-Oct-24 27-Oct-24 21-Oct-24 B Closed 8 Aconex
to 0+143 - Cross-section Details Sheet 05
Shop Drawings Layout for Soil Improvement Works in Zone 01 from
WF-006926 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02004C4 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 14-Oct-24 28-Oct-24 21-Oct-24 B Closed 7 Aconex
sta. 0+400 to 0+500 incl VTR 01 and LS 06
Shop Drawings Cross-Sections for Soil Improvement Works in Zone
WF-006926 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02005C4 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 14-Oct-24 28-Oct-24 21-Oct-24 B Closed 7 Aconex
JVC-WTRAN- 01 from sta. 0+400 to 0+500 incl VTR 01 and LS 07
006559 Shop Drawings Coordinates Sheet 1 for Soil Improvement Works in
WF-006926 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02006C4 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 14-Oct-24 28-Oct-24 21-Oct-24 B Closed 7 Aconex
Zone 01 from sta. 0+400 to 0+500 incl VTR 01 and LS 08
Shop Drawings Coordinates Sheet 2 for Soil Improvement Works in
WF-006926 R02Z00-C021-JVC-01-XXX-SDW-GT-GT-02007C4 Latest Zone 01 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 14-Oct-24 28-Oct-24 21-Oct-24 B Closed 7 Aconex
Zone 01 from sta. 0+400 to 0+500 incl VTR 01 and LS 09
JVC-WTRAN- As Built CMC Layout from sta 0+993.979 to 1+013.979. (Seg. J-Z03-
WF-006927 R02Z00-C021-JVC-03-XXX-ABD-GT-GT-01005 C0 Latest Zone 03 As Built Geotechnical Geotechnical Engr. Yaseen 14-Oct-24 28-Oct-24 16-Oct-24 B Closed 2 Aconex
006560 01)
Shop Drawings for Soil Improvement Works in Zone 07 from sta.
WF-006964 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-01001C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 15-Oct-24 29-Oct-24 21-Oct-24 B Closed 6 Aconex
0+018 to 0+140 - General Layout Sheet 0
Shop Drawings for Soil Improvement Works in Zone 07 from sta.
WF-006964 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-01002C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 15-Oct-24 29-Oct-24 21-Oct-24 B Closed 6 Aconex
0+018 to 0+140 - General Layout Sheet 1
Shop Drawings for Soil Improvement Works in Zone 07 from sta.
WF-006964 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-01003C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 15-Oct-24 29-Oct-24 21-Oct-24 B Closed 6 Aconex
JVC-WTRAN- 0+018 to 0+140 - General Layout Sheet 2
006593 Shop Drawings for Soil Improvement Works in Zone 07 from sta.
WF-006964 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-01004C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 15-Oct-24 29-Oct-24 21-Oct-24 B Closed 6 Aconex
0+018 to 0+140 - Cross-Section Sheet 01
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

JVC-WTRAN-
006593
Response
ACONEX
Workflow Shop Drawings for Soil Improvement Works in Zone 07 from sta. Total
Workflow Document JVC Planned 21-Oct-24
WSP Status
B Overdue Overdue Submittal
WF-006964 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-07-XXX-SDW-GT-GT-01005C0 Status 0+018 to 0+140 - Coordinates
Description
Sheet 1
Zone 07
Location Shop Drawing Geotechnical
Discipline Geotechnical Submitted
Sub-Discipline by 15-Oct-24
Engr. Yaseen 29-Oct-24 Closed
Status 6
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawings for Soil Improvement Works in Zone 07 from sta. date
WF-006964 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-01006C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 15-Oct-24 29-Oct-24 21-Oct-24 B Closed Today
6 Aconex
0+018 to 0+140 - Coordinates Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006990 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02001C5 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Oct-24 30-Oct-24 22-Oct-24 B Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 1
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006990 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02002C5 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Oct-24 30-Oct-24 22-Oct-24 B Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006990 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02003C5 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Oct-24 30-Oct-24 22-Oct-24 B Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006990 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02004C5 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Oct-24 30-Oct-24 22-Oct-24 B Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Cross-Sections
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006990 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02005C5 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Oct-24 30-Oct-24 22-Oct-24 B Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 1
JVC-WTRAN- Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006990 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02006C5 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Oct-24 30-Oct-24 22-Oct-24 B Closed 6 Aconex
006593 from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006990 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02007C5 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Oct-24 30-Oct-24 22-Oct-24 B Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006990 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02008C5 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Oct-24 30-Oct-24 22-Oct-24 B Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 4
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006990 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02009C5 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Oct-24 30-Oct-24 22-Oct-24 B Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 5
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006990 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02010C5 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Oct-24 30-Oct-24 22-Oct-24 B Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 6
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-006990 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02011C5 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 16-Oct-24 30-Oct-24 22-Oct-24 B Closed 6 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 7
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00131C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00132C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00133C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00134C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00135C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00136C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00146C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00147C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00148C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00149C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00150C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00151C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00152C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00153C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00154C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00155C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00156C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00157C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00158C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00159C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00160C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00161C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00162C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00163C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00164C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00165C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00166C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00167C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00168C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure

JVC-WTRAN-
006674
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow UT-Utilities & UT-Utilities & Total
Workflow Document JVC Planned WSP Status
B Overdue Overdue Submittal
WF-007052 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00169C2 Status Combined Utility Plan for Roads 12 & 13 - D09
Description D09
Location Shop Drawing Discipline
Infrastructure Sub-Discipline Engr. Fawzy 19-Oct-24
Infrastructure Submitted by Submitted
2-Nov-24 4-Nov-24 Closed
Status 16
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Reply Response Code from WSP from JVC
No. as of
JVC-WTRAN- UT-Utilities & UT-Utilities & date
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00170C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed Today
16 Aconex
006674 Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00171C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00172C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00173C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00174C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00175C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00176C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00177C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00178C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00179C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00180C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00181C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00182C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00183C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00184C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00185C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00186C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00187C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00188C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00189C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00190C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00191C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00192C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00193C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00194C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00195C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00196C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00197C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00198C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00199C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007052 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00200C2 Latest Combined Utility Plan for Roads 12 & 13 - D09 D09 Shop Drawing Engr. Fawzy 19-Oct-24 2-Nov-24 4-Nov-24 B Closed 16 Aconex
Infrastructure Infrastructure
Shop drawings for Soil Improvement for Zone 4 Including LS05
MIP-JVC-SHD-GEO-
WF-007094 R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01001C5 Latest VTR 06 and ES13, 14, 17 & 18 from sta. 1+260 to sta. 1+773 - Zone 04 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 28-Oct-24 B Closed 8 Aconex
000021-04-B
Layout
Shop Sheet 1 for Soil Improvement for Zone 4 Including LS05
drawings
MIP-JVC-SHD-GEO-
WF-007094 R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01002C5 Latest VTR 06 and ES13, 14, 17 & 18 from sta. 1+260 to sta. 1+774 - Zone 04 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 28-Oct-24 B Closed 8 Aconex
000021-04-B
Layout Sheet 2 for Soil Improvement for Zone 4 Including LS05
Shop drawings
MIP-JVC-SHD-GEO-
WF-007094 R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01003C5 Latest VTR 06 and ES13, 14, 17 & 18 from sta. 1+260 to sta. 1+774 - Zone 04 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 28-Oct-24 B Closed 8 Aconex
000021-04-B
Layout
Shop Sheet 3 for Soil Improvement for Zone 4 Including LS05
drawings
MIP-JVC-SHD-GEO-
WF-007094 R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01004C5 Latest VTR 06 and ES13, 14, 17 & 18 from sta. 1+260 to sta. 1+774 - Cross- Zone 04 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 28-Oct-24 B Closed 8 Aconex
000021-04-B
section Sheet 1for Soil Improvement for Zone 4 Including LS05
Shop drawings
MIP-JVC-SHD-GEO-
WF-007094 R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01005C5 Latest VTR 06 and ES13, 14, 17 & 18 from sta. 1+260 to sta. 1+774 - Cross- Zone 04 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 28-Oct-24 B Closed 8 Aconex
000021-04-B
section
Shop Sheet 2for Soil Improvement for Zone 4 Including PS 03 VTR
drawings
MIP-JVC-SHD-GEO-
WF-007094 R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01006C5 Latest 06 and ES 13, 14, 17 & 18 from sta. 1+260 to sta. 1+773 - Co- Zone 04 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 28-Oct-24 B Closed 8 Aconex
000021-04-B
ordinate
Shop Sheet for
drawings 1 Soil Improvement for Zone 4 Including PS 03 VTR
MIP-JVC-SHD-GEO-
WF-007094 R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01007C5 Latest 06 and ES 13, 14, 17 & 18 from sta. 1+260 to sta. 1+773 - Co- Zone 04 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 28-Oct-24 B Closed 8 Aconex
000021-04-B
ordinate Sheet 2 Soil Improvement for Zone 4 Including PS 03 VTR
Shop drawings for
JVC-WTRAN- MIP-JVC-SHD-GEO-
WF-007094 R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01008C5 Latest 06 and ES 13, 14, 17 & 18 from sta. 1+260 to sta. 1+773 - Co- Zone 04 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 28-Oct-24 B Closed 8 Aconex
006716 000021-04-B
ordinate
Shop Sheet for
drawings 3 Soil Improvement for Zone 4 Including PS 03 VTR
MIP-JVC-SHD-GEO-
WF-007094 R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01009C5 Latest 06 and ES 13, 14, 17 & 18 from sta. 1+260 to sta. 1+773 - Co- Zone 04 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 28-Oct-24 B Closed 8 Aconex
000021-04-B
ordinate Sheet 4 Soil Improvement for Zone 4 Including PS 03 VTR
Shop drawings for
MIP-JVC-SHD-GEO-
WF-007094 R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01010C5 Latest 06 and ES 13, 14, 17 & 18 from sta. 1+260 to sta. 1+773 - Co- Zone 04 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 28-Oct-24 B Closed 8 Aconex
000021-04-B
ordinate Sheet 5
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242
JVC-WTRAN-
006716
Shop Drawing Submittals E 0 247 Terminated

Response
Shop drawings for Soil Improvement for Zone 4 Including PS 03 VTR ACONEX
Workflow Total MIP-JVC-SHD-GEO-
Workflow Document JVC Planned WSP Status
B Overdue Overdue Submittal
WF-007094 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01011C5 Status 06 and ES 13, 14, 17 & 18 from sta. 1+260 to sta. 1+773 - Co-
Description Zone 04
Location Shop Drawing Geotechnical
Discipline Geotechnical Submitted
Sub-Discipline by 20-Oct-24
Engr. Yaseen 3-Nov-24 28-Oct-24 Closed
Status 8
Duration Aconex
Ref.
Alternative Ref. #
000021-04-B Remarks
Ref. No. ordinate Sheet for
6 Soil Improvement for Zone 4 Including PS 03 VTR Type Submitted Reply Response Code from WSP from JVC
No. Shop drawings as of
date MIP-JVC-SHD-GEO-
WF-007094 R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01012C5 Latest 06 and ES 13, 14, 17 & 18 from sta. 1+260 to sta. 1+773 - Co- Zone 04 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 28-Oct-24 B Closed Today
8 Aconex
000021-04-B
ordinate Sheet for
Shop drawings 7 Soil Improvement for Zone 4 Including PS 03 VTR
MIP-JVC-SHD-GEO-
WF-007094 R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01013C5 Latest 06 and ES 13, 14, 17 & 18 from sta. 1+260 to sta. 1+773 - Co- Zone 04 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 28-Oct-24 B Closed 8 Aconex
000021-04-B
ordinate
Shop Sheet for
drawings 8 Soil Improvement for Zone 4 Including PS 03 VTR
MIP-JVC-SHD-GEO-
WF-007094 R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01014C5 Latest 06 and ES 13, 14, 17 & 18 from sta. 1+260 to sta. 1+773 - Co- Zone 04 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 28-Oct-24 B Closed 8 Aconex
000021-04-B
ordinate Sheet 9 Soil Improvement for Zone 4 Including PS 03 VTR
Shop drawings for
MIP-JVC-SHD-GEO-
WF-007094 R02Z00-C021-JVC-04-XXX-SDW-GT-GT-01015C6 Latest 06 and ES 13, 14, 17 & 18 from sta. 1+260 to sta. 1+773 - Co- Zone 04 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 28-Oct-24 B Closed 8 Aconex
000021-04-B
ordinate Sheet 10
Shop Drawing for Shoring Works in Zone 07 South (Airport) from sta.
WF-007085 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-04006C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 22-Oct-24 B Closed 2 Aconex
JVC-WTRAN- 0+045 to 0+175 - Elevation Sheet 1
006707 Shop Drawing for Shoring Works in Zone 07 South (Airport) from sta.
WF-007085 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-04007C0 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 20-Oct-24 3-Nov-24 22-Oct-24 B Closed 2 Aconex
0+045 to 0+175 - Elevation Sheet 2
UT-Utilities & UT-Utilities &
WF-007147 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00229C0 Latest Combined utility plan for road 14 Road 14 Shop Drawing Engr. Fawzy 22-Oct-24 5-Nov-24 6-Nov-24 B Closed 15 Aconex
Infrastructure Infrastructure
JVC-WTRAN- UT-Utilities & UT-Utilities &
WF-007147 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00230C0 Latest Combined utility plan for road 14 Road 14 Shop Drawing Engr. Fawzy 22-Oct-24 5-Nov-24 6-Nov-24 B Closed 15 Aconex
006765 Infrastructure Infrastructure
UT-Utilities & UT-Utilities &
WF-007147 R02Z00-C021-JVC-XX-XXX-SDW-UT-UT-00231C0 Latest Combined utility plan for road 14 Road 14 Shop Drawing Engr. Fawzy 22-Oct-24 5-Nov-24 6-Nov-24 B Closed 15 Aconex
Infrastructure Infrastructure
JVC-WTRAN- As-Built CMC layout for Tunnel 01 (Zone 09) from
WF-007148 R02Z00-C021-JVC-09-XXX-ABD-GT-GT-02007 C0 re-s Zone 09 As Built Geotechnical Geotechnical Engr. Yaseen 22-Oct-24 5-Nov-24 23-Oct-24 B Closed 1 Aconex
006766 station 0+235 to 0+281
Shop drawings for unit substation 500kva with ring main unit details
WF-007191 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02001C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 24-Oct-24 7-Nov-24 4-Nov-24 C Closed 11 Aconex
foundation and earthing system
Shop drawings for unit substation 500kva with ring main unit details
WF-007191 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02002C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 24-Oct-24 7-Nov-24 4-Nov-24 C Closed 11 Aconex
foundation and earthing system
Shop drawings for unit substation 500kva with ring main unit details
WF-007191 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02003C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 24-Oct-24 7-Nov-24 4-Nov-24 C Closed 11 Aconex
foundation and earthing system
Shop drawings for unit substation 500kva with ring main unit details
WF-007191 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02004C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 24-Oct-24 7-Nov-24 4-Nov-24 C Closed 11 Aconex
foundation and earthing system
JVC-WTRAN- Shop drawings for unit substation 500kva with ring main unit details
WF-007191 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02005C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 24-Oct-24 7-Nov-24 4-Nov-24 C Closed 11 Aconex
006766 foundation and earthing system
Shop drawings for unit substation 500kva with ring main unit details
WF-007191 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02006C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 24-Oct-24 7-Nov-24 4-Nov-24 C Closed 11 Aconex
foundation and earthing system
Shop drawings for unit substation 500kva with ring main unit details
WF-007191 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02007C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 24-Oct-24 7-Nov-24 4-Nov-24 C Closed 11 Aconex
foundation and earthing system
Shop drawings for unit substation 500kva with ring main unit details
WF-007191 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02008C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 24-Oct-24 7-Nov-24 4-Nov-24 C Closed 11 Aconex
foundation and earthing system
Shop drawings for unit substation 500kva with ring main unit details
WF-007191 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02009C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 24-Oct-24 7-Nov-24 4-Nov-24 C Closed 11 Aconex
foundation and earthing system
Shop Drawings for Soil Improvement works for Zone 06 from sta.
WF-007194 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-02004C0 re-s Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 24-Oct-24 7-Nov-24 28-Oct-24 B Closed 4 Aconex
2+200 to 2+320 incl LS 02 - General Layout
Shop Drawings for Soil Improvement works for Zone 06 from sta.
WF-007194 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-02005C0 re-s Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 24-Oct-24 7-Nov-24 28-Oct-24 B Closed 4 Aconex
JVC-WTRAN- 2+200 to 2+320 incl LS 02 - Cross Sections
006805 Shop Drawings for Soil Improvement works for Zone 06 from sta.
WF-007194 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-02006C0 re-s Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 24-Oct-24 7-Nov-24 28-Oct-24 B Closed 4 Aconex
2+200 to 2+320 incl LS 02 - Co-ordinates Sheet 1
Shop Drawings for Soil Improvement works for Zone 06 from sta.
WF-007194 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-02007C0 re-s Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 24-Oct-24 7-Nov-24 28-Oct-24 B Closed 4 Aconex
2+200 to 2+320 incl LS 02 - Co-ordinates Sheet 2
Shop drawings for unit substation 1000kva with ring main unit details
WF-007206 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02101C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 26-Oct-24 9-Nov-24 6-Nov-24 C Closed 11 Aconex
foundation and earthing system
Shop drawings for unit substation 1000kva with ring main unit details
WF-007206 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02102C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 26-Oct-24 9-Nov-24 6-Nov-24 C Closed 11 Aconex
foundation and earthing system
Shop drawings for unit substation 1000kva with ring main unit details
WF-007206 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02103C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 26-Oct-24 9-Nov-24 6-Nov-24 C Closed 11 Aconex
foundation and earthing system
Shop drawings for unit substation 1000kva with ring main unit details
WF-007206 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02104C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 26-Oct-24 9-Nov-24 6-Nov-24 C Closed 11 Aconex
foundation and earthing system
JVC-WTRAN- Shop drawings for unit substation 1000kva with ring main unit details
WF-007206 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02105C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 26-Oct-24 9-Nov-24 6-Nov-24 C Closed 11 Aconex
006817 foundation and earthing system
Shop drawings for unit substation 1000kva with ring main unit details
WF-007206 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02106C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 26-Oct-24 9-Nov-24 6-Nov-24 C Closed 11 Aconex
foundation and earthing system
Shop drawings for unit substation 1000kva with ring main unit details
WF-007206 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02107C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 26-Oct-24 9-Nov-24 6-Nov-24 C Closed 11 Aconex
foundation and earthing system
Shop drawings for unit substation 1000kva with ring main unit details
WF-007206 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02108C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 26-Oct-24 9-Nov-24 6-Nov-24 C Closed 11 Aconex
foundation and earthing system
Shop drawings for unit substation 1000kva with ring main unit details
WF-007206 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02109C0 re-s RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 26-Oct-24 9-Nov-24 6-Nov-24 C Closed 11 Aconex
foundation and earthing system
Shop Drawing for Soil Improvement Works at Zone 05 from sta.
WF-007220 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01023-C0 Latest 1+953 to 2+053 and Zone 07 from sta. 0+018 to 0+060 - General Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 26-Oct-24 9-Nov-24 27-Oct-24 Terminated Aconex
Layout
Shop Drawing for Soil Improvement Works at Zone 05 from sta.
WF-007220 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01024-C0 Latest 1+953 to 2+053 and Zone 07 from sta. 0+018 to 0+060 - Co- Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 26-Oct-24 9-Nov-24 27-Oct-24 Terminated Aconex
ordinates
Shop Sheet
Drawing for01
Soil Improvement Works at Zone 05 from sta.
WF-007220 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01025-C0 Latest 1+953 to 2+053 and Zone 07 from sta. 0+018 to 0+060 - Co- Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 26-Oct-24 9-Nov-24 27-Oct-24 Terminated Aconex
ordinates Sheet 02
Shop Drawing for Soil Improvement Works at Zone 05 from sta.
JVC-WTRAN- As per Engr.
WF-007220 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01026-C0 Latest 1+953 to 2+053 and Zone 07 from sta. 0+018 to 0+060 - Co- Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 26-Oct-24 9-Nov-24 27-Oct-24 Terminated Aconex
006831 Yaseen
ordinates
Shop Sheet
Drawing for03
Soil Improvement Works at Zone 05 from sta.
WF-007220 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01027-C0 Latest 1+953 to 2+053 and Zone 07 from sta. 0+018 to 0+060 - Co- Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 26-Oct-24 9-Nov-24 27-Oct-24 Terminated Aconex
ordinates
Shop Sheet
Drawing for04
Soil Improvement Works at Zone 05 from sta.
WF-007220 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01028-C0 Latest 1+953 to 2+053 and Zone 07 from sta. 0+018 to 0+060 - Co- Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 26-Oct-24 9-Nov-24 27-Oct-24 Terminated Aconex
ordinates Sheet 05
Shop Drawing for Soil Improvement Works at Zone 05 from sta.
WF-007220 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01029-C0 Latest 1+953 to 2+053 and Zone 07 from sta. 0+018 to 0+060 - Cross- Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 26-Oct-24 9-Nov-24 27-Oct-24 Terminated Aconex
Section
JVC-WTRAN- Transportation Transportation & MIP-JVC-SHD-
WF-007230 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06123-C0 Latest Plan & Profile for Kaar at grade -03 Zone 08 Shop Drawing Engr. Sunil 27-Oct-24 10-Nov-24 28-Oct-24 Terminated Aconex
006841 & Road Road RDW-000027-00
JVC-WTRAN- Transportation Transportation & MIP-JVC-SHD-
WF-007231 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06124-C0 Latest Shop drawing Plan & Profile for Kaar at grade - 04 Zone 08 Shop Drawing Engr. Sunil 27-Oct-24 10-Nov-24 28-Oct-24 Terminated Aconex
006842 & Road Road RDW-000034-01
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation & Total
Workflow Document JVC Planned 28-Oct-24
WSP Status Terminated Overdue Overdue Submittal
WF-007232 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06216-C0 Status grade road 03 & 04 Description Zone 08
Location Shop Drawing Discipline
& Road Sub-Discipline
Road
Engr. Sunilby 27-Oct-24
Submitted 10-Nov-24 Status Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. JVC-WTRAN- Type Submitted Reply Response Code from WSP from JVC
No. as of
006843 Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation & date
WF-007232 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06217-C0 Latest Zone 08 Shop Drawing Engr. Sunil 27-Oct-24 10-Nov-24 28-Oct-24 Terminated Today Aconex
grade road 03 & 04 & Road Road
Shop Drawing for Indicative section of Material Backfilling at Zone
WF-007235 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07650 C1 Latest Zone 03 Shop Drawing Civil Civil Engr. Sunil 27-Oct-24 10-Nov-24 31-Oct-24 B Closed 4 Aconex
03 from Sta. 1+000 to 1+260
Shop Drawing for Indicative section of Material Backfilling at Zone
WF-007235 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07651 C1 Latest Zone 03 Shop Drawing Civil Civil Engr. Sunil 27-Oct-24 10-Nov-24 31-Oct-24 B Closed 4 Aconex
03 from Sta. 1+000 to 1+260
Shop Drawing for Indicative section of Material Backfilling at Zone
WF-007235 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07652 C1 Latest Zone 03 Shop Drawing Civil Civil Engr. Sunil 27-Oct-24 10-Nov-24 31-Oct-24 B Closed 4 Aconex
03 from Sta. 1+000 to 1+260
Shop Drawing for Indicative section of Material Backfilling at Zone
WF-007235 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07653 C1 Latest Zone 03 Shop Drawing Civil Civil Engr. Sunil 27-Oct-24 10-Nov-24 31-Oct-24 B Closed 4 Aconex
03 from Sta. 1+000 to 1+260
Shop Drawing for Indicative section of Material Backfilling at Zone
WF-007235 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07654 C1 Latest Zone 03 Shop Drawing Civil Civil Engr. Sunil 27-Oct-24 10-Nov-24 31-Oct-24 B Closed 4 Aconex
03 from Sta. 1+000 to 1+260
Shop Drawing for Indicative section of Material Backfilling at Zone
WF-007235 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07655 C1 Latest Zone 03 Shop Drawing Civil Civil Engr. Sunil 27-Oct-24 10-Nov-24 31-Oct-24 B Closed 4 Aconex
03 from Sta. 1+000 to 1+260
Shop Drawing for Indicative section of Material Backfilling at Zone
WF-007235 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07656 C1 Latest Zone 03 Shop Drawing Civil Civil Engr. Sunil 27-Oct-24 10-Nov-24 31-Oct-24 B Closed 4 Aconex
JVC-WTRAN- 03 from Sta. 1+000 to 1+260
006846 Shop Drawing for Indicative section of Material Backfilling at Zone
WF-007235 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07657 C1 Latest Zone 03 Shop Drawing Civil Civil Engr. Sunil 27-Oct-24 10-Nov-24 31-Oct-24 B Closed 4 Aconex
03 from Sta. 1+000 to 1+260
Shop Drawing for Indicative section of Material Backfilling at Zone
WF-007235 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07658 C1 Latest Zone 03 Shop Drawing Civil Civil Engr. Sunil 27-Oct-24 10-Nov-24 31-Oct-24 B Closed 4 Aconex
03 from Sta. 1+000 to 1+260
Shop Drawing for Indicative section of Material Backfilling at Zone
WF-007235 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07659 C1 Latest Zone 03 Shop Drawing Civil Civil Engr. Sunil 27-Oct-24 10-Nov-24 31-Oct-24 B Closed 4 Aconex
03 from Sta. 1+000 to 1+260
Shop Drawing for Indicative section of Material Backfilling at Zone
WF-007235 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07660 C1 Latest Zone 03 Shop Drawing Civil Civil Engr. Sunil 27-Oct-24 10-Nov-24 31-Oct-24 B Closed 4 Aconex
03 from Sta. 1+000 to 1+260
Shop Drawing for Indicative section of Material Backfilling at Zone
WF-007235 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07661 C1 Latest Zone 03 Shop Drawing Civil Civil Engr. Sunil 27-Oct-24 10-Nov-24 31-Oct-24 B Closed 4 Aconex
03 from Sta. 1+000 to 1+260
Shop Drawing for Indicative section of Material Backfilling at Zone
WF-007235 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07662 C1 Latest Zone 03 Shop Drawing Civil Civil Engr. Sunil 27-Oct-24 10-Nov-24 31-Oct-24 B Closed 4 Aconex
03 from Sta. 1+000 to 1+260
Shop Drawing for Indicative section of Material Backfilling at Zone
WF-007235 R02Z00-C021-JVC-03-XXX-SDW-CL-CL-07663 C1 Latest Zone 03 Shop Drawing Civil Civil Engr. Sunil 27-Oct-24 10-Nov-24 31-Oct-24 B Closed 4 Aconex
03 from Sta. 1+000 to 1+260
Shop Drawing for Soil Improvement at Tunnel 03 from Sta. 0+310 to
WF-007248 R02Z00-C021-JVC-11-XXX-SDW-GT-GT-02001C5 Latest Zone 11 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 27-Oct-24 10-Nov-24 4-Nov-24 B Closed 8 Aconex
0+434, Staircase 15, 16 and Room 12A - General Layout
Shop Drawing for Soil Improvement at Tunnel 03 from Sta. 0+310 to
WF-007248 R02Z00-C021-JVC-11-XXX-SDW-GT-GT-02002C5 Latest Zone 11 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 27-Oct-24 10-Nov-24 4-Nov-24 B Closed 8 Aconex
0+434, Staircase 15, 16 and Room 12A - Cross Sections
Shop Drawing for Soil Improvement at Tunnel 03 from Sta. 0+310 to
WF-007248 R02Z00-C021-JVC-11-XXX-SDW-GT-GT-02003C5 Latest Zone 11 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 27-Oct-24 10-Nov-24 4-Nov-24 B Closed 8 Aconex
JVC-WTRAN- 0+434, Staircase 15, 16 and Room 12A - Coordinates Sheet 1
006857 Shop Drawing for Soil Improvement at Tunnel 03 from Sta. 0+310 to
WF-007248 R02Z00-C021-JVC-11-XXX-SDW-GT-GT-02004C5 Latest Zone 11 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 27-Oct-24 10-Nov-24 4-Nov-24 B Closed 8 Aconex
0+434, Staircase 15, 16 and Room 12A - Coordinates Sheet 2
Shop Drawing for Soil Improvement at Tunnel 03 from Sta. 0+310 to
WF-007248 R02Z00-C021-JVC-11-XXX-SDW-GT-GT-02005C5 Latest Zone 11 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 27-Oct-24 10-Nov-24 4-Nov-24 B Closed 8 Aconex
0+434, Staircase 15, 16 and Room 12A - Coordinates Sheet 3
Shop Drawing for Soil Improvement at Tunnel 03 from Sta. 0+310 to
WF-007248 R02Z00-C021-JVC-11-XXX-SDW-GT-GT-02006C5 Latest Zone 11 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 27-Oct-24 10-Nov-24 4-Nov-24 B Closed 8 Aconex
0+434, Staircase 15, 16 and Room 12A - Coordinates Sheet 4
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07664 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07665 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07666 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07667 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07668 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07669 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07670 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07671 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07672 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07673 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
JVC-WTRAN- Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07674 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
006862 from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07675 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07676 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07677 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07678 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07679 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07680 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07681 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07682 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
Shop Drawing for Indicative section of Material Backfilling at Zone 02
WF-007256 R02Z00-C021-JVC-02-XXX-SDW-CL-CL-07683 C0 Latest Zone 02 Shop Drawing Civil Civil Engr. Sunil 28-Oct-24 11-Nov-24 31-Oct-24 B Closed 3 Aconex
from Sta: 0+520 to 0+900
JVC-WTRAN-
006862

Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow Shop Drawing for Indicative section of Material Backfilling at Zone 02 Total
Workflow Document JVC Planned 31-Oct-24
WSP Status
B Overdue Overdue Submittal
WF-007256 TransmittalR02Z00-C021-JVC-02-XXX-SDW-CL-CL-07684
Drawing No. Rev. Status from Sta: 0+520 to 0+900 Description
C0 Latest Zone 02
Location Shop Drawing Civil
Discipline Civil
Sub-Discipline Engr. Sunilby 28-Oct-24
Submitted 11-Nov-24 Closed
Status 3
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. Shop Drawing for Soil Improvement Works at Zone 05 from sta. as of
date
WF-007271 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01023C0 Latest 1+953 to 2+053 and Zone 07 from sta. 0+018 to 0+060 - General Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 28-Oct-24 11-Nov-24 3-Nov-24 B Closed Today
6 Aconex
Layout
Shop Drawing for Soil Improvement Works at Zone 05 from sta.
WF-007271 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01024C0 Latest 1+953 to 2+053 and Zone 07 from sta. 0+018 to 0+060 - Co- Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 28-Oct-24 11-Nov-24 3-Nov-24 B Closed 6 Aconex
ordinates
Shop Sheet
Drawing for01
Soil Improvement Works at Zone 05 from sta.
WF-007271 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01025C0 Latest 1+953 to 2+053 and Zone 07 from sta. 0+018 to 0+060 - Co- Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 28-Oct-24 11-Nov-24 3-Nov-24 B Closed 6 Aconex
ordinates Sheet 02
Shop Drawing for Soil Improvement Works at Zone 05 from sta.
JVC-WTRAN-
WF-007271 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01026C0 Latest 1+953 to 2+053 and Zone 07 from sta. 0+018 to 0+060 - Co- Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 28-Oct-24 11-Nov-24 3-Nov-24 B Closed 6 Aconex
006877
ordinates Sheet
Shop Drawing for03
Soil Improvement Works at Zone 05 from sta.
WF-007271 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01027C0 Latest 1+953 to 2+053 and Zone 07 from sta. 0+018 to 0+060 - Co- Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 28-Oct-24 11-Nov-24 3-Nov-24 B Closed 6 Aconex
ordinates
Shop Sheet
Drawing for04
Soil Improvement Works at Zone 05 from sta.
WF-007271 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01028C0 Latest 1+953 to 2+053 and Zone 07 from sta. 0+018 to 0+060 - Co- Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 28-Oct-24 11-Nov-24 3-Nov-24 B Closed 6 Aconex
ordinates Sheet 05
Shop Drawing for Soil Improvement Works at Zone 05 from sta.
WF-007271 R02Z00-C021-JVC-05-XXX-SDW-GT-GT-01029C0 Latest 1+953 to 2+053 and Zone 07 from sta. 0+018 to 0+060 - Cross- Zone 05 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 28-Oct-24 11-Nov-24 3-Nov-24 B Closed 6 Aconex
Section
Excavation Cross section for Shoring Zone 01 at Sta
WF-007285 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05352 C2 re Zone 01 Shop Drawing Civil Civil Engr. Sunil 29-Oct-24 12-Nov-24 4-Nov-24 C Closed 6 Aconex
0+103.88 to 0+160
Excavation Cross section for Shoring Zone 01 at Sta
WF-007285 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05353 C2 re-s Zone 01 Shop Drawing Civil Civil Engr. Sunil 29-Oct-24 12-Nov-24 4-Nov-24 C Closed 6 Aconex
JVC-WTRAN- 0+103.88 to 0+160
006890 Excavation Cross section for Shoring Zone 01 at Sta
WF-007285 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05354 C2 re-s Zone 01 Shop Drawing Civil Civil Engr. Sunil 29-Oct-24 12-Nov-24 4-Nov-24 C Closed 6 Aconex
0+103.88 to 0+160
Excavation Cross section for Shoring Zone 01 at Sta
WF-007285 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05374 C0 re-s Zone 01 Shop Drawing Civil Civil Engr. Sunil 29-Oct-24 12-Nov-24 4-Nov-24 C Closed 6 Aconex
0+103.88 to 0+160
Shop Drawings Layout for Soil Improvement Works in Zone 10 from
WF-007323 R02Z00-C021-JVC-10-XXX-SDW-GT-GT-02001C1 Latest Zone 10 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 30-Oct-24 13-Nov-24 31-Oct-24 C Open 84 Aconex
sta. 0+342 to 0+402 incl. VTR 11
JVC-WTRAN- Shop Drawings Cross Section for Soil Improvement Works in Zone 10
WF-007323 R02Z00-C021-JVC-10-XXX-SDW-GT-GT-02002C1 Latest Zone 10 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 30-Oct-24 13-Nov-24 31-Oct-24 C Open 84 Aconex
006919 from sta. 0+342 to 0+402 incl. VTR 11
Shop Drawings Coordinates for Soil Improvement Works in Zone 10
WF-007323 R02Z00-C021-JVC-10-XXX-SDW-GT-GT-02003C1 Latest Zone 10 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 30-Oct-24 13-Nov-24 31-Oct-24 C Open 84 Aconex
from sta. 0+342 to 0+402 incl. VTR 11
JVC-WTRAN- As-Built CMC layout for Tunnel 01 (Zone 09) VTR 3A from
WF-007324 R02Z00-C021-JVC-09-XXX-ABD-GT-GT-02008 C0 Latest Zone 09 As Built Geotechnical Geotechnical Engr. Yaseen 30-Oct-24 13-Nov-24 3-Nov-24 B Closed 4 Aconex
006920 station 0+241 to 0+274
JVC-WTRAN- Transportation Transportation &
WF-007342 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06123-.C1 Latest Plan & Profile for Kaar at grade -03 Zone 08 Shop Drawing Engr. Sunil 30-Oct-24 13-Nov-24 5-Nov-24 Terminated Aconex
006936 & Road Road
JVC-WTRAN- Transportation Transportation &
WF-007343 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06124-.C2 Latest Shop drawing Plan & Profile for Kaar at grade - 04 Zone 08 Shop Drawing Engr. Sunil 30-Oct-24 13-Nov-24 5-Nov-24 Terminated Aconex
006937 & Road Road
Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation &
WF-007346 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06216-.C0 Latest Zone 08 Shop Drawing Engr. Sunil 30-Oct-24 13-Nov-24 5-Nov-24 Terminated Aconex
grade road 03 & 04 & Road Road
Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation &
WF-007346 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06217-.C0 Latest Zone 08 Shop Drawing Engr. Sunil 30-Oct-24 13-Nov-24 5-Nov-24 Terminated Aconex
grade road 03 & 04 & Road Road
JVC-WTRAN- Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation &
WF-007346 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06218-C0 Latest Zone 08 Shop Drawing Engr. Sunil 30-Oct-24 13-Nov-24 5-Nov-24 Terminated Aconex
006940 grade road 03 & 04 & Road Road
Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation &
WF-007346 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06219-C0 Latest Zone 08 Shop Drawing Engr. Sunil 30-Oct-24 13-Nov-24 5-Nov-24 Terminated Aconex
grade road 03 & 04 & Road Road
Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation &
WF-007346 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06220-C0 Latest Zone 08 Shop Drawing Engr. Sunil 30-Oct-24 13-Nov-24 5-Nov-24 Terminated Aconex
grade road 03 & 04 & Road Road
JVC-WTRAN- Shop Drawings for Shoring Works at Zone 07 North from sta. 0+080
WF-007372 R02Z00-C021-JVC-07-XXX-SDW-GT-GT-04010C1 Latest Zone 07 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 31-Oct-24 14-Nov-24 4-Nov-24 B Closed 4 Aconex
006965 to 0+143 - General Layout and Co-ordinates
Shop drawings for street light network layout and coordinates walls
WF-007411 R02Z00-C021-JVC-07-XXX-SDW-EL-LG-91001 C0 re-s Zone 07 Shop Drawing Electrical Lighting Engr. Sherif 3-Nov-24 17-Nov-24 19-Nov-24 C Closed 16 Aconex
for airport road tunnel zone-07
Shop drawings for street light network layout and coordinates walls
WF-007411 R02Z00-C021-JVC-07-XXX-SDW-EL-LG-91002 C0 re-s Zone 07 Shop Drawing Electrical Lighting Engr. Sherif 3-Nov-24 17-Nov-24 19-Nov-24 C Closed 16 Aconex
for airport road tunnel zone-07
Shop drawings for street light network layout and coordinates walls
WF-007411 R02Z00-C021-JVC-07-XXX-SDW-EL-LG-91003 C0 re-s Zone 07 Shop Drawing Electrical Lighting Engr. Sherif 3-Nov-24 17-Nov-24 19-Nov-24 C Closed 16 Aconex
JVC-WTRAN- for airport road tunnel zone-07
007003 Shop drawings for street light network layout and coordinates walls
WF-007411 R02Z00-C021-JVC-07-XXX-SDW-EL-LG-91004 C0 re-s Zone 07 Shop Drawing Electrical Lighting Engr. Sherif 3-Nov-24 17-Nov-24 19-Nov-24 C Closed 16 Aconex
for airport road tunnel zone-07
Shop drawings for street light network layout and coordinates walls
WF-007411 R02Z00-C021-JVC-07-XXX-SDW-EL-LG-91005 C0 re-s Zone 07 Shop Drawing Electrical Lighting Engr. Sherif 3-Nov-24 17-Nov-24 19-Nov-24 C Closed 16 Aconex
for airport road tunnel zone-07
Shop drawings for street light network layout and coordinates walls
WF-007411 R02Z00-C021-JVC-07-XXX-SDW-EL-LG-91006 C0 re-s Zone 07 Shop Drawing Electrical Lighting Engr. Sherif 3-Nov-24 17-Nov-24 19-Nov-24 C Closed 16 Aconex
for airport road tunnel zone-07
UT-Utilities &
WF-007432 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01442C1 Latest Proposed Storm Water Drainage Network Catch Basin Plan for Part 07 Zone 07 Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 19-Nov-24 B Closed 16 Aconex
Infrastructure
UT-Utilities &
WF-007432 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01468C1 Latest Proposed Storm Water Drainage Network Catch Basin Plan for Part 07 Zone 07 Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 19-Nov-24 B Closed 16 Aconex
Infrastructure
UT-Utilities &
WF-007432 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01469C1 Latest Proposed Storm Water Drainage Network Catch Basin Plan for Part 07 Zone 07 Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 19-Nov-24 B Closed 16 Aconex
JVC-WTRAN- Infrastructure
007022 UT-Utilities &
WF-007432 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01470C1 Latest Proposed Storm Water Drainage Network Catch Basin Plan for Part 07 Zone 07 Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 19-Nov-24 B Closed 16 Aconex
Infrastructure
UT-Utilities &
WF-007432 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01471C1 Latest Proposed Storm Water Drainage Network Catch Basin Plan for Part 07 Zone 07 Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 19-Nov-24 B Closed 16 Aconex
Infrastructure
UT-Utilities &
WF-007432 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01472C1 Latest Proposed Storm Water Drainage Network Catch Basin Plan for Part 07 Zone 07 Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 19-Nov-24 B Closed 16 Aconex
Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01400C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01403C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01404C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01405C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01406C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01408C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities & Total
Workflow Document JVC Planned WSP Status
B Overdue Overdue Submittal
WF-007440 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01409C1 Status 08 and 09) Description RAM-MIP
Location Shop Drawing Discipline
Infrastructure
Storm Water Submitted
Sub-Discipline by 3-Nov-24 17-Nov-24 20-Nov-24
Engr. Fawzy Closed
Status 17
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities & date
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01412C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed Today
17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01413C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01419C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01420C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01421C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01422C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01423C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01424C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01425C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01426C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01427C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01428C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01429C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01430C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
JVC-WTRAN- Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01431C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
007030 08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01432C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01433C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01434C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01435C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01451C2 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01452C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01453C2 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01454C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01455C2 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01456C2 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01457C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01458C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01459C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01460C3 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01461C1 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01462C3 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01463C2 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01464C3 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01465C2 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01466C2 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Storm Water Network Plan and Profile For (Part 03 & 04 & 05 & 06 & UT-Utilities &
WF-007440 R02Z00-C021-JVC-XX-XXX-SDW-UT-SM-01467C2 Latest RAM-MIP Shop Drawing Storm Water Engr. Fawzy 3-Nov-24 17-Nov-24 20-Nov-24 B Closed 17 Aconex
08 and 09) Infrastructure
Shop drawings for street light network layout and coordinates walls
WF-007452 R02Z00-C021-JVC-06-XXX-SDW-EL-LG-92001 C0 re-s Zone 06 Shop Drawing Electrical Lighting Engr. Sherif 4-Nov-24 18-Nov-24 19-Nov-24 C Closed 15 Aconex
for jadat al haram unnel zone-06
Shop drawings for street light network layout and coordinates walls
WF-007452 R02Z00-C021-JVC-06-XXX-SDW-EL-LG-92002 C0 re-s Zone 06 Shop Drawing Electrical Lighting Engr. Sherif 4-Nov-24 18-Nov-24 19-Nov-24 C Closed 15 Aconex
for jadat al haram unnel zone-06
Shop drawings for street light network layout and coordinates walls
WF-007452 R02Z00-C021-JVC-06-XXX-SDW-EL-LG-92003 C0 re-s Zone 06 Shop Drawing Electrical Lighting Engr. Sherif 4-Nov-24 18-Nov-24 19-Nov-24 C Closed 15 Aconex
JVC-WTRAN- for jadat al haram unnel zone-06
007042 Shop drawings for street light network layout and coordinates walls
WF-007452 R02Z00-C021-JVC-06-XXX-SDW-EL-LG-92004 C0 re-s Zone 06 Shop Drawing Electrical Lighting Engr. Sherif 4-Nov-24 18-Nov-24 19-Nov-24 C Closed 15 Aconex
for jadat al haram unnel zone-06
Shop drawings for street light network layout and coordinates walls
WF-007452 R02Z00-C021-JVC-06-XXX-SDW-EL-LG-92005 C0 re-s Zone 06 Shop Drawing Electrical Lighting Engr. Sherif 4-Nov-24 18-Nov-24 19-Nov-24 C Closed 15 Aconex
for jadat al haram unnel zone-06
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

JVC-WTRAN-
Shop Drawing Submittals E 0 247 Terminated

007042

Response
ACONEX
Workflow Shop drawings for street light network layout and coordinates walls Total
Workflow Document JVC Planned 19-Nov-24
WSP Status
C Overdue Overdue Submittal
WF-007452 TransmittalR02Z00-C021-JVC-06-XXX-SDW-EL-LG-92006
Drawing No. Rev.
C0 Status
re-s Description
for jadat al haram unnel zone-06
Zone 06
Location Shop Drawing Electrical
Discipline Lighting
Sub-Discipline Engr. Sherif
Submitted by 4-Nov-24 18-Nov-24 Closed
Status 15
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
JVC-WTRAN- Transportation Transportation & date
WF-007493 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06123 C1 re-s Plan & Profile for Kaar at grade -03 Zone 08 Shop Drawing Engr. Sunil 5-Nov-24 19-Nov-24 7-Nov-24 B Closed Today
2 Aconex
007081 & Road Road
JVC-WTRAN- Transportation Transportation &
WF-007494 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06124 C2 Latest Shop drawing Plan & Profile for Kaar at grade - 04 Zone 08 Shop Drawing Engr. Sunil 5-Nov-24 19-Nov-24 7-Nov-24 B Closed 2 Aconex
007082 & Road Road
Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation &
WF-007495 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06216 C0 re-s Zone 08 Shop Drawing Engr. Sunil 5-Nov-24 19-Nov-24 11-Nov-24 B Closed 6 Aconex
grade road 03 & 04 & Road Road
Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation &
WF-007495 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06217 C0 re-s Zone 08 Shop Drawing Engr. Sunil 5-Nov-24 19-Nov-24 11-Nov-24 B Closed 6 Aconex
grade road 03 & 04 & Road Road
JVC-WTRAN- Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation &
WF-007495 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06218 C0 re-s Zone 08 Shop Drawing Engr. Sunil 5-Nov-24 19-Nov-24 11-Nov-24 B Closed 6 Aconex
007083 grade road 03 & 04 & Road Road
Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation &
WF-007495 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06219 C0 re-s Zone 08 Shop Drawing Engr. Sunil 5-Nov-24 19-Nov-24 11-Nov-24 B Closed 6 Aconex
grade road 03 & 04 & Road Road
Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation &
WF-007495 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06220 C0 Latest Zone 08 Shop Drawing Engr. Sunil 5-Nov-24 19-Nov-24 11-Nov-24 B Closed 6 Aconex
grade road 03 & 04 & Road Road
Excavation Cross section for Shoring Zone 01 at Sta
WF-007586 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05350 C2 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 9-Nov-24 23-Nov-24 21-Nov-24 C Open 74 Aconex
0+100 to 0+171.49
Excavation Cross section for Shoring Zone 01 at Sta
WF-007586 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05352 C3 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 9-Nov-24 23-Nov-24 21-Nov-24 C Open 74 Aconex
0+100 to 0+171.49
Excavation Cross section for Shoring Zone 01 at Sta
WF-007586 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05353 C3 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 9-Nov-24 23-Nov-24 21-Nov-24 C Open 74 Aconex
0+100 to 0+171.49
Excavation Cross section for Shoring Zone 01 at Sta
WF-007586 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05354 C3 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 9-Nov-24 23-Nov-24 21-Nov-24 C Open 74 Aconex
0+100 to 0+171.49
JVC-WTRAN- Excavation Cross section for Shoring Zone 01 at Sta
WF-007586 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05374 C1 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 9-Nov-24 23-Nov-24 21-Nov-24 C Open 74 Aconex
007169 0+100 to 0+171.49
Excavation Cross section for Shoring Zone 01 at Sta
WF-007586 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05375 C0 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 9-Nov-24 23-Nov-24 21-Nov-24 C Open 74 Aconex
0+100 to 0+171.49
Excavation Cross section for Shoring Zone 01 at Sta
WF-007586 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05376 C0 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 9-Nov-24 23-Nov-24 21-Nov-24 C Open 74 Aconex
0+100 to 0+171.49
Excavation Cross section for Shoring Zone 01 at Sta
WF-007586 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05377 C0 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 9-Nov-24 23-Nov-24 21-Nov-24 C Open 74 Aconex
0+100 to 0+171.49
Excavation Cross section for Shoring Zone 01 at Sta
WF-007586 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-05378 C0 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 9-Nov-24 23-Nov-24 21-Nov-24 C Open 74 Aconex
0+100 to 0+171.49
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007610 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02001C6 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Nov-24 24-Nov-24 12-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 1
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007610 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02002C6 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Nov-24 24-Nov-24 12-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007610 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02003C6 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Nov-24 24-Nov-24 12-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007610 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02004C6 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Nov-24 24-Nov-24 12-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Cross-Sections
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007610 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02005C6 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Nov-24 24-Nov-24 12-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 1
JVC-WTRAN- Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007610 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02006C6 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Nov-24 24-Nov-24 12-Nov-24 B Closed 2 Aconex
007193 from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007610 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02007C6 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Nov-24 24-Nov-24 12-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007610 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02008C6 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Nov-24 24-Nov-24 12-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 4
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007610 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02009C6 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Nov-24 24-Nov-24 12-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 5
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007610 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02010C6 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Nov-24 24-Nov-24 12-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 6
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007610 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02011C6 re-s Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Nov-24 24-Nov-24 12-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 7
Shop Drawings for Soil Improvement works for Zone 06 from sta.
WF-007611 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-02004C1 Latest Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Nov-24 24-Nov-24 23-Nov-24 B Closed 13 Aconex
2+200 to 2+320 incl LS 02 - General Layout
Shop Drawings for Soil Improvement works for Zone 06 from sta.
WF-007611 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-02005C1 Latest Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Nov-24 24-Nov-24 23-Nov-24 B Closed 13 Aconex
JVC-WTRAN- 2+200 to 2+320 incl LS 02 - Cross Sections
007194 Shop Drawings for Soil Improvement works for Zone 06 from sta.
WF-007611 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-02006C1 Latest Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Nov-24 24-Nov-24 23-Nov-24 B Closed 13 Aconex
2+200 to 2+320 incl LS 02 - Co-ordinates Sheet 1
Shop Drawings for Soil Improvement works for Zone 06 from sta.
WF-007611 R02Z00-C021-JVC-06-XXX-SDW-GT-GT-02007C1 Latest Zone 06 Shop Drawing Geotechnical Geotechnical Engr. Yaseen 10-Nov-24 24-Nov-24 23-Nov-24 B Closed 13 Aconex
2+200 to 2+320 incl LS 02 - Co-ordinates Sheet 2
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007675 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07806 C0 Latest D09 Shop Drawing Civil Civil Engr. Sunil 13-Nov-24 27-Nov-24 25-Nov-24 B Closed 12 Aconex
D9-1 from Sta: 0+000 to 0+162.02
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007675 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07807 C0 Latest D09 Shop Drawing Civil Civil Engr. Sunil 13-Nov-24 27-Nov-24 25-Nov-24 B Closed 12 Aconex
D9-1 from Sta: 0+000 to 0+162.02
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007675 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07808 C0 Latest D09 Shop Drawing Civil Civil Engr. Sunil 13-Nov-24 27-Nov-24 25-Nov-24 B Closed 12 Aconex
D9-1 from Sta: 0+000 to 0+162.02
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007675 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07809 C0 Latest D09 Shop Drawing Civil Civil Engr. Sunil 13-Nov-24 27-Nov-24 25-Nov-24 B Closed 12 Aconex
D9-1 from Sta: 0+000 to 0+162.02
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007675 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07810 C0 Latest D09 Shop Drawing Civil Civil Engr. Sunil 13-Nov-24 27-Nov-24 25-Nov-24 B Closed 12 Aconex
D9-1 from Sta: 0+000 to 0+162.02
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007675 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07811 C0 Latest D09 Shop Drawing Civil Civil Engr. Sunil 13-Nov-24 27-Nov-24 25-Nov-24 B Closed 12 Aconex
D9-1 from Sta: 0+000 to 0+162.02
JVC-WTRAN- Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007675 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07812 C0 Latest D09 Shop Drawing Civil Civil Engr. Sunil 13-Nov-24 27-Nov-24 25-Nov-24 B Closed 12 Aconex
007242 D9-1 from Sta: 0+000 to 0+162.02
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007675 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07813 C0 Latest D09 Shop Drawing Civil Civil Engr. Sunil 13-Nov-24 27-Nov-24 25-Nov-24 B Closed 12 Aconex
D9-1 from Sta: 0+000 to 0+162.02
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007675 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07814 C0 Latest D09 Shop Drawing Civil Civil Engr. Sunil 13-Nov-24 27-Nov-24 25-Nov-24 B Closed 12 Aconex
D9-1 from Sta: 0+000 to 0+162.02
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007675 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07815 C0 Latest D09 Shop Drawing Civil Civil Engr. Sunil 13-Nov-24 27-Nov-24 25-Nov-24 B Closed 12 Aconex
D9-1 from Sta: 0+000 to 0+162.02
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals


JVC-WTRAN- D 0 1242
007242
Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow Shop Drawing for Indicative section of Material Backfilling at Culvert Total
Workflow Document JVC Planned 25-Nov-24
WSP Status
B Overdue Overdue Submittal
WF-007675 TransmittalR02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07816
Drawing No. Rev. Status D9-1 from Sta: 0+000 to 0+162.02
C0 Latest Description D09
Location Shop Drawing Civil
Discipline Civil
Sub-Discipline Engr. Sunilby 13-Nov-24
Submitted 27-Nov-24 Closed
Status 12
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawing for Indicative section of Material Backfilling at Culvert date
WF-007675 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07817 C0 Latest D09 Shop Drawing Civil Civil Engr. Sunil 13-Nov-24 27-Nov-24 25-Nov-24 B Closed Today
12 Aconex
D9-1 from Sta: 0+000 to 0+162.02
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007675 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07818 C0 Latest D09 Shop Drawing Civil Civil Engr. Sunil 13-Nov-24 27-Nov-24 25-Nov-24 B Closed 12 Aconex
D9-1 from Sta: 0+000 to 0+162.02
Shop drawings for unit substation 500kva with ring main unit details
WF-007681 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02001C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Nov-24 27-Nov-24 30-Nov-24 C Open 70 Aconex
foundation and earthing system
Shop drawings for unit substation 500kva with ring main unit details
WF-007681 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02002C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Nov-24 27-Nov-24 30-Nov-24 C Open 70 Aconex
foundation and earthing system
Shop drawings for unit substation 500kva with ring main unit details
WF-007681 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02003C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Nov-24 27-Nov-24 30-Nov-24 C Open 70 Aconex
foundation and earthing system
Shop drawings for unit substation 500kva with ring main unit details
WF-007681 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02004C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Nov-24 27-Nov-24 30-Nov-24 C Open 70 Aconex
foundation and earthing system
JVC-WTRAN- Shop drawings for unit substation 500kva with ring main unit details
WF-007681 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02005C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Nov-24 27-Nov-24 30-Nov-24 C Open 70 Aconex
007247 foundation and earthing system
Shop drawings for unit substation 500kva with ring main unit details
WF-007681 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02006C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Nov-24 27-Nov-24 30-Nov-24 C Open 70 Aconex
foundation and earthing system
Shop drawings for unit substation 500kva with ring main unit details
WF-007681 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02007C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Nov-24 27-Nov-24 30-Nov-24 C Open 70 Aconex
foundation and earthing system
Shop drawings for unit substation 500kva with ring main unit details
WF-007681 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02008C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Nov-24 27-Nov-24 30-Nov-24 C Open 70 Aconex
foundation and earthing system
Shop drawings for unit substation 500kva with ring main unit details
WF-007681 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02009C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 13-Nov-24 27-Nov-24 30-Nov-24 C Open 70 Aconex
foundation and earthing system
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007768 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07821 C0 Latest D9-2 Shop Drawing Civil Civil Engr. Sunil 16-Nov-24 30-Nov-24 26-Nov-24 B Closed 10 Aconex
D9-2 from Sta: 0+020 to 0+191.45
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007768 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07822 C0 Latest D9-2 Shop Drawing Civil Civil Engr. Sunil 16-Nov-24 30-Nov-24 26-Nov-24 B Closed 10 Aconex
D9-2 from Sta: 0+020 to 0+191.45
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007768 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07823 C0 Latest D9-2 Shop Drawing Civil Civil Engr. Sunil 16-Nov-24 30-Nov-24 26-Nov-24 B Closed 10 Aconex
D9-2 from Sta: 0+020 to 0+191.45
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007768 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07824 C0 Latest D9-2 Shop Drawing Civil Civil Engr. Sunil 16-Nov-24 30-Nov-24 26-Nov-24 B Closed 10 Aconex
D9-2 from Sta: 0+020 to 0+191.45
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007768 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07825 C0 Latest D9-2 Shop Drawing Civil Civil Engr. Sunil 16-Nov-24 30-Nov-24 26-Nov-24 B Closed 10 Aconex
D9-2 from Sta: 0+020 to 0+191.45
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007768 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07826 C0 Latest D9-2 Shop Drawing Civil Civil Engr. Sunil 16-Nov-24 30-Nov-24 26-Nov-24 B Closed 10 Aconex
D9-2 from Sta: 0+020 to 0+191.45
JVC-WTRAN- Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007768 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07827 C0 Latest D9-2 Shop Drawing Civil Civil Engr. Sunil 16-Nov-24 30-Nov-24 26-Nov-24 B Closed 10 Aconex
007313 D9-2 from Sta: 0+020 to 0+191.45
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007768 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07828 C0 Latest D9-2 Shop Drawing Civil Civil Engr. Sunil 16-Nov-24 30-Nov-24 26-Nov-24 B Closed 10 Aconex
D9-2 from Sta: 0+020 to 0+191.45
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007768 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07829 C0 Latest D9-2 Shop Drawing Civil Civil Engr. Sunil 16-Nov-24 30-Nov-24 26-Nov-24 B Closed 10 Aconex
D9-2 from Sta: 0+020 to 0+191.45
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007768 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07830 C0 Latest D9-2 Shop Drawing Civil Civil Engr. Sunil 16-Nov-24 30-Nov-24 26-Nov-24 B Closed 10 Aconex
D9-2 from Sta: 0+020 to 0+191.45
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007768 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07831 C0 Latest D9-2 Shop Drawing Civil Civil Engr. Sunil 16-Nov-24 30-Nov-24 26-Nov-24 B Closed 10 Aconex
D9-2 from Sta: 0+020 to 0+191.45
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007768 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07832 C0 Latest D9-2 Shop Drawing Civil Civil Engr. Sunil 16-Nov-24 30-Nov-24 26-Nov-24 B Closed 10 Aconex
D9-2 from Sta: 0+020 to 0+191.45
Shop Drawing for Indicative section of Material Backfilling at Culvert
WF-007768 R02Z00-C021-JVC-XX-XXX-SDW-CL-CL-07833 C0 Latest D9-2 Shop Drawing Civil Civil Engr. Sunil 16-Nov-24 30-Nov-24 26-Nov-24 B Closed 10 Aconex
D9-2 from Sta: 0+020 to 0+191.45
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007788 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02001C7 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 17-Nov-24 1-Dec-24 19-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 1
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007788 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02002C7 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 17-Nov-24 1-Dec-24 19-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007788 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02003C7 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 17-Nov-24 1-Dec-24 19-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007788 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02004C7 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 17-Nov-24 1-Dec-24 19-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Cross-Sections
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007788 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02005C7 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 17-Nov-24 1-Dec-24 19-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 1
JVC-WTRAN- Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007788 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02006C7 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 17-Nov-24 1-Dec-24 19-Nov-24 B Closed 2 Aconex
007332 from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007788 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02007C7 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 17-Nov-24 1-Dec-24 19-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007788 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02008C7 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 17-Nov-24 1-Dec-24 19-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 4
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007788 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02009C7 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 17-Nov-24 1-Dec-24 19-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 5
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007788 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02010C7 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 17-Nov-24 1-Dec-24 19-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 6
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007788 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02011C7 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 17-Nov-24 1-Dec-24 19-Nov-24 B Closed 2 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 7
Shop drawings for unit substation 1000kva with ring main unit details
WF-007856 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02101C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Nov-24 3-Dec-24 5-Dec-24 C Open 64 Aconex
foundation and earthing system
Shop drawings for unit substation 1000kva with ring main unit details
WF-007856 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02102C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Nov-24 3-Dec-24 5-Dec-24 C Open 64 Aconex
foundation and earthing system
Shop drawings for unit substation 1000kva with ring main unit details
WF-007856 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02103C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Nov-24 3-Dec-24 5-Dec-24 C Open 64 Aconex
foundation and earthing system
Shop drawings for unit substation 1000kva with ring main unit details
WF-007856 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02104C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Nov-24 3-Dec-24 5-Dec-24 C Open 64 Aconex
foundation and earthing system
JVC-WTRAN- Shop drawings for unit substation 1000kva with ring main unit details
WF-007856 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02105C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Nov-24 3-Dec-24 5-Dec-24 C Open 64 Aconex
007395 foundation and earthing system
Shop drawings for unit substation 1000kva with ring main unit details
WF-007856 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02106C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Nov-24 3-Dec-24 5-Dec-24 C Open 64 Aconex
foundation and earthing system
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

JVC-WTRAN-
007395

Response
ACONEX
Workflow Shop drawings for unit substation 1000kva with ring main unit details Total
Workflow Document JVC Planned WSP Status
C Overdue Overdue Submittal
WF-007856 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02107C1 Status foundation and earthing system
Description RAM-MIP
Location Shop Drawing Electrical
Discipline Medium Voltage Submitted
Sub-Discipline by 19-Nov-24 3-Dec-24
Engr. Sherif 5-Dec-24 Open
Status 64
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop drawings for unit substation 1000kva with ring main unit details date
WF-007856 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02108C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Nov-24 3-Dec-24 5-Dec-24 C Open Today
64 Aconex
foundation and earthing system
Shop drawings for unit substation 1000kva with ring main unit details
WF-007856 R02Z00-C021-JVC-00-XXX-SDW-EL-MV-02109C1 Latest RAM-MIP Shop Drawing Electrical Medium Voltage Engr. Sherif 19-Nov-24 3-Dec-24 5-Dec-24 C Open 64 Aconex
foundation and earthing system
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007857 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02001C8 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 19-Nov-24 3-Dec-24 20-Nov-24 B Closed 1 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 1
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007857 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02002C8 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 19-Nov-24 3-Dec-24 20-Nov-24 B Closed 1 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007857 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02003C8 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 19-Nov-24 3-Dec-24 20-Nov-24 B Closed 1 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Layout Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007857 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02004C8 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 19-Nov-24 3-Dec-24 20-Nov-24 B Closed 1 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Cross-Sections
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007857 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02005C8 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 19-Nov-24 3-Dec-24 20-Nov-24 B Closed 1 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 1
JVC-WTRAN- Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007857 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02006C8 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 19-Nov-24 3-Dec-24 20-Nov-24 B Closed 1 Aconex
007396 from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 2
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007857 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02007C8 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 19-Nov-24 3-Dec-24 20-Nov-24 B Closed 1 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 3
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007857 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02008C8 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 19-Nov-24 3-Dec-24 20-Nov-24 B Closed 1 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 4
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007857 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02009C8 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 19-Nov-24 3-Dec-24 20-Nov-24 B Closed 1 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 5
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007857 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02010C8 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 19-Nov-24 3-Dec-24 20-Nov-24 B Closed 1 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 6
Shop Drawings for Soil Improvement works for Tunnel 01 Zone 09
WF-007857 R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02011C8 Latest Zone 09 Shop Drawing Geotechnical Geotechnical Engr. Muragan 19-Nov-24 3-Dec-24 20-Nov-24 B Closed 1 Aconex
from sta. 0+041 to 0+300 incl VTR 3A - Co-ordinates Sheet 7
JVC-WTRAN- As-Built CMC layout for Tunnel 01 (Zone 09) from
WF-007904 R02Z00-C021-JVC-09-XXX-ABD-GT-GT-02007 C1 Latest Zone 09 As Built Geotechnical Geotechnical Engr. Muragan 20-Nov-24 4-Dec-24 26-Nov-24 B Closed 6 Aconex
007442 station 0+235 to 0+281

WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00102C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex

WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00103C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex

WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00104C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex

WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00105C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex

WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00106C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex

WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00107C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex

WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00108C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex

WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00109C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex

WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00110C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex

WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00111C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex

WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00112C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex
JVC-WTRAN-
007495
WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00113C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex

WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00114C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex

WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00115C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex

WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00116C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex

WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00117C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex

WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00118C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex

WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00119C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex

WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00120C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex

WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00121C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex

WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00122C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex

WF-007961 R02Z00-C021-JVC-00-XXX-SDW-ME-CW-00123C0 Latest Chilled water network layout plan and general details RAM-MIP Shop Drawing Mechanical Chilled Water Engr. Fawzy 24-Nov-24 8-Dec-24 8-Dec-24 C Open 59 Aconex

Shop Drawing for Indicative section of Material Backfilling at Zoneb


WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07521 C0 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07522 C0 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07523 C0 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07524 C0 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07525 C0 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow Shop Drawing for Indicative section of Material Backfilling at Zoneb Total
Workflow Document JVC Planned WSP Status
C Overdue Overdue Submittal
WF-007963 TransmittalR02Z00-C021-JVC-06-XXX-SDW-CL-CL-07526
Drawing No. Rev.
C0 Status
re-s
06 from Sta: 2+200 to 2+660 Description Zone 06
Location Shop Drawing Civil
Discipline Civil
Sub-Discipline Engr. Sunilby 24-Nov-24
Submitted 8-Dec-24 8-Dec-24 Closed
Status 14
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawing for Indicative section of Material Backfilling at Zoneb date
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07527 C0 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed Today
14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07528 C0 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07529 C0 re-s Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07530 C0 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07531 C0 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07532 C0 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07533 C2 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
JVC-WTRAN- 06 from Sta: 2+200 to 2+660
007496 Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07534 C2 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07535 C2 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07536 C2 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07537 C2 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07538 C2 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07539 C2 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07540 C2 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07541 C2 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07542 C0 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07543 C0 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07544 C0 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07545 C0 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zoneb
WF-007963 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07546 C0 Re-S Zone 06 Shop Drawing Civil Civil Engr. Sunil 24-Nov-24 8-Dec-24 8-Dec-24 C Closed 14 Aconex
06 from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07548 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07549 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07550 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07551 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07552 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07553 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07554 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07555 C2 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07556 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
JVC-WTRAN- from Sta: 2+680 to 3+020
007527 Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07557 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07558 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07559 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07560 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07561 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07562 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07563 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07564 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-007997 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07565 C0 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 25-Nov-24 9-Dec-24 5-Dec-24 B Closed 10 Aconex
from Sta: 2+680 to 3+020
Shop drawings for street light network layout and coordinates above
WF-008014 R02Z00-C021-JVC-00-XXX-SDW-EL-LG-93001-C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 25-Nov-24 9-Dec-24 9-Dec-24 Terminated Aconex
grade for kaar tunnel zone-08
Shop drawings for street light network layout and coordinates above
WF-008014 R02Z00-C021-JVC-00-XXX-SDW-EL-LG-93002-C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 25-Nov-24 9-Dec-24 9-Dec-24 Terminated Aconex
JVC-WTRAN- grade for kaar tunnel zone-08
007543 Shop drawings for street light network layout and coordinates above
WF-008014 R02Z00-C021-JVC-00-XXX-SDW-EL-LG-93003-C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 25-Nov-24 9-Dec-24 9-Dec-24 Terminated Aconex
grade for kaar tunnel zone-08
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

JVC-WTRAN-
007543
Response
ACONEX
Workflow Shop drawings for street light network layout and coordinates above Total
Workflow Document JVC Planned WSP Status Terminated Overdue Overdue Submittal
WF-008014 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-00-XXX-SDW-EL-LG-93004-C0 Status grade for kaar tunnel zone-08
Description Zone 08
Location Shop Drawing Electrical
Discipline Lighting
Sub-Discipline Submitted by 25-Nov-24
Engr. Sherif 9-Dec-24 9-Dec-24 Status Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawing for Indicative section of Material Backfilling at Zone 04 date
WF-008045 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07613 C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed Today
9 Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008045 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07614 C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008045 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07615 C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008045 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07616 C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008045 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07617 C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008045 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07618 C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+520 to 1+760
JVC-WTRAN- Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008045 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07619 C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
007574 from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008045 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07620 C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008045 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07621 C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008045 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07622 C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008045 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07623 C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008045 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07624 C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008045 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07625 C0 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+520 to 1+760
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008046 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07598 C1 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+280 to 1+500
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008046 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07599 C1 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+280 to 1+500
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008046 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07600 C1 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+280 to 1+500
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008046 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07601 C2 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+280 to 1+500
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008046 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07602 C2 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+280 to 1+500
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008046 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07603 C2 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+280 to 1+500
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008046 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07604 C2 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+280 to 1+500
JVC-WTRAN- Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008046 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07605 C2 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
007575 from Sta: 1+280 to 1+500
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008046 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07606 C2 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+280 to 1+500
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008046 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07607 C2 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+280 to 1+500
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008046 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07608 C2 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+280 to 1+500
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008046 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07609 C2 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+280 to 1+500
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008046 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07610 C2 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+280 to 1+500
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008046 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07611 C2 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+280 to 1+500
Shop Drawing for Indicative section of Material Backfilling at Zone 04
WF-008046 R02Z00-C021-JVC-04-XXX-SDW-CL-CL-07612 C2 Latest Zone 04 Shop Drawing Civil Civil Engr. Sunil 26-Nov-24 10-Dec-24 5-Dec-24 B Closed 9 Aconex
from Sta: 1+280 to 1+500
JVC-WTRAN- As-Built CMC layout for Tunnel 01 (Zone 09) from
WF-008066 R02Z00-C021-JVC-09-XXX-ABD-GT-GT-02009 C0 Latest Zone 09 As Built Geotechnical Geotechnical Engr. Muragan 27-Nov-24 11-Dec-24 5-Dec-24 B Closed 8 Aconex
007594 station 0+261 to 0+281 (Including VTR-3A
Shop drawings for telecom network stc and mobily plan and tie-in UT-Utilities &
WF-008215 R02Z00-C021-JVC-08-XXX-SDW-UT-IS-08001 C0 Latest Zone 08 Shop Drawing ICT Engr. Sherif 3-Dec-24 17-Dec-24 16-Dec-24 B Closed 13 Aconex
point at kaar-amida road zone 08 Infrastructure
Shop drawings for telecom network stc and mobily plan and tie-in UT-Utilities &
WF-008215 R02Z00-C021-JVC-08-XXX-SDW-UT-IS-08002 C0 Latest Zone 08 Shop Drawing ICT Engr. Sherif 3-Dec-24 17-Dec-24 16-Dec-24 B Closed 13 Aconex
point at kaar-amida road zone 08 Infrastructure
Shop drawings for telecom network stc and mobily plan and tie-in UT-Utilities &
WF-008215 R02Z00-C021-JVC-08-XXX-SDW-UT-IS-08003 C0 Latest Zone 08 Shop Drawing ICT Engr. Sherif 3-Dec-24 17-Dec-24 16-Dec-24 B Closed 13 Aconex
JVC-WTRAN- point at kaar-amida road zone 08 Infrastructure
007737 Shop drawings for telecom network stc and mobily plan and tie-in UT-Utilities &
WF-008215 R02Z00-C021-JVC-08-XXX-SDW-UT-IS-08004 C0 Latest Zone 08 Shop Drawing ICT Engr. Sherif 3-Dec-24 17-Dec-24 16-Dec-24 B Closed 13 Aconex
point at kaar-amida road zone 08 Infrastructure
Shop drawings for telecom network stc and mobily plan and tie-in UT-Utilities &
WF-008215 R02Z00-C021-JVC-08-XXX-SDW-UT-IS-08005 C0 Latest Zone 08 Shop Drawing ICT Engr. Sherif 3-Dec-24 17-Dec-24 16-Dec-24 B Closed 13 Aconex
point at kaar-amida road zone 08 Infrastructure
Shop drawings for telecom network stc and mobily plan and tie-in UT-Utilities &
WF-008215 R02Z00-C021-JVC-08-XXX-SDW-UT-IS-08006 C0 Latest Zone 08 Shop Drawing ICT Engr. Sherif 3-Dec-24 17-Dec-24 16-Dec-24 B Closed 13 Aconex
point at kaar-amida road zone 08 Infrastructure
Shop drawings for extra low voltage network above grade plan, UT-Utilities &
WF-008221 R02Z00-C021-JVC-08-XXX-SDW-UT-IS-07211 C0 Latest Zone 08 Shop Drawing ICT Engr. Sherif 4-Dec-24 18-Dec-24 16-Dec-24 B Closed 12 Aconex
profile and manhole details for kaar road zone 08. Infrastructure
Shop drawings for extra low voltage network above grade plan, UT-Utilities &
WF-008221 R02Z00-C021-JVC-08-XXX-SDW-UT-IS-07212 C0 Latest Zone 08 Shop Drawing ICT Engr. Sherif 4-Dec-24 18-Dec-24 16-Dec-24 B Closed 12 Aconex
JVC-WTRAN- profile and manhole details for kaar road zone 08. Infrastructure
007743 Shop drawings for extra low voltage network above grade plan, UT-Utilities &
WF-008221 R02Z00-C021-JVC-08-XXX-SDW-UT-IS-07213 C0 Latest Zone 08 Shop Drawing ICT Engr. Sherif 4-Dec-24 18-Dec-24 16-Dec-24 B Closed 12 Aconex
profile and manhole details for kaar road zone 08. Infrastructure
Shop drawings for extra low voltage network above grade plan, UT-Utilities &
WF-008221 R02Z00-C021-JVC-08-XXX-SDW-UT-IS-07214 C0 Latest Zone 08 Shop Drawing ICT Engr. Sherif 4-Dec-24 18-Dec-24 16-Dec-24 B Closed 12 Aconex
profile and manhole details for kaar road zone 08. Infrastructure
JVC-WTRAN- UT-Utilities & Sewerage
WF-008222 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01207C2 Latest Sewage Network Plan for Part 07 RAM-MIP Shop Drawing Engr. Fawzy 4-Dec-24 18-Dec-24 16-Dec-24 B Closed 12 Aconex
007744 Infrastructure Effluent

WF-008263 R02Z00-C021-JVC-00-XXX-SDW-ST-FO-00001 C2 Latest Foundation Details for Street Light Poles RAM-MIP Shop Drawing Structural Foundation Engr. Sherif 5-Dec-24 19-Dec-24 10-Dec-24 B Closed 5 Aconex
JVC-WTRAN-
007785
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

JVC-WTRAN- Response
ACONEX
Workflow
007785 Total
Workflow Document JVC Planned 10-Dec-24
WSP Status
B Overdue Overdue Submittal
WF-008263 TransmittalR02Z00-C021-JVC-00-XXX-SDW-ST-FO-00002
Drawing No. Rev. Status Foundation Details for Street
C2 Latest Light Poles
Description RAM-MIP
Location Shop Drawing Structural
Discipline Foundation
Sub-Discipline Engr. Sherif
Submitted by 5-Dec-24 19-Dec-24 Closed
Status 5
Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. Type Submitted Reply Response Code from WSP from JVC
No. as of
Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation & date
WF-008321 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06216 C1 Latest Zone 08 Shop Drawing Engr. Sunil 8-Dec-24 22-Dec-24 19-Dec-24 B Closed Today
11 Aconex
grade road 03 & Road Road
Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation &
WF-008321 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06217 C1 Latest Zone 08 Shop Drawing Engr. Sunil 8-Dec-24 22-Dec-24 19-Dec-24 B Closed 11 Aconex
grade road 03 & Road Road
Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation &
WF-008321 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06218 C1 Latest Zone 08 Shop Drawing Engr. Sunil 8-Dec-24 22-Dec-24 19-Dec-24 B Closed 11 Aconex
JVC-WTRAN- grade road 03 & Road Road
007836 Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation &
WF-008321 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06219 C1 Latest Zone 08 Shop Drawing Engr. Sunil 8-Dec-24 22-Dec-24 19-Dec-24 B Closed 11 Aconex
grade road 03 & Road Road
Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation &
WF-008321 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06220 C1 Latest Zone 08 Shop Drawing Engr. Sunil 8-Dec-24 22-Dec-24 19-Dec-24 B Closed 11 Aconex
grade road 03 & Road Road
Shop Drawing for KAAR tunnel-Zone 08 cross section for roads and at Transportation Transportation &
WF-008321 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06221 C0 Latest Zone 08 Shop Drawing Engr. Sunil 8-Dec-24 22-Dec-24 19-Dec-24 B Closed 11 Aconex
grade road 03 & Road Road
Transportation Transportation &
WF-008332 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06123 C2 Re-S Plan & Profile for Kaar at grade -03 Zone 08 Shop Drawing Engr. Sunil 9-Dec-24 23-Dec-24 16-Dec-24 C Closed 7 Aconex
& Road Road
Shop drawings for street light network layout and coordinates above
WF-008342 R02Z00-C021-JVC-00-XXX-SDW-EL-LG-93001 C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 9-Dec-24 23-Dec-24 12-Dec-24 Terminated Aconex
grade for kaar tunnel zone-08
Shop drawings for street light network layout and coordinates above
WF-008342 R02Z00-C021-JVC-00-XXX-SDW-EL-LG-93002 C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 9-Dec-24 23-Dec-24 12-Dec-24 Terminated Aconex
JVC-WTRAN- grade for kaar tunnel zone-08
007856 Shop drawings for street light network layout and coordinates above
WF-008342 R02Z00-C021-JVC-00-XXX-SDW-EL-LG-93003 C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 9-Dec-24 23-Dec-24 12-Dec-24 Terminated Aconex
grade for kaar tunnel zone-08
Shop drawings for street light network layout and coordinates above
WF-008342 R02Z00-C021-JVC-00-XXX-SDW-EL-LG-93004 C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 9-Dec-24 23-Dec-24 12-Dec-24 Terminated Aconex
grade for kaar tunnel zone-08
UT-Utilities & Sewerage
WF-008380 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-04031C1 Latest Structure sewage network manhole details internal dia.4000mm RAM-MIP Shop Drawing Engr. Fawzy 10-Dec-24 24-Dec-24 18-Dec-24 B Closed 8 Aconex
JVC-WTRAN- Infrastructure Effluent
007893 UT-Utilities & Sewerage
WF-008380 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-04032C1 Latest Structure sewage network manhole details internal dia.4000mm RAM-MIP Shop Drawing Engr. Fawzy 10-Dec-24 24-Dec-24 18-Dec-24 B Closed 8 Aconex
Infrastructure Effluent
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07521 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07522 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07523 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07524 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07525 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07526 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07527 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07528 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07529 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07530 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07531 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07532 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07533 C3 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
JVC-WTRAN- from Sta: 2+200 to 2+660
007948 Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07534 C3 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07535 C3 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07536 C3 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07537 C3 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07538 C3 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07539 C3 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07540 C3 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07541 C3 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07542 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07543 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07544 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07545 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop Drawing for Indicative section of Material Backfilling at Zone 06
WF-008438 R02Z00-C021-JVC-06-XXX-SDW-CL-CL-07546 C1 Latest Zone 06 Shop Drawing Civil Civil Engr. Sunil 12-Dec-24 26-Dec-24 19-Dec-24 B Closed 7 Aconex
from Sta: 2+200 to 2+660
Shop drawings for street light network layout and coordinates above
WF-008441 R02Z00-C021-JVC-08-XXX-SDW-EL-LG-93001-C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 12-Dec-24 26-Dec-24 18-Dec-24 Terminated Aconex
grade for kaar tunnel zone-08
Shop drawings for street light network layout and coordinates above
WF-008441 R02Z00-C021-JVC-08-XXX-SDW-EL-LG-93002-C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 12-Dec-24 26-Dec-24 18-Dec-24 Terminated Aconex
grade for kaar tunnel zone-08

JVC-WTRAN-
007951
Latest Status

Closed WSP JVC


Pending Open
A 45 13 168

B 1016 Total Submittals

D 0 1242

Shop Drawing Submittals E 0 247 Terminated

Response
ACONEX
Workflow Shop drawings for street light network layout and coordinates above Total
Workflow Document JVC Planned WSP Status Terminated Overdue Overdue Submittal
WF-008441 Transmittal Drawing No. Rev. Latest
R02Z00-C021-JVC-08-XXX-SDW-EL-LG-93003-C0 Status grade for kaar tunnel zone-08
Description Zone 08
Location Shop Drawing Electrical
Discipline Lighting
Sub-Discipline Submitted by 12-Dec-24 26-Dec-24 18-Dec-24
Engr. Sherif Status Duration Aconex
Ref.
Alternative Ref. # Remarks
Ref. No. JVC-WTRAN- Type Submitted Reply Response Code from WSP from JVC
No. as of
007951 Shop drawings for street light network layout and coordinates above date
WF-008441 R02Z00-C021-JVC-08-XXX-SDW-EL-LG-93004-C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 12-Dec-24 26-Dec-24 18-Dec-24 Terminated Today Aconex
grade for kaar tunnel zone-08
Shop drawings for street light network layout and coordinates above
WF-008441 R02Z00-C021-JVC-08-XXX-SDW-EL-LG-93005-C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 12-Dec-24 26-Dec-24 18-Dec-24 Terminated Aconex
grade for kaar tunnel zone-08
Shop drawings for street light network layout and coordinates above
WF-008441 R02Z00-C021-JVC-08-XXX-SDW-EL-LG-93006-C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 12-Dec-24 26-Dec-24 18-Dec-24 Terminated Aconex
grade for kaar tunnel zone-08

WF-008529 R02Z00-C021-JVC-00-XXX-ABD-CL-CL-11269 C0 Latest As built side slope cross section for D9-1 at sta 0+040 to 0+140 D9-1 As Built Civil Civil Engr. Sunil 17-Dec-24 31-Dec-24 O Pending 36 Aconex

WF-008529 R02Z00-C021-JVC-00-XXX-ABD-CL-CL-11270 C0 Latest As built side slope cross section for D9-1 at sta 0+040 to 0+140 D9-1 As Built Civil Civil Engr. Sunil 17-Dec-24 31-Dec-24 O Pending 36 Aconex

WF-008529 R02Z00-C021-JVC-00-XXX-ABD-CL-CL-11271 C0 Latest As built side slope cross section for D9-1 at sta 0+040 to 0+140 D9-1 As Built Civil Civil Engr. Sunil 17-Dec-24 31-Dec-24 O Pending 36 Aconex
JVC-WTRAN-
008034
WF-008529 R02Z00-C021-JVC-00-XXX-ABD-CL-CL-11272 C0 Latest As built side slope cross section for D9-1 at sta 0+040 to 0+140 D9-1 As Built Civil Civil Engr. Sunil 17-Dec-24 31-Dec-24 O Pending 36 Aconex

WF-008529 R02Z00-C021-JVC-00-XXX-ABD-CL-CL-11273 C0 Latest As built side slope cross section for D9-1 at sta 0+040 to 0+140 D9-1 As Built Civil Civil Engr. Sunil 17-Dec-24 31-Dec-24 O Pending 36 Aconex

WF-008529 R02Z00-C021-JVC-00-XXX-ABD-CL-CL-11274 C0 Latest As built side slope cross section for D9-1 at sta 0+040 to 0+140 D9-1 As Built Civil Civil Engr. Sunil 17-Dec-24 31-Dec-24 O Pending 36 Aconex

JVC-WTRAN- UT-Utilities & Sewerage


WF-008561 R02Z00-C021-JVC-XX-XXX-SDW-UT-SG-01203C2 Latest Sewage Network Plan Part 03 RAM-MIP Shop Drawing Engr. Fawzy 18-Dec-24 1-Jan-25 21-Dec-24 B Closed 3 Aconex
008064 Infrastructure Effluent
Shop drawings for street light network layout and coordinates above
WF-008582 R02Z00-C021-JVC-08-XXX-SDW-EL-LG-93001 C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 18-Dec-24 1-Jan-25 21-Dec-24 B Closed 3 Aconex
grade for kaar tunnel zone-08
Shop drawings for street light network layout and coordinates above
WF-008582 R02Z00-C021-JVC-08-XXX-SDW-EL-LG-93002 C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 18-Dec-24 1-Jan-25 21-Dec-24 B Closed 3 Aconex
grade for kaar tunnel zone-08
Shop drawings for street light network layout and coordinates above
WF-008582 R02Z00-C021-JVC-08-XXX-SDW-EL-LG-93003 C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 18-Dec-24 1-Jan-25 21-Dec-24 B Closed 3 Aconex
JVC-WTRAN- grade for kaar tunnel zone-08
008084 Shop drawings for street light network layout and coordinates above
WF-008582 R02Z00-C021-JVC-08-XXX-SDW-EL-LG-93004 C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 18-Dec-24 1-Jan-25 21-Dec-24 B Closed 3 Aconex
grade for kaar tunnel zone-08
Shop drawings for street light network layout and coordinates above
WF-008582 R02Z00-C021-JVC-08-XXX-SDW-EL-LG-93005 C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 18-Dec-24 1-Jan-25 21-Dec-24 B Closed 3 Aconex
grade for kaar tunnel zone-08
Shop drawings for street light network layout and coordinates above
WF-008582 R02Z00-C021-JVC-08-XXX-SDW-EL-LG-93006 C0 Latest Zone 08 Shop Drawing Electrical Lighting Engr. Sherif 18-Dec-24 1-Jan-25 21-Dec-24 B Closed 3 Aconex
grade for kaar tunnel zone-08
Shop drawings for street light network layout and coordinates walls
WF-008586 R02Z00-C021-JVC-07-XXX-SDW-EL-LG-91001 C1 Latest Zone 07 Shop Drawing Electrical Lighting Engr. Sherif 19-Dec-24 2-Jan-25 23-Dec-24 B Closed 4 Aconex
for airport road tunnel zone-07
Shop drawings for street light network layout and coordinates walls
WF-008586 R02Z00-C021-JVC-07-XXX-SDW-EL-LG-91002 C1 Latest Zone 07 Shop Drawing Electrical Lighting Engr. Sherif 19-Dec-24 2-Jan-25 23-Dec-24 B Closed 4 Aconex
for airport road tunnel zone-07
Shop drawings for street light network layout and coordinates walls
WF-008586 R02Z00-C021-JVC-07-XXX-SDW-EL-LG-91003 C1 Latest Zone 07 Shop Drawing Electrical Lighting Engr. Sherif 19-Dec-24 2-Jan-25 23-Dec-24 B Closed 4 Aconex
JVC-WTRAN- for airport road tunnel zone-07
008088 Shop drawings for street light network layout and coordinates walls
WF-008586 R02Z00-C021-JVC-07-XXX-SDW-EL-LG-91004 C1 Latest Zone 07 Shop Drawing Electrical Lighting Engr. Sherif 19-Dec-24 2-Jan-25 23-Dec-24 B Closed 4 Aconex
for airport road tunnel zone-07
Shop drawings for street light network layout and coordinates walls
WF-008586 R02Z00-C021-JVC-07-XXX-SDW-EL-LG-91005 C1 Latest Zone 07 Shop Drawing Electrical Lighting Engr. Sherif 19-Dec-24 2-Jan-25 23-Dec-24 B Closed 4 Aconex
for airport road tunnel zone-07
Shop drawings for street light network layout and coordinates walls
WF-008586 R02Z00-C021-JVC-07-XXX-SDW-EL-LG-91006 C1 Latest Zone 07 Shop Drawing Electrical Lighting Engr. Sherif 19-Dec-24 2-Jan-25 23-Dec-24 B Closed 4 Aconex
for airport road tunnel zone-07

WF-008612 R02Z00-C021-JVC-07-XXX-ABD-CL-CL-11268 C0 Latest As built side slope cross section for Zone-07 at sta 0+220 to 0+240 Zone 07 As Built Civil Civil Engr. Sunil 19-Dec-24 2-Jan-25 22-Dec-24 A Closed 3 Aconex
JVC-WTRAN-
008109
WF-008612 R02Z00-C021-JVC-07-XXX-ABD-CL-CL-11275 C0 Latest As built side slope cross section for Zone-07 at sta 0+220 to 0+240 Zone 07 As Built Civil Civil Engr. Sunil 19-Dec-24 2-Jan-25 22-Dec-24 A Closed 3 Aconex

Shop drawings for street light network layout and coordinates walls
WF-008629 R02Z00-C021-JVC-06-XXX-SDW-EL-LG-92001 C1 Latest Zone 06 Shop Drawing Electrical Lighting Engr. Sherif 21-Dec-24 4-Jan-25 O Pending 32 Aconex
for jadat al haram unnel zone-06
Shop drawings for street light network layout and coordinates walls
WF-008629 R02Z00-C021-JVC-06-XXX-SDW-EL-LG-92002 C1 Latest Zone 06 Shop Drawing Electrical Lighting Engr. Sherif 21-Dec-24 4-Jan-25 O Pending 32 Aconex
for jadat al haram unnel zone-06
Shop drawings for street light network layout and coordinates walls
WF-008629 R02Z00-C021-JVC-06-XXX-SDW-EL-LG-92003 C1 Latest Zone 06 Shop Drawing Electrical Lighting Engr. Sherif 21-Dec-24 4-Jan-25 O Pending 32 Aconex
JVC-WTRAN- for jadat al haram unnel zone-06
008109 Shop drawings for street light network layout and coordinates walls
WF-008629 R02Z00-C021-JVC-06-XXX-SDW-EL-LG-92004 C1 Latest Zone 06 Shop Drawing Electrical Lighting Engr. Sherif 21-Dec-24 4-Jan-25 O Pending 32 Aconex
for jadat al haram unnel zone-06
Shop drawings for street light network layout and coordinates walls
WF-008629 R02Z00-C021-JVC-06-XXX-SDW-EL-LG-92005 C1 Latest Zone 06 Shop Drawing Electrical Lighting Engr. Sherif 21-Dec-24 4-Jan-25 O Pending 32 Aconex
for jadat al haram unnel zone-06
Shop drawings for street light network layout and coordinates walls
WF-008629 R02Z00-C021-JVC-06-XXX-SDW-EL-LG-92006 C1 Latest Zone 06 Shop Drawing Electrical Lighting Engr. Sherif 21-Dec-24 4-Jan-25 O Pending 32 Aconex
for jadat al haram unnel zone-06
JVC-WTRAN- Shop Drawing for Indicative section of Material Backfilling at Zone-
WF-008706 R02Z00-C021-JVC-01-XXX-SDW-CL-CL-07702 C0 Latest Zone 01 Shop Drawing Civil Civil Engr. Sunil 24-Dec-24 7-Jan-25 O Pending 29 Aconex
008199 01 from Sta: 0+400
JVC-WTRAN- Transportation Transportation &
WF-008738 R02Z00-C021-JVC-08-XXX-SDW-TR-TR-06123 C3 Latest Plan & Profile for Kaar at grade -03 Zone 08 Shop Drawing Engr. Sunil 25-Dec-24 8-Jan-25 29-Dec-24 B Closed 4 Aconex
008227 & Road Road