Grid-Connected PV Inverter: User Manual
Grid-Connected PV Inverter: User Manual
Grid-connected PV Inverter
SUN-3K-G05-1 SUN-3K-G05 SUN-4K-G05
SUN-5K-G05 SUN-6K-G05 SUN-7K-G05
SUN-8K-G05 SUN-10K-G05 SUN-12K-G05
User Manual
About This Manual
The manual mainly describes the product informa�on, guidelines for installa�on, opera�on and
maintenance. The manual cannot include complete informa�on about the photovoltaic (PV) system.
Family load
Applica�on of inverter in photovoltaic power system
1. Introduc�on
1.1 Appearance Introduc�on
On-grid Inverter can convert solar panel DC power into AC power which can directly input to
the grid. Its appearance is shown below.These models contain SUN-3K-G05-1, SUN-3K-G05,
SUN-4K-G05, SUN-5K-G05, SUN-6K-G05, SUN-7K-G05, SUN-8K-G05,SUN-10K-G05,
SUN-12K-G05.
The following is collec�vely referred to as “inverter”.
SUN-(3-10)K-G05 SUN-12K-G05
User
manual
Meter(op�onal)
User manual x1 Datalogger (op�onal) x1
x1
*Sensor Clamp(op�onal)
x3
2. Safety warnings and instruc�ons
Improper use may result in poten�al electric shock hazards or burns. This manual contains
important instruc�ons that should be followed during installa�on and maintenance. Please
read these instruc�ons carefully before use and keep them for future reference.
Warning:
Warning symbol indicates important safety instruc�ons, which if not correctly
followed, could result in serious injury or death.
Shock Hazard:
Cau�on, risk of electric shock symbol indicates important safety instruc�ons,
which if not correctly followed, could result in electric shock.
Safety Hint:
Note symbol indicates important safety instruc�ons, which if not correctly
followed, could result in some damage or the destruc�on of the inverter.
Warning:
Electrical installa�on of the inverter must conform to the safety opera�on rules
of the country or local area.
Warning:
Inverter adopts non-isolated topology structure, hence must insure DC input and
AC output are electrical isolated before opera�ng the inverter.
Shock Hazard:
Prohibit disassembling inverter case, there exis�ng shock hazard, which may
cause serious injury or death, please ask qualified person to repair.
Shock Hazard:
When PV module is exposed to sunlight, the output will generate DC voltage.
Prohibit touching to avoid shock hazard.
Shock Hazard:
While disconnect the input and output of the inverter for maintenance, please
waits for at least 5 mins un�l the inverter discharge the remnant electricity.
1. Inverter should be installed and maintained by qualified person under local standard
regula�ons.
2. Must disconnect the AC side first, then disconnect DC side while doing installa�on and
maintenance, a�er that, please wait at least 5 mins to avoid ge�ng shocked.
3. Local temperature of the inverter may exceed 80 ℃ while under opera�ng. Do not touch
to avoid ge�ng injured.
4. All electrical installa�on must be in accord with local electrical standards, and a�er
obtaining the permission of the local power supply department, the professionals can
connect the inverter to the grid.
5. Please take appropriate an�-sta�c measure.
6. Please install where children can not touch.
7. The steps to start the inverter1) switch on the AC side circuit breaker, 2) Switch on the
DC side circuit breaker of the PV panel. 3) Turn on the DC switch of the inverter.
The steps to stop the inverter1) switch off the AC side circuit breaker, 2) switch off the DC
side circuit breaker of the PV panel. 3) Turn off the DC switch of the inverter.
8. Don’t insert or remove AC and DC terminals when the inverter is in normal opera�on.
9. The DC input voltage of the inverter must not exceed the maximum value of the model.
3. Opera�on Interface
3.1 Interface View
DC AC Normal Alarm
Safety Hint:
Do not place or store any items next to the inverter.
1 5
5 00m
Pic 4.3 Installa�on Gap
Anchoring
Moun�ng bracket
Inverter
2. Ensure that the posi�on of the installa�on holes on the wall is in accordance with the
moun�ng plate, and the moun�ng rack is ver�cally placed.
3. Hang the inverter to the top of the moun�ng rack and then use the M4 screw in the
accessory to lock inverter heat sink to the hanging plate, to ensure that the inverter will not
move.
Warning:
When using PV modules, please ensure the PV+ & PV- of solar panel is not
connected to the system ground bar
Safety Hint:
Before connec�on, please make sure the polarity of the output voltage of PV
array matches the “DC+” and “DC-” symbols.
Warning:
Before connec�ng inverter, please make sure the PV array open circuit voltage is
within the 1000V of the inverter.
Pic 5.1 DC+ male connector Pic 5.2 DC- female connector
Safety Hint:
Please use approved DC cable for PV system.
Cross section
Cable type
Range Recommended value
Industry generic PV cable 4.0~6.0
4.0(12AWG)
(model: PV1-F) (12~10AWG)
Warning:
Sunlight shines on the panel will generate voltage, high voltage in series may
cause danger to life. Therefore, before connec�ng the DC input line, the solar
panel needs to be blocked by the opaque material and the DC switch should
be 'OFF', otherwise, the high voltage of the inverter may lead to life-
threatening condi�ons.
Warning:
Use the DC power connector of the accessories. Do not interconnect the
connectors of different manufacturers.
Warning:
Prohibit using a single circuit breaker for mul�ple inverters, prohibit the
connec�on of load between inverter circuit breakers.
Model Cable CSA Cable outer dia AWG Breaker Max cable length
Outside cable
SUN-12K-G05 6mm 20-25mm 10 30A/400V
(3+N+PE)20m
Step 1: Remove the cable sealing ring and sleeve in sequence from the AC connector.
Step 2: Use strippers to strip the protec�ve sheath and insula�on layer of the AC cable to the
right length, as shown in Picture 5.8.
Step 3: Insert the cable (L1, L2, L3, NPE) into the sealing sleeve.
Warning:
Be careful to dis�nguish the L1, L2,L3,N and PE of the AC cables.
Step 4: Use the hexagon screwdriver, loosen the bolts of the socket in turn, and insert each
cable core into the corresponding jack, and set each screw. The connec�on hole of AC
connec�on terminal labeling is shown in Picture 5.9.
Pic 5.9 AC Connector Hole Pa�ern
Warning:
Inverter has built-in leakage current detec�on circuit, If an external leakage
current protec�on device is connected, its opera�ng current must be greater
than 300 mA or higher, otherwise inverter may not work properly.
5.4 Max. over current protec�on device
In order to protect the inverter AC connec�on, it is recommended to install a circuit breaker to
prevent overcurrent. See table 5.3 below.
Phone
GPRS
PC
a). The maximum open circuit voltage of each set of photovoltaic modules shall not exceed
1000Vdc under any condi�ons.
b). Each input of the inverter be�er use the same type of photovoltaic module in series.
c). Total output power of PV shall not exceed the maximum input power of inverter, each
photovoltaic modules shall not exceed the rated power of each channel.
6.1 Start up the inverter
When star�ng up the three phase string inverter, should fellow steps below
2. Turn on the DC switch of the photovoltaic module, and if the panel provides sufficient
star�ng voltage and power, the inverter will start.
3. The inverter will first check the internal parameters and the grid parameters, while the
liquid crystal will show that the inverter is self-checking.
4. If the parameter is within acceptable range, the inverter will generate energy.
NORMAL indicator light is on.
2. Wait for 30 seconds, turn off the DC switch (if any), or simply disconnect the DC input
connector. The inverter will close the LCD and all LED within two minutes.
Inverter
PV+
... PV- V+
R
S
PID
V- T
PE
The An�-PID module repairs the PID effect of the PV module at night.The PID module always
runs when connected to AC.
If maintenance is required and turn off the AC switch can disable the An�-PID func�on.
Warning:
The PID func�onality is automa�c.When the DC bus voltage is below 50VDC, the PID module
will create 450VDC between the PV and ground.No control and equipment are required.
Warning:
If you need to maintain the inverter, Please turn off the AC switch first,then turn off the DC switch,
and wait 5 minutes before you do other opera�ons.
7. Zero-export func�on via energy meter
There're two kinds of energy meters for this series inverter. First type is Eastron
SDM630-Modbus V2 which is able to measure the Max. 100A current directly. More details
please refer to Pic 7.1 & 7.2. For the Eastron SDM630 MCT 40mA, it needs external CT to
measure the current. The CT power range is from 5A-2000A. More details about the Eastron
SDM630 MCT, please refer to Pic 7.3 & 7.4. Also, the CHNT meter DTSU666 is supported, it can
measure the Max. 80A current directly. More details about the DTSU666, please refer to Pic
7.5 & 7.6.
When you are reading this, we believe that you have completed the connec�on according to
the requirements of chapter 5, if you have been running your inverter at this �me, and you
want to use the zero-export func�on, please turn off AC and DC switch of the inverter, and
wait for 5 minutes un�l the inverter completely discharged.Please follow below Picture 7.1
to connect the energy meter.
For system wiring diagram, the red line refers to L line (L1, L2, L3), the black line refers to the
neutral line (N). Connec�ng energy meter RS485 cable to inverter's RS485 port. It's recommended
to install an AC switch between the inverter and the u�lity grid, the specs of the AC switch are
determined by the power of load.
If there is no integrated DC switch inside the inverter you purchased, we commend you to
connect the DC switch. The voltage and current of the switch depend on the PV array you access.
1 2 3 4 5 6 7 8
(1,2,3,4) (5,6,7,8)
B A G
5 6 7 8
RS 485
RS 485 B RS 485 A GND
Inverter
Solar Panel array SUN-(3-10)K-G05 SUN-12K-G05
AC Breaker
RS 485
Male
connector L1 L2 L3 N
Family load
VCC_5V 485_B
N L3 L2 L1
RS 485
Female connector L1 L2 L3 N
GND 485_A
meter
5 6 7 8
L1 L2 L3 N
485_A L1 L2 L3 N
485_B
RS485 Communication
GND
Warning:
In final installa�on, breaker cer�fied according to IEC 60947-1 and IEC 60947-2
shall be installed with the equipment.
9 1 0 11 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0
3 PHASE 4 WIRE
P2 P1
L1
L2
P2 P1 S2 S1
L3
P2 P1 S2 S1
S2 S1
N
1 2 3 4 5 6 15 16 17 18 19 20
Grid voltage Auxiliary Current inputs
sampling power supply
1 2 3 4 5 6 7 8
14 13 12
RS 485
RS 485 A RS 485 B GND
Pic 7.3 Eastron meter
Inverter
Solar Panel array SUN-(3-10)K-G05 SUN-12K-G05
AC Breaker
RS 485
N L3 L2 L1
Male connector
Family load
black line
VCC_5V 485_B
White line
CT3
black line
Female CT2
connector black line
White line
CT1
GND 485_A
GND B A S2 S1 S2 S1 S2 S1
9 1 0 11 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0
8
7
N L3 L2 L1 LA NA
6
5
4
3
2
1
485_A
485_B
meter L1 L2 L3 N
RS485 Communication
GND
Grid
Pic 7.4 Connec�on diagram of Eastron meter
(1,4,7,10) (3,6,9,10)
RS 485
Inverter
Solar Panel array SUN-(3-10)K-G05 SUN-12K-G05
AC Breaker
RS 485
N L3 L2 L1
Male connector
L1 L2 L3 N Family load
VCC_5V 485_B
RS 485
Female connector
meter
GND 485_A
L1 L2 L3 N
485_A
485_B
RS485 Communication
Grid
This applica�on is that when the string inverters work in parallel, there is only one
power grid and one load, and only one meter can be connected to prevent reverse
current, so only this many-to-one an�-reverse current connec�on can be connected.
If there’s several inverters in a plant, also it can use 1pcs meter to realize zero export
func�on.For example,if there’s 3pcs inverter in the system with 1pcs meter.We need
to setup 1pcs inverter as the master and others setup as slaves. And, all of them need
to connect to the meter via RS485. Below is the system diagram and configura�on of
the system.
NoteSelect Meter op�on in Run Param and long press ENTER bu�on to enter this Meter
Se�ng page.
1 2 3 4 5 6 7 8
(1,2,3,4) (5,6,7,8)
B A G
5 6 7 8
RS 485
RS 485 B RS 485 A GND
Grid
RS485 L1 L2 L3 N
485_B
485_A
GND
Grid meter
(as short as possible)
485_B
485_A
485_A
GND
GND
5 6 7 8
L1 L2 L3 N
VCC_5V 485_B
RS 485
Female connector
RS485 RS485
GND 485_A
AC Breaker
L1
L2
L3
N
load
AC Breaker
L1
L2
L3
N
Solar Panel array
AC Breaker
L1
L2
L3
N
Solar Panel array
AC Breaker
L1
L2
L3
N
Solar Panel array
3 PHASE 4 WIRE
P2 P1
L1
L2
P2 P1 S2 S1
L3
P2 P1 S2 S1
S2 S1
N
1 2 3 4 5 6 15 16 17 18 19 20
Grid voltage Auxiliary Current inputs
sampling power supply
1 2 3 4 5 6 7 8
14 13 12
RS 485
RS 485 A RS 485 B GND
AC Breaker
L1
L2
L3
N
Solar Panel array
AC Breaker
L1
L2
L3
N
Solar Panel array
AC Breaker
L1
L2
L3
N
Solar Panel array
AC Breaker
L1
L2
L3
N
load
black line
White line
CT2
RS 485 black line
White line
GND 485_A
L1 L2 L3 N
GND B A S2 S1 S2 S1 S2 S1
9 1 0 11 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0
8
7
N L3 L2 L1 LA NA
6
5
4
3
2
1
RS485
485_A
GND
(as short as possible)
485_B
485_A
485_A
GND
GND
RS485 RS485
RS 485
AC Breaker
L1
L2
L3
N
Solar Panel array
AC Breaker
L1
L2
L3
N
Solar Panel array
AC Breaker
L1
L2
L3
N
Solar Panel array
AC Breaker
L1
L2
L3
N
load
VCC_5V 485_B
RS 485
Female connector
GND 485_A
RS485
485_B
485_A
GND
(as short as possible)
485_B
485_A
485_A
L1 L2 L3 N
RS485 RS485
Grid
Pic 7.13 CHNT Connec�on diagram(The pass-through table)
7.2 Use of zero-export func�on
When the connec�on is completed, the following steps should be refered to use this func�on:
1. Turn on the AC switch.
2. Turn on the DC switch, wai�ng for the inverter's LCD is turned on.
3. Press Enter bu�on on the LCD panel in the main interface into the menu op�ons, select
[parameter se�ng] to enter setup submenu, and then select [running parameters] as shown
in picture 7.14, at this �me please input the default password 1234 through pressing the
bu�on [up down, enter], enter the opera�on parameter se�ng interface, shown as
picture 7.15.
Meter Power:
20W
Pic 7.16 Zero-export func�on via energy meter turn on
7. Meter power XXW shows posi�ve means grid is supplying the load, and no power fed into
grid. if meter power shows nega�ve, it means PV energy is being sold to grid or energy meter
wiring connce�on has problem.
8. A�er properly connec�on is done, wait for inverter star�ng. If the power of the PV array
meets the current power consump�on, the inverter will keep a certain output to counteract
the power of the grid without backflow .
7.3 Notes while using zero export func�on
For your safety and the opera�on of limiter func�on of the inverter, we put forward the
following sugges�ons and precau�ons:
Safety Hint:
Under zero export mode we strongly recommend that the two PV arrays are
formed by the same number of PV panels of the same size, which will make the
inverter more responsive to limit the power.
Safety Hint:
While the u�lity power is nega�ve and inverter has no output power, that means
the orienta�on of the current sensor is wrong, please turn off the inverter and
change orienta�on of the current sensor.
7.4 How to browse the load power of your PV grid-�e plant on monitoring pla�orm?
If you want to browse load power of the system and how much energy (KWH) does it export to
gridinverter output power is used to power the load firstly and then the surplus energy will
feed into grid. You also need to connect the meter according to above diagram. A�er the
connec�on completed successfully, the inverter will show the load power on the LCD. But please
don’t setup “Meter ON”. Also, you will be able to browse the load power on the monitoring
pla�orm. The plant se�ng method as below descrip�on.
Firstly, go to the solarman pla�orm(h�ps://pro.solarmanpv.com, this link is for solarman
distributor account; or h�ps://home.solarmanpv.com, this link is for solarman end user
account;) plant home page and click “edit”
And then choose your system type as “Self-consump�on”
Secondly, go to plant page, if it shows the PV power, load power and grid power, which means
the configura�on is correct.
8. General Opera�on
During normal opera�on, the LCD shows the current status of the inverter, including the
current power, total genera�on, a bar chart of power opera�on and inverter ID,etc. Press the
Up key and the Down key to see the current DC voltage, DC current, AC voltage, AC current,in-
verter radiator temperature,so�ware version number and Wifi connec�on state of the
inverter.
LCD Main menu
Turn OFF
*Meter
Bright Keep
Setup System param Display Set
Delay �me 05S
Confirm Reset
Factory Reset
Cancel
I Confirm
Set Restore
Cancel
P1-P6
QP Vstart
Q1-Q6
Vstop
PFP
Pstart P1-P6 PF1-PF6
Pstop RmpTime
Ac�veP QU
PmpTime
Q-Mode PtUsed
PF
VRated V1-V6 Q1-Q6
Q(%)
ReactP
PF OFF
AVG
Fun- ISO Exp_Mode
CT_Ra�o 0 MIN AUTO
Fun RCD MFR EASTRON
FeedIn ACREL
SelfCheck OFF CHNT
Shunt MST
ShuntQTY SLV
Island
Generator
Meter G.CT AUTO
EASTRON
Setup Limiter
G.MFR
G.FeedIn
ACREL
CHNT
Running param Feed-in G.Cap
V1-V12
MPPT Num DC1-Wind OFF/ON
DC2-Wind OFF/ON
WindTurbine OK
CLR
Cancel
ARC ON
OFF
OF-Derate HYS
ON
UF-Uprate OFF
WGRa
WGraStr
ON
PU OFF
V1-V4 P1-P4
LVRT
HVRT HardLimita�on
PowerLim Enable
Point
DRM So�Limita�on
Sunspec
*Note: These parameters will be avaiable a�er the meter is INMETRO
connected successfully. Otherwise, it won't show. EN50549
EN50438
IEC61727
CUSTOM
VDE_4105
UTE_C15
RD1699
CEI_0_21
G98_G99
AS4777(.2)
NB/T 32004
MEA
GridStanderd PEA
Protect Param Advanced OverVolt Lv3-Lv1
Point 240.0V
Back Delay 1000ms
UnderVolt Lv1-Lv3
Point 235.0V
Delay 1000ms
Setup OverFreq Lv3-Lv1
Point 52.00Hz
Delay 1000ms
UnderFreq Lv1-Lv3
Point 48.00Hz
Delay 1000ms
Reconnec�on
Vup
Vdown
Fup
Fdown
OV 10 Minutes
Enable
Point
Grid: 127/220V
Address:01
Comm. param Meter:AUTO
BaudRate: 9600
Power: 0W Power: 0W
State: Standby State: Com.Error
Pic 8.2 The ini�al interface
Press UP or Down, you can check inverter DC voltage, DC current, AC voltage, AC current and
inverter temperature.
E-Total : 134KWh
Pic 8.7 PV genera�on
21 - 05 - 2020 Meter
15 : 57 : 08 Power: 0W
Pic 8.8 Time Pic 8.9 Meter power
LoadEp: Daily consump�on;
LoadEp: 0.00KWh Total: Total energy consump�on.
Total : 0.00KWh
Pic 8.10 Load consump�on
ImpEp: Daily energy purchased from grid;
ImpEp: 0.00KWh Total: Total energy purchased from grid.
Total : 0.00KWh
Pic 8.11 Electrical energy
ExpEp: Daily energy sold to grid;
ExpEp: 0.00KWh Total: Total energy sold to grid.
Total : 0.00KWh
Pic 8.12 Electrical energy
8.2 Submenus in the Main Menu
There are five submenus in the Main Menu.
ID:2107279701 Inv1400
Inv1400 LcdA238
Pic 8.13 Device informa�on
8.2.2 Fault Record
It can keep Eight fault records in the menu including �me, customer can deal with it depends
on the error code.
8.2.4 PV VA se�ng
I Confirm <<
Cancel
Pic 8.24 Set Restore
8.4 Running param set
Warning:
Password required-- only for access-authorized engineer. Un-authorized access
may avoid the warranty. The ini�al password is 1234.
PassWord
Pic 8.27
ARC ON UF-Uprate OFF <-
OF-Derate OFF <- WGra 0.000%
WGra 0.0% << PU ON
WGraStr 0.0% PowerLim <<
Pic 8.28
HardLimitation HardLimitation
Enable OFF << Point 0.0% <<
SoftLimitation OK << Cancel
Enable OFF <<
Pic 8.29
ARC ON ARC ON
OF-Derate ON <- OFDMode HYS <-
ARC ON
OF-Derate OFF <-
Tab. 11-4 Definition of Over-frequency Response Parameters
Rated
Output RecPT
Power(kW)
Fstr
ActiveP 0% ActiveP 0%
Q-Mode OFF << Q-Mode Q(P) <<
ActiveP 0% ActiveP 0%
Q-Mode PF(P) << Q-Mode Q(U) <<
ActiveP 0% ActiveP 0%
Q-Mode PF << Q-Mode Q(%)<<
Pic 8.32
"OFF" Mode
The reac�ve power regula�on func�on is disabled. The PF is fixed at +1.000
Q(%)
Adjust reac�ve power output in %.
"PF" Mode
The power factor (PF) is fixed and the reac�ve power is regulated by the parameter
PF. The PF ranges from 0.8 leading to 0.8 lagging.
•Leading: the inverter is sourcing reac�ve power to the grid.
•Lagging: the inverter is injec�ng reac�ve power into the grid.
"Q(U)" Mode
The reac�ve power output of the inverter varies in response to the grid voltage.
"Q(P)" Mode
The reactive power output by the inverter is controlled by the active power
of the inverter.
"PF(P)" Mode
The PF is controlled by the active power of the inverter.
“PU” Mode
The ac�ve power output of the inverter varies in response to the grid voltage
(U1,P1)
(U2,P2)
(U3,P3)
(U4,P4)
P/Pn
(U2,Q2)
(U4,Q4)
Grid
Voltage
(U3,Q3)
(U5,Q5)
Lower
Q/Pn Cap (U6,Q6)
P2(P2,Q2)
P4(P4,Q4) P/Pn
P3(P3,Q3)
P5(P5,Q5)
Lower
P6(P6,Q6)
Q/Pn Cap
P2(P2,PF2)
P4(P4,PF4)
P/Pn
P3(P3,PF3)
P5(P5,PF5)
P6(P6,PF6)
PF leading
Warning:
Engineer Only.
We will set the param depends on the safety requirements, so customers don't
need to reset it. The password is same as 8.4 Running param
Back <<
INMETRO EN50438
EN50549 << IEC61727 <<
CUSTOM UTE_C15
VDE_4105 << RD1699 <<
_ 21
CEI_0 AS4777(.2)
G98_G99 << NB/T 32004
MEA OK Cancel <<
PEA <<
Warning:
Engineer only.
Safety Hint:
No solvent, abrasive materials or corrosive materials can be used for cleaning
any parts of the inverter.
F03 DC leakage current fault Hardly appear the code. Never ever happened so far
F04 Ground fault GFDI Check the solar panel output connec�on.
F05 Read the memory error Failure in reading memory (EEPROM). Restart the inverter if the
fault s�ll exists, contact your installer or Deye service.
F06 Write the memory error Failure in wri�ng memory (EEPROM). Restart the inverter if the
fault s�ll exists, contact your installer or Deye service.
F07 GFDI blown fuse Hardly appear the code. Never ever happened so far
F08 GFDI grounding touch failure Hardly appear the code. Never ever happened so far
F09 IGBT damaged by excessive drop Hardly appear the code. Never ever happened so far.
voltage
F11 AC main contactor errors Hardly appear the code. Never ever happened so far
F12 AC auxiliary contactor errors Hardly appear the code. Never ever happened so far
F14 DC firmware over current Hardly appear the code. Never ever happened so far.
F17 Three phase current, Hardly appear the code. Never ever happened so far.
over-current fault
F19 All hardware failure synthesis Hardly appear the code. Never ever happened so far.
Error code Descrip�on Ongrid - Three Phase
1. Check whether solar panel output current is within the
allowed range.
F20 DC over current fault of the 2. Check DC current sensor and its detec�on circuit.
hardware 3. Check if the inverter FW version is suitable for the hardware.
4. Restart the inverter, if the error s�ll exists, please contact your
installer or Deye service.
F21 DC leakage flow fault Hardly appear the code. Never ever happened so far.
F22 Crash stop (if there is a stop Contact your installer for help.
bu�on)
F25 DC feedback fault Hardly appear the code. Never ever happened so far
F27 DC end insula�on error Hardly appear the code. Never ever happened so far
F28 Inverter 1 DC high fault Hardly appear the code. Never ever happened so far
F29 AC load switch failure Hardly appear the code. Never ever happened so far
1. At least one Relay can't be closed. Check relays and its driver
F31 signal. (Old inverter not have relays detec�on func�on)
Relay open circuit fault 2. Restart the inverter, if the fault s�ll exists, contact your
installer or Deye service.
F32 Inverter 2 dc high fault Hardly appear the code. Never ever happened so far
F33 AC over current Hardly appear the code. Never ever happened so far
F34 AC current over load Hardly appear the code. Never ever happened so far
F37 AC three-phase voltage unbalance Hardly appear the code. Never ever happened so far.
failure
F38 AC three-phase current unbalance Hardly appear the code. Never ever happened so far.
failure
F40 DC over current Hardly appear the code. Never ever happened so far
F46 AC Line U,V low voltage Check the AC voltage protec�on se�ng.
F49 U phase grid current DC Hardly appear the code. Never ever happened so far.
component over current
F50 V phase grid current DC Hardly appear the code. Never ever happened so far.
component over current
F51 W phase grid current DC Hardly appear the code. Never ever happened so far.
component over current
F52 AC inductor A, phase current Hardly appear the code. Never ever happened so far.
DC current high
F53 AC inductor B, phase current Hardly appear the code. Never ever happened so far.
DC current high
F54 AC inductor C, phase current Hardly appear the code. Never ever happened so far.
DC current high
F58 AC grid U over current Hardly appear the code. Never ever happened so far.
F59 AC grid V over current Hardly appear the code. Never ever happened so far.
F60 AC grid W over current Hardly appear the code. Never ever happened so far.
F61 Reactor A phase over current Hardly appear the code. Never ever happened so far.
F62 Reactor B phase over current Hardly appear the code. Never ever happened so far.
Safety Hint:
If your string inverter has any of the fault informa�on shown in Table 10-1,and
when you reset the machine and s�ll don’t solve the problem,please contact our
distributor and provide the below details: