Visual Testing Report
CLIENT Name                  KAR GROUP, KAR-1               REPORT NO.               NY-BR-Kar-VT-191123-1
      Project Name                     100 Area               REPORTING DATE                   04//12/2023
     REFERENCE                                                INSPECTION DATE                   04/12/2023
                                 NAYA-DOC-2017-014-A0
     PROCEDURE                                                    Report pages                    1 Page
        WPS                   WPS NY-KAR-BR-WPS-6G-001.       TEST & ACC CODE                 API 572:2016
     DRAWING NO                                                INSPECTED ITEM              Heat Exchanger E111
                      External Visual Inspection for Heat Exchanger checklist
                Description               Yes    No                               Comment
Present and properly installed             √                                 Good Condition
Free of paint                              √                                 Good Condition
Legible                                    √                                 Good Condition
                                                Inspect Shell Wall
External wall corrosion (remove
insulation plugs, removal partial wall     √           Corrosion is found in some points
insulation)
Examine for process leaks (reinforcing
                                           √                                      Not found
pads, weep holes)
Wall deformation (bulges, dents)           √                                      Not found
Wall condition (remove insulation,
corrosion at support rings, check for      √                                      Not found
repaired areas)
                                          Examine Nozzles & Manways
Corrosion (between flanges and bolt
                                           √                           Corrosion is found in nozzle
holes, check insulation sealing)
Examine for leaks (discoloration, check
                                           √                                      Not found
weep holes, check for missing bolts)
Examine for proper bolting (missing
                                                                                  Not found
bolts, minimum two bolt threads            √
protruding from nuts
                                            Examine Head Condition
Corrosion (lifting lugs, moisture trap
                                           √                              Corrosion is founded
inspection, remove partial insulation)
 Examine for process leaks                 √           Leaks is founded in head
Deformation (bulge or concave areas,
                                           √                                      Not found
indication of metal stress)
                                                Valves Condition
Inlet and outlet Valves                    √                                          -
                                            Inspect Support & Skirts
Corrosion activity                         √                                      Need paint
                                            Visual Testing Report
Concrete support                                                                    Not good
Steel support                                                                      needs paint
Anchor bolts                                                                     Good Condition
                                              Inspect External Coatings
Coating voids (nozzle to shell welds,
                                              √                                  Good Condition
flange welds, supports/support rings)
Peeling                                       √
Blistering                                    √                             Founded in flange and head
Deterioration                                 √
                                             Inspect Ladders & Stairways
Corrosion (bolting/nuts, check insulation
                                              √                                    Needs paint
seal)
Assure securely attached (check bolt
tightness, check for cracked welds/ loose     √                                       Good
bolts)
                                              Inspect External Insulation
Missing areas of insulation                   √                                       Good
Missing jackets                               √                              Missing head and nozzle
Leaks from outside (breaks/tears,
                                              √                                         -
inspection plugs)
                                        Examine Condition of Electrical Ground
Loose connection                              √                                     Not found
Missing connection                            √                                     Not found
                                   Visual Testing Report
                            UT Gauge Measurements for Rear Head
                         Pressure
             Nominal
                         Required
Point        Thickness                 0            90             180              270
                         Thickness
               (mm)
                           (mm)
  1            12.00        4.95       -             -              -                -
                          UT Gauge Measurements for Rear cylinder
                         Pressure
             Nominal
                         Required
Point        Thickness                0             90            180               270
                         Thickness
               (mm)
                           (mm)
  1            9.53         5.05    10.50         11.02           8.50             10.69
                                       UT Gauge Measurements for Shell
                           0                90              180                   270
   Shell1                10.11             10.24           10.33                  9.40
   Shell 2               10.34             10.20             10                  10.16
   Shell 3               9.70              10.07           10.30                 10.15
                                     Pressure
                         Nominal
             Diameter                Required
Nozzle                   Thickness                0         90           180             270
              (inch)                 Thickness
                           (mm)
                                       (mm)
  A             8          23.01        1.82     22.08     22.70         22.65       22.12
  B             8          23.01        1.82     22.51     22.23         22.49         -
  C             4          13.49        1.07     13.82     14.04         13.81         -
  D             4          13.49        1.07     13.85     14.04         14.21         -