Date:
Ref:
Cast in Place Concrete Inspection
Location:
S.N Type of concrete Mixer No Time Concrete Slump No of Remarks
Batching Casting Temp (oc) (mm) Cubes
Tested by: Checked and Approved by:
1/2
1/2
1/2
1/2
Date:
Ref:
Cast in Place Concrete Inspection
Location:
S.N Type of concrete Mixer No Time Concrete Slump No of Remarks
Batching Casting Temp (oc) (mm) Cubes
Tested by: Checked and Approved by:
2/2
2/2
2/2
2/2