0% found this document useful (0 votes)
80 views1 page

Sprinkler Installation Guide

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
80 views1 page

Sprinkler Installation Guide

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SPRINKLER LOCATION REQUIREMENTS 13-73

9-3-9-2 Protection Against Freezing- Sprinklers in exhaust The spacing of the sprinklers over the open-grid ceiling
ducts subject to freezing shall be properly protected against shall then comply with the following:
freezing. (See 1 6. 4. 1.) (a) In light hazard occupancies where sprinkler spacing
9_3_9_3 Sprinkler Access- Access shall be provided to all sprin­ (either spray or old-style sprinklers) is less than 10 ft
klers for inspection, testing, and maintenance. 10 ft (3 m 3 m), a minimum clearance of at least
x x

9.3.9.4 Strainers. A listed line strainer shall be installed in the


18 in. (450 mm) shall be provided between the
main water supply preceding sprinklers having nominal K­ sprinkler deflectors and the upper surface of the
factors smaller than K-2.8 (40). open-grid ceiling. Where spacing is greater than
10 ft 10 ft (3 m 3 m) but less than 10 ft 12 ft
x x x

9.3. 10* Open-Grid Ceilings. Open-grid ceilings shall only be (3 m 3.7 m), a clearance of at least 24 in.
x

installed beneath sprinklers where one of the following is met: (600 mm) shall be provided from spray sprinklers
(1) Open-grid ceilings in which the openings are Y., in. and at least 36 in. (900 mm) from old-style sprin­
(6 mm) or larger in the least dimension, where the thick­ klers. Where spacing is greater than 10 ft 12 ft x

ness or depth of the material does not exceed the least (3 m 3.7 m), a clearance of at least 48 in. (1.2 m)
x

dimension of the opening, and where such openings shall be provided.


constitute 70 percent of the area of the ceiling material. (b) In ordinary hazard occupancies, open-grid ceilings
shall be permitted to be installed beneath spray
sprinklers only. Where sprinkler spacing is less than
10 ft 10 ft (3 m 3 m), a minimum clearance of at
x x

:zs r-
least 24 in. (600 mm) shall be provided between the
sprinkler deflectors and the upper surface of the
r-

/ff-f--
Complete
open-grid ceiling. Where spacing is greater than
r- vertical 10 ft 10 ft (3 m 3 m), a clearance of at least
x x

- -J r-
divider 36 in. (900 m) shall be provided.
(2) Other types of open-grid ceilings shall be permitted to be
1 - -J
installed beneath sprinklers where they are listed for such
zs r- -l zs r- -l zs r- i

f-
QJ "oo"' service and are installed in accordance with instructions
� - -J r- -l r- -l r- -J - walkway - contained in each package of ceiling material.
c either solid
8QJ - -j r- -l r- -l r- -J or with 9.3. 1 1 Drop-Out Ceilings and Ceiling Materials.
U) -
-J r- -l r- -l r- -J
ventilation
_ open1ngs Drop-out ceilings and ceiling materials shall be
9.3. 1 1 . 1 *
permitted to be installed beneath sprinklers where the ceiling
i - -J zs r- -l zs r- -l zs r- -J ZS r- - panels or ceiling materials are listed for that service and are
� - -J r- -l r- -l r- -l r- -
installed in accordance with their listings.
�-
LL -J r- -l r- -l r- -l 1- - 9.3. 1 1 .2 Drop-out ceilings and ceiling materials meeting the
- -J r- -l r- -l 1- -l 1- -
criteria in 9.3.11.1 shall not be installed below quick-response
or extended coverage sprinklers unless specifically listed for
that application.
FIGURE 9.3.7(a) Sprinklers in Multitier Bookstacks with 9.3. 1 1 .3 Drop-out ceilings and ceiling materials meeting the
Complete Vertical Dividers. criteria in 9.3.11.1 shall not be considered ceilings within the

f-f- f-f-
context of this standard.
t --1
I I I

1- + -J � �����li lete
r- + -J :zs H - -J r- + -J zs r- - 9.3. 1 1 .4* Piping installed above drop-out ceilings and ceiling

!E - -J
-J + -J + -J
materials meeting the criteria in 9.3.11.1 shall not be consid­
f- -(f 1- - divider
ered concealed piping.
+ -J f -J
_

f- f-f- Iff--
� -:
1--- 9.3. 1 1 .5* Sprinklers shall not be installed beneath drop-out
r- + -J r- + -J 1- + -J r- -
r, - r-H - f-H - H--1 - f-
ceilings or ceiling materials meeting the criteria in 9.3.11.1.
9.3. 1 2 * Old-style sprinklers shall be installed in fur storage
.� - l ZS +l + l ZS 1- + l Ventilation vaults.
:;:;c - -J f- t -J + -J f- + -J 1- - openings
§ -1 r- + -J r- + -J 1- + -J r- -
9.3.13 Stages.

1-i
-

r- + -J r- + -1 r- + -J r- - 9.3. 13.1 Sprinklers shall be installed under the roof at the ceil­
f--H f-+-1 H--J f-----
ing, in spaces under the stage either containing combustible
t - -1 materials or constructed of combustible materials, and in all
- - - -

r- + -J zs r- + -J r- + -J zs r- - adjacent spaces and dressing rooms, storerooms, and work­


� - -J r- + -J r- + -J 1- + -J r- - shops.
.LL
� - -J r- + -J r- + -J r- + -J r- -
� - -J
9.3. 13.2 Where proscenium opening protection is required, a
r- + -J r- + -J r- + -J r- - deluge system shall be provided with open sprinklers located
not more than 3 ft (900 mm) away from the stage side of the
FIGURE 9.3.7(b) Sprinklers in Multitier Bookstacks with
proscenium arch and spaced up to a maximum of 6 ft (1.8 m)
Incomplete Vertical Dividers.
on center. (See Chapter 1 9for design criteria.)
Shaded text = Revisions. .0. = Text deletions and figure/table revisions. • = Section deletions. N = New material. 2022 Edition

You might also like