0% found this document useful (0 votes)
42 views1 page

Rough Summary Cost

Uploaded by

Meseret Shimelis
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views1 page

Rough Summary Cost

Uploaded by

Meseret Shimelis
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

SN Description of Activities Unit Amount (ETB)

Bill No 1 General Provisions LS 5,065,000.00


Bill No 2 Camping and Offices No 1,901,184.38
Bill No 3 Head Works (Dam Body) No 14,007,376.29
Bill No 4 Dam Instrumentation No 939,932.36
Bill No 5 Spillway works No 25,646,701.88
Bill No 6 Outlet works No 22,840,134.08
Bill No 7 Gravel Access Road No 3,532,799.13
Bill No 8 Irrigation works No 23,175,201.00
Total carried to summary 97,108,329
15% VAT 14,566,249.37
Grand Total of Project Cost 111,674,578.488