0% found this document useful (0 votes)
22 views2 pages

LR 00 MCW Closing

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views2 pages

LR 00 MCW Closing

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Dhruv Consultancy ServicesLtd.

in Associate with
Varad Associates
Narayaneeyam 7/263 A, Akathoottu Madappad Nr Seva bharathi, Container road Opposite Toyota Kairali Ford
Cheranellore P.O,Pin 682034.Website:www.dhruvconsultancy.in Email ID: tl.dhruvcochin@gmail.com

Ref. No: DCSL-VA/NHAI/COK/NH966/2024-25/861 Date: 11.01.2025


To,
The Project Director,
National Highways Authority of India
PIU-Cochin-II,
No.35/192, East BTSRRA-125, "Kandathil Gardens",
BTS Road, Edappally, Kochi – 682024

Project: Consultancy Services for Supervision Consultant of Operation & Maintenance of Four
Lane NH Connectivity to ICTT Vallarpadam from Kalamassery (Ch. Km 0+000) to
Vallarpadam (Ch. Km 17+121) in the State of Kerala.
Sub: Request for Permission to Conduct MBIU Inspection on Bridges Along ICTT Vallarpadam
Container Road- reg.

Respected Sir,

As you are aware, the rectification and strengthening works for the bridges along the ICTT
Vallarpadam Container Road are currently in progress. As part of these activities and as per the provision
of CA, we need to conduct a Mobile Bridge Inspection Unit (MBIU) inspection for all the bridges along
the project stretch.

The primary objective of this inspection is to assess and identify damages in critical structural components,
including bearings, pedestals, pier caps, abutments, etc. Since certain sections of these bridges are located
over water bodies, visual inspection from above is not feasible. The use of the MBIU unit is essential to
facilitate the inspection of the underside of the bridges.

In this regard, we plan to carry out the MBIU inspection starting from 11.01.2024. During the inspection, it
will be necessary to close the main carriageway (MCW) at bridge locations for a minimum duration of one
hour per bridge, depending on the span length and site conditions.

To ensure a smooth and safe execution of the inspection, we request the competent authority to issue an
official letter to the Kochi Traffic Police and the Mulavukadu Station House Officer (SHO), seeking the
necessary permissions for the planned closures.

We appreciate your prompt action in this regard and look forward to your support in facilitating this critical
inspection.

This is for your kind information and necessary action please.

Yours Sincerely

Suma KS
Resident Engineer _
Dhruv Consultancy Services Ltd
Dhruv Consultancy ServicesLtd.
in Associate with
Varad Associates
Narayaneeyam 7/263 A, Akathoottu Madappad Nr Seva bharathi, Container road Opposite Toyota Kairali Ford
Cheranellore P.O,Pin 682034.Website:www.dhruvconsultancy.in Email ID: tl.dhruvcochin@gmail.com

Association Varad Associates