HVAC Work in Hospital 1728899467

HVAC

Uploaded by

078thobeka992
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views18 pages

HVAC Work in Hospital 1728899467

HVAC

Uploaded by

078thobeka992
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 18

HVAC Work

AL-JAHRA Hospital
A B C D E F G K L M N O

GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
physical chemotherapy WITH SPECIFICATIONS.
therapy Male
8 7 D. BEFORE COMMENCEMENT OF WORK , THE
16.5 m² 31.1 m²
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
Doctor SHOP DRAWINGS FOR THE ENGINEER'S
3 APPROVAL.
15.2 m²
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
physical
therapy
IN MILLIMETERS,AND LEVELS IN METERS
9 UNLESS OTHERWISE STATED .
15.3 m²
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.

Lobby SYMBOL LEGEND


6
50.7 m²

chemotherapy
33
29.2 m²
3 3

4 Operation Operation 4
Theatre Theatre 02
19 18
34.7 m² 44.5 m²

3D OR
2

5 4 3 2 1
5 Drugged 5
Room
Drugged 30
Room 24.1 m²
29
12.9 m²

1 Support Post-anesthesia
recovery
31
24.1 m²

Operation
Theatre 3
21
33.8 m²
6
2 Flexable Round Duct 10" 6

PROJECT NAME.

Hospital
3 Supply Duct 100% FA CONSULTANT.

ASEC
7 002 Ground Floor Plan 7
1 1 : 100 GENERAL CONTRACTOR.

4 Exhaust Grill 12x12" ASEC


ELECTROMECH CONTRACTOR.

ASEC

8
5 Exhaust Duct DISCIPLINE ROOF 8

DESIGNED BY ABDULLAH AHMED

CHECKED BY MOHAMED HESHAM


SCALE SHEET NO REV CODE
1 : 100 A105 A B C
ASEC TEAM - BIM TECH

A B C D E F G K L M N O
A B C D E F G K L M N O

GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
physical chemotherapy WITH SPECIFICATIONS.
therapy Male
8 7 D. BEFORE COMMENCEMENT OF WORK , THE
16.5 m² 31.1 m²
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
Doctor SHOP DRAWINGS FOR THE ENGINEER'S
3 APPROVAL.
15.2 m²
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
physical
therapy
IN MILLIMETERS,AND LEVELS IN METERS
9 UNLESS OTHERWISE STATED .
15.3 m²
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.

Lobby SYMBOL LEGEND


6
50.7 m²

chemotherapy
33
29.2 m²
3 3

4 Operation Operation 4
Theatre Theatre 02
19 18
34.7 m² 44.5 m²
375.15 cm

5 Drugged 5
Room
30
330 cm

Drugged
Room 24.1 m²
29
290 cm

12.9 m²

Post-anesthesia
recovery
31
24.1 m²

Operation
Theatre 3
21
33.8 m²
6 6
40 cm
6.65 cm

PROJECT NAME.
13.88 cm
Hospital
CONSULTANT.

ASEC
7 Section OR 002 Ground Floor Plan 7
2 1 : 20
1 1 : 100 GENERAL CONTRACTOR.

ASEC
ELECTROMECH CONTRACTOR.

ASEC

8 DISCIPLINE ROOF 8

DESIGNED BY ABDULLAH AHMED

CHECKED BY MOHAMED HESHAM


SCALE SHEET NO REV CODE
As indicated A105 A B C
ASEC TEAM - BIM TECH

A B C D E F G K L M N O
A B C D E F G K L M N O

GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY

77.75 cm
43.63 cm ITS RELEVANT NORTH DIRECTION SIGN
51.38 cm

145 cm
121.24 cm ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
135.13 cm WITH SPECIFICATIONS.
180 cm D. BEFORE COMMENCEMENT OF WORK , THE
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
IN MILLIMETERS,AND LEVELS IN METERS
UNLESS OTHERWISE STATED .
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
179.5 cm DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.
180.5 cm
180 cm

129.75 cm physical
therapy
SYMBOL LEGEND
8
16.5 m²
chemotherapy
Male
7
121.25 cm 31.1 m²

360 cm
3 3
Doctor
3
15.2 m²

177.14 cm
physical
therapy
9
15.3 m²

251.05 cm 239.5 cm
158.89 cm

4 4
198.76 cm 279.25 cm
89
.5
cm
139.75 cm
339.75 cm 239.5 cm
99.89 cm

Lobby
6
50.7 m²

182.46 cm
132.8 cm

5 5
179.5 cm

chemotherapy
33
29.2 m²
218.49 cm 179.5 cm
301 cm
150.79 cm

6 6
98.5 cm

180 cm PROJECT NAME.

Hospital
211.5 cm

212.5 cm

CONSULTANT.
194.96 cm 269.95 cm
7
ASEC 7
GENERAL CONTRACTOR.

Operation
Theatre Operation
ASEC
19 Theatre 02
34.7 m² 18
44.5 m² ELECTROMECH CONTRACTOR.
268.55 cm

268.43 cm

ASEC

8 DISCIPLINE ROOF 8

DESIGNED BY ABDULLAH AHMED

CHECKED BY MOHAMED HESHAM


002 Ground Floor Plan SCALE SHEET NO REV CODE
1 1 : 60
1 : 60 A105 A B C
ASEC TEAM - BIM TECH

A B C D E F G K L M N O
A B C D E F G K L M N O

Exhaust FRD Exhaust FRD


4" 6" GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY

100 CFM 100 CFM ITS RELEVANT NORTH DIRECTION SIGN


ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
Fresh Air C. DRAWINGS SHOULD BE READ IN CONJUNCTION
WITH SPECIFICATIONS.
D. BEFORE COMMENCEMENT OF WORK , THE
10x8" CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S

100 CFM APPROVAL.


E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE

Fresh Air IN MILLIMETERS,AND LEVELS IN METERS


UNLESS OTHERWISE STATED .
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2
12x10" UNDER THE GUIDANCE OF THE ENGINEER, ALL
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.
2

200 CFM SYMBOL LEGEND

3 Fresh Air Fresh Air 3

12x10" 10x8"
400 CFM 200 CFM

4
Supply Air Supply Air
4

20x12" 12x12"
1600 CFM physical
600 CFM
therapy
8
16.5 m²

5 Fresh Air 5
chemotherapy
Male Supply Air
12x10" 7
31.1 m²

12x12"
500 CFM
300 CFM
6 Supply Air 6

12x12" Fresh Air


800 CFM 10x8" PROJECT NAME.

Hospital
physical
300 CFM CONSULTANT.
therapy
9
15.3 m²

7
ASEC 7
GENERAL CONTRACTOR.

ASEC
Supply & Return Supply & Return ELECTROMECH CONTRACTOR.

1" 002 Ground Floor Plan


0.75" ASEC

1
8 9.6 GPM 1 : 30
Supply & Return 2.4 GPM DISCIPLINE ROOF 8

DESIGNED BY ABDULLAH AHMED


1.25" CHECKED BY MOHAMED HESHAM
12 GPM SCALE SHEET NO REV CODE
1 : 30 A105 A B C
ASEC TEAM - BIM TECH

A B C D E F G K L M N O
A B C D E F G K L M N O

Supply Air Supply Air Fresh Air Supply Air Fresh Air Supply Air
16x12" 16x12" 12x10" 12x12" 10x6" 10x12" GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
1200 CFM 900 CFM 1000 CFM 600 CFM 200 CFM 800 CFM ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
WITH SPECIFICATIONS.
D. BEFORE COMMENCEMENT OF WORK , THE
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
Supply Air SHOP DRAWINGS FOR THE ENGINEER'S
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
10x12" IN MILLIMETERS,AND LEVELS IN METERS
UNLESS OTHERWISE STATED .

2
Exhaust Air 400 CFM F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
6" COMMENCEMENT OF THEIR RELEVANT WORKS.

100 CFM SYMBOL LEGEND

3
Fresh Air 3
chemotherapy
33
29.2 m² 20x10"
1500 CFM
Supply & Return
4 2" 4

36 GPM

5 5

Operation
Theatre Operation
19 Theatre 02
34.7 m² 18
44.5 m²

6 6

PROJECT NAME.

Hospital
002 Ground Floor Plan
1 1 : 50
CONSULTANT.

ASEC
7
Supply Air Exhaust Air Supply Air Exhaust Air GENERAL CONTRACTOR.
7

16x14" 20x12" 16x14" 20x12" ASEC

1300 CFM 2700 CFM 1600 CFM 1500 CFM ELECTROMECH CONTRACTOR.

ASEC

8 DISCIPLINE ROOF 8

DESIGNED BY ABDULLAH AHMED

CHECKED BY MOHAMED HESHAM


SCALE SHEET NO REV CODE
1 : 50 A105 A B C
ASEC TEAM - BIM TECH

A B C D E F G K L M N O
A B C D E F G K L M N O

GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
WITH SPECIFICATIONS.
D. BEFORE COMMENCEMENT OF WORK , THE
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
IN MILLIMETERS,AND LEVELS IN METERS
UNLESS OTHERWISE STATED .
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.

SYMBOL LEGEND

3 3

4 4

5 5

6 6

Supply Pipe Supply Pipe Supply Pipe Supply Pipe Supply Pipe Supply Pipe PROJECT NAME.

14.4 GPM 12 GPM 9.6 GPM 7.2 GPM 4.8 GPM 2.4 GPM Hospital

1.25" 1.25" 1" 1" 0.75" 0.75" CONSULTANT.

7
ASEC 7

Return Pipe Return Pipe Return Pipe Return Pipe Return Pipe Return Pipe GENERAL CONTRACTOR.

ASEC
14.4 GPM 12 GPM 9.6 GPM 7.2 GPM 4.8 GPM 2.4 GPM ELECTROMECH CONTRACTOR.

1.25" 1.25" 1" 1" 0.75" 0.75" ASEC

8 DISCIPLINE ROOF 8

DESIGNED BY ABDULLAH AHMED

CHECKED BY MOHAMED HESHAM


SCALE SHEET NO REV CODE
1 : 45 A105 A B C
ASEC TEAM - BIM TECH

A B C D E F G K L M N O
A B C D E F G K L M N O

GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
WITH SPECIFICATIONS.
D. BEFORE COMMENCEMENT OF WORK , THE
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
IN MILLIMETERS,AND LEVELS IN METERS
UNLESS OTHERWISE STATED .
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.

SYMBOL LEGEND

3 3

4 4

5 5

003 First Floor Plan


1 1 : 45

6 Linear Slot 1 6

6 7
1 1m Ball Valve 2
300 CFM 3 4 PROJECT NAME.

Hospital

2 Flexable connection 7 Strainer 6 5 CONSULTANT.

7
ASEC 7
GENERAL CONTRACTOR.

3 Return 0.75" 8 Balancing Valve ASEC

8 ELECTROMECH CONTRACTOR.

ASEC
4 Supply 0.75" 9 2-Way Valve
8
9 DISCIPLINE ROOF 8

DESIGNED BY ABDULLAH AHMED


5 Drain 0.75" 10 Return Diffuser 60x60 10
CHECKED BY MOHAMED HESHAM
SCALE SHEET NO REV CODE
3D FCU 1 : 45 A105 A B C
2 ASEC TEAM - BIM TECH

A B C D E F G K L M N O
A B C D E F G K L M N O

GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
WITH SPECIFICATIONS.
D. BEFORE COMMENCEMENT OF WORK , THE
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
IN MILLIMETERS,AND LEVELS IN METERS
UNLESS OTHERWISE STATED .
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.

SYMBOL LEGEND

3 3

4 4

5 5

003 First Floor Plan


1 1 : 45

6
1 6

1 Exhaust Inline Fan


PROJECT NAME.

Hospital

2 Round Flexable connection 4" 2 CONSULTANT.

7
ASEC 7

Round Exhaust Diffuser 4" GENERAL CONTRACTOR.

3 ASEC
100 CFM ELECTROMECH CONTRACTOR.

3 ASEC

8 DISCIPLINE ROOF 8

3D FCU DESIGNED BY ABDULLAH AHMED


2
CHECKED BY MOHAMED HESHAM
SCALE SHEET NO REV CODE
1 : 45 A105 A B C
ASEC TEAM - BIM TECH

A B C D E F G K L M N O
A B C D E F G K L M N O

GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
WITH SPECIFICATIONS.
D. BEFORE COMMENCEMENT OF WORK , THE
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
IN MILLIMETERS,AND LEVELS IN METERS
UNLESS OTHERWISE STATED .
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.

SYMBOL LEGEND

3 3
30.52 cm

44.52 cm

49.5 cm
ø 21.14 cm
4 4

60 cm
108.78 cm

50 cm 60 cm
146.48 cm

3D room
5 2 5

100 cm
34.5 cm 25 cm

66.03 cm
15.91 cm
6 49.41 cm 6

PROJECT NAME.

Hospital
CONSULTANT.

7
ASEC 7
GENERAL CONTRACTOR.

ASEC
ELECTROMECH CONTRACTOR.

ASEC

8 DISCIPLINE ROOF 8

DESIGNED BY ABDULLAH AHMED

CHECKED BY MOHAMED HESHAM


003 First Floor Plan Section 3 SCALE SHEET NO REV CODE
1 1 : 25
3 1 : 20 As indicated A105 A B C
ASEC TEAM - BIM TECH

A B C D E F G K L M N O
A B C D E F G K L M N O

GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
WITH SPECIFICATIONS.
D. BEFORE COMMENCEMENT OF WORK , THE
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
IN MILLIMETERS,AND LEVELS IN METERS
UNLESS OTHERWISE STATED .
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.

SYMBOL LEGEND

3 3

4 4

5 5

3D chiller Roof Floor Plan


2 1 1 : 100

6 6

PROJECT NAME.

Hospital
Supply 3" Flexable Connection CONSULTANT.

ASEC
7
Return 3" Pressure Gauge GENERAL CONTRACTOR.
7

Gate Valve Temperature Gauge ASEC


ELECTROMECH CONTRACTOR.

Strainer Drain ASEC

ROOF
8
Balancing Valve Flow Switch DISCIPLINE 8

DESIGNED BY ABDULLAH AHMED

CHECKED BY MOHAMED HESHAM


SCALE SHEET NO REV CODE
3D chiller D 1 : 100 A105 A B C
3 ASEC TEAM - BIM TECH

A B C D E F G K L M N O
A B C D E F G K L M N O

GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
WITH SPECIFICATIONS.
D. BEFORE COMMENCEMENT OF WORK , THE
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
IN MILLIMETERS,AND LEVELS IN METERS
UNLESS OTHERWISE STATED .
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.

SYMBOL LEGEND

3 3

4 4

5 5

6 6

PROJECT NAME.

Hospital
Chiller Section CONSULTANT.
1 1 : 10
7
ASEC 7
GENERAL CONTRACTOR.

ASEC
ELECTROMECH CONTRACTOR.

ASEC

8 DISCIPLINE ROOF 8

DESIGNED BY ABDULLAH AHMED

CHECKED BY MOHAMED HESHAM


SCALE SHEET NO REV CODE
1 : 10 A105 A B C
ASEC TEAM - BIM TECH

A B C D E F G K L M N O
A B C D E F G K L M N O

Flexable Connection GENERAL NOTES


A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
Pressure Gauge ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
Strainer WITH SPECIFICATIONS.
D. BEFORE COMMENCEMENT OF WORK , THE
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S

Gate Valve APPROVAL.


E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
IN MILLIMETERS,AND LEVELS IN METERS
UNLESS OTHERWISE STATED .
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.

SYMBOL LEGEND

3 3

4 4

5 5

3D Chilled Pump Roof Floor Plan


2 1 1 : 100

6 6

PROJECT NAME.

Hospital
Flexable Connection CONSULTANT.

ASEC
7
Pressure Gauge GENERAL CONTRACTOR.
7

Check Valve ASEC


ELECTROMECH CONTRACTOR.

Balancing Valve ASEC

ROOF
8
Gate Valve DISCIPLINE 8

DESIGNED BY ABDULLAH AHMED


Decoupler CHECKED BY MOHAMED HESHAM
SCALE SHEET NO REV CODE
3D Chilled Pump D 1 : 100 A105 A B C
3 ASEC TEAM - BIM TECH

A B C D E F G K L M N O
A B C D E F G K L M N O

GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
WITH SPECIFICATIONS.
D. BEFORE COMMENCEMENT OF WORK , THE
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
IN MILLIMETERS,AND LEVELS IN METERS
UNLESS OTHERWISE STATED .
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.

SYMBOL LEGEND

3 3

4 4

5 5

3D AHU Roof Floor Plan


2 1 1 : 100

6 6

Supply Duct Supply 2"


PROJECT NAME.

Plenum Box Balancing Valve Hospital


CONSULTANT.

7
Flexable Connection Strainer ASEC 7
GENERAL CONTRACTOR.
Return 2" 3-Way Valve ASEC

Pressure Gauge Gate Valve ELECTROMECH CONTRACTOR.

ASEC

8
Temperature Gauge Drain DISCIPLINE ROOF 8

DESIGNED BY ABDULLAH AHMED

CHECKED BY MOHAMED HESHAM


SCALE SHEET NO REV CODE
1 : 100 A105 A B C
ASEC TEAM - BIM TECH

A B C D E F G K L M N O
A B C D E F G K L M N O

GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
WITH SPECIFICATIONS.
D. BEFORE COMMENCEMENT OF WORK , THE
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
IN MILLIMETERS,AND LEVELS IN METERS
UNLESS OTHERWISE STATED .
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.

SYMBOL LEGEND

3 3

4 4

5 5

6 6

PROJECT NAME.

Hospital
CONSULTANT.

7
ASEC 7
GENERAL CONTRACTOR.

ASEC
ELECTROMECH CONTRACTOR.
AHU Section
1 1 : 13 ASEC

8 DISCIPLINE ROOF 8

DESIGNED BY ABDULLAH AHMED

CHECKED BY MOHAMED HESHAM


SCALE SHEET NO REV CODE
1 : 13 A105 A B C
ASEC TEAM - BIM TECH

A B C D E F G K L M N O
A B C D E F G K L M N O

GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
WITH SPECIFICATIONS.
D. BEFORE COMMENCEMENT OF WORK , THE
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
IN MILLIMETERS,AND LEVELS IN METERS
UNLESS OTHERWISE STATED .
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.

SYMBOL LEGEND

3 3

4 4

5 5

6 6

PROJECT NAME.

Hospital
CONSULTANT.

7
ASEC 7
GENERAL CONTRACTOR.

ASEC
3D Roof ELECTROMECH CONTRACTOR.
1
ASEC

8 DISCIPLINE ROOF 8

DESIGNED BY ABDULLAH AHMED

CHECKED BY MOHAMED HESHAM


SCALE SHEET NO REV CODE
A105 A B C
ASEC TEAM - BIM TECH

A B C D E F G K L M N O
A B C D E F G K L M N O

GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
WITH SPECIFICATIONS.
D. BEFORE COMMENCEMENT OF WORK , THE
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
IN MILLIMETERS,AND LEVELS IN METERS
UNLESS OTHERWISE STATED .
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.

SYMBOL LEGEND

3D Fresh Fan
5

3 3

4 4

5 5

Roof Floor Plan


1 1 : 100

6 6

3D Expansion Tank
3
PROJECT NAME.

Hospital
CONSULTANT.

7
ASEC 7
GENERAL CONTRACTOR.

ASEC
ELECTROMECH CONTRACTOR.

ASEC

8 DISCIPLINE ROOF 8

DESIGNED BY ABDULLAH AHMED

CHECKED BY MOHAMED HESHAM


SCALE SHEET NO REV CODE
3D Centrifugal Pump 3D Air Separator
4 2 1 : 100 A105 A B C
ASEC TEAM - BIM TECH

A B C D E F G K L M N O
A B C D E F G K L M N O

GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
WITH SPECIFICATIONS.
D. BEFORE COMMENCEMENT OF WORK , THE
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
IN MILLIMETERS,AND LEVELS IN METERS
UNLESS OTHERWISE STATED .
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.

SYMBOL LEGEND

3 3

4 4

5 5

6 6

PROJECT NAME.

Hospital
CONSULTANT.

7
ASEC 7
GENERAL CONTRACTOR.

ASEC
ELECTROMECH CONTRACTOR.

ASEC

8 DISCIPLINE ROOF 8

DESIGNED BY ABDULLAH AHMED

CHECKED BY MOHAMED HESHAM


SCALE SHEET NO REV CODE
A105 A B C
ASEC TEAM - BIM TECH

A B C D E F G K L M N O