HVAC Work in Hospital 1728899467
HVAC Work in Hospital 1728899467
AL-JAHRA Hospital
A B C D E F G K L M N O
GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
physical chemotherapy WITH SPECIFICATIONS.
therapy Male
8 7 D. BEFORE COMMENCEMENT OF WORK , THE
16.5 m² 31.1 m²
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
Doctor SHOP DRAWINGS FOR THE ENGINEER'S
3 APPROVAL.
15.2 m²
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
physical
therapy
IN MILLIMETERS,AND LEVELS IN METERS
9 UNLESS OTHERWISE STATED .
15.3 m²
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.
chemotherapy
33
29.2 m²
3 3
4 Operation Operation 4
Theatre Theatre 02
19 18
34.7 m² 44.5 m²
3D OR
2
5 4 3 2 1
5 Drugged 5
Room
Drugged 30
Room 24.1 m²
29
12.9 m²
1 Support Post-anesthesia
recovery
31
24.1 m²
Operation
Theatre 3
21
33.8 m²
6
2 Flexable Round Duct 10" 6
PROJECT NAME.
Hospital
3 Supply Duct 100% FA CONSULTANT.
ASEC
7 002 Ground Floor Plan 7
1 1 : 100 GENERAL CONTRACTOR.
ASEC
8
5 Exhaust Duct DISCIPLINE ROOF 8
A B C D E F G K L M N O
A B C D E F G K L M N O
GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
physical chemotherapy WITH SPECIFICATIONS.
therapy Male
8 7 D. BEFORE COMMENCEMENT OF WORK , THE
16.5 m² 31.1 m²
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
Doctor SHOP DRAWINGS FOR THE ENGINEER'S
3 APPROVAL.
15.2 m²
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
physical
therapy
IN MILLIMETERS,AND LEVELS IN METERS
9 UNLESS OTHERWISE STATED .
15.3 m²
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.
chemotherapy
33
29.2 m²
3 3
4 Operation Operation 4
Theatre Theatre 02
19 18
34.7 m² 44.5 m²
375.15 cm
5 Drugged 5
Room
30
330 cm
Drugged
Room 24.1 m²
29
290 cm
12.9 m²
Post-anesthesia
recovery
31
24.1 m²
Operation
Theatre 3
21
33.8 m²
6 6
40 cm
6.65 cm
PROJECT NAME.
13.88 cm
Hospital
CONSULTANT.
ASEC
7 Section OR 002 Ground Floor Plan 7
2 1 : 20
1 1 : 100 GENERAL CONTRACTOR.
ASEC
ELECTROMECH CONTRACTOR.
ASEC
8 DISCIPLINE ROOF 8
A B C D E F G K L M N O
A B C D E F G K L M N O
GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY
77.75 cm
43.63 cm ITS RELEVANT NORTH DIRECTION SIGN
51.38 cm
145 cm
121.24 cm ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
135.13 cm WITH SPECIFICATIONS.
180 cm D. BEFORE COMMENCEMENT OF WORK , THE
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
IN MILLIMETERS,AND LEVELS IN METERS
UNLESS OTHERWISE STATED .
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
179.5 cm DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.
180.5 cm
180 cm
129.75 cm physical
therapy
SYMBOL LEGEND
8
16.5 m²
chemotherapy
Male
7
121.25 cm 31.1 m²
360 cm
3 3
Doctor
3
15.2 m²
177.14 cm
physical
therapy
9
15.3 m²
251.05 cm 239.5 cm
158.89 cm
4 4
198.76 cm 279.25 cm
89
.5
cm
139.75 cm
339.75 cm 239.5 cm
99.89 cm
Lobby
6
50.7 m²
182.46 cm
132.8 cm
5 5
179.5 cm
chemotherapy
33
29.2 m²
218.49 cm 179.5 cm
301 cm
150.79 cm
6 6
98.5 cm
Hospital
211.5 cm
212.5 cm
CONSULTANT.
194.96 cm 269.95 cm
7
ASEC 7
GENERAL CONTRACTOR.
Operation
Theatre Operation
ASEC
19 Theatre 02
34.7 m² 18
44.5 m² ELECTROMECH CONTRACTOR.
268.55 cm
268.43 cm
ASEC
8 DISCIPLINE ROOF 8
A B C D E F G K L M N O
A B C D E F G K L M N O
12x10" 10x8"
400 CFM 200 CFM
4
Supply Air Supply Air
4
20x12" 12x12"
1600 CFM physical
600 CFM
therapy
8
16.5 m²
5 Fresh Air 5
chemotherapy
Male Supply Air
12x10" 7
31.1 m²
12x12"
500 CFM
300 CFM
6 Supply Air 6
Hospital
physical
300 CFM CONSULTANT.
therapy
9
15.3 m²
7
ASEC 7
GENERAL CONTRACTOR.
ASEC
Supply & Return Supply & Return ELECTROMECH CONTRACTOR.
1
8 9.6 GPM 1 : 30
Supply & Return 2.4 GPM DISCIPLINE ROOF 8
A B C D E F G K L M N O
A B C D E F G K L M N O
Supply Air Supply Air Fresh Air Supply Air Fresh Air Supply Air
16x12" 16x12" 12x10" 12x12" 10x6" 10x12" GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
1200 CFM 900 CFM 1000 CFM 600 CFM 200 CFM 800 CFM ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
WITH SPECIFICATIONS.
D. BEFORE COMMENCEMENT OF WORK , THE
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
Supply Air SHOP DRAWINGS FOR THE ENGINEER'S
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
10x12" IN MILLIMETERS,AND LEVELS IN METERS
UNLESS OTHERWISE STATED .
2
Exhaust Air 400 CFM F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
6" COMMENCEMENT OF THEIR RELEVANT WORKS.
3
Fresh Air 3
chemotherapy
33
29.2 m² 20x10"
1500 CFM
Supply & Return
4 2" 4
36 GPM
5 5
Operation
Theatre Operation
19 Theatre 02
34.7 m² 18
44.5 m²
6 6
PROJECT NAME.
Hospital
002 Ground Floor Plan
1 1 : 50
CONSULTANT.
ASEC
7
Supply Air Exhaust Air Supply Air Exhaust Air GENERAL CONTRACTOR.
7
1300 CFM 2700 CFM 1600 CFM 1500 CFM ELECTROMECH CONTRACTOR.
ASEC
8 DISCIPLINE ROOF 8
A B C D E F G K L M N O
A B C D E F G K L M N O
GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
WITH SPECIFICATIONS.
D. BEFORE COMMENCEMENT OF WORK , THE
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
IN MILLIMETERS,AND LEVELS IN METERS
UNLESS OTHERWISE STATED .
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.
SYMBOL LEGEND
3 3
4 4
5 5
6 6
Supply Pipe Supply Pipe Supply Pipe Supply Pipe Supply Pipe Supply Pipe PROJECT NAME.
14.4 GPM 12 GPM 9.6 GPM 7.2 GPM 4.8 GPM 2.4 GPM Hospital
7
ASEC 7
Return Pipe Return Pipe Return Pipe Return Pipe Return Pipe Return Pipe GENERAL CONTRACTOR.
ASEC
14.4 GPM 12 GPM 9.6 GPM 7.2 GPM 4.8 GPM 2.4 GPM ELECTROMECH CONTRACTOR.
8 DISCIPLINE ROOF 8
A B C D E F G K L M N O
A B C D E F G K L M N O
GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
WITH SPECIFICATIONS.
D. BEFORE COMMENCEMENT OF WORK , THE
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
IN MILLIMETERS,AND LEVELS IN METERS
UNLESS OTHERWISE STATED .
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.
SYMBOL LEGEND
3 3
4 4
5 5
6 Linear Slot 1 6
6 7
1 1m Ball Valve 2
300 CFM 3 4 PROJECT NAME.
Hospital
7
ASEC 7
GENERAL CONTRACTOR.
8 ELECTROMECH CONTRACTOR.
ASEC
4 Supply 0.75" 9 2-Way Valve
8
9 DISCIPLINE ROOF 8
A B C D E F G K L M N O
A B C D E F G K L M N O
GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
WITH SPECIFICATIONS.
D. BEFORE COMMENCEMENT OF WORK , THE
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
IN MILLIMETERS,AND LEVELS IN METERS
UNLESS OTHERWISE STATED .
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.
SYMBOL LEGEND
3 3
4 4
5 5
6
1 6
Hospital
7
ASEC 7
3 ASEC
100 CFM ELECTROMECH CONTRACTOR.
3 ASEC
8 DISCIPLINE ROOF 8
A B C D E F G K L M N O
A B C D E F G K L M N O
GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
WITH SPECIFICATIONS.
D. BEFORE COMMENCEMENT OF WORK , THE
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
IN MILLIMETERS,AND LEVELS IN METERS
UNLESS OTHERWISE STATED .
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.
SYMBOL LEGEND
3 3
30.52 cm
44.52 cm
49.5 cm
ø 21.14 cm
4 4
60 cm
108.78 cm
50 cm 60 cm
146.48 cm
3D room
5 2 5
100 cm
34.5 cm 25 cm
66.03 cm
15.91 cm
6 49.41 cm 6
PROJECT NAME.
Hospital
CONSULTANT.
7
ASEC 7
GENERAL CONTRACTOR.
ASEC
ELECTROMECH CONTRACTOR.
ASEC
8 DISCIPLINE ROOF 8
A B C D E F G K L M N O
A B C D E F G K L M N O
GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
WITH SPECIFICATIONS.
D. BEFORE COMMENCEMENT OF WORK , THE
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
IN MILLIMETERS,AND LEVELS IN METERS
UNLESS OTHERWISE STATED .
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.
SYMBOL LEGEND
3 3
4 4
5 5
6 6
PROJECT NAME.
Hospital
Supply 3" Flexable Connection CONSULTANT.
ASEC
7
Return 3" Pressure Gauge GENERAL CONTRACTOR.
7
ROOF
8
Balancing Valve Flow Switch DISCIPLINE 8
A B C D E F G K L M N O
A B C D E F G K L M N O
GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
WITH SPECIFICATIONS.
D. BEFORE COMMENCEMENT OF WORK , THE
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
IN MILLIMETERS,AND LEVELS IN METERS
UNLESS OTHERWISE STATED .
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.
SYMBOL LEGEND
3 3
4 4
5 5
6 6
PROJECT NAME.
Hospital
Chiller Section CONSULTANT.
1 1 : 10
7
ASEC 7
GENERAL CONTRACTOR.
ASEC
ELECTROMECH CONTRACTOR.
ASEC
8 DISCIPLINE ROOF 8
A B C D E F G K L M N O
A B C D E F G K L M N O
SYMBOL LEGEND
3 3
4 4
5 5
6 6
PROJECT NAME.
Hospital
Flexable Connection CONSULTANT.
ASEC
7
Pressure Gauge GENERAL CONTRACTOR.
7
ROOF
8
Gate Valve DISCIPLINE 8
A B C D E F G K L M N O
A B C D E F G K L M N O
GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
WITH SPECIFICATIONS.
D. BEFORE COMMENCEMENT OF WORK , THE
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
IN MILLIMETERS,AND LEVELS IN METERS
UNLESS OTHERWISE STATED .
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.
SYMBOL LEGEND
3 3
4 4
5 5
6 6
7
Flexable Connection Strainer ASEC 7
GENERAL CONTRACTOR.
Return 2" 3-Way Valve ASEC
ASEC
8
Temperature Gauge Drain DISCIPLINE ROOF 8
A B C D E F G K L M N O
A B C D E F G K L M N O
GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
WITH SPECIFICATIONS.
D. BEFORE COMMENCEMENT OF WORK , THE
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
IN MILLIMETERS,AND LEVELS IN METERS
UNLESS OTHERWISE STATED .
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.
SYMBOL LEGEND
3 3
4 4
5 5
6 6
PROJECT NAME.
Hospital
CONSULTANT.
7
ASEC 7
GENERAL CONTRACTOR.
ASEC
ELECTROMECH CONTRACTOR.
AHU Section
1 1 : 13 ASEC
8 DISCIPLINE ROOF 8
A B C D E F G K L M N O
A B C D E F G K L M N O
GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
WITH SPECIFICATIONS.
D. BEFORE COMMENCEMENT OF WORK , THE
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
IN MILLIMETERS,AND LEVELS IN METERS
UNLESS OTHERWISE STATED .
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.
SYMBOL LEGEND
3 3
4 4
5 5
6 6
PROJECT NAME.
Hospital
CONSULTANT.
7
ASEC 7
GENERAL CONTRACTOR.
ASEC
3D Roof ELECTROMECH CONTRACTOR.
1
ASEC
8 DISCIPLINE ROOF 8
A B C D E F G K L M N O
A B C D E F G K L M N O
GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
WITH SPECIFICATIONS.
D. BEFORE COMMENCEMENT OF WORK , THE
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
IN MILLIMETERS,AND LEVELS IN METERS
UNLESS OTHERWISE STATED .
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.
SYMBOL LEGEND
3D Fresh Fan
5
3 3
4 4
5 5
6 6
3D Expansion Tank
3
PROJECT NAME.
Hospital
CONSULTANT.
7
ASEC 7
GENERAL CONTRACTOR.
ASEC
ELECTROMECH CONTRACTOR.
ASEC
8 DISCIPLINE ROOF 8
A B C D E F G K L M N O
A B C D E F G K L M N O
GENERAL NOTES
A. THE ORIENTATION OF BUILDING IS DEFINED BY
ITS RELEVANT NORTH DIRECTION SIGN
ILLUSTRATED ON THE PROJECT KEY PLAN
SHOWN IN EACH DRAWING.
1 B. DO NOT SCALE FROM DRAWINGS. 1
C. DRAWINGS SHOULD BE READ IN CONJUNCTION
WITH SPECIFICATIONS.
D. BEFORE COMMENCEMENT OF WORK , THE
CONTRACTOR SHOULD SUBMIT ALL REQUIRED
SHOP DRAWINGS FOR THE ENGINEER'S
APPROVAL.
E. ALL DIMENSIONS SHOWN ON DRAWINGS ARE
IN MILLIMETERS,AND LEVELS IN METERS
UNLESS OTHERWISE STATED .
F. THE CONTRACTOR IS TO VERIFY AND RESOLVE ,
2 UNDER THE GUIDANCE OF THE ENGINEER, ALL 2
DISCREPANCIES OF ANY ACTIVITY BEFORE
COMMENCEMENT OF THEIR RELEVANT WORKS.
SYMBOL LEGEND
3 3
4 4
5 5
6 6
PROJECT NAME.
Hospital
CONSULTANT.
7
ASEC 7
GENERAL CONTRACTOR.
ASEC
ELECTROMECH CONTRACTOR.
ASEC
8 DISCIPLINE ROOF 8
A B C D E F G K L M N O