Construction Planning & Scheduling
Construction Planning & Scheduling
CT411
Construction Planning & Scheduling
SUBMITTED BY:
GODOY, JOHN ALBERT
LADERAS, RAPHAEL ANGELO
MANALAD, JUSTIN MICO
TEJERERO, VINCENT
BETCT-4F
SUBMITTED TO:
PROF. CHARLENE RICOPUERTO
5 8 8 8 8 8 8
FLOOR AREA =
2100.00m² LOT AREA
= 588.00 m² H1
7
(CITY/ DISTRICT/ MUNICIPALITY)
= 1.40 M.
H2 =1.00 M. 8
VOLUME OF INTERIOR
7
LINE AND GRADE
(H1)
= 2100.00(1.40)
= 2940.00 m³ 5
2 ARCHITECTURAL
VOLUME OF EXTERIOR
5
5
m² 7
STRUCTURAL
SANITARY
I. VOLUME ACTUAL
1 GROUND FLOOR PLAN
VACT = VINT +
VEXT
= 2940.00 + 1512.00
= 4452.00 m³
ELECTRICAL
MECHANICAL
DESIGNER: REPUBLIC ACT 545 PROJECT TITLE OWNER SHEET CONTENT CADD BY: SHEET NO.
CERTIFIED BY:
ENGR. GROUP 2
TUP MANILA
"ARCHITECTURE LAW OF THE PHILIPPINES",
ARTICLE 2, SECTION 25: DESIGNED BY:
JHON ALBERT D. GODOY DRAWINGS & SPECIFICATIONS DULY SIGNED,
ENGR. GROUP 2
PROPOSED SPORT COMPLEX
S-2
STAMPED & OR SEALED AS INSTRUMENTS SLAB DETAIL
CIT - CET
ENGINEER OF SERVICE ARE THE
SLAB SCHEDULE
PROPERTIES & DOCUMENTS OF THE ARCHITECT, CHECKED BY:
TIN: WHETHER THE PURPOSE FOR WHICH THEY ARE STAIR DETAIL
PRC NO. MADE IS EXECUTED OR NOT. IT SHALL BE
STAIR DIAGRAM PROF. CHARLENE
13.16 m³
11.82 m³
STRUCTURAL
II. VOLUME OF COLUMN
m³
DESIGNER: REPUBLIC ACT 545 PROJECT TITLE OWNER SHEET CONTENT CADD BY: SHEET NO.
CERTIFIED BY:
ENGR. GROUP 2
TUP MANILA
"ARCHITECTURE LAW OF THE PHILIPPINES",
ARTICLE 2, SECTION 25: DESIGNED BY:
JHON ALBERT D. GODOY DRAWINGS & SPECIFICATIONS DULY SIGNED,
ENGR. GROUP 2
PROPOSED SPORT COMPLEX
S-1
STAMPED & OR SEALED AS INSTRUMENTS SLAB DETAIL
CIT - CET
ENGINEER OF SERVICE ARE THE
SLAB SCHEDULE
PROPERTIES & DOCUMENTS OF THE ARCHITECT, CHECKED BY:
WHETHER THE PURPOSE FOR WHICH THEY ARE STAIR DETAIL
TIN: PROF. CHARLENE
PRC NO. MADE IS EXECUTED OR NOT. IT SHALL BE
STAIR DIAGRAM
10MM @0.15
BEAM2 0.25M 0.35M 2-16MM 2-16MM 2-12MM 2-12MM 10MM @0.15 LAND USE AND ZONING
BEAM3 0.30M 0.45M 3-16MM 3-16MM 4-12MM 4-12MM 10MM @0.15
13.16 m³ RDM 0.25M 0.40M 3-16MM 3-16MM 4-12MM 4-12MM 10MM @0.15
5
OF FTB = 11.82 m³
4
1
VC1 = 4(0.20)(0.30)(15.00) = 3.60 m³ SCHEDULE OF COLUMN ARCHITECTURAL
VC2 = 9(0.20)(0.40)(15.00) = 10.80 m³
COLUMN
3
VFTB - FIRST FLOOR = 11.82 m³ RB 0.20M 0.30M 4-12MM 4-12MM NONE NONE 10MM @0.15
V. VOLUME OF SLAB
DESIGNER: REPUBLIC ACT 545 PROJECT TITLE OWNER SHEET CONTENT CADD BY: SHEET NO.
CERTIFIED BY:
ENGR. GROUP 2
TUP MANILA
"ARCHITECTURE LAW OF THE PHILIPPINES",
ARTICLE 2, SECTION 25: DESIGNED BY:
JHON ALBERT D. GODOY DRAWINGS & SPECIFICATIONS DULY SIGNED,
ENGR. GROUP 2
PROPOSED SPORT COMPLEX
S-3
STAMPED & OR SEALED AS INSTRUMENTS SLAB DETAIL
CIT - CET
ENGINEER OF SERVICE ARE THE
SLAB SCHEDULE
PROPERTIES & DOCUMENTS OF THE ARCHITECT, CHECKED BY:
WHETHER THE PURPOSE FOR WHICH THEY ARE STAIR DETAIL
TIN: PROF. CHARLENE
PRC NO. MADE IS EXECUTED OR NOT. IT SHALL BE
STAIR DIAGRAM
II. FOOTING TIE-BEAM = 11.82m³ (USE CLASS A V. SLAB = 52.52m³ (USE CLASS A MIXTURE) VSTEP = (0.30)(1.20)(18)(0.15) = 0.972 VSTEP = (0.30)(1.20)(18)(0.15) = 0.972
MIXTURE) m m LAND USE AND ZONING
VI. VOLUME OF STAIR TABLE 1. CONCRETE PROPORTION THIRD FLOOR TO FOURTH FLOOR: VLANDING = 1(1.20)(1.20)(0.15) = 0.216
ARCHITECTURAL
VSTR = 24.84 m³ II. TOTAL VOLUME OF FOOTING TIE BEAM (FTB) 11.82 m³
DESIGNER: REPUBLIC ACT 545 PROJECT TITLE OWNER SHEET CONTENT CADD BY: SHEET NO.
CERTIFIED BY:
ENGR. GROUP 2
TUP MANILA
"ARCHITECTURE LAW OF THE PHILIPPINES",
ARTICLE 2, SECTION 25: DESIGNED BY:
JHON ALBERT D. GODOY DRAWINGS & SPECIFICATIONS DULY SIGNED,
ENGR. GROUP 2
PROPOSED SPORT COMPLEX
S-4
STAMPED & OR SEALED AS INSTRUMENTS SLAB DETAIL
CIT - CET
ENGINEER OF SERVICE ARE THE
SLAB SCHEDULE
PROPERTIES & DOCUMENTS OF THE ARCHITECT, CHECKED BY:
TIN: WHETHER THE PURPOSE FOR WHICH THEY ARE STAIR DETAIL
PRC NO. MADE IS EXECUTED OR NOT. IT SHALL BE
STAIR DIAGRAM PROF. CHARLENE
= 89.00 (3.00) -
D-4
7
= 111.55SQ.M
TOTAL BAGS OF CEMENT
7
= 393 + 70
2
= 373.55SQ.M
7
= 373.55 (12.50)
7
7
= 13.79SQ.M OF SAND
= 4669.38 OR 4670PCS OF
CHB
AINT. W = 32.50 (0.0435)
= 1.41SQ.M OF SAND
SANITARY
TOTAL OF SAND PER SQ. M
= 13.79 + 1.14
= 15.2 SQ. M OF SAND
1 GROUND FLOOR PLAN
ELECTRICAL
MECHANICAL
DESIGNER: REPUBLIC ACT 545 PROJECT TITLE OWNER SHEET CONTENT CADD BY: SHEET NO.
CERTIFIED BY:
ENGR. GROUP 2
TUP MANILA
"ARCHITECTURE LAW OF THE PHILIPPINES",
ARTICLE 2, SECTION 25: DESIGNED BY:
JHON ALBERT D. GODOY DRAWINGS & SPECIFICATIONS DULY SIGNED,
ENGR. GROUP 2
PROPOSED SPORT COMPLEX
S-5
STAMPED & OR SEALED AS INSTRUMENTS SLAB DETAIL
CIT - CET
ENGINEER OF SERVICE ARE THE
SLAB SCHEDULE
PROPERTIES & DOCUMENTS OF THE ARCHITECT, CHECKED BY:
TIN: WHETHER THE PURPOSE FOR WHICH THEY ARE STAIR DETAIL
PRC NO. MADE IS EXECUTED OR NOT. IT SHALL BE
STAIR DIAGRAM PROF. CHARLENE
(USE CLASS 'B' MIXTURE) NUMBER OF CHB FOR SEE TABLE 1.2
NUMBER OF CHB FOR
SEE TABLE 1.2 FIRST FLOOR
FIRST FLOOR
AEXT. W = 110.31
AEXT. W = 110.31 CHB = AWALL (12.50) (0.125)
CHB = AWALL (12.50)
(0.125) = 373.55 (12.50) = 13.79SQ.M OF SAND
= 373.55 (12.50)
= 13.79SQ.M OF SAND = 4669.38 OR 4670PCS OF
= 4669.38 OR 4670PCS OF CHB
STRUCTURAL
= 13.79 + 1.14
= 15.2 SQ. M OF SAND
ELECTRICAL
MECHANICAL
DESIGNER: REPUBLIC ACT 545 PROJECT TITLE OWNER SHEET CONTENT CADD BY: SHEET NO.
CERTIFIED BY:
ENGR. GROUP 2
TUP MANILA
"ARCHITECTURE LAW OF THE PHILIPPINES",
ARTICLE 2, SECTION 25: DESIGNED BY:
JHON ALBERT D. GODOY DRAWINGS & SPECIFICATIONS DULY SIGNED,
ENGR. GROUP 2
PROPOSED SPORT COMPLEX
S-6
STAMPED & OR SEALED AS INSTRUMENTS SLAB DETAIL
CIT - CET
ENGINEER OF SERVICE ARE THE
SLAB SCHEDULE
PROPERTIES & DOCUMENTS OF THE ARCHITECT, CHECKED BY:
TIN: WHETHER THE PURPOSE FOR WHICH THEY ARE STAIR DETAIL
PRC NO. MADE IS EXECUTED OR NOT. IT SHALL BE
STAIR DIAGRAM PROF. CHARLENE
BAGS OF CEMENT FOR FIRST FLOOR AREA OF WALL BAGS OF CEMENT FOR FIRST FLOOR
(USE CLASS 'B' MIXTURE) (USE CLASS 'B' MIXTURE)
AEXT. W = PEXT (H) - AD - AW SEE TABLE 1.2
SEE TABLE 1.2 AEXT. W = PEXT (H) - AD - AW (CITY/ DISTRICT/ MUNICIPALITY)
FIRST FLOOR
CHB = AWALL (12.50) AEXT. W = 110.31 AEXT. W = 110.31
CHB = AWALL (12.50) (0.125)
= 373.55 (12.50) (0.125)
= 373.55 (12.50) = 13.79SQ.M OF SAND
= 4669.38 OR 4670PCS OF = 13.79SQ.M OF SAND
CHB = 4669.38 OR 4670PCS OF
CHB STRUCTURAL
AINT. W = 32.50 (0.0435) AINT. W = 32.50
= 1.41SQ.M OF SAND (0.0435)
= 1.41SQ.M OF SAND
TOTAL OF SAND PER SQ. M
= 13.79 + 1.14 TOTAL OF SAND PER SQ. M
= 15.2 SQ. M OF SAND = 13.79 + 1.14
TOTAL SUMMARY OF MASONRY MATERIALS SANITARY
= 15.2 SQ. M OF SAND
TOTAL NUMBER TOTAL NUMBER TOTAL BAGS OF TOTAL SQ. M.
OF 4'' CHB OF 6'' CHB CEMENT OF SAND
FIFTH FLOOR
1394PCS 4,670PCS 463BAGS 16SQ.M
MECHANICAL
97.47, SAY 8.02, SAY
SEPTIC TANK 150PCS 750PCS 97BAGS 8SQ.M
DESIGNER: REPUBLIC ACT 545 PROJECT TITLE OWNER SHEET CONTENT CADD BY: SHEET NO.
CERTIFIED BY:
ENGR. GROUP 2
TUP MANILA
"ARCHITECTURE LAW OF THE PHILIPPINES",
ARTICLE 2, SECTION 25: DESIGNED BY:
JHON ALBERT D. GODOY DRAWINGS & SPECIFICATIONS DULY SIGNED,
ENGR. GROUP 2
PROPOSED SPORT COMPLEX
S-7
STAMPED & OR SEALED AS INSTRUMENTS SLAB DETAIL
CIT - CET
ENGINEER OF SERVICE ARE THE
SLAB SCHEDULE
PROPERTIES & DOCUMENTS OF THE ARCHITECT, CHECKED BY:
TIN: WHETHER THE PURPOSE FOR WHICH THEY ARE STAIR DETAIL
PRC NO. MADE IS EXECUTED OR NOT. IT SHALL BE
STAIR DIAGRAM PROF. CHARLENE
CEMENT IN BAG
CLASS SAND
STOREY PROPORTION
(0.192)
MIXTURE 40KG 50KG
CHB = AEXT. W
THREE B 1 : 3 12.0 9.5 1.0
CEMENT IN BAGS
II. SECOND FLOOR IV. FOURTH FLOOR MIXTURE
THICKNESS OF PLASTER
CLASS
VI. SEPTIC TANK 8MM 12MM 16MM 20MM 25MM
CHB = AINT. W CHB = AINT. W A 0.144 0.216 0.288 0.36 0.45
(12.50) CHB = AINT. W
(12.50) B 0.096 0.144 0.192 0.24 0.3 SANITARY
=111.50 (12.50)
=111.50 C 0.072 0.108 0.144 0.18 0.225
(12.50) = 12 (12.50)
(12.50) D 0.06 0.09 0.12 0.15 0.188
= 1393.75PC = 150PCS
= 1393.75PC SAND 0.008 0.012 0.016 0.02 0.025
TABLE 1.3
V. FIFTH FLOOR
ELECTRICAL
QUANTITY OF CEMENT AND SAND FOR MORTAR AND PLASTER IN SQUARE. METER CHB = AINT. W
SIZE OF NUMBER
BAGS OF CEMENT MIXTURE (12.50)
SIZE CHB IN CM. PER SQ. M A B C D SAND =111.50
(12.50)
4" 10 x 20 x 40 12.5 0.792 0.522 0.394 0.328 0.0435
= 1393.75PC
5" 15 x 20 x 40 12.5 1.526 1.018 0.763 0.633 0.0844
TABLE 1.2
MECHANICAL
PROPOSE
PROPERTIES & DOCUMENTS OF THE ARCHITECT, WHETHER THE PURPOSE
CIT - CET
ENGINEER FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE
UNLAWFUL FOR ANY PERSON, WITHOUT THE WRITTEN CONSENT OF THE
ARCHITECT OR AUTHOR OF SAID DOCUMENTS TO
TIN: ISSUED ON:
PRC NO.
D SPORT
DUPLICATE OR MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE
REPITITION OF & FOR OTHER PROJECTS OR
ENGR.
CHARLE
SLAB
S-8
NE STAIR DIAGRAM ENGR. GROUP 2 CHECKED BY: PROF.
RICO SLAB SCHEDULE
SHEET CONTENT STAIR CADD BY: CHARLENE APPROVED BY: SHEET NO.
PUER DETAI
DETAIL
TO L ENGR. GROUP 2 DESIGNED BY:
ISSUED AT: BUILDING, WHETHER EXECUTED PARTLY OR IN WHOLE
BSCC LOCATION: PH9 PKG6 BLK67 LOT18 APPROVED PROF. CHARLENE
1. FOOTINGS
REPUBLIC OF THE PHILIPPINES
A. LENGTH OF FOOTINGS
SCHEDULE OF FOOTINGS OFFICE OF THE BUILDING OFFICIAL
CITY ENGINEER'S OFFICE
LFTG1 = L - (CONCRETE COVER) TLF2 = NO. OF FTG (NO. OF BAR) (LF1) FOOTINGS
TEMPERATURE
BARS
2 + (PCS OF BAR) (WF1) FOOTINGS
= 9(13) (1.46) + (13) (0.66) L W L W
=1.20 - 0.07 (2)
=1.06m = 151.84 + 8.58 0.80m 11-20mmØ TEMPERATURE
(CITY/ DISTRICT/ MUNICIPALITY)
F1 1.20m BARS BOTH WAYS
= 179.40m
F2 1.60m 0.80m 13-20mmØ TEMPERATURE
LFTG2 = L - (CONCRETE COVER) 2 BARS BOTH WAYS
= 1.60 - 0.07 (2) TLF3 = NO. OF FTG (NO. OF BAR) (LF1) F3 2.00m 0.80m
17-20mmØ
TEMPERATURE
13-20mmØ
TEMPERATURE LAND USE AND ZONING
8PCS-20mmØ VERTICAL
C3 0.50 0.20m BARS w/ 10mmØ TIES @ 10mm
M.
DESIGNER: REPUBLIC ACT 545 PROJECT TITLE OWNER SHEET CONTENT CADD BY: SHEET NO.
CERTIFIED BY:
ENGR. GROUP 2
TUP MANILA
"ARCHITECTURE LAW OF THE PHILIPPINES",
ARTICLE 2, SECTION 25: DESIGNED BY:
JHON ALBERT D. GODOY DRAWINGS & SPECIFICATIONS DULY SIGNED,
ENGR. GROUP 2
PROPOSED SPORT COMPLEX
S-9
STAMPED & OR SEALED AS INSTRUMENTS SLAB DETAIL
CIT - CET
ENGINEER OF SERVICE ARE THE
SLAB SCHEDULE
PROPERTIES & DOCUMENTS OF THE ARCHITECT, CHECKED BY:
WHETHER THE PURPOSE FOR WHICH THEY ARE STAIR DETAIL
TIN: PROF. CHARLENE
PRC NO. MADE IS EXECUTED OR NOT. IT SHALL BE
STAIR DIAGRAM
BEAM
WIDTH DEPTH CONTINUOUS BARS EXTRA BARS
STIRRUPS TOTAL 5. STIRRUPS
(a) (b) TOP BAR BOT. BAR @SUPPORT @MIDSPAN SPACING PERIMETER BEAM 2
BEAM 1 BEAM 3
BEAM1 0.30M 0.45M 3-16MM 3-16MM 4-12MM 4-12MM 10MM @0.15 168m
BEAM2 0.25M 0.35M 2-16MM 2-16MM 2-12MM 2-12MM 10MM @0.15 246m STIRRUPS FOR FOOTING TIE-BEAM. C. TOTAL LENGTH OF STIRRUPS
BEAM3 0.30M 0.45M 3-16MM 3-16MM 4-12MM 4-12MM 10MM @0.15 54m LAND USE AND ZONING
RDB 0.25M 0.40M 3-16MM 3-16MM 4-12MM 4-12MM 10MM @0.15 NONE
PERIMETER FOR FOOTING TIE-BEAM: 1. TOTAL LENGTH OF STIRRUP FOR FTB-1
RB 0.20M 0.30M 4-12MM 4-12MM NONE 10MM 96m
@0.15
PFTB1 = 59m TLSTRP = (NO. OF STRP) (LSTRP)
RB PFTB2 = 22m = 393.33 (1.60)
RDB
= 629.32m
4. BEAM (TYPICAL) A. NUMBER OF STIRRUPS FOR FTB
II. TOTAL LENGTH OF STIRRUP FOR FTB-2
NOTE: SINCE THE BEAMS ARE TYPICAL. III. TOTAL LENGTH FOR BEAM-3 I. NUMBER OF STIRRUPS FOR FTB-1 TLSTRP = (NO. OF STRP) (LSTRP)
LINE AND GRADE
THEREFORE, THE PERIMETER OF BEAMS TLB3 = TPB3 (NO. OF CONT. BAR) PCS OF STRP = PFTB-1 ÷ SPACING = 146.67 (1.20)
WILL BE MULTIPLY BY THREE (3), EXCEPT (1.10) = 59 ÷ 0.15 = 176.04m
ROOF BEAM. = 54 (6) (1.10) = 393.33pcs
= 356.40m
PBEAM1 = 56m x 3 = II. NUMBER OF STIRRUPS FOR FTB-2 D. NUMBER OF BAR FOR STIRRUPS OF
168m PBEAM2 = 82m x TLB3 = TPB3 (NO. OF EXTR. BAR) PCS OF STRP = PFTB-2 ÷ SPACING FOOTING TIE-BEAM.
3 = 246m PBEAM3 = (1.10) = 22 ÷0.15
18m x 3 = 54m = 54 (8) (1.10) = 146.67 TLSTRP.FTB1 = 629.32 ARCHITECTURAL
PROOF BEAM = 32m x 3 = 96m = 475.20m TLSTRP.FTB2 = 176.04
TOTAL LENGTH = 805.32m
A. TOTAL LENGTH FOR BEAMS B. LENGTH OF STIRRUPS
(USE CONT. & EXTRA BARS) IV. TOTAL LENGTH FOR ROOF BEAM NOTE: USE 6.00METER LONG OF STEEL BAR
SEE SCHEDULE OF BEAMS TLRB = TPRM (NO. CONT. BAR) (SEE TABLE 1.1)
I.LENGTH OF STIRRUP FOR FTB-1
(1.10) LSTRP = 2a + 2b
I. TOTAL LENGTH FOR BEAM-1 = 32 (8) (1.10) NUMBER OF BAR = TL ÷ SBL
= 2 (0.30) + 2 (0.50)
TLB1 = TPB1 (NO. OF CONT. BAR) (1.10) = 281.60m = 805.32 ÷ 6.00
= 1.60m STRUCTURAL
= 168m (6) (1.10) = 134.22 SAY 135pcs of 10mmØ x 6.00m STEEL
= 1,108.80m B. NUMBER OF HORIZONTAL BAR
II. LENGTH OF STIRRUP FOR FTB-2
BAR FOR BEAM (TYPICAL) LSTRP = 2a + 2b
TLB1 = TPB1 (NO. EXTR. OF BAR) (1.10)
= 2 (0.25) + 2 (0.35)
= 168m (8) (1.10) TLB1.CONT = 1,108.80 = 1.20m
= 1,478.40m TLB1.EXTR = 1,478.40
TLB2.CONT = 1,082.40
II. TOTAL LENGTH FOR BEAM-2 TLB2.EXTR = 1,082.40 SANITARY
MECHANICAL
DESIGNER: REPUBLIC ACT 545 PROJECT TITLE OWNER SHEET CONTENT CADD BY: SHEET NO.
CERTIFIED BY:
ENGR. GROUP 2
TUP MANILA
"ARCHITECTURE LAW OF THE PHILIPPINES",
ARTICLE 2, SECTION 25: DESIGNED BY:
JHON ALBERT D. GODOY DRAWINGS & SPECIFICATIONS DULY SIGNED,
ENGR. GROUP 2
PROPOSED SPORT COMPLEX
S-10
STAMPED & OR SEALED AS INSTRUMENTS SLAB DETAIL
CIT - CET
ENGINEER OF SERVICE ARE THE
SLAB SCHEDULE
PROPERTIES & DOCUMENTS OF THE ARCHITECT, CHECKED BY:
TIN: WHETHER THE PURPOSE FOR WHICH THEY ARE STAIR DETAIL
PRC NO. MADE IS EXECUTED OR NOT. IT SHALL BE
STAIR DIAGRAM PROF. CHARLENE
SCHEDULE OF BEAMS
WIDTH DEPTH CONTINUOUS BARS EXTRA BARS
STIRRUPS TOTAL
BEAM
(a) (b) TOP BAR BOT. BAR @SUPPORT @MIDSPAN SPACING PERIMETER
BEAM 2
BEAM1 BEAM 1 BEAM 3 (CITY/ DISTRICT/ MUNICIPALITY)
0.30M 0.45M 3-16MM 3-16MM 4-12MM 4-12MM 10MM @0.15 168m
BEAM2 0.25M 0.35M 2-16MM 2-16MM 2-12MM 2-12MM 10MM @0.15 246m FTB 2
BEAM3 0.30M 0.45M 3-16MM 3-16MM 4-12MM 4-12MM 10MM @0.15 54m
RDB 0.25M 0.40M 3-16MM 3-16MM 4-12MM 4-12MM 10MM @0.15 NONE
RB 0.20M 0.30M 4-12MM 4-12MM NONE 10MM 96m
@0.15 FTB 1 LAND USE AND ZONING
RB
= 2(0.25) + 2(0.35) = 4,828 ÷ 6.00 LTC-2 = 2a + 2b NOTE: USE 6.00METER LONG OF STEEL BAR
= 1.20m = 804.66 SAY 805pcs of 10mmØ x 6.00m = 2(0.40) + 2(0.20) (SEE TABLE 1.1)
DESIGNER: REPUBLIC ACT 545 PROJECT TITLE OWNER SHEET CONTENT CADD BY: SHEET NO.
CERTIFIED BY:
ENGR. GROUP 2
TUP MANILA
"ARCHITECTURE LAW OF THE PHILIPPINES",
ARTICLE 2, SECTION 25: DESIGNED BY:
JHON ALBERT D. GODOY DRAWINGS & SPECIFICATIONS DULY SIGNED,
ENGR. GROUP 2
PROPOSED SPORT COMPLEX
S-11
STAMPED & OR SEALED AS INSTRUMENTS SLAB DETAIL
CIT - CET
ENGINEER OF SERVICE ARE THE
SLAB SCHEDULE
PROPERTIES & DOCUMENTS OF THE ARCHITECT, CHECKED BY:
TIN: WHETHER THE PURPOSE FOR WHICH THEY ARE STAIR DETAIL
PRC NO. MADE IS EXECUTED OR NOT. IT SHALL BE
STAIR DIAGRAM PROF. CHARLENE
STRUCTURAL
SANITARY
ELECTRICAL
MECHANICAL
DESIGNER: REPUBLIC ACT 545 PROJECT TITLE OWNER SHEET CONTENT CADD BY: SHEET NO.
CERTIFIED BY:
ENGR. GROUP 2
TUP MANILA
"ARCHITECTURE LAW OF THE PHILIPPINES",
ARTICLE 2, SECTION 25: DESIGNED BY:
JHON ALBERT D. GODOY DRAWINGS & SPECIFICATIONS DULY SIGNED,
ENGR. GROUP 2
PROPOSED SPORT COMPLEX
S-12
STAMPED & OR SEALED AS INSTRUMENTS SLAB DETAIL
CIT - CET
ENGINEER OF SERVICE ARE THE
SLAB SCHEDULE
PROPERTIES & DOCUMENTS OF THE ARCHITECT, CHECKED BY:
TIN: WHETHER THE PURPOSE FOR WHICH THEY ARE STAIR DETAIL
PRC NO. MADE IS EXECUTED OR NOT. IT SHALL BE
STAIR DIAGRAM PROF. CHARLENE
TOTAL MASONRY MATERIAL'S COST DESCRIPTION QUANTITY UNIT PRICE TOTAL PRICE
DESCRIPTION QUANTITY UNIT PRICE TOTAL PRICE FOOTINGS 72PCS ₱544.00/pc ₱39,168.00
6'' CHB 24,100PCS OF CHB ₱25.00/pc ₱602,500.00 COLUMN 191PCS ₱544.00/PC ₱103,904.00
SANITARY
TIES 312PCS
TOTAL COST = ₱1,475,340.00 ₱191.00/pc ₱59,592.00
ELECTRICAL
MECHANICAL
DESIGNER: REPUBLIC ACT 545 PROJECT TITLE OWNER SHEET CONTENT CADD BY: SHEET NO.
CERTIFIED BY:
ENGR. GROUP 2
TUP MANILA
"ARCHITECTURE LAW OF THE PHILIPPINES",
ARTICLE 2, SECTION 25: DESIGNED BY:
JHON ALBERT D. GODOY DRAWINGS & SPECIFICATIONS DULY SIGNED,
ENGR. GROUP 2
PROPOSED SPORT COMPLEX
S-13
STAMPED & OR SEALED AS INSTRUMENTS SLAB DETAIL
CIT - CET
ENGINEER OF SERVICE ARE THE
SLAB SCHEDULE
PROPERTIES & DOCUMENTS OF THE ARCHITECT, CHECKED BY:
TIN: WHETHER THE PURPOSE FOR WHICH THEY ARE STAIR DETAIL
PRC NO. MADE IS EXECUTED OR NOT. IT SHALL BE
STAIR DIAGRAM PROF. CHARLENE