100% found this document useful (1 vote)
663 views7 pages

Supplier Audit Check Sheet

Uploaded by

skumarriico
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
663 views7 pages

Supplier Audit Check Sheet

Uploaded by

skumarriico
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 7

Format No: F-02(PRC-P-03)

LECTRIX E-VEHICLES PVT LTD Rev. No: 00

SUPPLIER PROCESS & PRODUCT AUDIT CHECK SHEET Effective Date: 01-08-2022

Supplier NamHEADWAY INDUSTRIES Audit Date :


Plant Location
KANKROLA SEC 87 Area :
Part Description : Auditor :
Auditee:
S. No Check Items Result Score Remarks
1 ) Operating Instructions/Work Instructions/Standard Operating Sheet

Are all the product SOS / set up WI sheets available at


1.1 O 2
the location?

1.2 Are latest drawings available with the supplier ? O 2

Are the statements of instruction in local language


1.3 O 2
(operator readable & understandable)?

Is the operation following the sequence of steps used


1.4 O 2
as per the WI / standard operating sheet?

1.5 Is Control Plan available for this process. O 2

Is significant, critical characteristics & control method


1.6 O 2
identified in Control plan?

2 ) Process Control

Are Instructions for safety wear on shop floor / process


2.1 O 2
displayed.

Is operator wear PPE during working i.e Shoes, helmet,


2.2 O 2
goggles etc.

Is Skill matrix updated & is operator aware about


2.3 O 2
process/ product ?

Is proper area with traceability available for raw


2.4 O 2
material storage ?

Is raw material stored in proper racks/ trolleys/ bins


2.5 O 2
with identification ?

Is start up check sheet available & Is there system to


2.6 O 2
record data in start up check sheet ?

Is there system to start machine when all setup /


2.7 O 2
process parameter within specification.

Is action taken if setup / process parameter not within


2.8 S 1
specification.

2.9 Is tool life monitoring of tool as per defined tool life. O 2

Is there system and recording of first piece / set up


2.10 O 2
approval.

2.11 Is the First piece & Last piece kept and identified. O 2

Is process control check sheets available on line &


2.12 inspection frequency & Sample size defined as per O 2
control plan.

Is hourly production maintained and verified by


2.13 O 2
supervisor?

Is make entry rejection / rework part in hourly


2.14 production sheet & Verification sign by supervisor for O 2
NG qty.

Do the operators know how to deal with the NC


2.15 O 2
product?
S. No Check Items Result Score Remarks

2.16 Is identification done for rework part & reject part. O 2

Do the rework & repair instructions available, followed


2.17 O 2
& record of rework part maintained?

Is record of rejected part properly maintained and


2.18 O 2
matched with scrap note?

Is there any proper feedback system for pervious


2.19 O 2
operation problem available among the operators?

Is the mistake proofing / Poka Yoke validated whenever


2.20 O 2
start of working.

2.21 Is the operator aware of mistake proofing / Poka Yoke? O 2

2.22 Is action taken in case of Poka Yoke not working? O 2

Is the operator aware of abnormal situation and action


2.23 is taken in case of part made during abnormal O 2
condition?

Are people trained on significant, critical characteristics


2.24 S 1
and its controlling method?

Are limit / master samples / defect matrix displayed at


2.25 inspection area and limit sample are validate during O 2
startup.

Are the products properly identified and traceable


2.26 S 1
during all stages of production ?

Is there identification mark on shop floor for Finish


2.27 O 2
part , WIP, before process & after process etc.

2.28 Are critical processes identified ? O 2

Are clean bins being used and is there any damage


2.29 O 2
bin / box / trolley used in WIP.

Does the supplier have packaging standard defined for


2.30 each part & is the supplier dispatching supplies as per O 2
approved packing std. ?

2.31 Is operator aware about customer, internal complaints O 2

Is corrective action effectively monitoring of complaints


2.32 O 2
at concern process?

Does the supplier have red bins located on each


2.33 O 2
process for rejected parts disposal ?

2.34 Is there proper lighting and Ventilation? O 2

Is 4M change monitored effectively and action taken as


2.35 S 1
defined?

Does the suppler has system for Initial flow control and
2.36 S 1
followed effectively?

3 ) Inspection & Testing

Are instrument & gauge used calibrated and free from


3.1 O 2
any damage.

3.2 Is the Instrument & gauge used as per control plan? O 2

Are required gauges / inspection fixtures / instruments


3.3 O 2
available. Do the instruments checklist followed?

Are the SPC / X bar-R charts filled in correctly (if


3.4 appropriate)? Are they referenced on SPC instruction & O 2
Control plan?
If the process go beyond the control limits, resetting
3.5 S 1
the process is done or not?
S. No Check Items Result Score Remarks
Is cpk value on significant / critical characteristics
3.6 coming more than 1.67, if <1.67 then action plan is O 2
available.

Is Firewall/ PDI station available for part inspection with


3.7 display of Final Inspection Standard & work O 2
instruction ?

Are all type of gauges available at final inspection stage


3.8 O 2
as required by Final Inspection Standard ?

Is skill matrix avilable for inspectors inspecting at


3.9 O 2
Firewall / PDI stations

Total Score 96

O OK No Discrepancy (2 Points) D Major Discrepancy - Major NC (0 points)

Minor Discrepancy - Minor NC (1


s Points)
NA Not Applicable

II - PROCESS CHECKS (Control plan based audit)


Parameter Score
Observatio
Sl No Process Specificatio (0 or Remarks
n
n 2)
Parameter Score
Observatio
Sl No Process Specificatio (0 or Remarks
n
n 2)

Total

III - PRODUCT CHECKS (Verification of FG material available in plant ready for dispatch)
Observatio
Product Parameter Specification Score Remarks
Sl No n
1 Visual Parameter

2 Packing

3 Labeling

4 Bin/ Trolley etc. condition

Total

Note: Supplier process audit weightage- 40%


Control plan based audit weightage- 30%
Product audit weightage- 30%
Previous audit Non Conformities' countermeasure effectiveness:

Customer complaints countermeasure effectiveness:


Improvement points:

Rating Parameter Target Rating Actual Rating Achieved


Process Audit 40%
Control plan based audit 30%
Product Audit 30%
100%
Auditor : Auditee:

Result Criteria:- Marks (In %)


Green ≥80%
Yellow 40~79%
Red <40%