PPM - INSPECTION LUMINARIES CHECKLIST
Work Order: Date:
Starting Time: End Time:
Status: ( ) if OK ( X ) if not OK with
written notes
Action: ( R ) for Repair, ( C ) for Change, ( A ) for
Adjust
SN Location Description Status Action Notes
Check Switch ON /
OFF
Check and ensure that
all lightings are
BUILDING working
ROOF TOP / Check cables
ELEVATOR / conditions / terminals
ELECTRICAL for any rusty or loose
ROOM / connections and repair
1 GARBAGE if necessary and clean
CHUTE ROOM /
LV ROOM / Switch OFF and
GENERATOR change lamps if
ROOM / FIRE necessary
PUMP ROOM
Switch ON and
confirm all lights are
working
Close service door and
lock
Check all light
condition
FENCE LIGHT /
WALL LIGHT / Electrical wiring
2 condition
GARDEN
LIGHT
Clean and remove dust
if necessary
Tel: 4444 0067 ; Fax: 4436 2598 ; Email: info@atlantic.qa ; P.O. Box 37111 – Doha, Qatar
LOBBY / Check all light
CORRIDOR condition
LIGHT /
STAIRWAY Electrical wiring
LIGHT / EXIT condition
LIGHT /
BASEMENT
Clean and remove dust
LIGHT
if necessary
BASEMENT
3 SENSOR LIGHT
Guard Room
CHECK
INSTRUMENTS
V - Volts
4 I - Currents
(Amps)
R - Resistance
(Ohms)
Remarks
Done By: Approved By:
______________________________________ ______________________________________
Technician Sign and Name Engineer or Manager