0% found this document useful (0 votes)
61 views10 pages

Kanul Abdul Riyaz MEP SR Engg

Uploaded by

arktechnodxb
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
61 views10 pages

Kanul Abdul Riyaz MEP SR Engg

Uploaded by

arktechnodxb
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 10

KANUL ABDUL RIYAZ

Sr Project Engineer – Electrical


A result oriented & performance driven professional with skills in
Execution of project life-cycle right from development to delivery
encompassing monitoring, interdisciplinary coordination, resource
planning and documentation as per quality, time & budget norms with a
leading organization of high repute in Power Transmission, Sub Station

+971544774126 kanulabdul@gmai
https://www.linkedin.com/in/abdul-r-kanul-11759422

Profile Summary
• Qualified D.E. (Electrical and Electronics) with over 15 years of rich exp
Project Management, Operations Management, P & L Accountability,
Management, Business Development, Sales Operations and Client Servicing.
Expert IN • Associated pioneers in the electrical industry like TATA Projects Lim
Projects Limited, Bajaj Electricals Limited and IVRCL Infrastruct
Projects Limited.
• Merit of independently managing & showcasing expertise in managing
 EPC, Value projects of 132 KV - 400 KV Transmission Lines and Substations.
Engineering • Excellent understandings of Mechanical, Electrical and Plumbing syst
including HVAC and Firefighting system.
• Demonstrated excellence to drive transformation and leveraged te
 Project commercial acumen to optimize processes and deliver value during all co
Management projects across career – Power, Utility, MEP projects.
• Ability to interpret MEP drawings, schematics, and specifications accurately.
• Championed in monitoring the contractor’s progress and performance to en
and service conform to the contract requirements.
 P&L • Excels in planning & Spearheading construction projects involving
administration, resource planning with a flair for adopting modern co
Accountability methodologies in compliance with quality standards
• Proficient in managing business operations with key focus on top & b
profitability by ensuring optimal utilization of resources.
 Contracts
• Expert at implementing Global Standards / HSE Systems, Conducting Audits
Management Designing Construction HSE Standards and taking preventive corrective
minimize risk/accidents.
• Flair for adopting modern construction methodologies / techniqu
engineering tools and applicable engineering codes & quality standards.
 Business • Dynamic & self-starter with strong planning, communication, analytical &
solving skills
Development • and coordinating with site management functions.
• Preparing purchase schedules for procurement of materials to ensu
execution of business operations.
 Client Servicing • Preparation of project deliverables and ensure to achieve all deliverables are
• Developing project base lines and controlling projects with respects to cos
deployments, time over runs and quality compliance to ensure satisfactory
of projects.
 Budgeting & Cost • Preparing and implementing stringent systems, detailed engineering and qu
to ensure high quality standards during all the stages of the project
Control

 Vendor
Development

 Liaison &
Coordination
Professional Experiance
M plus E Engineerings, Hyderabad Jan’ 2021 – Till Date
Sr Project Manager

EPC Projects:
 Provident Noera Residential Project, Bangalore. Client: Star worth Infra.
 Puravankara, Provident Park Square, Bangalore. Client: Star worth Infra.
 KIMS Hospitals, Hyderabad & KIMS hospitals Anantapur. Client : KIMS.

Role and Responsibilities


• Responcible for Handling complete project from award stage (post-tender) to completion (Financial
closer) stage
• Prepared the initial scope of the project, in alignment with overall project strategy and direction.
• Construction supervision for MEP utilities - Electrical Power Cabling Network, LED Street Lighting,
ICT network, Storm Water network, Fire Fighting Network, Plumbing, Bore-wells and Mechanical Plant
Room.
• Supervised installations & Testing for Fire Alarm System, Public Address System, Access Control
System, CCTV System and Gate Barrier Control System.
• Review and approve MEP material submittals, shop drawings, and test reports to ensure compliance
with project specifications and requirements
• Overall Installation of Electrical and Low current system for fault and alarm conditions and all data and
alarm indicators checked with full events records.
• Review of external MEP interface coordination drawings, and coordinated clash resolutions for interface
between Architectural, Structural & MEP services.
• Prepared detailed MEP monthly / fortnightly reports addressing project progress, key issues, time, costs
and quality
• Provide technical support and guidance to the project team, addressing MEP-related queries and issues.
• Chairing-up project progress meetings, materials procurement meetings, technical meetings and safety
meetings and prepared weekly / monthly MEP Progress reports.
• Installation of switch yard equipment, cable laying and termination , preparation of load schedules, cable
tray schedules
• Installation of LV switchgears PCC, MCC, ACDB control panels, cable laying and termination,
preparation of load schedules, cable tray schedules.

Bajaj Electricals Limited, Mumbai Oct’ 2017 – Aug’ 2020


Sr Project Manager

EPC (TLT) Projects:


 220 KV Substation at Moghalkot, Belagavi Karnataka : Cost: 208 cr. Client : KPTCL.
 400 KV NTPC – Narsapur Transmission Line: cost: 500 cr. Client: TS Transco.
 400 KV NTPC – Ramadugu Transmission Line: cost: 250 cr. Client: TS Transco.
Roles and Responsibilities:
• Handle complete project from award stage (post-tender) to completion (Financial closer) stage.
• Instrumental in construction of the projects, all activities like Survey, Foundation, Erection and stringing
of the transmission Line.
• Responsible for Bay Installations, Transformer installations and Earthing layouts activities
• Prepared Strategic Planning & Benchmarking of the EHV Substations, as per base lines, considering
balancing and alignment of all elements.
• Prepared the issues; objectives; priorities; resources; Budget; deadlines; skills & the roles and
responsibilities of each.
• Preparation of panel schemes up to 132 KV and single line diagram (SLD) of power system in Auto
CADD software.
• Contributes to the commercial success of projects, supporting the commercial team in the valuation of
works incorporating change management, and claims
• Plan and forecast project budget and human resource requirements
• Create and execute project work plans and revise as appropriate to meet changing needs and
requirements
TATA Projects Limited, Hyderabad Feb’2012 – Oct’2017
Construction Manager

Construction Projects:

 400 KV Jaisalmer-2 Substation BAY extension: cost: 97 cr. Client: RRVPNL.


 765 KV Jabalpur- Dharamjaigarh Transmission line: Cost: 208 cr. Client: PGCIL.
 765 KV Nellore – Kurnool Transmission line Cost; 720 CR Client: PGCIL.
Role:
• Overall, in charge for handling construction of the projects.
• Planning and mobilizing the resources and finalize sub-contractors according to the plan.
• Instrumental in all activities like Survey, Foundation, Erection and stringing of the transmission Line.
• Deployment of resources, sub-contractors and gangs as per the priority of works and Preparation of
work methods for diff activities.
• Effectively achieved the turnover as committed in the current and previous financial years.
• Review and monitoring the site activities, and to ensure completion of tasks within the cost parameters
and effective resource utilization to maximize the output
• Instrumental in Project Execution since from the site establishment to closer outs of the project.
• To ensure that the project successfully completed on time by monitoring milestones project priorities re
assignment, resource management within Budget and with quality and safety.
• Coordination with the customer and all the stake holders of the projects.
• Review the project schedule with the Senior Management and all other staff that will be affected by the
project activities and revise the schedule as required.
• Preparing DPRs, MPRs and communicating the same as per the MIS system.
• Coordinating with competent agencies to obtain the approvals of data/drawings/salutatory requirements.
• Studying the critical and near critical activities to anticipate problems and emerging the device to
overcome them

High lights:
• Completed all set targets of 250 foundations and 110 kms stringing of 765 kV TL erection works within
defined schedule. And completed major crossings in stringing works without any nonconformity.
• Appreciated by the management for achieving the desired revenue and managing the sub-contractor
to deliver the best with available material and resource.
• Carried out some Major power Line crossings by using Hot Line Techniques (Live Line crossings)

Larsen and Toubro Limited, Delhi Feb’ 2005 – Feb’ 2012


Assistant Manager

Construction Projects:
 400 KV Parbathi – Amritsar Transmission Line: cost: 97 cr. Client: PGCIL.
 765 KV Antha – Phagi Transmission Line: cost: 307 cr. Client: RRVPNL
Role: Section IN charge.

• Played a key role in the execution of Transmission line activities


• Efficiently interfaced with more than 10 no of foundation gangs,10 no erection, 3 no of TSE gangs and
6 no of Manual stringing gangs for streamlining the operations
• Significantly prepared deliveries as per schedule as well as completed all set targets within the
stipulated time period.
• Ensuring all works are carried out and managed in accordance with the Integrated Management
System.
• Manages technical coordination meetings with clients, contractors, and utility providers.
• Dexterously completed 16 unequal leg extension foundation at hilly terrain using heavy excavator like
EX200 and made approaches to reach all men/materials for foundation & erection work.
• Ensuring sub-contractor compliance with all site and project requirements, including operational health
and safety obligations
Highlights:
• Completed all set targets of 250 foundations and 110 kms stringing of 400 kV TL erection works in
difficult Hilly terrains of Himachal Pradesh within defined schedule.
• Skillfully executed all unequal leg extension (ULE) foundations in hilly terrain.
• Gained the exposer in Project management and Quality management/ISO standards.
IVRCL Infra Projects Limited, Hyderabad Feb’ 2001 – Feb’ 2005
Site Engineer

 Hillridge Springs G + 10 Residential projects, Hyderabad


 Hillridge Villas Gated community housing project, Hyderabad.
Role: Project Engineer.

• Installations of domestic house wiring and residential complex utilities.


• Support the Head of Construction on the day-to-day tasks.
• Prepares and reviews pre-construction documentation including shop drawings, material submittals,
method statements, Quality Plans, HSE plans, and Commissioning Plans.
• Played a key role in the execution of complex switching yard installation activities
• Prepared load schedules, work out designs (with consultant support as needed), and prepare detailed
designs, timelines, and Bill of Materials when required for execution
• Installations of Electrical control panels like PCC, MCC, ACDB, LDB
• Prepared Cable laying schedules and cable terminations
• Distribution transformer and switch yards installations.
• Installation of domestic water pump house with hydro pneumatic pumps.
• Installations of Firefighting system, and Public Addressing system.
• Street lighting Installations

ECC constructions (L&T group), Chennai May’1998 – Dec’2000


Technical Assistant

 L and T Cement Projects (now Ultratech Cements) - Tadipatri, Andhra Pradesh

Role: Tech Assistant


Education: • Installations of Industrial wiring and Area Lightings.
• Played a key role in the erection of LV electrical control panels installation activities
- Diploma in Electrical & • Installations of PCC, MCC, ACDB, LDB control panels.
Electronics Engg. • Prepared cable load schedules
- SV University – Tirupathi • Personal involvements in Substation Installations,
- Aggregate: 73% • LT cable terminations, LT cable laying
- Year: 1997 • Distribution transformer and switch yards installations.
• Installations of Firefighting system, and Public Addressing system.
• LV Motors Pump sets Installations in L and T Cements Project Tadipatri.
Languages:
English : Read, Write & Speak
Hindi : Read, Write & Speak
Telugu : Read, Write & Speak
Tamil : Speak

Personal Details:
Date of Birth : 1st Jul 1977
Marital Status : Married
Passport : M3381033
Valid : Nov 2024
ARK Technical Services, Dubai, UAE 2023 – Till Date
Founder and Owner Services

MEP Projects
 10K Litre LPG gas tank Installations and Maintenance, CONROD hotels DUBAI, Client: Hilton Hotels ltd.
 7 K litre LPG gas tank Installations and maintenance, TRUMP Golf Club Dubai, Client: DAMAC.
 MEP Installations, Otantic Restaurants Dubai. Client : Otantic Restaurants

M Plus E Projects, Hyderabad


Jan 2021 -Jun 2023
Sr.Manager - Projects
Date Services

MEP Projects:
 Provident Noera Residential Project, Bangalore. Client: Star worth Infra.
 Puravankara, Provident Park Square, Bangalore. Client: Star worth Infra.
 KIMS Hospitals, Hyderabad & KIMS hospitals Anantapur. Client : KIMS.

Bajaj Electricals Limited, Mumbai


Oct 2017 -Aug 2020
Manager - Projects
Date Services

EPC (TLT) Projects:


 220 KV Substation at Moghalkot, Belagavi Karnataka : Cost: 208 cr. Client : KPTCL.
 400 KV NTPC – Narsapur Transmission Line: cost: 500 cr. Client: TS Transco.
 400 KV NTPC – Ramadugu Transmission Line: cost: 250 cr. Client: TS Transco.

TATA Projects Limited, Hyderabad


Feb 2012 -Oct 2017
Asst .Manager - Projects
Date Services

Construction Projects:
 400 KV Jaisalmer-2 Substation BAY extension: cost: 97 cr. Client: RRVPNL.
 765 KV Jabalpur- Dharamjaigarh Transmission line: Cost: 208 cr. Client: PGCIL.
 765 KV Nellore – Kurnool Transmission line Cost; 720 CR Client: PGCIL.

Roles and Responsibilities:

Previous Experiance
Larsen and Toubro Limited, Delhi Feb’ 2005 – Feb’ 2012
Assistant Manager

C
onstruction Projects:
 400 KV Parbathi – Amritsar Transmission Line: cost: 97 cr. Client: PGCIL.
 765 KV Antha – Phagi Transmission Line: cost: 307 cr. Client: RRVPNL
 400 KV Ramagundam- Dichpally Transmission line Client : TS Transco.

IVRCL Infra Projects Limited, Hyderabad Feb’ 2001 – Feb’ 2005


Site Engineer

 Hillridge Springs G + 10 Residential projects, Hyderabad


 Hillridge Villas Gated community housing project, Hyderabad.

Role: Project Engineer.

• Installations of domestic house wiring and residential complex utilities.


• Support the Head of Construction on the day-to-day tasks.
• Prepares and reviews pre-construction documentation including shop drawings, material submittals,
method statements, Quality Plans, HSE plans, and Commissioning Plans.
• Played a key role in the execution of complex switching yard installation activities
• Prepared load schedules, work out designs (with consultant support as needed), and prepare detailed designs,
timelines, and Bill of Materials when required for execution
• Installations of Electrical control panels like PCC, MCC, ACDB, LDB
• Prepared Cable laying schedules and cable terminations
• Distribution transformer and switch yards installations.
• Installation of domestic water pump house with hydro pneumatic pumps.
• Installations of Firefighting system, and Public Addressing system.
• Street lighting Installations

Role: Section IN charge.

• Played a key role in the execution of Transmission line activities


• Efficiently interfaced with more than 10 no of foundation gangs,10 no erection, 3 no of TSE gangs and 6 no
of Manual stringing gangs for streamlining the operations
• Significantly prepared deliveries as per schedule as well as completed all set targets within the stipulated
time period.
• Ensuring all works are carried out and managed in accordance with the Integrated Management System.
• Manages technical coordination meetings with clients, contractors, and utility providers.
• Dexterously completed 16 unequal leg extension foundation at hilly terrain using heavy excavator like
EX200 and made approaches to reach all men/materials for foundation & erection work.
• Ensuring sub-contractor compliance with all site and project requirements, including operational health and
safety obligations

UAE DRIVING LICENCE:


DL NO : 4810323
VALID : Oct 2026
PLACE : DUBAI

Contact

www.linkedin.com/in/abdul-r-kanul-11759422

www.linkedin.com/in/abdul-r-kanul-11759422

+971544774126
kanulabdul@gmail.com

Dubai - UAE

arktechnodxb arktechnodxb

EHV and Sub station:

• Project Controller for Handling Transmission Line, Substation and MEP Projects.
• Head Electrical for Handling complete project from award stage (post-tender) to completion (Financial
closer) stage
• Prepared the initial scope of the project, in alignment with overall project strategy and direction.
• Instrumental in construction of the projects, all activities like Survey, Foundation, Erection and stringing of
the transmission Line.
• Responsible for Bay Installations, Transformer installations and Earthing layouts activities
• Prepared Strategic Planning & Benchmarking of the EHV Substations, as per base lines, considering
balancing and alignment of all elements.
• Prepared the issues; objectives; priorities; resources; Budget; deadlines; skills & the roles and responsibilities
of each.
• Preparation of panel schemes up to 132 KV and single line diagram (SLD) of power system in Auto CADD
software.
• Construction supervision for MEP utilities - Electrical Power Cabling Network, LED Street Lighting, ICT
network, Storm Water network, Fire Fighting Network, Plumbing, Bore-wells and Mechanical Plant Room.
• Supervised installations & Testing for Fire Alarm System, Public Address System, Access Control System,
CCTV System and Gate Barrier Control System.
• Review and approve MEP material submittals, shop drawings, and test reports to ensure compliance with
project specifications and requirements
• Overall Installation of Electrical and Low current system for fault and alarm conditions and all data and
alarm indicators checked with full events records.
• Review of external MEP interface coordination drawings, and coordinated clash resolutions for interface
between Architectural, Structural & MEP services.
• Prepared detailed MEP monthly / fortnightly reports addressing project progress, key issues, time, costs and
quality
• Contributes to the commercial success of projects, supporting the commercial team in the valuation of works
incorporating change management, and claims
• Plan and forecast project budget and human resource requirements
• Create and execute project work plans and revise as appropriate to meet changing needs and requirements
• Accountable for overseeing various functions entailing project control, turnover achievement, cost control,
developing team for projects, etc.
• Supervising a team of Site Managers and coordinating with BU Head & various client for expedition of final
contract closure activities as well as arranging the realization of final payments.

MEP projects :

Roles and Responsibilities:


• Provide technical support and guidance to the project team, addressing MEP-related queries and issues.
• Chairing-up project progress meetings, materials procurement meetings, technical meetings and safety
meetings and prepared weekly / monthly MEP Progress reports.
• Installation of switch yard equipment, cable laying and termination , preparation of load schedules, cable tray
schedules
• Installation of LV switchgears PCC, MCC, ACDB control panels, cable laying and termination, preparation
of load schedules, cable tray schedules.

Profile Summary
• Qualified D.E. (Electrical and Electronics) with over 15 years of rich experience in Project
Management, Operations Management, P & L Accountability, Contracts Management,
Business Development, Sales Operations and Client Servicing.
• Associated pioneers in the electrical industry like TATA Projects Limited, L&T Projects
Limited, Bajaj Electricals Limited and IVRCL Infrastructures and Projects Limited.
• Merit of independently managing & showcasing expertise in managing high-value projects
of 132 KV - 400 KV Transmission Lines and Substations.
• Excellent understandings of Mechanical, Electrical and Plumbing system (MEP), including
HVAC and Firefighting system.
• Demonstrated excellence to drive transformation and leveraged technical & commercial
acumen to optimize processes and deliver value during all construction projects across
career – Power, Utility, MEP projects.
• Ability to interpret MEP drawings, schematics, and specifications accurately.
• Championed in monitoring the contractor’s progress and performance to ensure goods and
service conform to the contract requirements.
• Excels in planning & Spearheading construction projects involving contract administration,
resource planning with a flair for adopting modern construction methodologies in
compliance with quality standards
• Proficient in managing business operations with key focus on top & bottom-line profitability
by ensuring optimal utilization of resources.
• Expert at implementing Global Standards / HSE Systems, Conducting Audits, Training,
Designing Construction HSE Standards and taking preventive corrective action to minimize
risk/accidents.
• Flair for adopting modern construction methodologies / techniques, latest
engineering tools and applicable engineering codes & quality standards.
• Dynamic & self-starter with strong planning, communication, analytical & problem-
solving skills
• and coordinating with site management functions.
• Preparing purchase schedules for procurement of materials to ensure smooth execution of
business operations.
• Preparation of project deliverables and ensure to achieve all deliverables are on time.
• Developing project base lines and controlling projects with respects to cost, resource
deployments, time over runs and quality compliance to ensure satisfactory execution of
projects.
• Preparing and implementing stringent systems, detailed engineering and quality plans to
ensure high quality standards during all the stages of the project

You might also like