MECHANICAL VENTILATION FOR B2
Total area = 1604 m2
Height of floor = 3.1 m
Volume = 1604*3.1 = 4972 m3
No. of air change per hour = 6 Times
Total flow rate (cfm) = volume * ACH
= 4972 * 6 /1.72 =17549 CFM
➢ Fan selection:
Exhaust Fan Capacity = 18000 CFM fire rated 2hr @ 300c
No. of fans = 1.0 nos. fans
MECHANICAL VENTILATION FOR B1
Total area = 1001 m2
Height of floor = 3.1 m
Volume = 1001*3.1 = 3103 m3
No. of air change per hour = 6 Times
Total flow rate (cfm) = volume * ACH
= 3103 * 6 /1.72 =10952 CFM
➢ Fan selection:
Exhaust Fan Capacity = 10000 CFM fire rated 2hr @ 300c
No. of fans = 1.0 nos. fans