Part A. EARTHWORKS
Structure Excavation
Thickness (m) length (m) width (m) Quantity volume (m3)
F1 1 0.8 0.8 6 3.84
total volume: 3.84
Gravel Fill
Thickness (m) length (m) width (m) Quantity volume (m3)
Slab 1 0.1 7.475 6.5 1 4.86
wall footing 0.1 29.15 0.2 1 0.58
F1 0.1 0.8 0.8 6 0.38
total volume: 5.83
Structural Concrete
Thickness (m) length (m) width (m) Quantity volume (m3)
Slab 1 0.1 7.475 6.5 1 4.86
F1 0.25 0.8 0.8 6 0.96
C1 1.05 0.3 0.3 6 0.57
total volume: 6.39 m3
Total no. of cement bags: 57.47 bags
Total volume of sand: 3.19 m3
Total Volume of Gravel: 6.39 m3
Reinforcing Steel, Grade 40
Finishing Hardware
No. of Doors 75
Sched length (m) height (m) area (m2) Quantity total area (m2)
D1 1.6 2.1 3.36 5 16.8
D2 0.9 2.1 1.89 4 7.56
D6 1.3 2.1 2.73 2 5.46
total area: 29.82
Sched length (m) height (m) area (m2) Quantity total area (m2)
W1 1.4 1.25 1.75 40 70
W2 0.7 1.25 0.875 4 3.5
W3 1 1.25 1.25 6 7.5
W4 1.3 0.65 0.845 4 3.38
W5 0.6 0.65 0.39 22 8.58
total area: 92.96
Sched length (m) height (m) area (m2) Quantity total area (m2)
W9 2.4 0.9 2.16 2 4.32
Sched length (m) height (m) area (m2) Quantity total area (m2)
W6 2.75 1 2.75 2 5.5
W11 0.3 2.1 0.63 14 8.82
W12 3.69 2.5 9.225 2 18.45
total area: 32.77
Jalousie Windows, Glass
N/A
Frames (Jambs, Still, Head, Transoms and Mullions)
sets
doors and windows 171
Door, Flush
Sched length (m) height (m) area (m2) Quantity total area (m2)
D8 0.6 2.1 1.26 8 10.08
D10 0.6 2.1 1.26 21 26.46
D11 0.7 2.1 1.47 3 4.41
total area: 40.95
Door, Wood Panel
Sched length (m) height (m) area (m2) Quantity total area (m2)
D3 0.9 2.1 1.89 6 11.34
D4 0.9 2.1 1.89 14 26.46
D5 0.9 2.1 1.89 2 3.78
D7 1.6 2.1 3.36 2 6.72
D9 1 2.1 2.1 2 4.2
D12 1.6 2.1 3.36 2 6.72
D13 1 2.1 2.1 4 8.4
total area: 67.62
length (m) height (m) area (m2) doors (m2) Windows net area (m2)
Interior
Common walls
Toilet
(Male/Female Ward) 178 3.2 569.6 31.2 538.40
Doctor Station Toilet 23.2 3.2 74.24 2.52 71.72
Nurse Station Toilet 51.6 3.2 165.12 7.98 157.14
Reception Area Toilet 39 3.2 124.8 6.09 118.71
Exterior
Common Walls
Toilet
(Male/Female Ward) 52 3.2 166.4 8.06 158.34
Nurse Station Toilet 10.8 3.2 34.56 1.56 33.00
Reception Area Toilet 9.6 3.2 30.72 1.56 29.16
Total Area: 1,106.47
Male Ward
Elevation length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
right 38.65 3.2 123.68 22.32 3.36 98.00
Left 50.65 4.2 212.73 21.25 3.78 187.70
Front 9.45 4.02 37.989 37.99
Rear 7.5 4.02 30.15 2.1 28.05
Interior Wall Male
Ward
Patient Bed Partition 40 2.4 96 96.00
Doffing 14 3.2 44.8 7.56 37.24
Donning 21.7 3.2 69.44 7.56 61.88
Nurse Station 15.85 3.2 50.72 2.75 7.14 40.83
Total Area 587.69
Female Ward
Elevation length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
Left 38.65 3.2 123.68 22.32 3.36 98
Right 50.65 4.2 212.73 21.25 3.78 187.7
Front 9.45 4.02 37.989 37.989
Rear 7.5 4.02 30.15 2.1 28.05
Interior Wall
Female Ward
Patient Bed Partition 42.5 2.6 110.5 110.50
Doffing 14 3.2 44.8 7.56 37.24
Donning 21.7 3.2 69.44 7.56 61.88
Nurse Station 15.85 3.2 50.72 2.75 7.14 40.83
Total Area 602.19
Reception Area
Elevation length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
Front 9.1 4.02 36.58 6.72 29.862
Rear 9.1 3.2 29.12 18.4 3.36 25.76
Total Area 55.622
Doctor Station
Elevation length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
Front 9.1 4.02 36.58 3.36 33.222
Rear 6.2 3.2 19.84 3.36 16.48
Interior Wall Doctor
Station 32.6 3.2 104.32 7.56 96.76
Total Area 146.462
length (m) height(m) area (m2) Doors (m2) Windows (m2) Net Area (m2)
Female Toilet (1) 64 3.2 204.8 4.2 4.03 196.57
Female Toilet (2) 19.8 3.2 63.36 3.99 0.78 58.59
Female Toilet (3) 5.8 3.2 18.56 1.26 17.3
PWD Toilet 10.2 3.2 32.64 2.1 0.78 29.76
Male Toilet (1) 64 3.2 204.8 4.2 4.03 196.57
Male Toilet (2) 19.8 3.2 63.36 3.99 0.78 58.59
Male Toilet (3) 5.8 3.2 18.56 1.26 17.3
Toilet 18 3.2 57.6 3.99 0.78 52.83
Total Area: 627.51
Unglazed Tiles
length (m) width(m) area (m2)
Female Toilet (1) 13 2.5 32.5
Female Toilet (2) 3 2.7 8.1
Female Toilet (3) 1.45 1.45 2.1025
PWD Toilet 2.4 2.7 6.48
Male Toilet (1) 13 2.5 32.5
Male Toilet (2) 3 2.7 8.1
Male Toilet (3) 1.45 1.45 2.1025
Toilet 2.4 2.7 6.48
total area: 98.365
Reflective Insulation (Greenwall EIFS - Exterior Insulation Finishing System for Exterior Wall)
Male Ward
Elevation length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
right 38.65 3.2 123.68 22.32 3.36 98.00
Left 50.65 4.2 212.73 21.25 3.78 187.70
Front 9.45 4.02 37.989 37.99
Rear 7.5 4.02 30.15 2.1 28.05
Total Area 351.74
Female Ward
Elevation length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
Left 38.65 3.2 123.68 22.32 3.36 98
Right 50.65 4.2 212.73 21.25 3.78 187.7
Front 9.45 4.02 37.989 37.989
Rear 7.5 4.02 30.15 2.1 28.05
Total Area 351.739
Reception Area
Elevation length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
Front 9.1 4.02 36.58 6.72 29.862
Rear 9.1 3.2 29.12 18.4 3.36 25.76
Total Area 55.622
Doctor Station
Elevation length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
Front 9.1 4.02 36.58 3.36 33.222
Rear 6.2 3.2 19.84 3.36 16.48
Total Area 49.702
Total Area: 808.80
(Cement Plaster Finish) length (m) height (m) area (m2) doors (m2) Windows net area (m2)
Interior walls
Common Toilet
178 3.2 569.6 31.2 538.40
(Male/Female Ward)
Doctor Station Toilet 23.2 3.2 74.24 2.52 71.72
Nurse Station Toilet 51.6 3.2 165.12 7.98 157.14
Reception Area Toilet 39 3.2 124.8 6.09 118.71
Exterior Walls
Common Toilet
(Male/Female Ward) 52 3.2 166.4 8.06 158.34
Nurse Station Toilet 10.8 3.2 34.56 1.56 33.00
Reception Area Toilet 9.6 3.2 30.72 1.56 29.16
Total Area: 1,106.47
(Fiber Cement Wall)
Male Ward
Elevation length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
Interior Wall Male
Ward
Patient Bed Partition 85 2.4 204 204.00
Doffing 28 3.2 89.6 7.56 82.04
Donning 43.4 3.2 138.88 7.56 131.32
Nurse Station 31.7 3.2 101.44 2.75 7.14 91.55
Total Area 508.91
Female Ward
Elevation length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
Interior Wall
Female Ward
Patient Bed Partition 85 2.6 221 221.00
Doffing 28 3.2 89.6 7.56 82.04
Donning 43.4 3.2 138.88 7.56 131.32
Nurse Station 31.7 3.2 101.44 2.75 7.14 91.55
Total Area 525.91
Doctor Station
Elevation length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
Interior Wall Doctor
Station 65.2 3.2 208.64 7.56 201.08
Total Area 201.08
Ceiling length (m) width (m) area (m2) windows (m2) doors (m2) net area (m2)
Male Ward 51.65 9.35 482.9275 0 0 482.9275
Female Ward 51.65 9.35 482.9275 0 0 482.9275
Doctor Station 9.1 11.60 105.56 0 0 105.56
Reception Area 9.1 8.95 81.445 0 0 81.445
Total Area: 1152.86
Hardiflex Wall
Male Ward
Elevation length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
right 38.65 3.2 123.68 22.32 3.36 98.00
Left 50.65 4.2 212.73 21.25 3.78 187.70
Front 9.45 4.02 37.989 37.99
Rear 7.5 4.02 30.15 2.1 28.05
Total Area 351.74
Female Ward
Elevation length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
Left 38.65 3.2 123.68 22.32 3.36 98
Right 50.65 4.2 212.73 21.25 3.78 187.7
Front 9.45 4.02 37.989 37.989
Rear 7.5 4.02 30.15 2.1 28.05
Total Area 351.739
Reception Area
Elevation length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
Front 9.1 4.02 36.58 6.72 29.862
Rear 9.1 3.2 29.12 18.4 3.36 25.76
Total Area 55.622
Doctor Station
Elevation length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
Front 9.1 4.02 36.58 3.36 33.222
Rear 6.2 3.2 19.84 3.36 16.48
Total Area 49.702
Column length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
90 Columns 1 3.7 333 333.0
Part A. EARTHWORKS
Structure Excavation
Thickness (m) length (m) width (m) Quantity volume (m3)
F1 1.2 2 2 5 24.00
F2 1.2 2.7 2.7 3 26.24
F3 1.2 2 4 2 19.20
1G1-1 0.35 47.5 0.25 1 4.16
1G1-2 0.4 12 0.25 1 1.20
total volume: 74.80
Gravel Fill
Thickness (m) length (m) width (m) Quantity volume (m3)
Slab 1 0.1 13.5 6 1 8.10
Slab 2 0.1 4.5 2 1 0.90
wall footing 0.1 59.5 0.25 1 1.49
F1 0.1 2 2 5 2.00
F2 0.1 2.7 2.7 3 2.19
F3 0.1 2 4 2 1.60
total volume: 16.27
Structural Concrete
Thickness (m) length (m) width (m) Quantity volume (m3)
Slab 1 0.1 13.5 6 1 8.10
Slab 2 0.1 4.5 2 1 0.90
F1 0.25 2 2 5 5.00
F2 0.3 2.7 2.7 3 6.56
F3 0.3 2 4 2 4.80
C1 0.35 0.35 8.6 9 9.48
C2 0.4 0.4 8.6 3 4.13
1G1-1 0.35 47.5 0.25 1 4.16
1G1-2 0.4 12 0.25 1 1.20
2G-1 0.35 47.5 0.25 1 4.16
2G-2 0.45 12 0.3 1 1.62
2B-1 0.35 16.5 0.25 1 1.44
2B-2 0.3 5.3 0.2 1 0.32
2CB1 0.4 2.76 0.25 1 0.28
2S1
1 0.11 3 1.5 1 0.50
2 0.11 1.38 4.5 1 0.68
2S2
1 0.11 2 4.5 1 0.99
2 0.11 3 1.3 1 0.43
2S3
1 0.11 3 12.2 1 4.03
2 0.11 3 13.5 1 14.17
RG-1 0.35 47.5 0.25 1 4.75
RG-2 0.4 12 0.25 1 1.05
RB-1 0.35 13.5 0.25 1 1.18
total volume: 79.92 m3
Total no. of cement bags: 719.28 bags
Total volume of sand: 39.96 m3
Total Volume of Gravel: 79.92 m3
Reinforcing Steel, Grade 40
Finishing Hardware
No. of Doors 75
Sched length (m) height (m) area (m2) Quantity total area (m2)
D1 1.6 2.1 3.36 5 16.8
D2 0.9 2.1 1.89 4 7.56
D6 1.3 2.1 2.73 2 5.46
total area: 29.82
Sched length (m) height (m) area (m2) Quantity total area (m2)
W1 1.4 1.25 1.75 40 70
W2 0.7 1.25 0.875 4 3.5
W3 1 1.25 1.25 6 7.5
W4 1.3 0.65 0.845 4 3.38
W5 0.6 0.65 0.39 22 8.58
total area: 92.96
Sched length (m) height (m) area (m2) Quantity total area (m2)
W9 2.4 0.9 2.16 2 4.32
Sched length (m) height (m) area (m2) Quantity total area (m2)
W6 2.75 1 2.75 2 5.5
W11 0.3 2.1 0.63 14 8.82
W12 3.69 2.5 9.225 2 18.45
total area: 32.77
Jalousie Windows, Glass
N/A
Frames (Jambs, Still, Head, Transoms and Mullions)
sets
doors and windows 171
Door, Flush
Sched length (m) height (m) area (m2) Quantity total area (m2)
D8 0.6 2.1 1.26 8 10.08
D10 0.6 2.1 1.26 21 26.46
D11 0.7 2.1 1.47 3 4.41
total area: 40.95
Door, Wood Panel
Sched length (m) height (m) area (m2) Quantity total area (m2)
D3 0.9 2.1 1.89 6 11.34
D4 0.9 2.1 1.89 14 26.46
D5 0.9 2.1 1.89 2 3.78
D7 1.6 2.1 3.36 2 6.72
D9 1 2.1 2.1 2 4.2
D12 1.6 2.1 3.36 2 6.72
D13 1 2.1 2.1 4 8.4
total area: 67.62
length (m) height (m) area (m2) doors (m2) Windows net area (m2)
Interior
Common walls
Toilet
(Male/Female Ward) 178 3.2 569.6 31.2 538.40
Doctor Station Toilet 23.2 3.2 74.24 2.52 71.72
Nurse Station Toilet 51.6 3.2 165.12 7.98 157.14
Reception Area Toilet 39 3.2 124.8 6.09 118.71
Exterior
Common Walls
Toilet
(Male/Female Ward) 52 3.2 166.4 8.06 158.34
Nurse Station Toilet 10.8 3.2 34.56 1.56 33.00
Reception Area Toilet 9.6 3.2 30.72 1.56 29.16
Total Area: 1,106.47
Male Ward
Elevation length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
right 38.65 3.2 123.68 22.32 3.36 98.00
Left 50.65 4.2 212.73 21.25 3.78 187.70
Front 9.45 4.02 37.989 37.99
Rear 7.5 4.02 30.15 2.1 28.05
Interior Wall Male
Ward
Patient Bed Partition 40 2.4 96 96.00
Doffing 14 3.2 44.8 7.56 37.24
Donning 21.7 3.2 69.44 7.56 61.88
Nurse Station 15.85 3.2 50.72 2.75 7.14 40.83
Total Area 587.69
Female Ward
Elevation length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
Left 38.65 3.2 123.68 22.32 3.36 98
Right 50.65 4.2 212.73 21.25 3.78 187.7
Front 9.45 4.02 37.989 37.989
Rear 7.5 4.02 30.15 2.1 28.05
Interior Wall
Female Ward
Patient Bed Partition 42.5 2.6 110.5 110.50
Doffing 14 3.2 44.8 7.56 37.24
Donning 21.7 3.2 69.44 7.56 61.88
Nurse Station 15.85 3.2 50.72 2.75 7.14 40.83
Total Area 602.19
Reception Area
Elevation length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
Front 9.1 4.02 36.58 6.72 29.862
Rear 9.1 3.2 29.12 18.4 3.36 25.76
Total Area 55.622
Doctor Station
Elevation length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
Front 9.1 4.02 36.58 3.36 33.222
Rear 6.2 3.2 19.84 3.36 16.48
Interior Wall Doctor
Station 32.6 3.2 104.32 7.56 96.76
Total Area 146.462
length (m) height(m) area (m2) Doors (m2) Windows (m2) Net Area (m2)
Female Toilet (1) 64 3.2 204.8 4.2 4.03 196.57
Female Toilet (2) 19.8 3.2 63.36 3.99 0.78 58.59
Female Toilet (3) 5.8 3.2 18.56 1.26 17.3
PWD Toilet 10.2 3.2 32.64 2.1 0.78 29.76
Male Toilet (1) 64 3.2 204.8 4.2 4.03 196.57
Male Toilet (2) 19.8 3.2 63.36 3.99 0.78 58.59
Male Toilet (3) 5.8 3.2 18.56 1.26 17.3
Toilet 18 3.2 57.6 3.99 0.78 52.83
Total Area: 627.51
Unglazed Tiles
length (m) width(m) area (m2)
Female Toilet (1) 13 2.5 32.5
Female Toilet (2) 3 2.7 8.1
Female Toilet (3) 1.45 1.45 2.1025
PWD Toilet 2.4 2.7 6.48
Male Toilet (1) 13 2.5 32.5
Male Toilet (2) 3 2.7 8.1
Male Toilet (3) 1.45 1.45 2.1025
Toilet 2.4 2.7 6.48
total area: 98.365
Reflective Insulation (Greenwall EIFS - Exterior Insulation Finishing System for Exterior Wall)
Male Ward
Elevation length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
right 38.65 3.2 123.68 22.32 3.36 98.00
Left 50.65 4.2 212.73 21.25 3.78 187.70
Front 9.45 4.02 37.989 37.99
Rear 7.5 4.02 30.15 2.1 28.05
Total Area 351.74
Female Ward
Elevation length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
Left 38.65 3.2 123.68 22.32 3.36 98
Right 50.65 4.2 212.73 21.25 3.78 187.7
Front 9.45 4.02 37.989 37.989
Rear 7.5 4.02 30.15 2.1 28.05
Total Area 351.739
Reception Area
Elevation length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
Front 9.1 4.02 36.58 6.72 29.862
Rear 9.1 3.2 29.12 18.4 3.36 25.76
Total Area 55.622
Doctor Station
Elevation length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
Front 9.1 4.02 36.58 3.36 33.222
Rear 6.2 3.2 19.84 3.36 16.48
Total Area 49.702
Total Area: 808.80
(Cement Plaster Finish) length (m) height (m) area (m2) doors (m2) Windows net area (m2)
Interior walls
Common Toilet
178 3.2 569.6 31.2 538.40
(Male/Female Ward)
Doctor Station Toilet 23.2 3.2 74.24 2.52 71.72
Nurse Station Toilet 51.6 3.2 165.12 7.98 157.14
Reception Area Toilet 39 3.2 124.8 6.09 118.71
Exterior Walls
Common Toilet
(Male/Female Ward) 52 3.2 166.4 8.06 158.34
Nurse Station Toilet 10.8 3.2 34.56 1.56 33.00
Reception Area Toilet 9.6 3.2 30.72 1.56 29.16
Total Area: 1,106.47
(Fiber Cement Wall)
Male Ward
Elevation length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
Interior Wall Male
Ward
Patient Bed Partition 85 2.4 204 204.00
Doffing 28 3.2 89.6 7.56 82.04
Donning 43.4 3.2 138.88 7.56 131.32
Nurse Station 31.7 3.2 101.44 2.75 7.14 91.55
Total Area 508.91
Female Ward
Elevation length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
Interior Wall
Female Ward
Patient Bed Partition 85 2.6 221 221.00
Doffing 28 3.2 89.6 7.56 82.04
Donning 43.4 3.2 138.88 7.56 131.32
Nurse Station 31.7 3.2 101.44 2.75 7.14 91.55
Total Area 525.91
Doctor Station
Elevation length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
Interior Wall Doctor
Station 65.2 3.2 208.64 7.56 201.08
Total Area 201.08
Ceiling length (m) width (m) area (m2) windows (m2) doors (m2) net area (m2)
Male Ward 51.65 9.35 482.9275 0 0 482.9275
Female Ward 51.65 9.35 482.9275 0 0 482.9275
Doctor Station 9.1 11.60 105.56 0 0 105.56
Reception Area 9.1 8.95 81.445 0 0 81.445
Total Area: 1152.86
Hardiflex Wall
Male Ward
Elevation length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
right 38.65 3.2 123.68 22.32 3.36 98.00
Left 50.65 4.2 212.73 21.25 3.78 187.70
Front 9.45 4.02 37.989 37.99
Rear 7.5 4.02 30.15 2.1 28.05
Total Area 351.74
Female Ward
Elevation length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
Left 38.65 3.2 123.68 22.32 3.36 98
Right 50.65 4.2 212.73 21.25 3.78 187.7
Front 9.45 4.02 37.989 37.989
Rear 7.5 4.02 30.15 2.1 28.05
Total Area 351.739
Reception Area
Elevation length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
Front 9.1 4.02 36.58 6.72 29.862
Rear 9.1 3.2 29.12 18.4 3.36 25.76
Total Area 55.622
Doctor Station
Elevation length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
Front 9.1 4.02 36.58 3.36 33.222
Rear 6.2 3.2 19.84 3.36 16.48
Total Area 49.702
Column length (m) height (m) area (m2) windows (m2) doors (m2) net area (m2)
90 Columns 1 3.7 333 333.0
Structure Excavation
Gravel Fill
Structural Concrete
PART C. FINISHING
Finishing Hardware
No. of Doors 89
Door, Flush
Cabinets
Unglazed Tiles
PART D. PLUMBING/SANITARY
Septic Vault
Plumbing Fixtures
PART E. ELECTRICAL
Current Transformer
Auxillary System
CCTV System
Exhaust Fan
SLAB
49.875
WALL FOOTING
TOTAL PCS KG LENGTH
63.12 G1-C 16mm 35 1.578 4.5
119.2968 G1-M 16mm 12 1.578 4.5
252.48 G1-C 16mm 21 1.578 3
126.24 G1-C 16mm 14 1.578 6
G1-C 16mm 14 1.578 2
252.48 G1-M 16mm 6 1.578 3
126.24 TOTAL
813.6168
STIRRUPS
PCS KG LENGTH
G1-C 10mm 273 0.617 0.93
10mm 116 0.617 0.93
10mm 108 0.617 1.03
10mm 46 0.617 0.93
SLAB
PCS KG LENGTH
H 10mm 34 0.617 13.5
V 10mm 15 0.617 6
H 10mm 5 0.617 2
V 10mm 5 0.617 2
FOOTING
PCS KG LENGTH
C1
VERT 16mm 72 1.578 10
TIE 10mm 648 0.617 1.24
RE 10mm 81 0.617 1.24
C2
VERT 20mm 24 2.458 10
TIE 10mm 648 0.617 1.24
RE 10mm 81 0.617 1.24
BEAM
PCS KG LENGTH
2G1
HOR 16mm 42 1.578 4.15
L/4 16mm 648 0.617 1.24
RE 10mm 81 0.617 1.24
C2
VERT 20mm 24 2.458 10
TIE 10mm 648 0.617 1.24
RE 10mm 81 0.617 1.24
GRAVEL BED
SLAB 9.9
CR 0.9
FOOTING 5.787
WF 1.49
TOTAL 18.077
TOTAL
248.535
85.212
99.414
132.552
44.184
28.404
638.301
TOTAL
156.6501
66.56196
68.63508
26.39526
318.2424
TOTAL
283.203
55.53
6.17
6.17
351.073
TOTAL
1136.16
495.7718
61.97148
589.92
495.7718
61.97148
2841.567
TOTAL
275.0454
495.7718
61.97148
589.92
495.7718
61.97148
1980.452