Calculation Sheet

The document outlines various construction activities related to infrastructure projects, including milestones, engineering, procurement, and execution phases. It details specific tasks such as installation of burial locks, PCC and RCC activities, and waterproofing for fire fighting, water, and sewage networks. Each activity is accompanied by metrics such as unit quantity, crew rate, and duration, providing a comprehensive overview of the project scope and requirements.

Uploaded by

ahm.anwar.1989
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views4 pages

Calculation Sheet

The document outlines various construction activities related to infrastructure projects, including milestones, engineering, procurement, and execution phases. It details specific tasks such as installation of burial locks, PCC and RCC activities, and waterproofing for fire fighting, water, and sewage networks. Each activity is accompanied by metrics such as unit quantity, crew rate, and duration, providing a comprehensive overview of the project scope and requirements.

Uploaded by

ahm.anwar.1989
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Activity ID WBS Activity Name Desc. Unit Quan. % Net Quan. # crew Rate Dur.

Remaining Fostat Infra


Key Milestone / Enabiling Work
A1000 Start Milestone
A1010 Finish Milestone
Engineering
Procurement
Material Submittal
Material Approval
PO Issuance
Material Manufactoring
Delivery to Site
Excuotion
Group 1 - Ready
Infrastructure
Irrigation Network
A1020 install Burial Lock 200 mm - 3 unit unit 3 1 3 1 1 3
PCC & RCC activities & pouring - Air
A1030 unit 2 1 2 1 0.29 7
Relief Valves Chamber - 2 unit
PCC & RCC activities & pouring -
A1040 unit 1 1 1 1 0.29 4
Back Wash Chamber - 1 unit
Fire Fighting Network
A1050 install Burial Lock 200 mm - 2 unit unit 2 1 2 1 1 2
PCC & RCC activities & pouring - Air
A1060 unit 2 1 2 1 0.29 7
Relief Valves Chamber - 2 unit
PCC & RCC activities & pouring -
A1070 unit 1 1 1 1 0.29 4
Pressure Reducer Chamber - 1 unit
Water Network
A1080 install Burial Lock 200 mm - 3 unit unit 3 1 3 1 1 3
PCC & RCC activities & pouring - Air
A1090 unit 2 1 2 1 0.29 7
Relief Valves Chamber - 2 unit
PCC & RCC activities & pouring -
A1100 unit 1 1 1 1 0.29 4
Back Wash Chamber - 1 unit
Tanks
Fire Fighting Tank
A1370 install replacment soil - F.F tank m3 5251 1 5251 1 200 26
PCC foundation activities & pouring -
A1380 4
F.F tank
formwork -
m3 207 1 207 2 50 2
PCC 40 cm
pouring - PCC
m3 207 1 207 1 120 2
40 cm
formwork -
m3 1 1 1 1 50 0
PCC 20 cm
pouring - PCC
m3 1 1 1 1 120 0
20 cm
apply external waterproofing - PC
A1390 3
foundation - F.F tank
external
m2 517.5 1 517.5 2 200 1
waterproofing
cement
m2 415 1 415 2 120 2
protection
RCC foundation activities & pouring -
A1400 16
F.F tank
formwork -
m3 283 1 283 2 50 3
RCC - 60 cm
fix steel - RCC -
m3 283 1 283 5 5 11
60 cm
pouring - RCC -
m3 283 1 283 2 120 1
60 cm
first fix plumping 1
formwork -
m3 3 1 3 1 50 0
RCC - 30 cm
fix steel - RCC -
m3 3 1 3 1 5 1
30 cm
pouring - RCC -
m3 3 1 3 1 120 0
30 cm
first fix plumping 1
formwork -
m3 1 1 1 1 50 0
RCC - 25 cm
fix steel - RCC -
m3 1 1 1 1 5 0
25 cm
pouring - RCC -
m3 1 1 1 1 120 0
25 cm
first fix plumping 1
RCC wall activities & pouring - F.F
A1410 19
tank
formwork -
m3 206 1 206 10 2.5 8
RCC - wall
fix steel - RCC -
m3 206 1 206 10 2.5 8
wall
pouring - RCC -
m3 206 1 206 1 120 2
wall
first fix plumping 1
formwork -
m3 4 1 4 1 1 4
RCC - beam
fix steel - RCC -
m3 4 1 4 1 2 2
beam
pouring - RCC -
m3 4 1 4 1 120 0
beam
first fix plumping 1
RCC slab activities & pouring - F.F
A1420 12
tank
formwork -
m3 2 1 2 1 100 0
RCC - slab
fix steel - RCC -
m3 2 1 2 1 100 0
slab
pouring - RCC -
m3 2 1 2 1 120 0
slab
first fix plumping 2
formwork -
m3 60 1 60 1 100 2
RCC - slab
fix steel - RCC -
m3 60 1 60 1 100 2
slab
pouring - RCC -
m3 60 1 60 1 120 2
slab
first fix plumping 2
formwork -
m3 14 1 14 1 100 0
RCC - slab
fix steel - RCC -
m3 14 1 14 1 100 0
slab
pouring - RCC -
m3 14 1 14 1 120 0
slab
first fix plumping 2
repaire the surface, apply internal
A1430 cement polymer paints & testting - 16
F.F tank
surface repaire m2 1206 1 1206 5 75 11
waterproofing m2 1206 1 1206 5 200 4
testting 5
A1435 apply internal epoxy paints - F.F tank 10
floor m2 273 1 273 4 100 2
wall m2 685 1 685 4 100 6
slab m2 263 1 263 4 100 2
A1460 install metal covers & stairs - F.F tank 2
600*2900 stair unit 1 1 1 1 5 1
600*4000 stair unit 1 1 1 1 5 1
600*4500 stair unit 1 1 1 1 5 1
1000*1000
unit 1 1 1 1 5 1
cover
install F.F equipment & final fix
A1470 7
electrical - F.F tank
fix external & internal plumping
A1480 7
system - F.F tank
A1490 final fix earthing system - F.F tank 2
apply external waterproofing -
A1500 7
foundation & wall - F.F tank
foundation m2 740 1 740 3 200 4
wall m2 552 1 552 3 200 3
A1520 backfilling around - F.F tank m3 1334 1 1334 2 150 15
Group 2
Sewage Network
excavate - 40 unit manhole - sewage
A1160 unit 1440 1 1440 1 300 5
network
PCC & RCC activities & pouring -
A1170 unit 40 1 40 4 0.29 35
manhole - sewage network
apply external waterproofing -
A1180 unit 40 1 40 4 0.29 35
manhole - sewage network
backfilling around - manhole -
A1190 unit 40 1 40 4 0.29 35
sewage network
excavate - pipe line path - sewage
A1191 4
network
UPVC 200 mm
m3 187.5 1 187.5 1 300 1
6 bar
UPVC 250 mm
m3 825 1 825 1 300 3
6 bar
install bedding sand layer under pipe
A1192 1
line - sewage network
UPVC 200 mm
m3 12.5 1 12.5 1 150 0
6 bar
UPVC 250 mm
m3 55 1 55 1 150 0
6 bar
piping & weldding pipe line - sewage
A1193 14
network
UPVC 200 mm
m 250 1 250 2 50 3
6 bar
UPVC 250 mm
m 1100 1 1100 2 50 11
6 bar
covering with sand pipe line path -
A1194 2
sewage network
UPVC 200 mm
m3 62.5 1 62.5 1 150 0
6 bar
UPVC 250 mm
m3 275 1 275 1 150 2
6 bar
testting & commessioning - sewage
A1195 2
network
Rain & Subsoil Sewage Network
excavate - 28 circular & 22 Square
A1250 manhole & stilling chamber - rain & unit 1800 1 1800 1 300 6
subsoil network
PCC & RCC activities & pouring -
A1260 unit 50 1 50 4 0.29 44
manhole - rain & subsoil network
apply external waterproofing -
A1270 unit 50 1 50 4 0.29 44
manhole - rain & subsoil network
backfilling around - manhole - rain &
A1280 unit 50 1 50 4 0.29 44
subsoil network
excavate - pipe line path - rain &
A1281 5
subsoil network
UPVC 250 mm
m3 787.5 1 787.5 1 300 3
6 bar
UPVC 250 mm
m3 450 1 450 1 300 2
10 bar
install bedding sand layer under pipe
A1282 1
line - rain & subsoil network
UPVC 250 mm
m3 52.5 1 52.5 1 150 0
6 bar
UPVC 250 mm
m3 30 1 30 1 150 0
10 bar
piping & weldding pipe line - rain &
A1283 11
subsoil network
UPVC 250 mm
m 1050 1 1050 3 50 7
6 bar
UPVC 250 mm
m 600 1 600 3 50 4
10 bar
covering with sand pipe line path -
A1284 2
rain & subsoil network
UPVC 250 mm
m 262.5 1 262.5 2 150 1
6 bar
UPVC 250 mm
m 150 1 150 2 150 1
10 bar
testting & commessioning - rain &
A1286 2
subsoil network
Irrigation Network
install 7 unit Burial Lock 200 mm -
A1305 unit 7 1 7 1 1 7
irrigation network
PCC & RCC activities & pouring - 1
A1310 unit Back Wash Chamber - irrigation unit 1 1 1 1 0.29 4
network
PCC & RCC activities & pouring - 5
A1320 unit Air Relief Valves Chamber - unit 5 1 5 1 0.29 18
irrigation network
Fire Fighting Network
install 7 unit Burial Lock 250 mm -
A1285 unit 7 1 7 1 1 7
F.F network
PCC & RCC activities - 1 unit
A1290 Pressure Reducer Chamber - F.F unit 1 1 1 1 0.29 4
network
Water Network
install 9 unit Burial Lock 200 mm -
A1335 unit 9 1 9 1 1 9
water network
PCC & RCC activities & pouring - 1
A1340 unit Back Wash Chamber - water unit 1 1 1 1 0.29 4
network
PCC & RCC activities & pouring - 4
A1350 unit Air Relief Valves Chamber - unit 4 1 4 1 0.29 14
water network
Electrical Network
Mid Voltage
A1560 excavate for cable path - mid voltage m3 7875 1 7875 2 300 13
install bedding sand layer under
A1570 m3 525 1 525 1 150 4
cable - mid voltage
install mid voltage cable - 10500 m -
A1580 m 10500 1 10500 1 1000 11
mid voltage
A1585 testting network - mid voltage 2
covering with sand cable path - mid
A1590 m3 2625 1 2625 2 150 9
voltage
install bricks & warrning sights - mid
A1600 m2 3150 1 3150 10 25 13
voltage
A1610 backfilling cable path - mid voltage m3 3675 1 3675 2 150 12
Transformers
A1850 install 12 unit trans. 1600 unit 12 1 12 1 2 6
A1860 install 5 unit trans. 1000 unit 5 1 5 1 2 3
Low Voltage
A1611 excavate for chambers - low voltage m3 6300 1 6300 2 300 11
PCC & RCC activities for chambers -
A1612 unit 175 1 175 5 0.43 82
low voltage
backfilling around chambers - low
A1613 m3 87.5 1 87.5 1 150 1
voltage
A1620 excavate for cable path - low voltage m3 4959 1 4959 2 300 8
install bedding sand layer under
A1630 m3 330.6 1 330.6 1 150 2
cable - low voltage
A1640 install low voltage cable - low voltage 4
m 25 1 25 1 1000 0
m 903 1 903 1 1000 1
m 4248 1 4248 2 1000 2
m 1436 1 1436 1 1000 1
A1645 testting network - low voltage 2
covering with sand cable path - low
A1650 m3 1653 1 1653 2 150 6
voltage
install bricks & warrning sights - low
A1660 m2 1984 1 1983.6 10 25 8
voltage
A1670 backfilling cable path - low voltage m3 2201 1 2201.1 2 150 7
RMU
A1870 install 17 unit RMU unit 17 1 17 1 2 9
Lighting
A1680 excavate for cable path - lighting m3 4000 1 4000 1 300 13
install bedding sand layer under
A1690 m3 800 1 800 1 150 5
cable - lighting
A1700 install lighting cable cable - lighting 8
m 4000 1 4000 1 1000 4
m 4000 1 4000 1 1000 4
covering with sand cable path -
A1710 m3 2000 1 2000 2 150 7
lighting
install bricks & warrning sights -
A1720 m2 2400 1 2400 7 25 14
lighting
A1730 backfilling cable path - lighting m3 2400 1 2400 1 150 16
A1800 install lighting posts - lighting unit 149 1 149 3 5 10
A1880 testting network - lighting 2
Distributor
A1840 install distributor unit 1 1 1 1 2 1
Fibre Optic
excavate for cable path - fiber optic
A1740 m3 124.5 1 124.5 1 300 0
cable
install bedding sand layer under
A1750 m3 8.3 1 8.3 1 150 0
cable - fiber optic cable
install fiber optic cable cable - fiber
A1760 4
optic cable
m 14 1 14 1 50 0
m 51 1 51 1 50 1
m 76 1 76 1 50 2
m 25 1 25 1 50 1
A1765 testting network - fiber optic 2
covering with sand cable path - fiber
A1770 m3 41.5 1 41.5 1 150 0
optic cable
install bricks & warrning sights - fiber
A1780 m2 83 1 83 1 25 3
optic cable
backfilling cable path - fiber optic
A1790 m3 49.8 1 49.8 1 150 0
cable