0% found this document useful (0 votes)
22 views1 page

Split 1

The document outlines the Risk-Based Inspection (RBI) procedure for Saudi Aramco facilities, detailing minimum requirements and guidelines for conducting assessments on stationary equipment. It specifies the scope of the procedure, including in-plant static equipment, piping, storage tanks, and offshore facilities, and emphasizes the need for systematic evaluation and documentation of RBI activities. Additionally, it defines roles, responsibilities, and resources necessary for effective RBI assessment implementation.

Uploaded by

amjedabbas514
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views1 page

Split 1

The document outlines the Risk-Based Inspection (RBI) procedure for Saudi Aramco facilities, detailing minimum requirements and guidelines for conducting assessments on stationary equipment. It specifies the scope of the procedure, including in-plant static equipment, piping, storage tanks, and offshore facilities, and emphasizes the need for systematic evaluation and documentation of RBI activities. Additionally, it defines roles, responsibilities, and resources necessary for effective RBI assessment implementation.

Uploaded by

amjedabbas514
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Document Responsibility: Inspection Engineering Standards Committee SAEP-343

Issue Date: 7 July 2015


Next Planned Update: 21 August 2018 Risk-Based Inspection (RBI) for Saudi Aramco Facilities

1 Scope

1.1 This engineering procedure provides minimum requirements for conducting risk
based inspection assessments on stationary equipment in all existing and planned
Saudi Aramco facilities based on API RP 580.

1.2 This procedure also provides guidelines to determine the type of RBI assessment
and process units that shall be covered by RBI assessment.

1.3 This procedure outlines when initial and evergreen RBI assessment shall be
conducted.

1.4 This SAEP applies to


1.2.1 In-plant static equipment
1.2.2 Piping
1.2.3 Storage tanks
1.2.4 Pressure relieving devices
1.2.5 Off-Plot Piping
1.2.6 Offshore facilities

2 Purpose

2.1 To assure that Saudi Aramco systematic evaluation process for Risk Based
Inspection (RBI) assessment is well defined.

2.2 Roles and responsibilities for RBI assessment activities in Saudi Aramco are
outlined and auditable.

2.3 RBI assessment recommendations and implementation are uniformly


documented for the purpose of corporate tracking and auditing.

2.4 Adequate resources are provided for RBI assessment.

2.5 Process and deliverables when utilizing Service Providers to perform RBI
assessment is clearly defined.

3 Conflicts and Deviations

3.1 Any conflicts between this Procedure and other applicable Saudi Aramco