Mark Scheme
Mark Scheme
  2(c)                                        2
                   oe                                                     M1 for
  2(d)                                        2                           FT their 28
                 oe
                                                                          M1 for
3(a)(iii)                    3
            oe                                           M2 for
or M1 for or
  3(b)                       3
             oe                                          M2 for
                                                         oe
or M1 for
  3(c)                       2
            oe                                           M1 for
   4                         3                           M2 for
             oe
or M1 for
or
  5(a)                       2
            oe                                           B1 for    or      provided
                                                         fraction is less than 1
                                        - Mark Scheme                                        /
5(b) 46 1
6(a) 14 1
6(b) 16 1
  6(c)                            3
                oe                                            M2 for
or M1 for seen
   7                            4                           M3 for
                oe
                                                             oe
                                                            or M2 for
oe or
oe
or M1 for or
or or
oe
8(a) 1
  8(b)     22                   1
                                 - Mark Scheme                                          /
  8(c)                     2                           M1 for
           oe
                                                            or
or or
                                                       or for 8 and 23
                                                       identified
9(a) 1
  9(b)                     3
           oe                                          M2 for
                                                       oe
                                                       or M1 for
                                                       oe
  10                        4                           0.712[1…]
            oe
                                                        M3 for
                                                        oe
                                                        or
                                                        oe
                                                        or M2 for sum of 3 or
                                                        more correct product
                                                        pairs and no incorrect
                                                        pairs
                                                        or for
                                                        or M1 for
                                                        seen
                                                        If 0 scored SC1 for
                                                        answer        oe
 11(a)                      2
           cao                                          M1 for
                                                        oe
                                           - Mark Scheme                                                     /
 11(b)                               3                           M2 for
                     oe
                                                                                       or
oe
or M1 for either or
or or
12(a) oe 1
12(b) 28 1
 12(c)                               1
                 oe
 12(d)                               3
                oe                                               M2 for
or M1 for or
  13                             3                           M2 for
               oe
or M1 for or
 15(a)                           1
              oe
 15(c)                     4                           M3 for
           oe
                                                       oe
                                                       or
seen
or for
or
                                                       seen
                                                       or M1 for
                                                                        or
                                                                              or
                                          - Mark Scheme                                               /
seen
16(a)(i) 1
16(b)(i)                            1
                oe
                                          - Mark Scheme                                                /
16(b)(ii)                           4                           M3 for
                   oe
                                                                or M2 for
                                                                                    isw
or M1 for
   17                                 2
                oe                                                M1 for          oe
   18                                 4                           M3 for
              oe
or M2 for
or
                                                                  or M1 for
                                                                                seen
or seen
oe
19(b)(i)                              4
            B1 for                                                FT their (a)(i) =
            A1 for
                                                                  With no errors or
                                                                  omissions seen and one
                                                                  further stage seen after
                                                                  final M1
                                                                  or for
                                                                  where either ab = –21 or
                                                                  4b + a = –25
                                                                  If 0 scored, SC1 for
                                                                  4x + 3 and x – 7 seen but
                                                                  not in factorised form
            B1 for 7 and
                                        - Mark Scheme                                                  /
   20                             3                           M2 for
                  oe
                                                                            oe
or M1 for oe
   21                             4                           M3 for
                 oe
                                                              oe
                                                              or M2 for
                                                                                 oe
or oe
or M1 for
or
 22(a)                                 2
                 oe                                                M1 for                   oe
                                                                   or M1 for
                                                                                 oe
 23(a)                                 1
                      oe
           or         and
           or 0.6 and 0.25
           or 60% and 25%
 23(b)                                 3
                oe                                                 M2 for
                                                                   oe
                                                                   or
                                                                   oe
or M1 for or
                                                                            oe
                                                                   (but not as part of a larger
                                                                   product)
                                          - Mark Scheme                                               /
  24                                3
               oe                                               M2 for
                                                                oe
                                                                or
                                                                oe
or M1 for or
 25(a)                              2
               oe                                               M1 for                oe
 25(b)     0                        1
                                                                Accept
26(a)(i)                           M2
                    oe                                          B1 for      oe seen
                                  - Mark Scheme                                               /
26(a)(ii)                   4                           M3 for
            oe
                                                        oe
                                                        or
                                                        oe
                                                        or M2 for the sum of two
                                                        products of different
                                                        flavours isw
                                                        or M1 for one correct
                                                        product of different
                                                        flavours isw
                                  - Mark Scheme                                                   /
 26(b)                      3                           M2 for
           oe
                                                        oe
                                                        or for
                                                                                 oe
                                                        or
oe
                                                        or M1 for
                                                        oe seen
  27                        3
            oe                                          M2 for                    oe
or oe
or M1 for or
                                                                    or
                                                        oe
                                  - Mark Scheme                                                /
 28(a)                      2
           oe                                           M1 for                or
                                                        better
 28(b)                      3
            oe                                          3FT
                                                        correctly evaluated
                                                        M2 for
oe
or M1 for or
 29(c)                      3                           M2 for
            oe
                                                                             +
oe
                                                        or M1 for
                                                                             or
oe
 30(a)                      3
           oe                                           M2 for
 30(b)                                3
               oe                                                 M2 for
                                                                  oe
                                                                  or M1 for one of these
                                                                  products
                                                                  OR
                                                                  M1 for probability tree
                                                                  identifying all 25
                                                                  outcomes with the correct
                                                                  9 identified
                                                                  OR
                                                                  M1 for completed
                                                                  possibility space / 2-way
                                                                  table identifying the 9
                                                                  possible outcomes out of
                                                                  25, oe
  31                           3                           M2 for
              oe
                                                           oe
                                                           or M1 for any one correct
                                                           product
                                                           OR
                                                           M1 for 4, 5, 4 and 5, 4, 4
                                                           and 5, 5, 4 clearly
                                                           identified on a tree or in
                                                           a list
 32(a)                         1
              oe
32(b)(i)                       2
           M1 for
           A1 for   oe
                                       - Mark Scheme                                                /
32(b)(ii)                        4                           M3 for
                 oe
                                                             oe
                                                             or M2 for
or
                                                             oe
                                                             or M1 for for one correct
                                                             product other than
                                                            ALT method
                                                            M3 for
                                                            0.4× (0.5 + 0.1) + 0.5 ×
                                                            (0.4 + 0.1) + 0.1× (0.4 +
                                                            0.5) oe
                                                            or
                                                            M2 for addition of any
                                                            three of:
                                                            0.4 × 0.5, 0.4 × 0.1, 0.5
                                                            × 0.4, 0.5 × 0.1, 0.1 × 0.4
                                                            and 0.1× 0.5
                                                            or
                                                            M1 for addition of any
                                                            two of:
                                                            0.4× 0.5, 0.4× 0.1, 0.5×
                                                            0.4, 0.5× 0.1, 0.1× 0.4
                                                            and 0.1× 0.5
                                                            If zero scored SC2 for
                                                            fully correct evaluated
                                                            method involving a
                                                            without replacement
                                                            method
                                                        - Mark Scheme                                                 /
 36(a)                                            2
           5 probabilities                 oe                                 B1 for    on first branch
 37(a)                         1
               oe
 37(b)                         2
               oe                                          M1 for           or
37(c) 0 1
[Total: 193]