HIRA For Truck Parking
HIRA For Truck Parking
                   Safety Aspect
                     (Activity /
    Zone /
                  Process / Task /         Safety Hazard
  Department
                  Material / Product
                     / Service)
                                       Moving plant
Green belt
                  Crew reaching the    Unknown place
area(construction
                  site                 Horse play
of shed)
                                      Damaged cable
                  Working with        Defective tool
                  Portable Electric   Loose components (Wheel,
                  Tools               switch, handles)
                                      Improper manual handling
                                      Improper handling of tools
                                      Non use of PPE
Truck parking
                                      Defective / damaged tools
area(construction
                  Working with        and tools without protective
of shed)
                  portable hand tools handles.
                                      Improper handling & storage
                                      Horse play
                                      Flying particles
                                            Sharp objects
                                          Manual Handling
                                        Movement of vehicles
Truck parking                          Overloading of cranes
                  Construction of
area(construction                   Collapse/Toppling of crane
                  beam
of shed)                              Unauthorized operation
                                    Litigation by government or
                                             private party
                                       1.Fall of men
                                       2.Fall of material
                                       3.Slip/trip
Truck parking
                                       4.Improper handling of tools
area(construction Scaffolding erection
                                       5.Cut injury
of shed)
                                       6.Sharp objects
                                       7.Scaffolding collapse
                               Fall from Height
                               Slip hazard
                               Trip hazard
                               Cut hazard
Truck parking                  Ultra critical activity
                   work and
area(construction              Equipment movement area
                  inspection
of shed)                       Using lifting equipment
                               vehicle and scissor lift,
                               boom lifts
                               Horse play
                                        Hot work
                                        Fire
                                        Fumes/dust
                                        Inhalation
                                        Cut hazard
                                        Flying particles
                                        Smoke
                                        Fall of materials
Truck parking                           Slip/ trip hazard
                    Fixing of temporary
area(construction                       Ultra critical activity
                       lifeline system
of shed)                                Equipment movement area
                                        Using lifting equipment
                                        vehicle and boom
                                        lifts/Collapse of equipment
                                        Horse play
                                        Manual Handling
                                              Sharp objects
                                             Fall from Height
                                             Slip/ trip hazard
                                           Ultra critical activity
                                        Equipment movement area
                                          Using lifting equipment
Truck parking
                                          vehicle and boom lifts
area(construction   Fixing roof sheet
                                                Horse play
of shed)
                                            Manual Handling
                                         Use of hand tools/power
                                                     tools
                                           Weather conditions
                                      Sharp objects
                                      Fall from Height
                                      Slip hazard
                                      Trip hazard
                                      Cut hazard
                                      Ultra critical activity
Truck parking                         Equipment movement area
area(construction Roof sheet fixing   Using scissor lift / boom lifts
of shed)                              Using power tools
                                      Vibration
                                      Horse play
                                      Manual Handling
                                      Cutting of tree branches
                                        1. Handling of ingredients.
Truck parking                           2. Contact with the
                  chemical handling
area(construction                       chemical.
                  (Paint and thinner)
of shed)
                                        Sharp objects
                                       Fall from Height
                                       Slip/ trip hazard
                                     Ultra critical activity
                                  Equipment movement area
Truck parking                       Using lifting equipment
area(construction Beam shifting     vehicle and boom lifts
of shed)                                  Horse play
                                      Manual Handling
                                   Use of hand tools/power
                                               tools
                                     1.Fall of men
                                     2.Fall of material
Truck parking                        3.Slip/trip
                  Scaffolding
area(construction                    4.Improper handling of tools
                  Dismantling work
of shed)                             5.Sharp objects
                                     6.Scaffolding collapse
                                                Sharp objects
                                              Manual Handling
                                            Movement of vehicles
Truck parking      Housekeeping and        Overloading of cranes
area(construction shifting of materials Collapse/Toppling of crane
of shed)           to greenbelt area.     Unauthorized operation
                                        Litigation by government or
                                                 private party
Truck parking
                    Emergency   height work,boomlift usage,
area(construction
                    Response           crane usage
of shed)
mam
Parking area)                            Total Hazards          13
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
        0
                                                 Existence of
                                                     legal
                        Cost of         Total
   Severity of                                  requirements
                       equipment       Severity
accident / incident                              specifically
                        damage          Score
                                                applicable to
                                                  this event
                      0-No equipment
    20-Fatality         damage / no      23        20-Yes
                         value lost
                      2-Equipment
                      damage / lost
   15-Limb Loss,
                         value is     19   20-Yes
Occupational Disease
                     between 1.001
                      - 10.000 US$
              0-No equipment
20-Fatality     damage / no    22   20-Yes
                 value lost
              1-Equipment
              damage / lost
20-Fatality      value is     24   20-Yes
               between 1 -
               1.000 US$
              4-Equipment
              damage / lost
                 value is
20-Fatality                   27   20-Yes
                between
                100.001 -
              500.000 US$
               2-Equipment
               damage / lost
20-Fatality       value is     24   20-Yes
              between 1.001
               - 10.000 US$
              4-Equipment
              damage / lost
                 value is
20-Fatality                   26   20-Yes
                between
                100.001 -
              500.000 US$
                3-Equipment
                damage / lost
20-Fatality        value is     26   20-Yes
              between 10.001
               - 100.000 US$
                       3-Equipment
                       damage / lost
   15-Limb Loss,
                          value is     20   20-Yes
Occupational Disease
                     between 10.001
                      - 100.000 US$
               2-Equipment
               damage / lost
20-Fatality       value is     25   20-Yes
              between 1.001
               - 10.000 US$
              0-No equipment
20-Fatality     damage / no    23   20-Yes
                 value lost
              0-No equipment
20-Fatality     damage / no    22   20-Yes
                 value lost
              0-No equipment
20-Fatality     damage / no    22   20-Yes
                 value lost
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
              Existenc Name of
  Name of                              Baseline /
                 e of    related
related legal                          Inherent Classification
              Company Company
requirement(                              Risk    of Impact
              requirem requireme
      s)                                 Score
                ents      nt(s)
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
Description of Controls Currently in Place
(consider, in sequence: Elimination, Substitution, Use of Barriers, Use
of Procedures, Use of Warning Systems/Signs, Use of PPE)
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
MISSING
SCORING
                        19/11/2023
Rev-01
1-Remote
3-Unlikely
5-Possible
7-Likely
 8-Certain
                                 Number of people
        Frequency
                                    exposed
          9-Continuous
                Seriousness of accident / incident
20-Fatality
                            Equipment damage
3-Localized impact to the environment - geographically limited remaining within the borders of the plant
0.5-Existing Controls Adequate but not Fully Implemented (for example if complete procedures in place & PPE identified/issue
0.8-Existing Controls Fully Implemented but additional controls required (for example if PPE is identified as the only control, bu
Contractor management
Electrical systems
Fall protection
                                       Fire control
           First aid
Fleet
Hearing conservation
Hot work
Lift trucks
Likelihood
Likelihood                                                                                                         value
                                                                                                                                       Safety Impact
Remote                                                                                                               1
Unlikely                                                                                                             3
Possible                                                                                                             5
Likely                                                                                                               7
Certain                                                                                                              9
                                                                                                                                                            This is the frequency of the aspect (activity/product/service) occurring. For example, if assessing a workshop, one activity could be "using a grinder"; in this case, the frequency would be how often the grinder is used.
Total Severity Level                                                                                                                       Frequency
                                                                                                                                                            Select the option in the tool which most closely matches
Number of People Exposed                                                                                           value
None                                                                                                                 0
1-2 People                                                                                                           1                                      For the aspect being assessed, a judgement needs to be made as to how likely it is that the identified injury/ill health (impact) would occur assuming any existing controls were not in place or not followed. For example, if assessing the activity "using a grinder", and
3-7 People                                                                                                           2                     Likelihood       one impact identified is "eye injury" (due to flying material), the risk assessment team will need to decide how likely it is that eye injury would occur in this situation, if controls (such as safety glasses or guard) are either not in place or not followed. Select the option
8-15 People                                                                                                          3                                      which most closely matches the team decision
16-50 People                                                                                                         4
More Than 50 People                                                                                                  6               Problem/accident
                                                                                                                                     happened within Select "Yes" or "No" depending on whether an injury (or ill health), specifically relating to the activity/situation being assessed, has actually happened in the last 5 years either in your facility or somewhere else similar to your facility.
                                                                                                                                        last 5 years
Assessing the severity of the safety Impact
                                                                                                                                      Total Likelihood
Total severity level                                                                                               value                                    This will be calculated by the tool based on both likelihood and occurrence within the last 5 years. The higher the score, the higher the likelihood. A result of 'Missing scoring' indicates that not all required fields were entered.
                                                                                                                                           Score
First aid incident or near miss                                                                                      1
Medical Treatment case (beyond first aid but no time off)                                                            3
Lost Time Incident - minor                                                                                           7                                This is the number of people who could be harmed/injured by the hazard related to the activity/situation. For example if the activity is "cleaning high level racking", then potential impact could be "Fall from Height". In this case, it is likely that the number of people
Lost Time Incident - major                                                                                          10               Number of People exposed may only be 1 or 2 (most likely only the person himself/herself, unless there are large numbers of people working underneath).
Limb Loss, Occupational Disease                                                                                     15                  Exposed       However, if the activity is "changing chlorine cylinders", with a potential hazard being release of toxic gas (hazardous chemical), then the number of people exposed would be the number of people who could be in the affected area
Fatality                                                                                                            20                                Select the option which most closely matches the team decision
Estimating the potential cost of repairing/replacing the equipment effected in the incident.
                                                                                                                                        Severity of
Cost of Equipment damage                                                                                           value                               The team conducting the risk assessment need to consider the potential severity of the accident/incident that could arise from the activity/situation (if controls not in place or not followed). If differing opinions, select the "worst case" injury that could occur in the situation
                                                                                                                                     accident/incident
No equipment damage / no value lost                                                                                  0
Equipment damage / lost value is between 1 - 1.000 US$                                                               1
Equipment damage / lost value is between 1.001 - 10.000 US$                                                          2
                                                                                                                                     Cost of equipment This is an estimate of the potential cost of repairing/replacing the equipment affected, in the event of the accident occurring. Select the option which most closely matches the team decision
Equipment damage / lost value is between 10.001 - 100.000 US$                                                        3
                                                                                                                                          damage       Note: Inclusion of equipment damage assessment increases the overall Impact score, but "Severity of accident/incident" category has a much greater effect on the score - thus emphasizing the fact that injury to people is the primary consideration in this process
Equipment damage / lost value is between 100.001 - 500.000 US$                                                       4
Equipment damage / lost value is between 500.001 - 1.000.000 US$                                                     5
Equipment damage / lost value is more than 1.000.000 US$                                                            6               Total Severity Score This will be calculated by the tool based on prior inputs. The higher the score, the higher the severity. A result of 'Missing scoring' indicates that not all required fields were entered.
                                                                                                                                       requirements
                                                                                                                                        specifically     The team conducting the risk assessment need to consider existence of specific Health & Safety regulations which specifically relate to the identified impact eg. "Control of Asbestos Regulations", "Noise at Work Regulations"
Calculation of Baseline/inherent risk score And classification of impact
                                                                                                                                     applicable to this
                                                                                                                                      Name of related
                                                                                                                                                         The name of the applicable regulation needs to be entered in this column eg. "Pressure Systems Safety Regulations"
                                                                                                                                    legal requirement(s)
Description & Effectiveness Of Controls In Place
Effectiveness of Current Controls                                                                                  value               Existence of
                                                                                                                                         company            There are a number of company requirements for environment eg. Confined Space, Hazardous Materials. If there is a TCCC EOSH requirement relating to the impact identified, then select "Yes"; if not, select "No"
Effectiveness of Current Controls                                                                                   0.1               requirement(s)
                                                                                                                                      Name of related
Existing Controls Adequate but not Fully Implemented (for example if complete procedures in place &
                                                                                                                    0.5                  company            The name of the TCCC EOSH requirement needs to be entered in this column eg. Hot Work, Fall Protection
PPE identified/issued, but compliance poor)
                                                                                                                                      requirement(s)
Existing Controls Fully Implemented but additional controls required (for example if PPE is identified as                            Baseline/inherent
                                                                                                                    0.8                                This will be calculated by the tool. The higher the score, the higher the risk. A result of 'Missing scoring' indicates that not all required fields were entered.
the only control, but in reality more should be done)                                                                                   Risk score
                                                                                                                                     Classification of
Existing Controls Inadequate (limited controls identified and limited implementation)                               0.9                                     Classification of Impact as 'significant' or 'insignificant' will be determined automatically, according to the baseline score.
                                                                                                                                          Impact
No action/control in place                                                                                          1                  Description of
                                                                                                                                                            In this column, the team should list all the controls which are actually in place to reduce the likelihood and/or severity of the impact. For example: barriers, guarding, warning signage, training, PPE, safety showers, first aid kits etc. Need to refer to the hierarchy of
                                                                                                                                    controls currently in
                                                                                                                                                            controls, to ensure all categories of controls are considered
                                                                                                                                           place
Classification of RISK
                                                                                                                                      Effectiveness of      Based on the extent of the controls listed - and observation of how well these are actually followed in practice (eg. if PPE is provided, is it being worn? If machine guards are provided - and interlocked - are interlocks being defeated?), the risk assessment team should
Classification of Risk as 'High', 'Medium', or 'Low' will be determined automatically, according to                                       controls                                                                                 make an assessment on the overall adequacy of the controls. Select the option which most closely matches the team decision
the re-calculated risk score
                                                                                                                                     Risk Score (with
Score                                                                                               Type of Risk
                                                                                                                                      actual level of       This will be calculated by the tool, based on the effectiveness of controls in place; the more effective the controls, the greater the reduction in risk. A result of 'Missing scoring' indicates that not all required fields were entered.
>0 and less than <250                                                                               Low                                   control)
                                                                                                                                     Classification of
>250 and less than<500                                                                                      Medium                                          Classification of Risk as 'High', 'Medium', or 'Low' will be determined automatically, according to the re-calculated risk score.
                                                                                                                                            Riskof action
                                                                                                                                    Description
>500                                                                                                        High                         required /         For all situations where Risk is classified as "Medium" or "High", then actions need to be identified to reduce the risk further. These should be summarized in this column (and then linked to a more detailed site action plan with timescales/responsibilities etc.)
If task or condition is coming under legal requirement and effectiveness of control is > or= 0.5            High                       management           Note: When identifying ways to improve effectiveness of controls, refer to "Hierarchy of Controls" and Company Requirements
                                                                                                                                        programme
                                                                                                            Fleet                              Hazardous                                              Classification of Accident / Incident
Combustible materials                                    Compressed gas                                     energy control                                  Personal protective equipments
Contractor management                                    Confined space entry                               Hearing
                                                                                                            Lift      conservation
                                                                                                                 trucks                       Hot work
                                                                                                                                              Local         Respiratory protection                               Warehouse safety
Electrical systems                                        Fall protection                                   exhaust ventilation
Fire control                                               First aid                                        Material handling equipments
                                  BOCW act 1996 & rule 1998
Sr. no   Sections         Clauses                                            Remarks
                                          An employer shall ensure at a construction site of a building or other
                                          construction work that adequate measures are taken to protect building
  1       S-34            Noise           workers against the harmful effects of excessive noise or vibration at such
                                          construction site and the noise level in no case exceeds the limits laid down in
                                          Schedule VI annexed to these rules
                                          The employer shall ensure at the building or other construction work that
                                          overhead protection is erected along the periphery of every building under
  7       S-41      Overhead protection   construction which shall be of fifteen metres or more in height when
                                          completed.
                                  1. All passageways, platforms and other places of construction work at the
                                  building or other construction work shall be kept by the employer free from
                                  accumulations of dust, debris or similar material and from other obstructions
                                  that may cause tripping.                                      (2) Any sharp
                                  projections or protruding nails or similar projections which may cause any
                                  cutting hazard to a building worker at the building or other construction work
                                  shall be removed or otherwise made safe by taking suitable measures by the
8    S-42        Slip, trip       employer.                                                               (3) No
                                  employer shall allow any building worker at building or other construction
                                  work to use the passageway, or a scaffold, platform or any other elevated
                                  working surface which is in a slippery and dangerous condition and shall
                                  ensure that water, grease, oil or other similar substances which may cause the
                                  surface slippery, be removed or sanded, saw dusted or covered with suitable
                                  material to make it safe from slipping hazard at a building or other
                                  construction work.
                                  The employer shall ensure that corrosive substances, including alkalis and
                                  acids, shall be stored and used by a person dealing with such substances at a
                                  building or other construction work in such a manner that it does not
10   S-44   Corrosive chemicals   endanger the building worker and suitable protective equipment shall be
                                  provided by the employer to a building worker during handling or use of such
                                  substances at a building or other construction work
                                  The employer shall ensure that illumination sufficient for maintaining safe
                                  working conditions at a site of a building or other construction work is
14   S-50      Illumination       provided where building workers are required to work or pass and for
                                  passageways, stairways and landing, such illumination is not less than that
                                  provided in the relevant national standards.
                                1. all vehicles and earth moving equipment are made of good material, proper
                                design and sound construction and are sufficiently strong for the purpose for
                                which such equipment are used and are maintained in good state of repair and
                                are properly used in accordance with standard safe operating practices.
                                                                                     2. all transport or earth
                                moving equipment and vehicles are
17   S-88    Heavy vehicle      inspected at least once a week by a responsible person and in
                                case any defect is noticed in such equipment or vehicle, it is
                                immediately taken out of use;
                                3. power trucks and tractors are equipped with effective brakes,
                                head lights and tail lamps and are maintained in good repair and
                                working orde
                                                                                                                  Risk Matrix
                                                                                                                                                                                           0.1-Existing
                                                                                                  0-No impact                                                                              Controls
                                                                                   0-No equipment                                                                 0-No       1.0-No
                                                                                                  to the                                                                                   Adequate                                 Combustible
1-Remote         1-Once per every 10 years       0-None            1-First Aid inc damage / no                        0-No        0-No                0-No        public     action/contro              No change     No change
                                                                                                  environmen                                                                               and Fully                                materials
                                                                                   value lost                                                                     concern    l in place
                                                                                                  t                                                                                        Implemente
                                                                                                                                                                                           d
                                                                                                                                                                                           0.5-Existing
                                                                                                                                                                                           Controls
                                                                                                                                                                                           Adequate
                                                                                                                                                                                           but not Fully
                                                                                                                                                                                           Implemente
                                                                    3-Medical                   1-Isolated                                                                                 d (for
                                                                                                                                                                  1-Little
                                                                   Treatment                    or little                                                                                  example if
                                                                                                                                                                  interest / 0.1-Eliminate                                          Compressed
3-Unlikely       2-Once per every 5 years        1-1-2 People      case (beyond 1-Equipment damage
                                                                                                impact               10-Yes 1 -20-Yes
                                                                                                    / losttovalue is between    1.000 US$            5-Yes                                 complete       Increase    Increase
                                                                                                                                                                  concern of the risk                                               gas
                                                                   first aid but                environmen                                                                                 procedures
                                                                                                                                                                  public
                                                                   no time off)                 t                                                                                          in place &
                                                                                                                                                                                           PPE
                                                                                                                                                                                           identified/iss
                                                                                                                                                                                           ued, but
                                                                                                                                                                                           compliance
                                                                                                                                                                                           poor)
                                                                                                                                                                                            0.8-Existing
                                                                                                                                                                                            Controls
                                                                                                                                                                                            Fully
                                                                                                  3-Localized
                                                                                                                                                                                            Implemente
                                                                                                  impact to
                                                                                                                                                                                            d but
                                                                                                  the
                                                                                                                                                                                            additional
                                                                                 2-Equipment      environmen
                                                                                                                                                                  3-Some                    controls
                                                                                 damage / lost    t-
                                                                                                                                                                  interest / 0.5-Reduce     required (for                           Contractor
5-Possible       3-Once per every 1-2 years      2-3-7 People      7-Lost Time Invalue is between geographica
                                                                                                                                                                  concern of the risk       example if                              management
                                                                                 1.001 - 10.000   lly limited
                                                                                                                                                                  public                    PPE is
                                                                                 US$              remaining
                                                                                                                                                                                            identified as
                                                                                                  within the
                                                                                                                                                                                            the only
                                                                                                  borders of
                                                                                                                                                                                            control, but
                                                                                                  the plant
                                                                                                                                                                                            in reality
                                                                                                                                                                                            more should
                                                                                                                                                                                            be done)
                                                                                                                                                                                            0.9-Existing
                                                                                                                                                                                            Controls
                                                                                                   5-Large
                                                                                  3-Equipment                                                                                               Inadequate
                                                                                                   scale impact                                                   4-Great
                                                                                  damage / lost                                                                                             (limited
                                                                                                   on the                                                         interest / 0.8-Isolate                                            Confined space
7-Likely         4-Once per every 6 months       3-8-15 People     10-Lost Time Invalue is between                                                                                          controls
                                                                                                   environmen                                                     concern of the risk                                               entry
                                                                                  10.001 - 100.000                                                                                          identified
                                                                                                   t-                                                             public
                                                                                  US$                                                                                                       and limited
                                                                                                   catastrophic
                                                                                                                                                                                            implementat
                                                                                                                                                                                            ion)
                                                                                  4-Equipment
                                                                                  damage / lost                                                                                             1.0-No
                                                                                                                                                                             1.0-Control                                            Electrical
8-Certain        5-Once per every 1-3 months     4-16-50 People    20-Fatality    value is between                                                                                          action/contr
                                                                                                                                                                             the risk                                               systems
                                                                                  100.001 -                                                                                                 ol in place
                                                                                  500.000 US$
                                                                                  5-Equipment
                                                                                  damage / lost
                 6-Once per every 1-2 weeks      6-More than 50 People            value is between                                                                                                                                  Fall protection
                                                                                  500.001 -
                                                                                  1.000.000 US$
                                                                                  6-Equipment
                                                                                  damage / lost
                 7-Once per every day                                             value is more                                                                                                                                     Fire control
                                                                                  than 1.000.000
                                                                                  US$
                                                                                                                                                                                                                                    Hazardous
                                                                                                                                                                                                                                    energy control
                                                                                                                                                                                                                                    Hearing
                                                                                                                                                                                                                                    conservation
                                                                                                                                                                                                                                    Hot work
                                                                                                                                                                                                                                    Lift trucks
                                                                                                                                                                                                                                    Local exhaust
                                                                                                                                                                                                                                    ventilation
                                                                                                                                                                                                                                    Machine
                                                                                                                                                                                                                                    guarding
                                                                                                                                                                                                                                    Managing
                                                                                                                                                                                                                                    hazardous
                                                                                                                                                                                                                                    materials
                                                                                                                                                                                                                                    Material
                                                                                                                                                                                                                                    handling
                                                                                                                                                                                                                                    equipments
                                                                                                                                                                                                                                    Personal
                                                                                                                                                                                                                                    protective
                                                                                                                                                                                                                                    equipments
Respiratory
protection
Warehouse
safety