Curriculum Vitae (CV)
Engr. Altaf Hossain
“Elephant Glory”
Flat 4C, (4th Floor)
276 Elephant Road, Dhaka -1205.
Phone: 01793 464856, E-mail: altafhossainsml@gmail.com
Professional experience
From March 2019 – July 2020
Head of Engineering, Ibrahim Cardiac Hospital & Research Institute (Dhaka)
My responsibility in this pioneer hospital of cardiac treatment is to lead all the engineering
functions of project management, building maintenance, electrical, mechanical and electro-
mechanical jobs, and maintenance of 1000 of biomedical equipment’s.
Apart from above I have been actively involved in supply chain management, accounts and
finance, HR development through training, IT functions and many more as a Senior
management Committee member.
From March 2018 – February 2019
Head of Operations, Maheen Accessories Ltd. (Madanpur, Narayangonj)
This was a contractual job for a project development of metal button manufacturing with
joint venture of China. It was basically a project management job. After successful
completion of the project in terms of trial run I got back Dhaka.
From June 2014 – February 2018
Plant Manager, SML PACKAGING SOLUTION BD LTD. (Adamjee EPZ, Siddhirganj)
My responsibilities in this pioneer Trim Supplier/Garment Accessories manufacturing plant
included Product Development (PD) responsibilities, Supply Chain Management (Local and
Overseas purchase, ware house management, inventory control), Production Monitoring &
Control (PMC), on-time delivery by maintaining product standard while keeping service level
intact, Quality Management System (QMS)/ISO, Engineering Services (Operating new Projects,
Installation/Testing/Commissioning of new machines; repairing & Maintenance management of
equipments and machineries of total plant, facility management, etc), Commercial Functions
(export, import and distribution/logistics); HR and administration, Policy formulation,
compliance management, project execution, and liaison with BEPZA Management. I was also
responsible for communications with head quarter based in Hong Kong and two mother
manufacturing plant in China.
From March 2008 – May 2014
General Manager – Factory, DEKKO ACCESSORIES LTD.
In this world class Garments Accessories Manufacturing Plant I was responsible for administration
of 1200 people (included 100 officers), improvement of service level, material planning and
procurement, coordinating 8 different production units to meet production target and to maintain
distribution schedule. I was also responsible for manufacturing budget preparation & control,
system development (Corporate Management, Quality Audit, KRA based performance appraisal,
TPM, IT), continuous improvement on manufacturing parameters, organizing monthly production
coordination meeting to streamline Operations and to ensure plant’s safety , security and industrial
health.
From October 2006- February 2008
Production Manager, BERGER PAINTS BANGLADESH LTD
Job responsibilities included preparation of yearly budget and production plan; maintain targeted
level of customer services through production of Category, Shades & pack sizes; Operating total
manufacturing management by managing man, machines, material, method & management;
Cross functional liaison with relevant departments, operation of project management; Coordinating
& participating corporate level production & working capital meeting, productivity improvement
and reducing processing cost etc. After paint manufacturing was also involved with TK group for
almost 6 months during one of its chemical project development/erection works of Caustic-Chlorine
manufacturing project in Dhaka.
From February 2005 – September 2006
Senior Manager (Production & Services), LIMO ELECTRONICS LTD
Responsible for total operations of Factory Management including Customer Service
Management, Human Resources Management, Sourcing and procurement of spare parts,
strengthening service audit, expansion of service operation to improve customer
satisfaction/Operation of CRM, Efficiency improvement for cost minimization and to improve
service income and close monitoring of monthly cost & profit analysis. Apart from the routine jobs,
was also involved as an active member of the Management committee and contributed to the
Organizational reform and improvement of operational management project.
From February 1993 – January 2005
Factory Manager, SINGER BANGLADESH LTD.
Stated career as Manager Quality and gradually moved in to Factory Manager Position. Job
responsibilities in this American-multinational included overall operation and administration of
Factory Management. From earth breaking to the construction of Singers state art of new
electronic assembling factory building at Savar; fabrication, erection (local and import) and
installation of all support facilities and structures; preparation of procurement plan (local &
imported), L/C Scheduling and monitoring, Production planning and monitoring, Inventory
control/Logistics (SCM), Budget preparation & Budgetary control, Plant Maintenance and
Engineering, Liaison with different Govt. agencies such as Labor office, Fire and Civil defense,
Department of Environment (DOE), local Union Parishad office, Rural power supply, Department of
Explosives etc and execution of “management by objective” (MBO). In addition responsibilities also
included operation of yearly maintenance program of total plant including civil works, power
distribution system, corrective & preventive maintenance of production and quality equipment’s and
machineries etc.
From May 1987 – January 1993
Production/Quality Engineer, PHILIPS BANGLADESH LIMITED
Job responsibilities in this Dutch-multinational included Execution of production plan, Designing of
production belt & support facilities, Time-motion study, efficiency drive by applying new methods &
techniques of production management, Incoming inspection of raw materials, process quality
control, outgoing quality of finished products etc.
From April 1986 – April 1987
Project Engineer, UNITED TRADERS LTD (Local Office, MOTOROLA)
Job responsibilities in this company included installation, maintenance & servicing of Telecom
equipment at different areas of Bangladesh of Govt., Semi Govt. & Non-Govt. Organizations.
Education
Post graduate diploma in Human Resources Management (PGDHRM) from BIM in April 2011
with CGPA 3.30
Master in Business Administration (MBA) from Independent University Bangladesh (IUB) major
in Marketing in 2009 with CGPA-3.46
B.Sc. (Engg.) with major in Electrical & Electronic Engineering from BUET in 1986 obtaining a
First Class degree.
Higher Secondary School Certificate Examination in 1980 from Rajshahi Board obtaining First
Division.
Secondary School Certificate Examination in 1978 from Rajshahi Board obtaining First Division.
Trainings
Participated in different overseas training programs in different countries on topics such as
Electronic Assembling (India), Electronic Assembling (South Korea), Machine Operations &
Maintenance (Taiwan), Electronic Assembling (Singapore), Inventory Management (Thailand),
Digital Data Processing (Hong Kong), Garments Accessories Manufacturing specially in RFID
(China), Advanced Course On TQM (Japan) etc.
Local trainings include topics such as Project Management at BIM, Dhaka; Financial
Management for non-finance managers; Public Relations; Industrial health and safety/fire
fighting/security management/first aid; EMS 14001 (sponsored by World Bank); Energy
Management; Supervisory skills for higher productivity in market Competitiveness; Supply Chain
Management; Lean Management; and Conflict Management.
Personal Information
Date of birth: June 30, 1963
Nationality: Bangladeshi
Height: 5 ft 7 inch
Family Status: Married with one Daughter
References
Mr. Syed Shabbir Raza Mr. Mosaddeque Azam Siddique
Managing Director Managing Director
A renowned Group of Industries. A renowned Electronics Company
Cell no: 01713 302889 Cell no: 01715 112898, 01777 774567
Mr. Altaf Hossain
Ex Chief Operating Officer (COO)
Rahim Afroze
Cell no: 01730 023777, 01730 376107