DEZMACNC Furniture production line
1. Quotation
Name Model Unit Quantity Unit price Total amount Delivery time
CNC router DM-U8 set 1 48,000USD 48,000USD 30days
Training fee(If needed)
FOB to QINGDAO PORT Total USD amount: 48,000USD
Shipping cost: 5,000USD need to add extra
1
2. Equipment configuration and list
Taiwan's Syntec system is stable, fast in response, and
has a friendly human-computer dialogue interface,
making operation easier and more convenient.
CNC router ATC tool changer: 9KW tool changer
spindle (10 tool magazines)
The upper and lower drill packages are CC9V drill
packages, and the slotting spindle upper and lower are
3.5KW spindle
2
Adopt industrial-grade label printing and labeling
integrated unit.
Double-clamp hand gripper, feeds materials to the
cutting machine for punching and slotting at one time,
with higher precision and efficiency.
Guide rail: Taiwan 25MM, higher precision and
higher hardness.
The main electrical components are from domestic
famous brand CHINT//DELIX Electric, with
guaranteed quality. They can be purchased all over the
country, making it convenient to replace damaged
electrical components in time.
3
Fuling inverter has fast response speed and is more
stable.
High-precision 1.5-die grinding rack transmission,
fast speed, high precision, strong wear resistance of
materials
Adopting the path-following air blowing device, the
cutting process is truly dust-free, environmentally
friendly, clean and hygienic.
The steel beam, bed and beam are all quenched and
processed by CNC pentahedron machining center to
ensure the strength of the gantry and the processing
accuracy during heavy cutting.
The solenoid valves of the equipment control
cylinders are all concentrated behind the beam, which
makes it easy to find problems and facilitate
centralized management.
4
Patented knife holder can be used 100,000 times, with
spring design at the back, high-quality PE material,
and lifetime quality assurance.
Equipped with 380v50hz 3kw and 4kw three-phase
double barrel vacuum cleaners.
7.5kw oil less pump, high-power adsorption, to ensure
that the small board does not shift
Equipped with wireless Logitech keyboard and mouse
5
The drag chain adopts imported layered wire style,
and each wire is separated
The XYZ drive motor of the cutting machine is a
1.5KW DEZMACNC servo motor, and the drilling
machine uses 1.5kw and 750w servo motors
6
3. CNC router parameter
Technical Parameters DM-ZQ49A
Working size 1220*2800mm
MAX Moving speed 65m/mim
Transmission X/Y Rack;Z Ball screw
Table structure Partition vacuum adsorption table
Spindle CC 9KW Air cooling tool change spindle
Spindle RPM 18000-24000r/min
Max woeking speed 20m/min
Voltage AC380/3PH/50HZ
4. Features:
1. This machine is an integrated processing equipment for drilling, grooving, cutting and blanking of
plates. It can be operated by one person, which is simple and efficient. It can complete the processing of
120-140 plates a day.
2. This model has added 3 new functions. One is the fast cutting function, which has a very fast
punching speed and greatly improves efficiency. One is the form sorting processing function, which does
not need to import the program one by one, and can be directly arranged and processed in sequence. One is
the start function behind the bed. Put the plate on the back of the bed, then press the start button to start
processing. There is no need to run back to the front operation box to press the start button, which saves
time running back and forth and improves production efficiency.
7
5. Warranty and Service
1. The warranty period is 24 months.
2. Free online after-sales service is provided during the warranty period. If there are any problems with
the quality of the machine, free accessories will be sent. If there are any after-sales service caused by
operator negligence, the after-sales service fee and accessories fee will be paid. The repair of equipment
after the warranty period will be clearly marked.
6. Production Process
1. Steel plate integral frame-type welded fuselage
2. Gantry milling machine processing
3. Internal stress elimination treatment:
1) Gantry crossbeam and side arm tempering (annealing) heat treatment
2) Bed vibration aging treatment
4. Finishing:
1) Use pentahedron machining center (mother machine) to position, clamp and fix the fuselage at one
time;
2) Overall precision milling of X, Y, Z three-axis bidirectional guide rails and rack installation
reference surfaces;
3) After completing the reference surface processing, the X, Y, Z three-axis bidirectional guide rails,
rack installation reference surface positioning pin holes, fixed installation holes and screw holes are
processed at one time under the same positioning accuracy.
5. Transfer to assembly process and assembly
6. Quality inspection process
1) Precision ruler and dial indicator: detect the straightness of X, Y, and Z axes
2) Precision ruler, dial indicator, level, laser interferometer detect the parallelism between X, Y, and Z
8
guide rails
3) Precision angle ruler, dial indicator, special gauge, ball bar: detect the verticality of X, Y, and Z
guide rails
4) Dial indicator, special gauge: spindle verticality detection
5) Special gauge, dial indicator, precision angle ruler: detect the parallelism and verticality of X, Y,
and Z racks and screws and the corresponding linear axes (guide rails)
7. Painting and packaging
8. Delivery