0% found this document useful (0 votes)
19 views3 pages

CV New 2

News information

Uploaded by

shaizabano.khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views3 pages

CV New 2

News information

Uploaded by

shaizabano.khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

+91-9967978855

linkedin.com/in/Faizan- FAIZAN KHAN (B.E.Mech)


khan-1aab7413a
khanfaizan701@gmail.com Engineer-Steel Structures
Mmmmomomom

Profile:
• A very good understanding of Indian standards for materials and hot rolled sections, structure Specifications for
fabrication, Painting and materials.
• Training and Certification in data center Projects.
• Fluent in everyday engineering Software such as MS project, AutoCAD, MS-Office.
• Hands on experience with tools and gauges used for measurement, welding quality, and painting and surface preparation
quality checks.
• On site experience of fabrication Production engineer in projects with quantum up to 200 tons.
• Experienced in dealing with fabrication involving BEAMS and RAFTER and COLUMNS fabricated from plate.

• Also, specialist in HILTI product of fire passive system.

Experience:-
COMPANY NAME: AARKFAB ENGINEERS PVT. LTD. FEB 2019 till date

1. Project name: CTRLS DATA CENTER (NAVI MUMBAI).


▪ Client name: CTRLS PVT. LTD.
▪ Quantum of work: 10 Tons.
▪ Project duration: 6 months.
▪ Summary of responsibilities: checking of plans, drawings and quantities for accuracy of calculations, communicating
with clients and their representatives including class surveyors, attending regular meetings to keep them informed of
progress, day-to-day management of the site, including supervising and monitoring the site Laboure force and the work
of any subcontractors prepare reports as required, overseeing quality control and health and safety matters on site.
Preparation of work completion certificates and getting them signed off by client.

2. Project name: PRIME FOCUS STUDIO.


▪ Client name: RELAINCE ENTERTAINMENT.
▪ Quantum of work: 60 Tons.
▪ Project duration: 6 months
▪ Summary of responsibilities: Planned and monitored daily tasks as per the project schedule, developed operating
instructions for production activities, Prepared and submitted daily progress reports, kept track of Incoming and outgoing
material in the form of MIR, packing lists & IR, Prepared, submitted & maintained work completion certificates, Liaised with
TPI and CA for the daily workarounds. Prepared shop drawings, weld plans for site use with detailed dimensioning, and
weld quality.

3. Project name: BRIDG DATA CENTER (NAVI MUM.)


▪ Client name: BRIDGE DATA CENTER.
▪ Quantum of work: INSTALLATION FIRE STOP SYSTEM (5 CR.)
▪ Project duration: 9 months
▪ Summary of responsibilities: communicating with clients and their representatives including class surveyors, attending
regular meetings to keep them informed of progress, day-to-day management of the site, including supervising and
monitoring the site labour force and the work of any subcontractors prepare reports as required, overseeing quality control
and health and safety matters on site, checking of plans, drawings and quantities for accuracy of calculations, Preparation
of work completion certificates and getting them signed off by Client Rep.
4. Project name: AWS BOM062 (NAVI MUMBAI).
▪ Client name: LISTENLIGHTS PVT LTD..
▪ Quantum of work: 80 Tons (CHILLER STRUCTURE AND DG PLATFORM)
▪ Project duration: 6 month
▪ Summary of responsibilities: Preparation of project related method statements and ITP and getting approval from
client prior to start of the project, planning of decommissioning sequence in coordination with engineering
subcontractor to avoid structure collapse, acting as a single point of contact between client and subcontractor,
ensuring compliance with QHSE norms, ensuring effective waste segregation, timely submission of associated
paperwork and weighing slips, Planning of lift and ensuring safe lifting operation, submission of weight control report
and getting work completion certificates signed off by Client.

5. Project name: AWS BOM063 (NAVI MUMBAI).


▪ Client name: LISTENLIGHTS PVT. LTD.
▪ Quantum of work: 200 TONS
▪ Project duration: (ON GOING)
▪ Summary of responsibilities: Review of GA drawings prior to submission to client, Preparation of fabrication
sequences and required procedures, Co-ordinating between engineering subcontractor and client representative,
Ensuring timely delivery for engineering deliverables, Preparation of Bill of material for final material procurement,
Preparation of fabrication schedule and ensuring timely completion for specified milestones, Assisting QC department
in welder qualification, Consumable control, Material inspection and control

6. Project name: DY PATIL MANAGEMENT COLLEGE.


▪ Client name: D.Y. PATIL.
▪ Quantum of work: 30 Tons.
▪ Project duration: 3 month
▪ Summary of responsibilities: Co-ordinated with client/Attending daily progress meetings Prepared Fabrication schedule
and tracked to achieve the final delivery date. Finalization of bill of material for steel & paint for final order placement.
Prepared and signed off Work completion report Preparation of red line mark-up drawing Oversaw the surface preparation
and painting activity.

7. Project name: RELAINCE TWIN TOWER (NAVI MUMBAI)


▪ Client name: RELAINCE PVT LTD.
▪ Quantum of work: combination of floor and wall cut out closing with fire protection system.
▪ Project duration: 10 month
▪ Summary of responsibilities: Co-ordinating between client and subcontractor, Preparation of project related
schedules Attending meetings with client and subcontractors, Preparing and submission of daily progress reports,
Preparation and submission of project weekly progress report. Finalization of the Bill of materials based on the
drawings provided by Client and ensuring correct delivery based on the client supplied project specifications.

8. Project name: DIRUBHAI AMBANI INTERNATINAL SCHOOL. (On- going)


▪ Client name: RELAINCE PVT LTD.
▪ Quantum of work: FABRICATION AND FIRE STOP SYSTEM.
▪ Project duration: 8 months.
▪ Summary of responsibilities: Preparation and submission of various project related documents in compliance with
client document control instructions, Co-ordinating between client and subcontractor for engineering tasks Attending
meetings with client and subcontractors, Preparation of project related schedules, reviewing engineering drawings
and ensuring timely submission to client, Preparing Minutes of meetings and weekly progress report.

9. Project name: COMMERCE 3 IT PARK


▪ Client name: OBEROI REALTY.
▪ Quantum of work: SHAFTS CLOSING WITH FIRE STOP SYSTEM.
▪ Project duration: 04 months
Skills and achievements:-
▪ Received an appreciation letter from AARKFAB ENGINEERS PVT LTD.
▪ Good understanding of measurement, QC and Billing documents.
▪ Successful completion of 100tonne fabrication in given deadline.
▪ Successfully time duration project completed.
▪ Preparing BOQ, QUOTATION and MEASUREMENT SHEET.
▪ The ability to work under pressure.

Educational qualification:-
SR UNIVERSITY
Type PERCENTAGE/GPA YEAR
NO
1. B.E MECHANICAL ENG. University of Mumbai 6.04 2018
Maharashtra state board of technical
2. DIPLOMA (MECH.) 67% 2015
education
3. Secondary school certificate Mumbai board 81.27% 2012

Personal Information:-
▪ Name: FAIZAN MUSTUFA KHAN.
▪ Address: D/301, Yogeshwar apartment, Mumbra main market, Mumbra, Thane, Maharashtra.
▪ E-Mail: khanfazian701@gmail.com
▪ Mobile No. +91 9967978855
▪ Date of birth: 25/12/1996
▪ Languages known: English, Marathi, Hindi, urdu
▪ Gender: Male
▪ Marital status: Married
▪ Nationality: Indian

DECLARATION :-
The information stated above is true to the best of my knowledge and belief.

PLACE: THANE
DATE : (KHAN FAIZAN)

You might also like