0% found this document useful (0 votes)
24 views22 pages

Commercial and Offices

The document outlines the design requirements for a commercial and office space project, detailing area statements and necessary facilities. It specifies project requirements including permissible site area, built-up area, and ground coverage, along with lists of facilities for commercial and office spaces. Additionally, it provides area statements for various components such as bus terminus, basement parking, commercial floors, office floors, and service floors.

Uploaded by

pallabhtprabhuu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views22 pages

Commercial and Offices

The document outlines the design requirements for a commercial and office space project, detailing area statements and necessary facilities. It specifies project requirements including permissible site area, built-up area, and ground coverage, along with lists of facilities for commercial and office spaces. Additionally, it provides area statements for various components such as bus terminus, basement parking, commercial floors, office floors, and service floors.

Uploaded by

pallabhtprabhuu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 22

UA21FA491A: DESIGN VII

Ar. Sharath H Aithal


Ar. Saranya Divakaran
Ar. Pranathi S Udupa
Ar. Anthony S J
Faculty of Architecture
UA21FA491A : DESIGN VII

Area statement and facilities to be


provided in the project – Commercial
and Office spaces.

Ar. Sharath H Aithal, Ar. Saranya Divakaran, Ar. Pranathi S Udupa, Ar. Anthony S J
Faculty of Architecture
UA21FA491A : DESIGN VII
Contents

1. Project requirements
2. List of requirements and facilities to be provided for
Commercial spaces.
3. List of requirements and facilities to be provided for
Office spaces.
4. Area statement – Commercial Spaces
5. Area statement – Office Spaces
6. Area statement – Service floor (below commercial and
office floor)
UA21FA491A : DESIGN VII

1. Project requirements

Ar. Sharath H Aithal, Ar. Saranya Divakaran, Ar. Pranathi S Udupa, Ar. Anthony S J
Faculty of Architecture
UA21FA491A : DESIGN
VII
Project requirements
Permissible regulation for the Site.

• Project Site area : 8.5 acres / 34,398 sq.mts / 3,70,122 sq.ft


• Permissible FAR for this site : 4

• Permissible total built up area : 1,37,592 sq.mts

• Permissible ground coverage (40%) : 13,759 sq.mts


UA21FA491A : DESIGN VII
Project requirements

PERMISSIBLE TOTAL BUILT UP AREA – 1,37,592 sq.mts

Note:

As per NBC, occupant load for the following areas are:

Waiting area - 1.5 sqm/person.


Office area / business / industrial - 10 sqm/person.
Dormitory- 7.5 sqm/person

Example - 1 person in an commercial / office area would require


approximately 10sq.mt area. Thus a floor area of 1000 sq.mt should
accommodate 100 people therefore the toilet and services requirements
should be calculated accordingly.
2. List of requirements and facilities to
be provided for Commercial spaces.

Ar. Sharath H Aithal, Ar. Saranya Divakaran, Ar. Pranathi S Udupa, Ar. Anthony S J
Faculty of Architecture
UA21FA491A : DESIGN VII
List of requirements and facilities to be provided for Commercial
spaces

● Shops and Showrooms.


● Administration offices.
● Multiplex.
● Food court / restaurant.
● Bank / ATM / e-lobby.
● Game zone.
● Hotel / restaurants/ spa / gym / banquet hall etc.
● Exhibition space.
● Service core (lobby, lift, stairs, fires staircase, fire lift, service lift,
escalators, service rooms etc.)
● Service Floor.
3. List of requirements and facilities to
be provided for office spaces

Ar. Sharath H Aithal, Ar. Saranya Divakaran, Ar. Pranathi S Udupa, Ar. Anthony S J
Faculty of Architecture
UA21FA491A : DESIGN VII
List of requirements and facilities to be provided for Office spaces

● Front offices (enquiry, ticket, records, ATM/ E-lobby, store, restrooms etc.)
● Administrative and personnel offices etc.
● Office spaces to be rented out.
● Stores.
● Staff facilities (lockers, change room, rest rooms, retiring room / dormitory,
dining / canteen etc.)
● Security rooms.
● Services (electrical, plumbing, water supply, fire escape etc.).
● Service core (lobby, lift, stairs, fires staircase, fire lift, service lift, escalators,
service rooms etc.)
● Staff parking.
● Service Floor.
UA21FA491A : DESIGN VII

4. Area statement – Commercial Spaces.

Ar. Sharath H Aithal, Ar. Saranya Divakaran, Ar. Pranathi S Udupa, Ar. Anthony S J
Faculty of Architecture
UA21FA491A : DESIGN VII
Project requirements with area statement
Bus terminus area statement
Facilities Area in Sq.mt
Security check 100
Lobby / lounge
• Service core – 3 nos. per floor
• Lift - 8 (2.20mX2.60m) / core Aprox. + 2 nos. Service lift (2.6mx2.6m)
• Bed lift - 1 (2.30mX3.10m) / core
• Staircase (4.00mx7.5m) / core 1500
• Fire lift with staircase (6.0m x 7.5m). Located at max. travel distance of 30m
• Gents toilet (Details refer NBC , volume 2, part 9,Table 14 clause 4.2.5.1, ) *
per core
•Ladies toilet (Details refer NBC , volume 2, part 9,Table 14 clause 4.2.5.1,)*
per core
• Reception / Information desk 50
• BMTC - Ticket counters 50
• KSRTC - ticket counters 50
• Metro and train ticket counters 50
• Baggage lost and found 50
• Lockers / baggage room 200
Table continued……
UA21FA491A : DESIGN VII
Project requirements with area statement
Facilities Area in Sq.mt
Front office 300
Time keeper room (record room) 50
Tourist office 50
Bank E-Lobby / ATM 30
Security office 50
Police outpost 50
Bangalore One (e – seva) 100
Health centre 100
Shops 200
Passengers waiting area - General 500
Passengers waiting area – Air conditioned 300
VIP waiting area 100
Dormitories* 200
Cafeteria 300
House keeping 100
Electrical room 100
Store 300
Miscellaneous (to be used towards core) 1500
Approximate total area of bus terminus 13,680
Note: * Toilets should include provision for bathing area as well
UA21FA491A : DESIGN VII
Project requirements with area statement
Basement parking floor area statement (3 floors)

Facilities Area in Sq.mt


Car park for 2000 cars @ 26 sq.mt/car 52000
Two wheelers parking for 900 vehicles @3 sq.mt/vehicle 2700
Service core – 6 nos for 3 floors Site area = 34,398 sq mts
• Service core – 3 nos. per floor Site area – offset area =
• Lift - 8 (2.20mX2.60m) / core Aprox. + 2 nos. Service lift (2.6mx2.6m) 23,513 sq mts (Basement area
• Bed lift - 1 (2.30mX3.10m) / core
per floor)
• Staircase (4.00mx7.5m) / core (1500x3)=4500
• Fire lift with staircase (6.0m x 7.5m). Located at max. travel distance of
30m
• Gents toilet (Details refer NBC , volume 2, part 9,Table 14 clause 4.2.5.1, )
* per core
•Ladies toilet (Details refer NBC , volume 2, part 9,Table 14 clause 4.2.5.1,)*
per core
Approximate total area for basement floors 60,200
UA21FA491A : DESIGN VII
Area statement

Project Requirements

3. Commercial floor

Area in Sq.mt
Facilities
Lobby/lounge 1000
• Service core – 3 nos. per floor
• Lift - 8 (2.20mX2.60m) / core Aprox. + 2 nos. Service lift (2.6mx2.6m)
• Bed lift - 1 (2.30mX3.10m) / core 1500
• Staircase (4.00mx7.5m) / core
Total core area per
• Fire lift with staircase (6.0m x 7.5m). Located at max. travel distance of 30m
floor
• Gents toilet (Details refer NBC , volume 2, part 9,Table 14 clause 4.2.5.1, ) * per core
•Ladies toilet (Details refer NBC , volume 2, part 9,Table 14 clause 4.2.5.1,)*
per core
Security check 50
Metro - Ticket counters 50
Railway - Ticket counters. 50

Others 3000
UA21FA491A : DESIGN VII
Area statement

Project Requirements

Commercial floor requirement continuation..

Area in Sq.mt
Facilities
15,350
Shops and premier shops
Inclusive of Toilets/Corridors.
Restaurants 1000
Housekeeping 50
Electrical room 50
Storage spaces 100
Multiplex area 2000
Food court 4200
Banquet hall 1000
Miscellaneous (to be used towards core) 5000
Approximate Total area of commercial floor 34,400
UA21FA491A : DESIGN VII

5. Area statement – Office Spaces.

Ar. Sharath H Aithal, Ar. Saranya Divakaran, Ar. Pranathi S Udupa, Ar. Anthony S J
Faculty of Architecture
UA21FA491A : DESIGN VII
Area statement
Project Requirements
5. Office floor
Area in Sq.mt
Facilities
Lobby/lounge 1000

• Service core – 3 nos. per floor


• Lift - 8 (2.20mX2.60m) / core Aprox. + 2 nos. Service lift (2.6mx2.6m)
• Bed lift - 1 (2.30mX3.10m) / core 1500
• Staircase (4.00mx7.5m) / core
Total core area per floor
• Fire lift with staircase (6.0m x 7.5m). Located at max. travel distance of 30m
• Gents toilet (Details refer NBC , volume 2, part 9,Table 14 clause 4.2.5.1, ) * per core
•Ladies toilet (Details refer NBC , volume 2, part 9,Table 14 clause 4.2.5.1,)*
per core
54,500
Offices (small and large) Inclusive of
Toilets/Corridors.
∙ House keeping 50
∙ Electrical room 50
∙ Storage spaces 100
∙ Cafeteria 1000
∙ Recreational facilities 1000
∙ Miscellaneous (to be used towards core) 10,500
Approximate total area of Office floors 68,800
UA21FA491A : DESIGN VII
Area statement

Project Requirements
5. Service floor (Below office floor)

Area in Sq.mt
Facilities
• Service core – 3 nos. per floor
• Lift - 8 (2.20mX2.60m) / core Aprox. + 2 nos. Service lift (2.6mx2.6m)
• Bed lift - 1 (2.30mX3.10m) / core
• Staircase (4.00mx7.5m) / core 1500
• Fire lift with staircase (6.0m x 7.5m). Located at max. travel distance of 30m Total core area per floor
• Gents toilet (Details refer NBC , volume 2, part 9,Table 14 clause 4.2.5.1, ) * per core
•Ladies toilet (Details refer NBC , volume 2, part 9,Table 14 clause 4.2.5.1,)*
per core
Services and shafts per core
Terminus office
1000
∙ Toilets
∙ Terminus staff facilities (rest rooms, lockers) 800
∙ Bus staff facilities (Retiring rooms, lockers, changing rooms etc.) 500
∙ Storage spaces 420
∙ Canteen 500
∙ Services 3,880
Approximate total area of Service floor 8,600
UA21FA491A : DESIGN VII
Assignment

Classwork:
• Finalize the list of requirements and area statement for
Commercial and office floors.

Assignment:
• Submission of List of requirements for the Hospitality floor
(Group work).
UA21FA491A : DESIGN VII
References
Web links:

http://bbmp.gov.in/documents/10180/504904/Zoning_Regulations_RMP2015f.pdf/0a91606
0-b198-4903-b7cd-d18db7096ebd

Books:

• National Building Code of 2016, Volume 1, Bureau of Indian Standards


• Ernst and Neufert’s Architects data, 3rd edition
• Design Standards for planning a bus terminus: International Journal of Advanced Research
in Basic Engineering Sciences and Technology (IJARBEST) - Vol.3, Special Issue.24, March
2017
• Transit Cooperative Research Program Report 153, “Guidelines for Providing Access to
Public Transportation TERMINUS”, accessed on Washington, D.C.2012. <www.trb.org>
• “Transit Design Standards” a reference guide by Transit Authority of a City September
2013.
• “Urban Bus Specifications – II Manual”, Ministry of Urban Development, Government of
India.
• Herbert S. Levinson, Samuel Zimmerman and Jennifer Clinger, C. Scott Rutherford (2002),
THANK YOU
▪ Ar. Sharath H Aithal
▪ Ar. Saranya Divakaran
▪ Ar. Pranathi S Udupa
▪ Ar. Anthony S J

Faculty of Architecture
+91 80 2672 6622 Extn. 779

You might also like