Service Cost
Oasis Project
Campus Layout Design
20/01/2025 [42]
Report No. Cost Total Notes
HAP Claculation LS 2000 2000
Design Report LS 2000 2000
QS of All Trades LS 2500 2500
Audio Recording Studio
HVAC Drawings Package(Concept Design) LS 4500 4500
Firefighting Drawings Package (Concept Design) LS 3000 3000
Plumbing Drawings Package (Concept Design) LS 2500 2500
Compressed Air Drawings Package (Concept Design) LS 2000 2000
Total Cost 18500 SAR
Shift Schedule Template
By Vertex42.com
https://www.vertex42.com/ExcelTemplates/shift-schedule.html
© 2008-2019 Vertex42 LLC
This spreadsheet, including all worksheets and associated
content is a copyrighted work under the United States and other
copyright laws.
Do not submit copies or modifications of this template to any
website or online template gallery.
Please review the following license agreement to learn how you
may or may not use this template. Thank you.
License Agreement
https://www.vertex42.com/licensing/EULA_privateuse.html
Do not delete this worksheet.