0% found this document useful (0 votes)
87 views12 pages

CC Copy 1

Uploaded by

bomort16
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
87 views12 pages

CC Copy 1

Uploaded by

bomort16
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

f?eference No.

: CIDCO/BP-15871/TPO(NM & K)12018/3088 Date: 16/03/2018

To,
SHRI. SATISH PRALHAD SAKLA
Plot no. 26, Narayan Hira Chawal,
Bandra {E), Mumbai 400057

ASSESSMENT ORDER NO. 2018/2923

Sub : Payrnent of New development charges for Residential + CommercialBuilding on Plot No. C-l 2, Sector 47
at Kamothe, Navi [Vlumbai.

Ref : 1 . Your Arch. Online application cjated 25 01 .2018

2. Letter of Award No. CIDCOiIAA/REH/Kamothei?01513172.

Your Proposal No. CIDCO/BP-15871IIPO(NM & K)/2018 dated23Jan, 2018

ORDER OF ASSESSMENT OF DEVELOPMENT CHARGES.


(AS PER MAHARASHTRA REGIONAL & TOWN PLANNING (AMENDED) ACT 2010)

Name SHRI, SATISH PRALHAD SAKLA.


Location Plot No.C-12. Sector 47 at Kamothe, Navi l/lumbai.
3) Plot Use Residential + Commercial
qEn
4) Plot
1F
5) FSI
c) per ASR
r-
.--.
Sr. Heads Form
No.
1 ny Fees Total {

Tt ,sed Charges 19234

ronrrarc!ffiE
7)
8)
of Assessment
tuE& s€ffi ":-
=,ffi
Sr. Challan Number Callan Challan Receipt Number Receipt Mode
No. Date Amount =-$=
Date
1 ctDCo/BP/2018/0780 07t03t2018 19234 0'1 034/TPO/Account/7609/20'1 8 12t3t2418 Demand
Draft
2 ClDCO/BP/20'18/'1051 09/3/2018 100 0 1 290/TPOlAccount/7609i20 1 8 12t3/2418 Demand
Draft

Unique Code No. 2018 04 021 A2 0992 01 is for this New Deveiopment Permission for Residential +
Commercial Building on Plot No. C-12, Sector 47 atKamotheNavi lt4umbai.

. \' ,,i' ,i r.I'rI


.i._,1
"
.711., ' i.:rr'

\.:rfi:n

'l,1r r;lrrrfitifit'
I

: CIDCOIBP'15871ITPO(NM & Ky2018/3088 Date : 16/03/2018


Reference No.

I
*l

X r F
r
I l

.d

WE ',lrlAKffi: :,mKYxffiffi

0rganiaation
Reference No. : CIDCOtBp-llgtltTpO(NM & K)/2018/3088 Date : 16/03/2018

To,
SHRI. SATISH PRALHAD SAKLA
Plot no. 26, Narayan Hira Chawal,
Bandra (E), Mumbai 40005.

ASSESSMENT ORDER NO. 2018/2971

Unique Code No. 2 0 o ,)


1 o 0 4 0 I 1 U 0 I v 2 0 1

Sub : Payrnent of Construction & Other Workers Welfare Cess charges


for Residentiai + 69p.,r"rcial Building
on Plot No. C-l2,Sector 47 at Kamothe,Navi lMumbai.

Ref '1)Your Proposai No. clDCoiBp-1587,1/Tpo(NM


& Ky2018 datecr23 Jan,201g

ORDER OF ASSESSMENT OF CONSTRUCTION & OTHER WORKERS


WELFARE CESS
(AS PER BUILDING AND OTHER CONSTRUCTIoT wonxens
wELFARE cESS R,LES, 1998)

1) Name of Assessee : SHRI. SATISH PRALHAD SAKLA.


2) Location : plot No.C_12, Sector 47 atKamothe,Navi Mumbai
3) Plot Use : Residential + Commercial
4) Plot Area : g50
5) Permissible FSI : 1.5
6) GROSS BUA FOR ASSESSEMENT; 2404.03
A) ESTIMATED COST OF CONSTN. : Rs. 3,10,40.400.00
B) AMOUNT OF CESS : Rs. 3,10,404.00

7) Payment Details i
6
Sr. Challan Number Challan Challan Number
No.
Receipt Mode
Date Amount Date
1 201804A21A2099201 1At3t2A18 310404 0 ,1
8 12t3t2018 Demand
Draft

IHi,Lf,-
.."'... l:lll.,i'"

\.rl!lt] t' I iL H

L'r ilr

l" 1'rE,::rrri:tinr !-"]iii.-;


Reference No. : CIDCO/BP-15871/TPO(NM & K)/2018/3088 Date : 16/03/2018

#.*

CO FI H E HCE},I EHT CE RTIFIIATE


t
To,
SHRI. SATISH PRALHAD SAKLA
Plot no. 26, Narayan Hira Chawal,
Bandra {E), Mumbai 40005.

Sub : Development Permission for Residential + Commercial I Residential + Commercial Bldg/Apartment ]


Building on Plot No. C-'l 2, Sector 47 at Kamothe.Navi lv4umbai.

Ref . l YourArch. Online application dated 25.01 2018


Award No. Cl DCO/IAA/REH/Kamothe/2a1 5i31 72

Dear Sir/lVladam,

Please refer application for Developmenr Permission for Residential + Commercial I


Residential I Building on P ot No C-12. Sector 47 at Kamothe Navi lrrlumbai.

is hereby granted to ccnstruct Residential +


on the

Cedificate as
enclosed

Developer/ Plot Owner to ensure that the plinth level of the


minimum the
siilt level to
plumbing services i e drainage obtained the
applicant concerned nodal Executive Engineer, CIDCO prior to the commencement of the construction
rlrork.

You will ensure that the building materials will not be stacked on the road during the construction period.

,'. ,l
'.-,,,1,

\anrc
Reference No. : CIDCOIBP-15871|TPO(NM & Ky2018/3088 Date: 16/0312018

The Developers/ Builders shall take all precautionary measures for prevention of Malaria breeding
during the construction period if the project. lf required, you can approach Health Department CIDCO, for
orientation program and pest control at project site to avoid Epidemic.

*
]
A
) r
I

X
tI,IAKffi.. .iCXY'Iffi.$

Organization
Reference No. : CIDCO/BP-15871/TPO(NM & K)12018/3088 Date : '16/0312018

coMMENCEMENT CERTTFICATE

Permission is hereby granted under section - 45 of the [,4aharashtra Regional and Town Planning Act. 1966
(llaharashtra XXXV!l) of 1966 to M/S SHRI. SATISH PRALHAD SAKLA., Flot no. 26, Narayan Hira Chawal.
Bandra (Ei, Mumbai 40005 For Plot No. C-l 2. Sector - 47, Node Kamothe, As per the approved plans and
subject to the following conditions for the development work of the proposed Residential + Commercial
[Residential + Commercial BldgiApartment] in lGround Floor + TFloor Net Builtup Area [Residentia! +
Commercial [Residential + Commercial Bldg/Apa(ment]= 24A4.A3 other [others] =00.00 Total BUA ;
2404.031sq m.

Nos. of Residential units :- 56

Nos. of Commercial units :- 13

A This Commencement Certificate is valid up to pirnth level only. The further order will be given after the
plinth is inspected and plinth completion certiflcate rs issued.

B Applicant should construct Hutments for labors at s te

Applicant should provide drinking water and toilet facllity for iabors at site

1. This Certificate is liable to be revoked by the corporation if :-


I
I (a) The development work in respect of which permission is granteci under this certificate in not carried out
or the use thereof is not in accordance with the sanctioned olans

1(b) Any of the conditions subject to which the same rs granted or any of the restrictions imposed r,rpon by
the corporation is contravened.

1(c) The l\4anaging Director is satisfied that the same is obtained by the applicant through fraud or
fi/lisrepresentation and the applicant and/or any person deriving title under him, in such an event shall be
deemed to have carrieci out the development work in contravention of section - 43 or 45 of the
Maharashtra Regional and Town Planning Act- 1966.

2. The applicant Shall :-

2(a) Give a notice to the Corporation for completion of Development work upto plinth level, at

I lli -.i':: -
_,r.',,: i--,li.ir, !

\tnir-: PA I iL. HH

'. :f r;;t'tl;: i ilf


Reference No. : CIDCOIBPI!5871ITPO(NM & Ky2018/3088 Date : 16/03/2018

Last 7 days before the commencement of the further work

2(b) Give written notice to the corporation regarding completion of the work.

2(c) Obtain Occupancy certificate from the corporation

2(d) Permit authorized officers of the corporation to enter the building or premises for which the permission
has been granted, at any time for the purpose of ensuring the building control Regulations and
conditions of this Certificate.

J The Certificate shall remain valid for period of 1 year from the date of its issue, thereafter revalidation of
the same shall be done in accordance with provision of section - 48 of MRTP Act- '1966 and as per
regulations no. 16.1(2)of the GDCRs - 1975,

4 The conditions of this certificate shall be binding not only on the applicant but also on its successors
and/or every person deriving title through or under him.

tr
A Ce(ified copy of the approved plan shall be exhibited on site.

6 The amount of Rs. /- de posited with CIDCO as security deposit shall be forfeited either in
whole or in part at the absolute discretion of the corporation for breach of any of the condition attached
to the permission covered by the commencement certiflcate. Such forfeiture shall be without prejudice to
any other remedy or right of corporation.

7 "Every Building shall be provided with underground and over head watertank. The capacity of the tanks
shall be as per norms fixed by CIDCO. ln case of high rise buildings underground and over head water
tank shall be provided as per the fire fighting requirements of CIDCO. The applicant shall seek approval
of the EE (Water Supply) of CIDCO in respect of capacity of domestic water tanks. The applicant shall
seek approval of the Fire Officer of CIDCO in respect of capacity of water tanks for the fire fighting
purpose."
\
8 You shall approach Executive Engineer, M.S.E.B. forthe power requirements, location of transformer, if
any, etc.

9. As per Govt. of Maharashtra memorandum vide no, TBP/4393/'1 5041C4-287194, UD-11/RDP,

I]elltrl*rt ceftl ed b, I HtLE Sn


JA!$ARDHAH

Name

Organization
: CIDCOtBP'15871ITPO(NM & Ky2018/3088 Date : 16/03/2018
Reference No.

dated 19th July, 1994 for all buildings following additional conditions shall apply.
by the
(i) As soon as the development permission for new construction or re-development is obtained
place in site indicating following
owners/Developer, he shall install a'Display Board'on the conspicuous
details :-

a) Name and address of the ownerideveloper, Architect and contractor.

reference along with


b) Survey Number/City survey Number, plot number/Sector & Node of Land under
description of its boundaries

permission issued by the


c) Order number and date of grant of development permission or re-development
Planning Authority or any other authority,

d) Number of Residential flaUcommercial units with areas'

e) Address where copies of detailed approved plans shall be available for inspection.

ii) A notice in the form of an advertisement. giving all the detailed mentioned in (i) above, shall be

published in two widely circulated newspapers one of which should be in regional language'

As directed by the Urban Development Deptt. Government of Maharashtra, under section -


154 of t\4R &
11
for all
Tp Act - 1966 and vide provision no. TPB 432001/2133/CR-230/01/UD-11, dated 10/03/2005,
condition of Rain water Harvesting shall apply'
buildings greater than 300.00 sq.m. following additional

a) All the layout open spaces/amenities spaced of Housing society and new
have one or
construction/reconstruction/additional on plots having area not less than 300'00 sq.m. shall
more Rain water Harvesting structures having minimum total capacity as detailed in schedule
(enclosed).

\ provided that the authority may approve the Rain Water Harvesting structures of specifications different
ensured un
from those in schedule, subject to the minimum capacity of Rain Water Harvesting being
each case.

The Owner/society of every building mentioned in the (a) above shall ensure that the
Rain
b)

ix{!rr!e{l ceflil,e{,
JA}.INRDHAN

Name : P

Planner
Organization
Date : 16103/2018
Reference No. : CIDCOtBP-15871ITPO(NM & K)/2018/3088

for storage of water for non potable purposes or


water Harvesting structure is maintained in good repaid
recharge of groundwater at all times'

The Authority may impose a levy of not exceeding Rs


100l per annum for every 100 sq.m. of built uP
I c)
area for the failure of the owner of any building mentioned
in the (a) above to provide or to maintain Rain

Water Harvesting structures as required under these byelaws'

T
j
I &
ffi
t

WE'.,MAKffii .mBYBffiS
Date : 16/03/2018
ReferenceNo.:CIDCOtBP-15871ITPO(NM&K)/2018/3088

SCHEDULE

RAIN WATER HARVESTING

terrace
or recharging into ground of rain water failing on the
Rain water Harvesting in a building includes storage
site'
or any paved or unpaved surface within the building
paved
the rain water drain from the terrace and the
1. The following system may be adopted for harvesting
surface.
into which rain water may be channeled and
i) open well of a minimum 1.00mt. dia. And mt in depth
allowedafterfiltrationforremovingsiltandfloatingmaterial'Thewellshallbeprovidedwithventilating
purposes such as washing'
for non-potable domestic
covers. The water from the open well may be used
flushing and for watering the garden etc

ii)

and sand
in the setback
iii) An im storage tank of required caPacitY maY be constructed
to the storage tank. The storage tank shall
rain water
shall have draw off taPs placed so that the rain
covers
off for
an overflow.

storage
trenches.
be 1.2 ml.
Terrance water to pits or
length

(a) as bottom
Reference No. : CIDCOIBP-1587'llTPO(NM & K)/2018/3088 Date : 16/03/2018

b) 20mm stone aggregate as lower middle layer up lo 20o/o of the depth'

c) Coarse sand as upper middle layer up to 20% of the depth.

d) A thin layer of fine sand as top layer.

e) Top 10% of the pits/trenches will be empty and a splash is to be provided in this portion in such a way
that roof top waterfalls on the splash pad.

0 Brick masonry is to be constructed on the exposed surface of pits/tranches and the cement mortar
plastered.

The depth of wall below ground shall be such that the wall prevents lose soil entering into pits/trenches.
The projection of the wall above ground shall at least be 15 cms.

s) Perforated concrete slabs shall be provided on the pits/trenches.

v) lf the open space surrounding the building is not paved, the top layer up to a sufficient depth shall be
refilled with course sand to allow percolat on of rain water into ground

2 The terrace connected to the open w'ell'bore vrell/storage tank/recharge piUtrench by means of
HDPE/pvc first washings from
roof or catchment, as they would contain undesirable dirt. The pipes and opening
of rain water, there
pipes of for a roof area of 100

1 structures shall be sited as not to


designed part of walls
of the or those of
I _--l

4. so collected/reached shall as far as possrble be used for

rain water in exceptionai circumstances will be utilized for drinking and/or


is shall be ensured that proper filter arrangement and the separate outlet for by

JA\IARBI-IAN

Organization
il
1

Date : 16/03/2018
Reference No' : CIDCOIBP'15871|TPO(NM & K)/2018/3088

passing the first rain-water has been provided'


water purification
for such use, proper disinfectants and the
Provided further that it will be ensured that
arrangements have been made'