Gatsibo
Gatsibo
GATSIBO DISTRICT
DEVELOPMENT
STRATEGY(2018/19-2023/24)
i
3.2.5. Foca1 Group Discussions........................................................................................................ 67
3.2.6. Review meetings and consultations ........................................................................................ 67
3.2.7. SWOT Analysis ...................................................................................................................... 67
3.3. Main issues at District level .................................................................................................. 68
3.3.1. Economic transformation pillar .............................................................................................. 68
3.3.2. Social transformation pillar ..................................................................................................... 68
3.3.3. Transformational Governance Pillar ....................................................................................... 69
3.4. Alignment of DDS to NST1 .................................................................................................. 69
3.4.1. Economic transformation pillar .............................................................................................. 69
Chapter IV: STRATEGIC FRAMEWORK .......................................................................................... 88
4.1. Introduction ............................................................................................................................. 88
4.2. The District Vision, Mission and Objectives .................................................................... 88
4.2.1. Vision .................................................................................................................................... 88
4.2.2. Mission .................................................................................................................................. 88
4.3. Main Priorities at District level................................................................................................ 90
4.4. Results Chain ........................................................................................................................... 92
4.5. Logical Framework ................................................................................................................... 93
Table 7: Logical frame work of 2018/2019-2023/24 for Gatsibo District ......................................... 93
4.6. Crosscutting areas and associated challenges related to the District’s development
152
5. Disaster Management ........................................................................................................................ 153
4.7. Mainstreaming 7 cross cutting areas ................................................................................. 154
CHAPTER V: IMPLEMENTATION OF DDS ................................................................................... 161
5.1. Introduction ......................................................................................................................... 161
5.2 Sequencing of interventions ............................................................................................... 161
5.3. DDS Implementation Strategy ........................................................................................... 168
5.3.1. Role of Public Institutions .............................................................................................. 168
5.3.2. The role of the Province and Provincial Steering Committee ............................................... 169
5.3.3. The role of the District .......................................................................................................... 169
5.3.4. Role of Private Sector ....................................................................................................... 169
5.3.5. The role of the Development Partners .................................................................................. 169
5.3.6. Role of Civil Society Organizations (CSOs). ............................................................... 170
5.3.7. Role of citizens .................................................................................................................. 170
5.4. Coordination mechanisms and information sharing amongst the stakeholders...... 170
5.5. Risk mitigation strategies ...................................................................................................... 171
5.6. Communication and marketing strategy for the District ....................................................... 172
CHAPTER VI: MONITORING AND EVALUATION ...................................................................... 173
6.1. Introduction ................................................................................................................................. 173
6.2. Methodology that will be used to monitor and evaluate DDS .............................................. 174
6.3. How to Assess District’s DDS? .......................................................................................... 174
6.4. Role of internal actors .......................................................................................................... 174
6.5. Role of external actors .......................................................................................................... 175
6.6. Reporting system .................................................................................................................. 176
ii
CHAPTER VII: COSTING AND FINANCING OF THE DISTRICT DEVELOPMENT
STRATEGY............................................................................................................................................. 179
7.1. Introduction ............................................................................................................................. 179
7.2. B. LOCAL ORGANIZATIONS .......................................................................................... 196
iii
LIST OF FIGURES
Figure 1: The Development Planning Framework for Vision 2050 and NST1 (Minecofin, 2017)
........................................................................................................................................ 11
Figure 2: Map of Gatsibo District (Source: www.gatsibo.gov.rw accessed on 25th October
2017) .............................................................................................................................. 14
Figure 3: District potentialities of Gatsibo (LODA 2013) ............................................................ 42
i
LIST OF TABLES
Table 2: Cultivated area by crop type ....................................................................................... 20
Table 3:SMEs and their sizes in Gatsibo District & Cooperatives which are active .................... 25
Table 4: Main DDP achievements in 5 years (2013-2018)........................................................... 31
Table 5: Strengthens, weaknesses, opportunities and threats of Gatsibo District in all Sectors
illustrated by SWOT Analysis approach ........................................................................ 43
Table 6: Alignment of Gatsibo DDS to NST1 .............................................................................. 70
Table 7: Logical frame work of 2018/2019-2023/24 for Gatsibo District .............................. 93
Table 8:Priority action matrix ..................................................................................................... 140
Table 9: Duties and responsibilities of M&E actors ................................................................... 175
Table 10: INTERNATIONAL ORGANIZATIONS .................................................................. 192
ii
LIST OF ABBREVIATIONS
AI Artificial Insemination
BDF Business Development Fund
DS District Development Strategies
DHS Demographic and Health Survey
ECD Early Childhood Development Center
EDPRS Economic Development and Poverty Reduction Strategy
EIA Environnemental Impact Assessment
EICV Enquête Intégré sur les Conditions de ie des ménages
GBV Gender Based Violence
HHs Households
HMP Historical Marginalized People
JADF Joint Action Development Forum
JRLO Justice, Reconciliation, Law and Order
MINALOC Ministry of Local Government
MINECOFIN Ministry of Finance and Economic Planning
MININFRA Ministry of Infrastructure
NCDs Non Communicable Diseases
NGO Non-Government Organization
NISR National Institute of Statistics
PTA Parents-Teachers Association
PWDs People With disabilities
RALGA Rwandese Association of Local Government Authorities
RDB Rwanda Development Board
RDSF Rwanda Decentralization Strategic Framework
LODA: Local administrative Development Agency
SACCO Saving and Credit Cooperative
SMEs Small and Medium Enterprises
TVET Technical and Vocational Education and Training
VTC Vocational Training Center
iii
VUP Vision 2020 Umurenge Program
YBE Years Basic Education
iv
EXECUTIVE SUMMARY
The Government of Rwanda adopted the Vision 2020 in 2000, with the main objective of
transforming Rwanda into a lower middle-income country by 2020. The Vision 2020 is being
implemented through the medium-term planning framework that began in 2002 with the first
Poverty Reduction Strategic Plan (PRSP I). This has since been followed by the Economic
Development and Poverty Reduction Strategy (EDPRS I) which covered the period of 2008-2012
and the Second Economic Development and Poverty Reduction Strategy (EDPRS 2) which is
being implemented from 2013/14 to 2017/18.
The Vision 2020 is remaining with 2 years of implementation while the EDPRS 2 is entering its
final year. The National Leadership retreat of 2015 resolved that the Vision 2050 should be
elaborated. The concept note of the Vision 2050 presented at the same forum in 2016 at which a
target was set for Rwanda to become an upper middle income country by 2035 and a high income
country by 2050. In the same spirit the National Strategy for Transformation (NST 1) considered
as 7 Year Rwandan Government Program is elaborated and will cover the period from 2017/18 to
2023/24.
The District Development Strategy (DDS) elaboration was conducted through a highly
participatory and consultative process involving the citizens, central and decentralized institutions,
development partners, civil society and the private sector in Gatsibo district.
Moreover, DDS elaboration referred to the formulation of priorities, alignment with Sector
Strategies, Citizens’ and stakeholders’ engagement, Consolidation of District priorities, District
Performance Reviews, District Profiles and Districts priorities shared with Sectors.
These DDS will be implemented within the district by different institutions: public Institutions,
national and international NGOs and civil society. Before this implementation,
The formulation of Gatsibo District priorities has entailed both bottom up as well as top down
communication channels. The bottom up channel ensured that priorities from citizens are collected
to shape the current and future citizens’ needs in the long and medium term while the top down
channel ensured that the overarching national development ambitions are well understood,
contextualized and packaged in Gatsibo DDS. In order to consider the full alignment of DDS with
NST-1, all three pillars (Economic Transformation, Social Transformation and Transformational
Governance) as well as all priorities composing DDS were translated from the NST-1 without any
modification.
Gatsibo District Development Strategy for 2018/19-2023/24 presents a thorough status review of
the district in all sectors and cross-cutting areas, identified key strength, weaknesses, opportunities
and as well as threats that the District encountered and outlines strategies to overcome them. In
particular, targeted objectives are set out, as outlined in chapter 4 of this strategy”. These intended
outputs and their corresponding indicators represent the key areas of progress to be achieved
through the duration of the DDS. The objectives and targets set in DDS will help the District to
achieve its Vision and Mission, where vision and mission of District are:
5
Vision
The vision of Gatsibo District is “Poverty eradication through promoting private sector
investment, agriculture transformation, sustainable human settlement and infrastructure
development while protecting the environment sustainably.”
Mission
Promotion of modernized agriculture geared to improve people’s welfare and accountable
governance.
OBJECTIVES
To build and strengthen an agro based economy with a view to making the District an agricultural
hub so that it is self-sufficient in food production, have a surplus for the market and create jobs for
its people, the ultimate goal being to reduce endemic poverty, fight hunger and malnutrition in the
District.
Specific Objectives:
Main challenges addressed by DDS referring to the elaborated NST1 in each Pillars
6
o Lack of agro-processing plants
To address above mentioned challenges, some interventions were formulated in the DDS.
1. Economic Transformation
Irrigate 255 ha using modern systems
Increase female and male farmers using organic fertilizers from 75% up to 100%
Ensure 11.8% female –headed and 89.2% male headed live in planned settlement.
Construct 4 industries in industry zone
7
Distribute new competence awards to district staff
Increase Rate of self-contribution to the annual budget;
Organize cell dialogues at cell level.
The implementation of the Gatsibo District Development Strategy will require an estimated cost
of One Hundred SevenBillions Twenty Millions Two Hundred Thousands Rwandan
francs,(107,020,200,000.Frw).The sources of fund include district revenues, community
participation, private sectors, different stakeholders and outside investors as well as government
support.
Gasana Richards
Mayor of Gatsibo District
8
CHAPTER I: GENERAL INTRODUCTION
1.1.Introduction
In the course of the elaboration of the National Strategy for Transformation (NST1) and Vision
2050, Districts are required to develop inclusive 6-years Development strategies that will guide
different actors in the District development over a medium term (2018/19-2023/24). The
elaboration of the District Development Strategies will generate sustainable strategies that will be
inspired by and align with the various national policies such as Vision 2020 and other international
mandates such as EAC Vision 2050, Africa Agenda 2063, SDGs, and Paris Climate agreement.
Among the national documents on which the DDS is based on are the Vision 2020 with the main
objective for Rwanda to become a middle-income country. The vision has been made operational
by medium-term national Strategies which started by Poverty Reduction Strategy Paper (PRSP I
2002-2007), the second was Economic Development and Poverty Reduction Strategy EDPRS I
(2008-2012) and EDPRS II (2013-2018) with a priority given to accelerating growth, creating
employment and generating exports. One of the principles on which EDPRS 2 and the above
mentioned thematic areas have been built on is District-led development. Districts have been
involved in elaboration and implementation of EDPRS 2 through District Development Plans
(DDSs). DDSs together with sector strategic plans (SSPs) have been elaborated simultaneously to
ensure coherence among national planning documents.
Vision 2020 is remaining with less than 4 years of implementation while the EDPRS 2 is in its
final year. It is in this context that the Government of Rwanda has adopted the elaboration of the
9
Vision 2050 with an objective of transforming Rwanda into an upper middle income country by
2035 and a high income country by 2050 (MINECOFIN, 2016). It will focus on five priorities1:
To achieve this, the instrument for implementation of the Vision 2050 will be the National Strategy
for Transformation (NST1) which will integrate from global to regional commitments such as (1)
Sustainable Development Goals (SDGs), (2) the Africa Union Agenda 2063 and its first 10-year
implementation plan, aspiring an Africa that is integrated, peaceful and prosperous, (3) the East
African Community Vision 2050 focusing on job creation and employment, (4) Paris agreement,
where the parties to this agreement have agreed to determine, plan and report their contribution to
mitigate global warming. In addition, NST1 also consider the manifesto of the RPF (the winning
party in the Presidential elections) and Presidential Pledges.
The figure below demonstrates the development planning framework of both Vision 2050 and
NST 1 and the place of the Sector Strategic plans and DDS.
1MINECOFIN, 2017: 7 Years Government Programme: National Strategy for Transformation (NST 1). Draft
document 13th September 2017
10
Vision 2020/2050
Imihigo, M&E
Figure 1: The Development Planning Framework for Vision 2050 and NST1 (Minecofin, 2017)
It is in the aforementioned process that the Districts were required to develop comprehensive 6
years development strategies (DDS) that will guide actors in the District over the medium term.
11
Plan, Local Community Priorities; together with National Strategies such as the NST1, Vision
2020, Vision 2050, National Road Map for Green Secondary Cities, as well as the regional and
global commitments. On the other hand, primary data was collected through an iterative process
of awareness creation, consultative meeting sessions, training workshops with the District involved
actors and stakeholders.
The elaboration process of DDS has been conducted through a highly participatory and
consultative process involving citizens, decentralized administrative leaders and employees as
well as all stakeholders operating in Gatsibo District.
Other documents were also reviewed in order to collect quantitative data and qualitative data were
collected using both primary and secondary data collection techniques EICV4, RDHS 2014/2015
were consulted and also the Citizen’s consultations were undertaken to collect primary data related
to District priority actions.
Chapter 1: is related to the introduction of DDS describing the context and purpose of its
elaboration as well as the process in order to come up with a comprehensive DDS.
Chapter 2: concerns the overview of Gatsibo District. It presents the District profile with the
geographical aspects and socio-economic environment. The chapter portrays the overview of
Gatsibo District achievements during DDP implementation in 16 sectors and depicts key district
economic potentialities. It also presents a district SWOT analysis as well as stakeholder’s
analysis.
Chapter 3: shows the alignment of DDS with national policy framework and explain the
methodology used during the elaboration of DDS. This chapter presents the main issues
encountered in Gatsibo Districts based on 3 pillars: economic transformation, social
transformation and transformational governance. It also presents the way DDS is aligned with
priorities formulated in NST-1.
Chapter 4: is related to strategic framework. From the vision and mission of Gatsibo District,
DDS has defined the results chain in three pillars (economic and social transformation and
transformational governance). It presents a logical framework considering all pillars and
priorities defined in NST-1 and consider all crosscutting areas.
12
Chapter 5: describes the implementation of DDS with a clear sequencing of interventions, DDS
implementation strategy, role and responsibilities of partners and stakeholders. In addition, the
chapter presents the coordination mechanisms and information sharing during DDS
implementation, a description of risks mitigation strategies as well as communication and
marketing strategies of DDS.
Chapter 6: presents the monitoring and evaluation of DDS with a clear management of
information and monitoring framework. It defines the mechanisms to be used during the
implementation of DDS as well as the evaluation mechanism so that tracking the progress will be
easy and fruitful.
Chapter 7: presents the cost and financing process of DDS. The total cost for implementing DDS
is evaluated approximately at One Hundred Seven Billions Twenty Millions Two Hundred
Thousands Rwandan francs (107,020,200,000.Frw).encompassing the cost for Economic and
Social Transformation and Transformational Governance.
13
CHAPTER II: OVERVIEW OF GATSIBO DISTRICT
2.1. Introduction
This chapter describes the overview of Gatsibo District with geographical information, social
economic development of the District in terms of demography, access to basic social and economic
facilities, as well as sectorial achievement and challenges. It also encompasses a District SWOT
analysis and Stakeholders operating in Gatsibo District.
2www.gatsibo.gov.rw
14
The table below provides a snapshot status of the district regarding selected socio-economic
indicators.
15
Environment and Natural resources
Percentage of Households with rain water 7.2% (EICV5) 14.5%
catchment systems
Percentage of Households using firewood 92.3% (EICV5) 79.9%
for cooking
Financial Sector
Percentage of Adult financial inclusion 87% 89%
According to the 2012 National Census results, the total population of Gatsibo District increased
from 283,456 in 2002 to 433,020 (population census 2012). It has population density of 274
persons per square kilometer. The increase in the population represents a growth rate of 53.1%
between 2002 and 2012. Males represent 48% of the population whereas females represent 52%
of the population with a sex ratio of 92. Rwanda 4th Population and Housing Census, 2012 (NISR)4
2.2.2. Relief
The relief of Gatsibo District is characterized by scarcely short hills and flat land separated by
valleys in East, South East and North, while at the West and South West is characterized by high
mountains in its their administrative sectors of Nyagihanga, Kageyo, Gatsibo, Muhura, Gasange
and Remera.
Gatsibo District is characterized in general by low inclined hills and flat land separated by dry
allies. The District is located in the granite low valley whose average altitude is 1550m spread on
the plateau and the savannah of the Eastern part of the country. This kind of topographical layout
constitutes an important potentiality for modern and mechanized agricultural farming. This relief
offers to Gatsibo a vocation agro pastoral and tourism5
2.2.3. Hydrograph
Gatsibo District is known of the low rainfall and high temperatures that limit the availability of
water. The hydrography of Gatsibo District is largely constituted of streams and rivers such as;
Walfu, Karungeri, Cyamuganga, Kanyonyomba, Rwangingo, Kabahanga, Kagina, Kagende,
16
Rwagitima and Ntende. This hydrographic network combined with the aforementioned relief
offers timeliness of irrigation in the District.
2.2.4. Grounds
District is characterized by an abundance of the humus-bearing grounds ferralisols one originating
laterite of the deterioration of the shales and phyllites, accumulation of the collisions in the valleys
dry Martini. The ground of granite origin cuts has texture with little red clay especially in the
South-West of the District. The termite mounds cover the biggest part of the District.
The combined action of the lithosphere (rock and roll mother granite), atmosphere (rains), and
biosphere (man and the other living beings) developed deep grounds drank of which the fertility
by the drought of the more stressed climate by drying out winds blowing East. Thus the
xérokaolisols in the party remains the ground type the more dominating. To the surface, they
identify themselves by the narrowness of to bush-hammer humus-bearing brought by the grassy
savannah.
The grounds of Gatsibo District contain Minerals such as the Cassiterite, the Colombo-tantalite,
the wolfram, etc. they also contain ores of construction materials like the gravel, sand, hardcore,
clay, etc.
17
lake Muhazi. The crocodiles exist also in certain valleys dams, especially in Rwimbogo Valley
Dam. The antelopes, the buffalo and other ruminating animals occupying the Akagera National
Park.
Gatsibo District is a rural District in the Eastern Province whose economy is principally dominated
by Primary, Secondary and Tertiary sectors. These sectors are not yet modernized and hence the
productions and productivity are still very low. Many challenges observed these Sectors constitute
barriers to District’s Development, consequently contribute to Poverty.
Therefore, the economic activities of Gatsibo District is divided into 3 main sectors depends on
what are predominant in term of productions and their occupants, which are Primary, Secondary
and tertiary Sectors.
This sector in Gatsibo District is characterized by activities associated with primary economic
activity includes agriculture both subsistence and commercial, mining, forestry, farming &
grazing, Fishing and quarrying.
18
leather unit into different equipment is at the assembling stage not yet be transformed to a factory
can make animal skin into finished products.
Agro-processors are critical in this important sector as they act as large-scale buyers of farmers’
products. They also engage in significant value creation. MINICOM works with agro-processors
across varied SMEs, including essential, coffee, maize, pineapple, passion fruit, tomatoes, honey,
dairy, animal feed, among others. In this framework, Gatsibo District is aiming to promote Gatsibo
Private Sector in order to cooperate and build their capacity in order to valorize these kinds of
opportunities in alignment of self-resilience and Kora-Wigire program, always in Made Rwanda
spirit.
Agriculture production and livestock is the principle economic activity in Gatsibo District.
According to EICV5, 16.8% is Percentage of land under consolidation compared to 15.9% at
19
national level, 72.7% is Percentage of land protected against soil erosion compared to 68.5% at
national level, 3.7% is Percentage of land under irrigation compared to 6%% at national level.
According to EICV4, 77.3% are employed by agriculture sector including the wage farm (13.6%)
and independent farmers (63.7%). The rest are either in the service or informal sectors.
Crop production
According to Seasonal Agricultural Survey - 2017 Season A, agricultural physical land represent
% of the district’s land, including cultivated land (75.2%), fallow (4.7%) and pasture and non-
agricultural land represent only 20.1%. The same survey showed that the main crop produced are
cereals (maize and Rice) representing 29.5% of cultivated land, followed by legumes and pulse
with 28.5% and banana on 23.14% agriculture data8 (NISR, 2017 Seasonal Agricultural Survey -
Season A)
20
Groundnut 2,296 3.25%
Soybean 727 1.03%
Vegetables and Fruits 480 0.68%
Vegetables 339 0.48%
Fruits 141 0.20%
Other crops 1,095 1.55%
Developed land 70,663 100.00%
Agricultural physical land 53,148 75.21%
In fact, the season A of 2017, in Gatsibo district mixed cropping was found in 91.9% of cultivated
land which is higher than the national average (83.2%), while pure cropping is 8.1% and improved
seeds are used in only 5% of cultivated land. This put out the weakness in use of improved seeds
need to be improved in order to increase production and productivity to the land cultivated, since
the land as production factor is no longer increased. Moreover, the use of fertilizers still at low
level where by in cultivated land organic and inorganic fertilizers are used in 41.2% and 10.3% of
all plots respectively while pesticides are used in 3.2% of those cultivated plots.
Another factor for crop production is irrigation and anti-erosion practice. In fact, considering the
weather and climate of Gatsibo district as external factor and treats facing agriculture sector, the
development of practices that would enhance the independence on rains is very crucial. Currently
as reported by NISR (2017), the irrigation is practiced on 2.6% of cultivated land in Gatsibo
District using mainly the stream water (95.5%). But, the District put more efforts in introducing
new Technology of adopting Small Scale irrigation and some valley dams have been developed,
and yet are not well exploited rationally.
Livestock
In addition to crops, livestock is another important source of income and food for agricultural
households. In Gatsibo District, 69.7% of HHs own any livestock mainly cows including 73.3%
in HHs headed by male and 58.1% in HHs headed by female. The milk production is increasing
over year following the introduction of exotic breeding being replacing local breeding. Today
Gatsibo District counts 63,848 local cows while Jersey and Friesian are 1,427 and 3,102
respectively, whereas cross Cows estimated at 14,406 Cows. However, Gatsibo has five milk
collections centre located in Rwimbogo, Kabarore, Ngarama, Kiziguro and Kiramuruzi Sector
with a collection capacity of 2,000 liters (MINAGRI Record 2013).
21
b) Urbanization and Rural Settlement
Gatsibo District is characterized by small semi-urban centers and the largest part is entirely rural.
According to EICV4, the housing in Gatsibo District are mainly in grouped in community
settlement (Imidugudu) represented by 62.7% of HHs while unplanned clustered rural housing is
at 25.4%, isolated rural housing 6.3%, modern planned area 4.2%. Master plans for Kabarore and
Ngarama towns have been completed as well as master plan for Development of Muhazi Lake
Shores. Systematic land registration has been completed in all 14 sectors and land owners in four
sectors have been issued with land titles. The movement of the population towards Imidugudu is
discouraged largely by the fact that there are no socio-economic infrastructure developments
available in such housing sites.
Transport
In terms of road network, the District has feeder roads networks of 413.93 km and out of that,
199.82 km are in good conditions whereas 214.11km need rehabilitation. Gatsibo District is
crossed by a tarmacked road Kayonza-Kagitumba. The District has 20 bridges whereby 8 are in
good condition, 3 in and 9 in bad conditions need to be rehabilitated.
Energy
The primary source of energy used in Gatsibo District by households for lighting was categorized
as follows: electricity, oil lamp, firewood, candle, lantern, solar panel, battery, and other
unspecified sources. EICV4 (2014) showed that the battery is the main source of lighting of most
HHs (59.5%) in Gatsibo. Moreover, 19% of households use electricity as main source of lighting
which is below the national average (19.8%). Meanwhile, this situation has improved compared
to 2012 whereby the use of electricity as main source of lighting in Gatsibo was at 13.4%.
Although the number of households using electricity for lighting has increased since 2012 it is still
very low by all standards. Today Households connected to electricity are 27%, and it requires
making more efforts to attain 70% planned into 2020 closely to be matured. Concrete actions shall
therefore be needed to increase the number of households accessing electricity.
According to EICV4 (2014), the main cooking fuel in Gatsibo district is firewood representing
93.2% of HHs followed by charcoal used by 6.0% of HHs while gas is used by 0.2% of HHs. The
22
District shall have to work extra hard to reverse the situation. We need to use other sources of
energy for cooking other than firewood to preserve our forests and protect the environment.
The EICV4 reported that 74.3% of Gatsibo district households use improved drinking water source
which are accessed in meantime of 15.7 minutes compared to 84.8% which are accessed in
meantime of 11.2 minutes at national level. This survey showed that majority of households use
protected spring water (30.6%), followed by public standpipe (29%). Other improved sources are
piped into dwelling or yard, borehole, protected well and rain water. Meanwhile, according to
EICV4, the access to improved drinking water source has been improved of 2% from 72.3% to
74.3% in 2011 and 2014 respectively.
In terms of sanitation, the EICV4 reported that Gatsibo district has 86.3% of households which
use improved sanitation facilities, which is slightly above the national average (83.4%). Other
households use unimproved sanitation facilities except 0.5% of HHs which do not have toilet at
all.
Gatsibo District is characterized by a vegetation cover of stipple wooded. Its hills are covered by
short grasses as well as small trees and shrubs. Concerning forests, the District lacks sufficient
forest cover/trees. The forest cover in the Gatsibo District is 24,085 ha out of 158,200 ha surface
of Gastibo District, represents 15.22%. Refer to this percentage it needs more 14.78% to reach a
national average of 30%. (2015-16 Eastern Province’s annual report) Agro-forest is also
predominant in the District. Environment protection activities carried out in the District are
essentially to fight soil erosion by reforestation and digging terraces.
According to EICV4, 79.8% of land are protected against soil erosion, 18.6% of land are affected
by land consolidation while only 1.8% of land are irrigated which is very low compared to national
average (4.0%).
23
According to EICV4 (2014), the main problems resulting from environmental destruction are due
to the destructive rains (12.2%), mountain slides (2.1%) and floods (0.21%). Despite that, only
10.7% of HHs in Gatsibo has rainwater catchment systems compared to 17.4% at national level9.
The mining sector in the District is still undeveloped despite some mineral deposits like casseterite,
wolfram and Coltan discovered in different parts of the District. For instance Coltan mineral
deposits discovered in Kamate, Rwikiniro and Nyamatete cells in Rwimbogo Sector. Casseterite
discovered in Bugarura, Bibare, and other areas to mention but a few. However, local miners
extract the minerals in unsafer way without considering and respecting the law protecting the
environment and by the people without legal documents.
Gatsibo, like other districts, has young and active population. According to EICV4 (2014), in
Gatsibo District, youth aged between 14 and 35 years represent 36.8% of the total population.
Regarding employment levels in the district, the overall employment rate is 82.3% of the resident
population aged 16 years and above, the unemployment rate is 1.1% (RLFS-August 2016-
Febrauary 2017)10. This employment rate is high compared to the national average which is 78.2%
and 4.9% according to RLFS-August 2016-February 2017:74).
In Gatsibo District, small and medium enterprises and cooperatives are more vibrant in craft
production activities. Craft centers were developed with the aim of promoting employment sector
based on promotion of District craft products, by producing good quality and competitive items
on the national market. Craft production centers are also established to provide the working
facilities which most craftsmen and women cannot afford on their own.
In order to attract additional businesses, the District has supported the construction of District
Hotel and Integrated Craft Production Centre (ICPC)-AGAKIRIRO. The remaining works should
be completed and be operational in order to serve different entrepreneurs dispersed in Kabarore
Center.
24
In addition to that, every administrative sector has an operational modern market: Modern markets
of Kabarore, Rwagitima, Kiramuruzi, Muhura, Ngarama, Mugera, Rwikiniro, Ndatemwa and
Gasange. Working in a group improves the quality standards and the production capacity whereby
experienced producers train young apprentices. Tables 3 and 4 below indicate small and medium
enterprises and cooperatives operational in Gatsibo District.
Table 2:SMEs and their sizes in Gatsibo District & Cooperatives which are active
N0 CATEGORY NUMBER Main Activity Number of
Cooperatives
1 Formal enterprises 187 Livestock 50
2 Informal enterprises 4,292 Agriculture 41
3 Micro enterprises 4,099 Service 20
4 Small enterprises 330 Trading 13
5 Medium enterprises 46 Craft Industry 8
6 Large enterprises 4 Mining 4
Transport 8
cooperatives
Fishing 1
Nurseries 1
Seed 1
multiplication
TOTAL 132
Source: Establishment Census, NISR 2014 & BDE Unit, 2017
To these, there are other opportunities for private sector development especially those related to
tourism development. In fact, Gatsibo offers a few ranges of hotels and restaurants. Only Gatsibo
Guest Hotel is newly opened while it has many touristic natural sites that attract numerous visitors.
The tourism attractions include Lake Muhazi, Urutare rwa Ngarama, Utubindi twa Ruganzu twa
Rubona and Kibondo Ibigabiro of King (Gatsibo k’Imitoma) and Akagera National Park. The
District needs to attract potential investors in eco and cultural-tourism to sustainably develop and
25
manage those sites for increased District revenue and employment. Moreover, together with the
Districts of Gatsibo and Kayonza, Gatsibo hosts a share of the Akagera National Park.
The access to finance is among the priorities of the government of Rwanda in order to facilitate
the creation of new businesses and ensure poverty eradication. According to EICV4 2014, 37.8%
of households in Gatsibo District have at least one saving account;
In Gatsibo, there are two kinds of financial sector: formal sector and informal sector. The formal
sector includes financial institutions (banks, microfinance institutions and insurance companies).
Currently, the district has two banks’ branches: Bank of Kigali and BANQUE POPULAIRE;
Nineteen microfinance institutions (UMWARIMU SACCO, 14 UMURENGE SACCO, RIM,
Vision Finance, DUTERIMBERE, and CT Murambi) and three insurance companies
(SONARWA, SORAS and RADIANT). To those formal financial institutions, there are many
informal financial groups among the population aiming at facilitating savings as well as access to
finance. The main challenge of this financial sector is the accessibility from the remote areas. In
fact, most of the formal institutions are condensed in developed areas mainly around the
headquarters of the district except Umurenge SACCO which is at sector level, thus, it is not easy
for HHs to access their services.
Achievements: In the previous EICV5, the poverty rate at district level was 42.1% including
18.8% in extreme poverty. This shows that there is no graduation from poor to non-poor population
(0.3%) and this 0.3% was increased to extreme poor since EICV 4 was 18.5%11. This was a result
to increase efforts of the district in supporting HHs in extreme poverty through different
mechanisms. Those may include Ubudehe programs, VUP, support to old poor people, promotion
of SMEs, and implement modern agriculture.
In Gatsibo District, sports activities are more focused on football, basketball, volleyball and are
mainly practiced by the youth in the sectors and schools. The main challenge of this sector is
related to infrastructure whereby the most playgrounds used belong to schools. Therefore, youth
26
out of schools do not easily accessing those infrastructures. There is no multipurpose hall for
cultural activities to entertain youth in cultural activities. Finally, cultural clubs are also mainly
found in secondary schools. In this coming DDS the District plans to construct accessible sports
infrastructure to develop this career.
b) Education
Pre-primary education
The Government of Rwanda describes ECD as “the processes by which children from pre
conception to six years grow and thrive physically, mentally, emotionally, morally and socially”.
“Pre-primary schooling” or nursery schooling is an important part of ECD. (ECD policy and
strategic plan MINEDUC 2011b).
Pre-primary education in Gatsibo District is still not developed although the number of nursery
schools has risen from 85 in 2012 to 135 in 2017. The District is confronted by insufficient number
of schools in relation to the demand. This is largely due to the lack of funds for construction and
to cover the running cost. Currently the only 45% of children attends the nursery schools at Gatsibo
district. (Annual District education report).
This progress was due on the partnership between parents and schools aiming at enabling children
to acquire required pre-primary knowledge. Moreover, the sensitization and role model schools
have been reinforced in last 4 years.
Primary education
According to EICV4, gross attendance rate dropped from 151.4% in 2012 to 138% in 2014 while
the Net attendance rate in primary schools decreased from 90.4% to 88.6% for the same period. In
this regards, the district reports shown that Gatsibo District has 85 primary schools which are
geographically equitably distributed in all administrative Sectors with 106,025 pupils out of which
53,991 are female while 52,034 are male with 1,521 teachers while the pupil teacher ratio is 69:1
(Annual District education report)
However those schools do not function efficiently as desired for several reasons: most of them
have buildings which are in a very bad state and require urgent rehabilitation. The total number of
pupils in almost all schools far exceeds the capacity of each classroom; Teaching materials are
literally not enough in all schools. There is a high school drop-out rate of 4% due to the following
reasons: Parents who are generally poor, Children lack any form of counseling from their parents,
pregnancy cases and repeated failure which discourage children who repeat certain classes, cases
of early child labor and others
Secondary education
27
According to EICV4, gross secondary school attendance rate dropped from 34.1% in 2012 to
32.2% in 2014 while the net secondary school attendance rate has increased from 15.9% to 16.8%
for the same period. The literacy rate for persons having at least 15 years old also increased from
62.5% in 2012 to 71.3% in 2014 while the computer literacy rate among the same group of people
is 4.6% (male are 6.3% and female are 3.1%).
According to district reports, Gatsibo District has 48 secondary schools with 20,841 total number
of students out of which 10,449 are female and 10,392 male with 777 teachers while the student’s
teacher ratio is at 27:1. The dropout rate is 3.3% in Primary School and 3.7% in O level while
1.1% is for A level. The District has 7 TVET schools with 410 students with 1112 teachers which
express the teacher student ratio of 38 students each teacher. Gatsibo District do not have any
Higher Learning Institution or technical schools training tertiary level.
c) Health
A heath population is fundamental in economic growth of any District. Gatsibo District has 19
health establishments and 2 hospitals of Kiziguro and Ngarama, 11 health post are available with
2,412 health community workers which implies that each administrative village have got 4 health
community workers and one District pharmacy.( District health annual report ).
Health personnel in each health center are insufficient both in terms of quality and quantity.
Similarly, available laboratories are insufficient in number and often lack the necessary
equipment12.
d) Social Protection
In Gatsibo district, vulnerable household represent 38.1% including 23.8% headed by women,
12.6% headed by disabled person and 1.7% headed by a person aged less than 21years old as
reported by EICV4 (2014). This situation is not improving compared to 36.1% whereby HHs
headed by disabled person doubled from 6.0%.
Under the ubudehe categorization, communities periodically rank the households in their area on
a scale of 1 to 4 according to their perceived poverty and vulnerability status, with a score of 1
being the most vulnerable and 4 the least.
To support those vulnerable HHs, the Government of Rwanda in General and Gatsibo district put
in place supporting programs including VUP, Girinka, support to genocide survivors, people with
disabilities, returnees from Tanzania, Marginalized people, etc.
28
a) Decentralization and Good governance
Gatsibo District is committed to successful implementation of decentralization policy, respect of
human rights and rule of law, exercising good governance and promoting the well-being of its
population. The intention is to improve the quality and efficiency of services, strengthen fiscal
management, enhance private sector development and increase local participation in decision-
making processes. The District has streamlined the working relationship with partners in
development (JADF). The principle of accountability is applied at all levels of district
administration while service delivery assessment is done quartely. This is explained by the CRC
findings whereby Gatsibo District ranked as the 1st with 75.6% (Rwanda citizen report card
survey 2016 ).
In line with national policies on justice, reconciliation, law and order; Gatsibo district put much
emphasize on the security from village level whereby a number of community policing agents are
in place and efficient supplemented by DASSO and ordinary security organs (Police and Military).
The justice is rendered to each and every person through various organs from community forum
(inteko z’abaturage), mediators (abunzi) established from cell level and courts at district level. For
the vulnerable people a special legal aid is available at district level know as MAJ (Maison d’Aide
à la Justice).
The newly established akagoroba k’ababyeyi at village level, helped much in preventing crimes
in HHs as well as GBV. In order to mainstream Rwandan values among its population, Gatsibo
district put also much emphasize on National Itorero which is organized from village level up to
the district. Moreover, the district established one transit centers at sector and district level for
correcting, educating and orienting delinquent people before their reintegration into the
community.
The reconciliation is ensured and enhanced by organizing public talks during the period of
commemoration of genocide against Tusti in 1994, supporting survivors, maintaining memorial
sites, and rewarding role model persons who saved lives from genocide known as Abarinzi
b’igihango.
c) ICT
29
The use of ICT in Gatsibo district is still at a low level. In fact, the telephone network coverage is
at 30% .. Moreover, according to EICV4 (2014), only 0.6% of households own a computer, 63.9%
own radio, 58.6% own a mobile phone, and 6.0%of HHs own a TV set in Gatsibo district. The
internet use is also at a very low level whereby only 0.6% of the population uses regularly the
internet service facility, 1.6% accesses them sometimes and 43.4% do not use them at all.
Meanwhile, the awareness of internet services have increased from 2012 to 2014. According to
EICV4 (2014), the percentage of people who don’t know about internet service dropped from
90.5% to 53.8% in 2012 and 2014 respectively. This may due to the increase of public services
delivered online through government portals like Irembo, E-recruitment, RRA, etc. such services
obliged the district to ensure availability of utilities at district level and increased the awareness
among the population.
Gatsibo district like any other public institution in Rwanda, is striving to be effective and efficient
in terms of management of public finance. Moreover, it is committed to increase internal revenue
by strengthening collection mechanisms of taxes. Today Gastibo District was raised 802,270,926
Rwf of own revenues coming from 557,565,996 Rwf collected in 2014/2015 and the District has
a target of collecting 904,414,336 Rwf by 2017/2018, always in spirit of Self reliance financially.
The aim of PFM district level is to have a clean audit opinion from OAG as well as implementation
of Auditor General’s recommendations on the previous year’s audits at 100%.
30
Table 3: Main DDP achievements in 5 years (2013-2018)13
Sector DDP
Baseline
Output targets Achievements %
(2012/2013)
2013-18
I. Economic Sector Development
Agriculture Land consolidation under CIP increased 24,631 58,515 65,260 112%
Number of Ha for banana plantation rehabilitated 1,542 6,000 6,542 109%
Fertilizer distributed 502 3,510 2,843 81%
Mechanized land agriculture developed and increased
400 ha 6,000 3100 52%
(ha)
Radical terraces constructed (ha) 900ha 2,500 2,250 90%
Progressive / slope terraces constructed (ha) 51822ha 28,202 22,442 80%
Marsh land developed (ha) 988ha 1700 1,130 66%
30 water pond
Water ponds constructed 70 35 50%
constructed
31
20 15 75%
Modern farms established 103 598 759 127%
5000 cows and
Livestock insemination and cross-breeding systems
heifers 15,000 12,500 83%
improved
inseminated
Cows distributed to poor and vulnerable groups and/or 12 911 cows
7,500 15,511 207%
families distributed
Pigs distributed to poor and vulnerable groups and/or 2150 goats
5,000 12,313 246%
families distributed
Goats distributed to poor and vulnerable groups and/or 1000 pigs
5000 5,300 106%
families distributed
New valley dams constructed 8 Valley dams 15 4 27%
Milk Collection Center (MC) increased 5MCs 2 2 100%
Animal diseases controlled 60826 78606 79474 101%
32
3. ENERGY Electric lines in rural areas serving 16,000 households
12876 HH 16,000 13,324 83%
installed
3 master plans
completed(Kabaro
re and Kiramuruzi
Master plans for towns and trading centers completed 4 4 100%
approved Muhazi
shores not yet
approved)
33
Layout plans for villages completed and implemented 4 58 17 29%
Model villages with basic infrastructure developed One site mapped 14 3 21%
Mobilization of
Cooperatives and
District investment group established 1 1 100%
Private sector in
progress
34
138 cooperative 150 85 57%
Increase number of Cooperatives and SMEs
Use of computers at cell and sector levels increased 186 100 89 89%
35
Feasibility study
Create District database MIS (development and available and e-
4 4 100%
implementation of software) filing already
installed
8 Environm
ent and Afforestation area replanted / rehabilitated increased 13,732 ha 1000 1300 130%
Natural District forest management plans updated and
Resources 13,732 Ha 14,732 14,732 100%
implemented
36
and Youth
Employment Youth talent detection & incubation programs for job 100 youth trained
in skills and job 1000 750 75%
creation in each sector (Umurenge) set up
creation programs
6Youth
Youth cooperatives, entrepreneurial initiatives
Cooperatives/Initia 28 28 100%
supported and M&E programs developed
tives supported
143
M&E program in social protection programs reinforced 70% 100%
%
Support of cooperatives for Genocide survivors 28 84 60 71%
Support creation of income generating activities for
0 15 13 87%
extreme poor.
Support creation of income generating activities for
7 23 18 78%
PWD,
Supply of livestock to Genocide survivors 78 152 136 89%
Rehabilitation of houses for vulnerable families 468 184 88 48%
37
Support students from vulnerable HMP to attain 132
15 25 33
education %
12. Health 109
New health posts constructed 11 22 24
%
100
New health center constructed 18 1 1
%
Health facilities rehabilitated 11 9 3 33%
Number of
Community health workers supported and their 100
Community health 1806 1806
capacity strengthened %
workers trained
Use of modern family planning methods increased 49. 7% 75% 62% 83%
Community health insurance coverage increased 79,9% 100% 79% 79%
Pregnant women receiving Ante Natal care (4 standard 193
46% 89%
visits) increased %
110
Child births attended in health facilities increased 63.90% 70.00%
%
chronic malnutrition rate (Weight-for-age) especially in
26.60% 23.00% 86%
under 5 years age group reduced
Children immunization enhanced 94.80% 90.00% 95%
13. 12 YBE scaled up and more classrooms constructed 437 classrooms 109
Education 300 328
(300 Classrooms) constructed %
135 Class rooms
Classrooms rehabilitated 144 99 69%
rehabilitated
100
one Model Secondary School constructed 2 1 1
%
New schools constructed 103 12 8 67%
More TVETs constructed and operationalized 7 TVETs 4 2 50%
TVET equipped with learning materials and ICT 100
5 5
equipments %
38
14 schools with 233
Teacher's accommodation established in schools 6 14
accommodation %
Access to Primary Schools increased 90.40% 100% 93.20% 93%
200
Science school laboratories constructed and equipped 2 science schools 4 8
%
102
Capacity building to teachers provided 245 518 530
%
14719/35000 113
Adult education programs enhanced 20,281 23,000
(43%) %
One higher institution of Education /university in 100
MoU 1 1
Gatsibo District established %
39
100
District staff trained on gender concepts 326 326
%
100
Create database for gender disaggregated data 0 1 1
%
170
District staff study visits conducted 10 17
%
15. Justice, Execution of judgments improved 80% 100% 85% 85%
Reconciliati 100
on, Law and 3% 3% 3%
%
Order 1000 CPCs
Capacity building for security personnel improved 314CPCs
Members 100
trainned and
and 500 %
148 DASSO
LDFs
Training of mediators for solving non-criminal cases 100
996 686 686
enhanced %
Police posts established at least one at each 156
5 police posts 9 14
administrative sector %
Legal family marriages increased 87% 100% 95% 95%
814 GBV
100
GBV Committees Supported Committees 814 814
%
established
16. Public 103
Finance District own revenues collection increased 510,257,500 RWF 989,187,000 1,014,448,756
%
Managemen
t Accounting
District staff, accountants of sectors, hospitals ,health manual procedures
100
centers' Schools and PFM committees public finance and public 3 3
%
management capacity increased financial laws in
place
40
2.4.Key District economic potentialities
Gatsibo District is having enough potentialities that can be backbone of its economy. To begin with, there is availability of suitable land
for coffee growing to enable agriculture export, agribusiness activities, like growing banana, maize, soybeans and beans growing and
cattle keeping for fresh milk production. Further, there are also mineral deposits and quarries for mining development (coltan, cassiterite,
clay, stones and sand). Mining is a strong opportunity to Gatsibo District since it provides diversified source of revenues and can create
job opportunities to the population in Gatsibo District. The Figure 2 below gives an overview of the local potentialities of Gatsibo
District. Tourism is a great socio-economic development potential for Gatsibo District since it is part of the Akagera national park but,
enabling tourism infrastructures such as hotels need to be established14.
41
Figure 3: District potentialities of Gatsibo (LODA 2013)
2.5.Mapping NST1 Pillars their respective Sectors:
NST1 PILLAR RESPECTIVE SECTORS OTHER POSSIBLE PILLAR
Agriculture
Private Sector Development & Youth
Employment
Transport
Energy Social Transformation
ECONOMIC
TRANSFORMATION Water and Sanitation Social Transformation
Urbanisation and Rural Settlements Social Transformation
ICT
Environment and Natural Resources
Financial Sector Development
Social Protection
SOCIAL
Health
TRANSFORMATION
Education
Governance and Decentralization
TRANSFORMATIONAL Justice, Reconciliation, Law and Order
GOVERNANCE
Economic, Social and
Sport and Culture
Governance
42
Public Financial Management
SWOT Analysis is a useful technique for understanding institution’s Strengths and Weaknesses, and for identifying both the
Opportunities open to a given institution and the Threats it is being facing in. However, the SWOT Analysis as technique was carried
out in order to assess the internal strengths and weakness as well as internal and external opportunities that the district would benefit of
and threats which may affect negatively the transformational journey of the district. This technique guided in analysis of all Sectors and
cross cutting areas for aiming the alignment of DDS to NST1 through contributing priorities. In this regards, the strengths, weaknesses,
opportunities and threats for Gatsibo District are observed through all 16 Sectors as follows:
Table 4: Strengthens, weaknesses, opportunities and threats of Gatsibo District in all Sectors illustrated by SWOT Analysis
approach
Sectors Strengths Weaknesses Opportunities Threats
43
Sectors Strengths Weaknesses Opportunities Threats
44
Sectors Strengths Weaknesses Opportunities Threats
45
Sectors Strengths Weaknesses Opportunities Threats
46
Sectors Strengths Weaknesses Opportunities Threats
Majority of household
have no access to
electricity; difficult
for businesses to
access reliable
electricity 3phase for
industrial growth
Small coverage of IT
system (4G)
3. Transport The geographic structure of Networks with distance Comfort Soil to construct and Rainfall cause
Gatsibo District friendly to of 365 km and out of that, rehabilitate rural and urban destruction of roads
110km are in good roads;
47
Sectors Strengths Weaknesses Opportunities Threats
construct and rehabilitate condition whereas Existence of Public institutions Failure to meet the
roads; 255km need support district’s projects of target for roads
Improved road network, rehabilitation. constructing and maintaining categorized in Road
Existence of 199.82895 km 12 bridges need to be District’s Roads (LODA, RTDA Class 1
out of 413.99 km of feeder rehabilitated and, RMI); Failure to meet
roads connecting District and Existing roads Community Works activities accessibility target;
Sectors in good condition constructed and (Umuganda) initiating, Recruitment and
District is traversed by a main maintained are not maintaining and rehabilitating retention of skilled
tarmacked road Kayonza- systematically roads within Sectors. staff;
Kagitumba. maintained; District Council has good Rural Roads
The District has 8 bridges in Lack of District’s willing of adopting Protocol
good condition procedures of recommendations and bylaws of
Existence of RTDA support Maintaining feeder maintaining District’s roads
district in construction and roads; connecting District and Sectors.
rehabilitation of roads; Limited resources for
Existence of RMF support construction and
district in road maintenance rehabilitation of all roads
Existence of local cooperative in bad condition
hired maintaining national connecting District and
road other Districts;
48
Sectors Strengths Weaknesses Opportunities Threats
49
Sectors Strengths Weaknesses Opportunities Threats
Existence of regulatory
agency for Transport services
(RURA)
4. Energy, Strong political will for Lack of enough Regional cooperation with Insufficient
electricity and energy electricity capacity to EAC and Economic electricity budget
infrastructure connect all desired hhs; Community of Great Lakes allocations to
supply and connection for Lack of enough budget to Countries (CEPGL): regional achieve significant
domestic use and acquire electrical interconnection and savings;
productive use; infrastructures to install exploitation of shared resources Insufficient or non-
Access to electricity High Voltage Line and (hydro and gas); existent
increased; Medium Voltage Line to measurement and
Existence of Private connect remote areas verification of
company skilled in Solar Electricity shortage ; savings;
energy already installed into Low capacity of Unplanned shortage
District; electricity to some of electricity a
District priorities to utilities due single phase
increase electricity access; instead of three phase
Clear roadmap, strategic connection for
papers and documents; productive use;
50
Sectors Strengths Weaknesses Opportunities Threats
Insufficient electrical
materials and equipments
to connect hhs (cash
power and cables);
Lack of experience or
capability to design and
implement Electricity
projects.
5. Water and Community awareness of Low per-capita water Strong political will at the Decentralized
Sanitation, use of drinkable water and availability and storage highest level of Government Governance and
rainwater harvesting; capacity; to embrace sustainable WRM Service Delivery
Supportive policy and legal Inadequate principles; including water
instruments (Water Policy coordination among Decentralized Governance management and
2010; Water Law 2008, WRM actors and Service Delivery projects initiations;
Environmental Law 2005); (Population and other framework provides structures Pressure of land
Existence of different end users-schools, and platform for local leading to
initiatives of increase water hospitals, etc) stakeholder mobilisation and destruction of
access in rural and urban Limited innovation and participation in WRM critical watersheds
area in District; modern technology use Increasing availability of and water
to recycle used water; cost-effective technologies catchments;
51
Sectors Strengths Weaknesses Opportunities Threats
52
Sectors Strengths Weaknesses Opportunities Threats
53
Sectors Strengths Weaknesses Opportunities Threats
Plots are being serviced for Many people in our The plots are cheap and most
more than 6km in this fiscal urban area have not the of them have access to road,
year of 2017-2018 capacity to erect the electricity and water.
Many plots access to clean proposed commercial Development of commercial
water and electricity in building building can be done easily
Kiramuruzi and Kabarore; People who live or because there is free land,
The rural settlement in the have plot in area not increase of settlement
district is at 93.7% of reserved for residential especially in Kabarore and
progress; house have the Kiramuruzi.
Most of the commercial difficulty to erect the There is an opportunity to
center has been house or make any develop touristic place near
rehabilitated major rehabilitation. It Lac Muhazi and at Ngarama
is not also possible to rock;
expropriate them; As the district has maize
There are no layout production, there is a benefit
plan, result of the in the construction of
unplanned settlement; industries and storage
There is still many facilities;
scattered and high risk The relief of Gatsibo district is
settlement. semi-arid, which can be easy
54
Sectors Strengths Weaknesses Opportunities Threats
55
Sectors Strengths Weaknesses Opportunities Threats
8. Environment and Available staff skilled in Large area of land with Land easily to be protected by High costs of mining
Natural environment protection; un planted forest soil erosion equipment and utilities
Resources,
Existence of mineral deposits Poor mind set of people There are mineral deposits and (water and power)
and quarries in Gatsibo soil in tree plantation; quarries for mining development Unstable global mining
Availability of manpower Deforestation due to (coltan, cassiterite, clay, stones market due to
Existence of laws and intensive usage or need and sand). economic crisis
regulations of charcoal and trees Mining is a strong opportunity to High consistent energy
A safe country (security) (timber or wood); Gatsibo District since it provides demand for mining
Insufficient skilled diversified source of revenues factory
labour and mining and can create job opportunities Competition of cheap
specialists to the population in Gatsibo substitutes from other
High cost of hiring expert District. countries like China
consultants Existence of mining investors and India
Using of artisanal mining and Private Sector Federation Foreign exchange risks
techniques High national and international Prolonged drought
Low mineral yield demand for minerals ; season
Insufficient electricity Existence of Ministries in charge
and energy for industries of Environment and Natural
(unstable power supply) resources with their affiliated
Environment destruction
56
Sectors Strengths Weaknesses Opportunities Threats
57
Sectors Strengths Weaknesses Opportunities Threats
58
Sectors Strengths Weaknesses Opportunities Threats
10. Social Needy assistance of Mindset change of Many programs to vulnerable Many community
Protection, vulnerable people provided community about groups for graduation are need of spoon
All needs of social protection graduation from poverty Education oriented TVET feeding from
are identified High population rate government
Good leadership with vision
11. Health, Health services have been Infrastructure needs Quality improvement policy The burden of
improved through existing for Ngarama and was adopted, standards was communicable
2 hospitals and 19 health Kiziguro District developed for compliance disease still high
centers, 22 health post. All Hospital, Some Health Political commitment avail especially for
sectors covered by health centers need to be adequate infrastructure in malaria and
center rehabilitated harmony with available hepatitis where we
Major progress in reducing Insufficient of health resources are experiencing
maternal and child professionals in In country training for health unpredictable cases
mortality different category(e.g: professionals through HRH We still have many
The burden of Actually the doctors Program with US households without
communicable disease and per pop ration Universities improve latrines,
non-communicable disease 1/20458) the situation Increase the intake in the and waste
have been reduced is almost the in other medical school management still a
category of health Multi sectorial program challenges because
professionals initiated by gvt in place we don’t have
59
Sectors Strengths Weaknesses Opportunities Threats
60
Sectors Strengths Weaknesses Opportunities Threats
12. Education, Available Education Low performance of Good policy education from Drop out available
infrastructure services students in some schools central level
61
Sectors Strengths Weaknesses Opportunities Threats
62
Sectors Strengths Weaknesses Opportunities Threats
63
2.7. STAKEHOLDER ANALYSIS
Gatsibo District has registered a considerable number of development stakeholders that are mainly
categorized into government institutions, civil society and private sectors. The first category could
be the Government institutions (Ministries, Parastatal agencies and Public projects) followed by
civil society organizations such as non-government organizations, associations and churches. The
third category of partners include private sector and Gatsibo Community which comprises of
banks, insurance companies, hotels, transport companies, cooperatives and individuals. All these
stakeholders are very active and are contributing to the development of the District.
However, during the elaboration of this DDS, several internal and external actors have been
involved at its different levels. Indeed, internal actors include private sector and civil society while
international actors are mainly international NGOs. Currently, the district has about 61 NGOs
involved in different domains within the district and 22 religious institutions. (See on appendix the
list of partners working within Gatsibo district and their respective interventional domain). The
domains of intervention of the above NGOs are grouped under four clusters which are Economy,
Social development, Health, Good governance and Justice. All of these partners are locally
represented and do participate in District meetings through the JADF forums.
Some Ministries and related institutions are working in Gatsibo towards district development. We
may specify some of them such as MINALOC through its program of Social Protection and LODA
which intervene mostly in rural development by Financing development Projects, Social programs
such as VUP and Ubudehe, MINICOM by implementing its program of promotion of SMES and
Cooperatives support, MININFRA through RTDA, REG and WASAC which contributes mostly
in roads development, electrification of the district, Water Supply and sanitation facilities
respectively. RDB also intervenes in tourism development within Akagera National Park and
MINEDUC and its affiliated agencies provide more efforts in education development by
enhancing skills development and so on.
64
CHAPTER III: ALIGNMENT WITH NATIONAL POLICY FRAMEWORK AND
METHODOLOGY
3.1. Introduction
This chapter put out the importance of District Development Strategies undertaken, the intended
outcomes and outputs in vision of Gatsibo District towards NST1 as national priorities guiding
District contributions and Rwanda wants in 2050. Then, the following chapter tries to cover all
District's overview that put out its geographical features, demography and by inspired by SWOT
Analysis approach it clarified its weaknesses, strengths, opportunities and threats which are
embodied the District or are based on for its socio-economic and governance transformation. It
will illustrate clearly the methodologies and techniques undertaken.
This chapter illustrates also how the Gatsibo DDS are integrated in National Strategy of
transformational (NST1) as inspired by other long term national and regional plans such as: Vision
2050, SDGs, Sector Strategic plans, Green development strategies, EAC vision 2050, African
Agenda 2063 with a deep reference to their pillars and their priority areas in terms of interventions
to achieve the respective visions and goals to become a middle-income country by 2020 and a
high-income country by 2050.
These DDS are centered on three pillars which are Economic transformation, Social
Transformation and Transformational Governance and distributed into sixteen sectors Strategic
Plans, 7 crosscutting issues and unfinished District Development plans (DDPs) targets.
3.2. Methodology
Elaboration of District Development Strategies of Gatsibo District was guided necessary by
different methods and techniques which were applied in function of needs assessment, sampling,
analysis and interpretation of the data gathered for accuracy of information and decision making
accordingly. Information was collected from four main sources: documentation, interviews,
focus group discussions and surveys with household representatives.
In this regards, the elaboration of Gatsibo DDS referred to the formulation of priorities, alignment
of DDSs and Sector Strategies, Citizens’ and stakeholders engagement, Consolidation of District
priorities, District Performance Reviews, District Profiles and Districts priorities shared with
Sectors.
65
overarching national development ambitions are well understood, contextualized and packaged in
Gatsibo District Development strategy.
The elaboration of the DDS is a highly participatory planning process that involved people of all
level at the district i.e. the citizens, the District Officials, Key Stakeholders and private sector
among others. The participation of citizens is a prerequisite in order to make sure that this DDS
was community needs.
The Citizens’ need assessment was conducted by the District Authorities through the Community
outreach programs such as Umuganda in Mi-October up November 2017. The objectives of this
step were: to exchange information to better understand and consider citizens’ needs during the
DDS development, to ensure the public ownership of the DDS and to improve cooperation between
the local government and the citizen by building confidence and transparency. The outputs from
this assessment are mainly identifying the needs and problems community are facing as demands
which would be subsequently ranked into priorities to be translated into actions to be taken.
In this regards, a desk review of District achievements was carried out by assessing relevant
literature that gives an insight on the past and current status of the District. The information
gathered help in preparation of district profile was developed in terms of economic, social,
governance and consideration of environmental aspects of the District.
To elaborate this DDS, several documents have been reviewed in order to understand the district
profile, to determine priorities and their baselines. In fact, District Performance achievements
reports, DDPs Projects implementation report, national surveys and census mainly EICV 3&4,
DHS (3,4 &5), LED strategy, District profile from the NISR website, Website MINECOFIN,
NISR, MINALOC, LODA, Climate Resilient documents (REMA), Master Plan, District
Potentialities, Rwanda National Water Resources Master Plan have been consulted to complement
District Development Strategies. The documents reviewed used here have to be mentioned in
order under the importance of these documents and relationships.
Other Leading documents for the review will include: 7YGP/NST 1, Vision 2020, EDPRS 2,
SDGs, MDGs, AU Agenda 2063, AU Agenda 2063 Ten Year Implementation Plan, EAC Vision
2050, The manifesto of the RPF (the winning party in the Presidential elections), Presidential
Pledges and commitments made during campaigns.
66
3.2.4. Interviews
Interviews were conducted, where all identified actors and staff were approached during the
elaboration process of this DDS document at the District level and Province level to ensure
harmonization. Those are: All Directors at the District including Director of Planning at Province
level, Executive Committee, Commissions of District Council, JADF Commission, PSF
Commission.
District has key different actors should be considered during elaboration process of DDS. To cover
all domain that are influential in decision making as they are closely to people as centre od DDS,
the focused groups are highly considered. In this framework, the Data were also collected using
qualitative method of Focal Group discussions and key stakeholders such as CNF, CNJ, PDWs,
NYC; Civil Society and Opinion Leaders were consulted.
The objective of these meetings and consultations were to receive inputs on what works and what
does not work well from the perspective of stakeholders, and recommendations on how to reform
the existing processes to better serve the objectives of the system.
However, consultations with various members of the District Officials, JADFs, Council Members,
and Key Stakeholders of the District, PSF, and various Staff of the District were conducted. The
results from the Citizen’s needs assessment were put together at the District level, and priorities
and interventions were selected. These priorities were brought to the aforementioned review
meetings and consultations. This facilitated the elaboration of key milestones of the DDS such as
M&E matrices. Moreover, consultations on possible strategies and recommendations were done
on regular basis especially with JADFs and PSF. A list of Key Stakeholders and their area of
intervention in the district was provided by the District Authorities.
SWOT Analysis is a useful technique for understanding institution’s Strengths and Weaknesses,
and for identifying both the Opportunities open to a given institution and the Threats it is being
facing in. In elaboration process of District Development Strategies SWOT Analysis was carried
out in order to assess the internal strengths and weakness as well as external opportunities that the
district would benefit of and threats which may affect negatively the transformational journey of
the district
67
3.3. Main issues at District level
Gatsibo District is among the districts with higher percentage of population identified as poor.
According to the EICV4 (2014), whereby (56.2%) of the population of district are under
poverty line (non-poor), while (43.8%) are under extreme poverty line (poor) against 39.1% and
16.3% at national level respectively. (Including 18.5% in extremely poverty against 16.3 % at
national level). The main challenges that the district is facing which affect its economy are the
following
o 50 % of households have very small land varying between 0 and 0.19 ha;
o Low use of agriculture inputs such as fertilizers, selected seeds and low level of livestock
productivity;
o Isolated habitat in the District and its implication on other sectors (84%);
o Low access to electricity (20.6 % of households);
o Road more damaged by landslide;
o 77,3 % live from income from agriculture, while 27% from wage income as well 5% live
from income generated from businesses;
o High pressure on forest due to human activities (charcoal, firewood and timber);
o Lack of agro-processing plants
Achievements: In the previous EICV3 (2012), the poverty rate at district level was 43.1% poverty
rate, including 18.8% in extreme poverty. This shows that there is a little graduation from poor to
non-poor population (0.7%) and 0.3% graduated from extremely poverty to poverty scale. This
was a result of efforts of the district in supporting HHs in extremely poverty through different
mechanisms. Those may include Ubudehe programs, VUP, support to old poor people, promotion
of SMEs, and implement modern agriculture. The main challenges that the district is facing in
this Cluster which affect its economy are the following;
o 28% of households use unimproved drinking water from surface water of river and lake,
and unprotected spring;
o High number of old primary classrooms to be rehabilitated;
o Insufficient of Technical Vocational Education Training Centre and laboratory and
libraries in secondary schools;
o 30.1 % of individuals aged 15 and above do not know how to read and write;
o Insufficient of health facilities and old health infrastructures:
68
3.3.3. Transformational Governance Pillar
The main challenges that the district is facing which affect its economy are the following:
o The insufficient skills and professional capacity for staff in technical, planning and decision
making positions across all District levels and in private sector.
o Low level of District’s own revenues collection;
o Lack of promotion of Values and Home grown solutions for Transformational governance
DDS relied on 7 priorities and 15 outcomes as defined in economic pillar, 5 priorities and 12
outcomes related to the social transformation, while transformational governance covers 5
priorities and 11 outcomes. All those outcomes will lead to achievement of Gatsibo District
Mission. The following constitute the strategic intervention.
69
Table 5: Alignment of Gatsibo DDS to NST1
NST-1 Pillar NST-1 NST-1 Outcome Gatsibo DDS Outputs Gatsibo DDS Strategic Interventions
Priority
Area15
I. Economic Transformation PILLAR
1. Agriculture
Modernize and increase 1.1.Agricultural production Output 1: Independent Irrigate 255 ha using modern systems
productivity of Agriculture and productivity agriculture systems from Reclaim 220 ha of Marshlands
and livestock increased through the rainfall promoted Increase the number of female and
use of modern system male farmers using modern irrigation
systems.
Purchase and install 60 farm dam
sheets
Supply and use 360 motor pumps
machines.
1.2.Increased financing and Output1: Use of fertilizer Increase female and male farmers
infrastructure for (organic manure and using organic fertilizers from 75% up
agriculture chemical) and improved to 100%
seeds increased Increase female and male farmers
using mineral/ Chemical fertilizers
from 34% up to 75%
Increase female and male farmers
using improved seeds from 34% up to
75%.
Increase seeds multipliers established
per crop from 8 up to 20
Level of farmers engaged in self-
reliance program
70
NST-1 Pillar NST-1 NST-1 Outcome Gatsibo DDS Outputs Gatsibo DDS Strategic Interventions
Priority
Area15
Output: Size of Sustain la consolidation of land
consolidated and belonging to independent famers
exploited land increased from 8,055 ha to 14,000 ha;
Sustain la consolidation of land
belonging to Cooperatives from
5,117 ha to 8,725ha;
Output: Productivity Increase productivity of selected crops:
increased and household 7 t/ha of Maize
resilience strengthened 2.3 t/ha of Beans
120 kg/Plant of banana produced
Output :Capacity Develop model farmer cooperatives
building of farmers Train model male and female famers in
improved agriculture techniques
Promote Ha mechanization.
Output: Exploited soil Protect cultivated land against erosion
protected against erosion Increase land covered by agro-forest
trees (ha)
Construct new bench (radical) terraces
Construct progressive terraces
Protect exploited land by Ditches
Output: Sustainable post- Establish new agro-processing plant ;
harvest plants for both Post-harvest handling and storage
handling and storage facilities/infrastructure constructed.
secured by the private Cover insurance of exploited land by
sector Agricultural yield the farming insurance;
added value increased. Ensure female and male farmers
accessing to agricultural bank loans
under CIP
71
NST-1 Pillar NST-1 NST-1 Outcome Gatsibo DDS Outputs Gatsibo DDS Strategic Interventions
Priority
Area15
Outcome: Improved Output: Large and small Provide Cows under Girinka program
livestock sector livestock increased both new men and women headed
especially within poorest households.
families Distribute new small livestock to poor
families by sex of head of HHs.
New fishery ponds constructed
Construction of improve animal feed
processing plants.
Output: Animal feeding Increase surface forage fields (ha)
ensured and Increase the Quantity of milk produced
domestication improved per day (liters) increased per day.
Increase quantity of meat produced per
month (kg);
Increase eggs produced per month;
Increase quantity of honey produced
per year;
Increase the quantity of tones of fish
produced per year (t/year)
Output: Local breed Improve cows by inseminate
genetically improved to
exotic one
Output: Animal diseases Vaccinate animal from epidemic
are prevented and diseases;
controlled. Establish new veterinary
pharmacies/clinics.
Output: Value of animal Construct new milk collection centers
products improved Establish dairy plant
Train Farmers in milk quality
management and processing;
72
NST-1 Pillar NST-1 NST-1 Outcome Gatsibo DDS Outputs Gatsibo DDS Strategic Interventions
Priority
Area15
Improve slaughterhouse established
Increase livestock covered by the
insurance
Operationalize veterinary laboratory.
Construct hatchery
Increase male and female farmers
accessing to agricultural bank loans
Outcome: Increased Output: Industrial crops Increase the area covered by coffee
traditional and non- production and plantation.
traditional export crops productivity increased Increase the quantity of Coffee
produced per tree.
2. Private Sector Development And Youth Employment
Create 50,000 (over 8,334 Increased Labor Output: Access to basic Construct 5 new modern markets
annually) decent and productivity in off-farm trade infrastructures and Rehabilitate 4 of existing modern
productive jobs for economic sectors formal business improved markets.
development Construct 2 livestock market.
Create about 50,000 off-farm jobs for
economic development.
Register 127 new SMEs
Equip and operationalize an Integrated
Craft Production Centre (agakiriro).
Increased number of Output: Youth Promote youth cooperatives through
Rwandans with appropriate workforce skills supporting art crafts centers
skills tailored to labour developed Train male and female youth in
market demands entrepreneurship.
Ensure development of new off-farm
employment opportunities by or for
youth.
73
NST-1 Pillar NST-1 NST-1 Outcome Gatsibo DDS Outputs Gatsibo DDS Strategic Interventions
Priority
Area15
1.2. Promote Export growth sustained at Output: Industries Develop industry zone
industrialization and 17% annually developed Construct 4 industries in industry zone
contribute to national Increased Services share of Output : Tourism Implement tourism study
objective of structural total exports developed
shift in the export based
to high value goods and
services with the aim of
growing exports by 17%
annually.
3. ENERGY SECTOR
Productive user access to Output: Access to Construction of 80km of electricity
electricity increased to electricity increased line in non-electrified
100% Electrify all productive use
1.3. Accelerate sustainable Street lighting expanded to Output: Existing major Install 20 Km of public lights.
Urbanization in the all national and district roads roads provided with street
District lighting.
4. TRANSPORT
1.4. Promote Improved and sustained Output:Transport Construct new 25 Km of asphalt/
industrialization and quality of road network facilities (roads and tarmac road.
attain a structural shift in bridges) developed Construct 16km of cobblestone/ stone
the export base to high- paved roads.
value goods and services Rehabilitate 200km of feeder roads
with the aim of growing Construction of 13 bridges;
exports by 17% annually Rehabilitation of 7 bridges.
Construct 2 tax parks.
5. WATER AND SANITATION
74
NST-1 Pillar NST-1 NST-1 Outcome Gatsibo DDS Outputs Gatsibo DDS Strategic Interventions
Priority
Area15
1.7. Moving Towards a Universal access to basic Output: 100% of people Increase clean water access from
Modern Rwandan household infrastructure (water, have access to clean 73.3% to 100%.
sanitation, electricity, ICT, water. Rehabilitate/maintain 569.4km of
shelter). existing water pipelines.
Construct 138 Km of new water
supply scheme
Protect 12 water springs.
Protect 8 new water springs sources.
Construct 86 boreholes.
Output: Sanitation Construct 3 public toilets.
facilities ensured for all. Rehabilitate 9 dilapidated public
latrines
Construct improved landfill (ikimoteri)
Construct Waste bins on trade centers
and well manage.
Construct standard incinerators at
hospital.
Output: Diseases due to Provide rubbish disposal to 95%
the lack of sanitation female-headed and 95% male-headed
within HHs prevented. HHs.
Equip 52% female-headed and 52%
male-headed HHs with hand washing
facilities.
6. URBANIZATION AND RURAL SETTLEMENT
6.1.Accelerate Sustainable Developed and integrated Output: District master Develop 35 trading centers.
Urbanization to 35% by urban and rural settlements. plan implemented Develop 23% for Kabarore and 21%
2024 for Ngarama master plan.
75
NST-1 Pillar NST-1 NST-1 Outcome Gatsibo DDS Outputs Gatsibo DDS Strategic Interventions
Priority
Area15
Output: Grouped Ensure 11.8% female –headed and
settlement developed 89.2% male headed live in planned
settlement.
Construct 3 new IDP Model Villages.
Output: Disasters Equip 182 of public buildings with
prevented on building and lightning conductors
public places
Output: Land use Implement 75% of Land use master plan
developed
Output 5: Greening and 100% All new public buildings greened
beautification improved
1.9. Establish Rwanda as a Gatsibo District is connected Output: ICT Ensure increase rate of telephone
Globally Competitive to the outer world and infrastructures and its network coverage (%) from 74.5% to
Knowledge-based Economy people (both men and usage improved 100%.
women) can access Ensure increase Rate of FM network
information easily. coverage (%) from 74.5% to 100%.
Increase Rate of schools equipped and
admitted to one laptop per child
program from 55.1% to 70%
Increase Rate of public institutions and
main trade centers accessing to internet
through optic fiber
Output: The use of ICT Increase the Rate of computer literacy
increased among people aged 6 and above from
0.5% to 3%.
The Rate of operation E-tracking
system at sector level from 0% to 2%.
Increase the Rate of female-headed and
male-headed HHs owning mobile
phone from 50.6% up to 70%.
76
NST-1 Pillar NST-1 NST-1 Outcome Gatsibo DDS Outputs Gatsibo DDS Strategic Interventions
Priority
Area15
Increase the Rate of female-headed and
male-headed HHs owning radio from
64.5% up to 80%.
Increase Rate of female-headed and
male-headed HHs owning television
from 2.2% up to 15%.
7. ENVIRONMENT AND NATURAL RESOURCES
7.1. Sustainable Increased sustainability and Output: Forest coverage Recruit 14 forest protectors (as
Management of Natural profitability of forestry is increased contractors);
Resources and
management Maintain 10,557 ha of forest;
Environment to Plant 30,000 ha of Agro forests.
Transition Rwanda Plant 1,800 ha 0f forest.
towards a Carbon Neutral
Economy
Promote Industrialization and Upgraded minerals, oil & Output: Quarry and Implement 100% (32/32 sites of
attain a Structural Shift in the gas sector mineral exploitation mining of master plan.
export base to High-value improved Increase the Rate of male and
goods and services with the female brick makers using modern
aim of growing exports by brickyards from 97% to 100%.
17% annually
77
NST-1 Pillar NST-1 NST-1 Outcome Gatsibo DDS Outputs Gatsibo DDS Strategic Interventions
Priority
Area15
survivors for male and female
beneficiaries.
11. Provide Direct Support to
Vulnerable genocide survivors.
Output: Life conditions 12. 30 HMP reintegrate schools
of Historical Marginalized 13. Maintain 2 Existing Modern
People improved potteries;
14. Provide 30 startup kit to HMP
Output 3: Life conditions 15. Support 54 income generating
of People With activities;
Disabilities (PWDs) 16. Assist 80% of PWD.
improved. 17. Upgrade 1 center in Ngarama
sector (Wikwiheba mwana ) .
18. Integrate PWDs under school age
by male and female.
Enhancing graduation from Increased graduation from Output: Poverty reduced 19. Employ vulnerable people
extreme Poverty and extreme poverty through VUP financial through VUP/PW
promoting resilience program 20. Support beneficiaries of Direct
support to reduce the number of
extreme poor from 3814 to 2379
(F=1674, M=705).
21. Ensure support of 38,755 new
income generating projects.
Universal access to basic Output: Access to 22. Provide 12,000 Solar energy to
infrastructure achieved ( electricity increased vulnerable Hhs;
electricity, shelter) 23. Electrify Hhs headed by female
and male electrified (on-grid) from
23% up to 70%.
78
NST-1 Pillar NST-1 NST-1 Outcome Gatsibo DDS Outputs Gatsibo DDS Strategic Interventions
Priority
Area15
HEALTH
Enhancing demographic Improved healthcare Output: Maternal Health Increase births attended at health
dividend through ensuring services improved facilities;
access to quality Health for all PW receiving 4 ANC Standards
Visits;
Increase Women with at least one
post natal consultation in 2 days
after Birth.
Output: Infant/Newborn Ensure reduction of the following health
and Child health indicators
improved Neonatal Mortality rate/1000;
Infant Mortality Rate/1000;
Under Five Mortality Rate/1000;
Prevalence of Stunting (Ht/Age);
ARI proportional morbidity < 5
years;
Malaria proportional morbidity < 5
years
Diarrhea prevalence for U5 children
<5
Ensure increase in performance of the
following key indicators:
Fully Children immunized;
Exclusive Breastfeeding < 6
months;
Percentage of new-born with at
least one PNC visit within the first
two days of birth.
79
NST-1 Pillar NST-1 NST-1 Outcome Gatsibo DDS Outputs Gatsibo DDS Strategic Interventions
Priority
Area15
Increased contraceptives Output 3:FP/ASRH Increase mobilization of use of
prevalence improved contraceptives in order to reduce
Fertility Rate (TFR%) from 4.7% to
4.3%;
Increase contraceptive Prevalence
Rate from 48% to 65%;
Prevent Teenage pregnancy and
motherhood rate (15-19 years ), so
that the rate will reduced from 15.8%
to 3.2%
Eradicating Malnutrition Reduced malnutrition Output: Nutrition Ensure screening of children <5 yrs in
among children improved CBNP;
Reduce Prevalence of Stunting
(Ht/Age) from 30.6% up to less than
15%.
Reduced Communicable Output: HIV and AIDS Sustain HIV prevalence among
Diseases and Non- reduced people aged 15-49 years;
Communicable Diseases Proportion of persons diagnosed with
(NCDs) HIV infection receiving sustained
ART
Output: Malaria reduced Increase proportion HH with at least
one LLIN.
Reduce malaria incidence per 1,000
population.
Reduce Malaria proportional
morbidity Rate (%).
Increase Proportion of children under
five years old who slept under a LLIN
the previous night.
80
NST-1 Pillar NST-1 NST-1 Outcome Gatsibo DDS Outputs Gatsibo DDS Strategic Interventions
Priority
Area15
Output: Neglected Increase proportion of targeted
Tropical Diseases population who received Mass
reduced Drugs Administration;
Output: TB reduced Manage TB Treatment Success
Rate.
Manage TB treatment coverage
rate.
Output: NCDs reduced Proportion of new cases treated in
health facilities (HC+DH) for
mental disorders”.
Teeth and gum diseases
morbidity rate at health facility
level.
Eye diseases problem morbidity
rate at health facility level.
Output: GBV reduced DHs with One Stop Centre
(GBV) functional;
Health centers with integrated
OSC services;
GBV victims received preventive
care according to national norms.
Output: Environmental Increase HHs with hand washing
Health improved. facilities;
Increase HHs with improved
latrines;
Hospitals with water treatment
plants according to standards;
Public Health Facilities (DH ,
HC, HP ) with effective waste
81
NST-1 Pillar NST-1 NST-1 Outcome Gatsibo DDS Outputs Gatsibo DDS Strategic Interventions
Priority
Area15
management systems according
to standards.
CHCs functional at village level.
82
NST-1 Pillar NST-1 NST-1 Outcome Gatsibo DDS Outputs Gatsibo DDS Strategic Interventions
Priority
Area15
Output: Quality Increase quality of health service
Assurance and delivered in order to allow DH to be
Accreditation of Health accredited at level 1;
Facility improved. District Hospital eligible for
Accreditation level 2.
HP offering minimum package
according to the norms and
standards(National).
Output 17:Health Increase Percentage of Health centers
Information System with functional internet (Fiber Optical)
improved and local area network connectivity.
Public health facilities (HC & DH)
using EMR full package system.
Ensure that Private facilities regularly
reporting through national data
collection systems (DHIS-2 and e-
IDSR).
Output 18:Service HF with standard guidelines,
Delivery improved procedures, protocols, available and
used.
HFs with functional suggestion boxes.
Output 19:Health Construct Health Post;
Geographical Construct Maternity ward in HFs
Accessibility improved Health Center Rehabilitated/ upgraded.
Extend District Hospital.
HFs Equipped for Medical Equipments.
Ratio ground ambulance / population
83
NST-1 Pillar NST-1 NST-1 Outcome Gatsibo DDS Outputs Gatsibo DDS Strategic Interventions
Priority
Area15
Output 20:Public-Private Health Post Operating under PPCP.
Partnership improved Establish Private clinic.
Establish Private Dispensary.
10.EDUCATION
Enhancing demographic Improved education quality Output: Educational Construct and rehabilitate Primary
dividend through improved in primary and secondary infrastructures improved schools.
access to quality education education Progress rate of implementation of
colleges of technology or higher
education institute.
Output: Qualified staff in New qualified teachers recruited in
education increased. Primary and Secondary Schools.
84
NST-1 Pillar NST-1 NST-1 Outcome Gatsibo DDS Outputs Gatsibo DDS Strategic Interventions
Priority
Area15
Increased adult literacy rates Output: Literacy Enhance adult literacy.
promoted among adult Rate of illiterate people attending
people adults’ literate schools both male and
female.
Outcome: Increased access Output: Early childhood Construct new ECDs;
to pre-primary education. developed
III. Transformational Governance Pillar
Increased Citizens Enhanced Decentralization Output: People involved Organize dialogues through community
Participation and Engagement system in community score card. assemblies, umuganda, participatory
in Development. planning and umugoroba w’ababyeyi.
85
NST-1 Pillar NST-1 NST-1 Outcome Gatsibo DDS Outputs Gatsibo DDS Strategic Interventions
Priority
Area15
Strengthen Justice, Law and Strengthened Judicial Output: Access to Enhance operation of district
Order System (Rule of law). equitable justice for all justice committees
Establish MAJ outlets at sector
level.
Abunzi elected and trained.
13. Sport and Culture
Reinforce Rwandan culture Increased number of Output 2: Youth’s health Construct 14 playing ground;
and values as a foundation for Rwandans with appropriate improved through sport construction of district min-
peace and unity skills tailored to labor activities stadium;
market demands. Creates District’s football team.
Enhanced unity of Output: Order and Organize itorero campaigns;
Rwandans. patriotism promoted. Empower associations promoting
Unit and Reconciliation
Output: Genocide
Rehabilitation of Kiziguro
memorials and cemeteries genocide survivors memorials
improved site;
Well managed and organized
public cemeteries.
Strengthened Judicial Output: Court decisions Resolve citizen complaints.
System (Rule of law) executed Rate of execution of court
decision;
86
NST-1 Pillar NST-1 NST-1 Outcome Gatsibo DDS Outputs Gatsibo DDS Strategic Interventions
Priority
Area15
Output 6: Law Organize of law awareness
awareness improved. campaigns ;
Post Public notice boards.
87
Chapter IV: STRATEGIC FRAMEWORK
4.1.Introduction
This chapter constitutes the core of this DDS. It contains priorities for the next 6 years according to the above challenges. After analyzing
the district current situation, challenges, identification of district priorities and existing potentialities, this chapter provides the strategic
framework for the district to achieve its vision and therefore, contributing to the country's development. The chapter presents the
district’s vision, mission, detailed discussion of different strategies that will be used to achieve intended outcomes and linking them to
the National Strategy for Economic Transformation, Social transformation and Governance Transformational globally into NST1. The
result chain through which this DDS will be implemented is also described below.
4.2.2. Mission
Pursuant to law n°08/2006 of 24/02/2006 determining the organization and functioning of the District, with respect to policy,
administration, economy, social welfare and culture, Gatsibo District has a mission of:
Implementing the government policy;
88
Giving services and helping sectors to deliver quality services;
Establishing, coordinating and implementing development programs;
Promoting solidarity and cooperation with other Districts
General Objective:
The general objective of Gatsibo District and off course that of the DDS is anchored on its vision and the aspirations of its people. Thus,
the general objective for Gatsibo District is:
“To build and strengthen an agro based economy with a view to making the District an agricultural hub so that it is self-sufficient in
food production, have a surplus for the market and create jobs for its people, the ultimate goal being to reduce endemic poverty, fight
hunger and malnutrition in the District”.
Specific Objectives:
89
4.3.Main Priorities at District level
Scholars of Economics define Economics as a study about “allocation of scarce resources to satisfy unlimited needs of society, it is a
discipline that advocates for prioritization and making choices in the process of allocating the scarce resources between competing needs
with a view to maximizing the satisfaction of society”. That being the case, therefore, in Gatsibo District, given the limited budget, we
have to prioritize and make choices between the competing unlimited needs our people have with a view to maximizing the services we
give them. The table below contains a list of priorities in Gatsibo District as per the wishes of the people from different administrative
sectors.
The methodology adopted to identify the priorities was based on the collection of wishes from the population of different administrative
sectors, grouping the wishes of the population according to socio-economic sectors in which they fall, assigning each group of wishes a
weight using IPAR's evaluation weights, counting the frequency of appearance for each group of wishes, calculating the total weight by
multiplying the weight with the frequency and finally ranking the wishes of the population as per the total weighted value. The identified
priorities were matched with the District LED priorities to produce the overall priorities which are shown in the table below.
Priority Areas Title of the projects as per the wish of the people Rank
91
4.4.Results Chain
The above diagram illustrates the logical arrangement of different interventions that create a series of results culminating into the bigger
ultimate result which is the impact. In other words, it represents the sequencing of interventions that lead to the achievement of results
at different levels, the utmost result being the impact of all the interventions to entire society.
Relating the above schematic representation to DDS, we can say that down at the input level, we have different resources in terms of
finance, human resource, and even natural resources that will be committed to different programs and projects in the DDS for the
realization of the targets therein.
At the activity level, we have the utilization of resources to carry out various activities for the realization of outputs targeted in the DDS
and at the output level, we have tangible products produced by carrying out different activities. For example, the outputs can be schools,
hospitals, tons of maize, rice, beans etc. that will be produced by carrying out various activities.
At the outcome level, we have behavioral changes that will accrue to the citizens of Gatsibo District after the realization of various
outputs targeted in the DDS. Whereas it easy and possible to budget for the outputs, it is impossible to explicitly budget for the outcomes.
92
In the DDS, therefore, we shall budget for the outputs by costing them, the summation of which will help us determine the total budget
of the DDS.
Finally, at the impact level, we expect to have wide spread improvement in the lives of citizens in Gatsibo District. Such change shall
be measured at the end of the of the sixth year i.e. in 2023/24 in an ex-post or summative evaluation to determine the extent to which
the DDS has impacted the lives of the citizens in Gatsibo District.
The sequencing of interventions in the DDS is clearly elaborated in the log frame, as shown below
4.5.Logical Framework
% of female and 3.7% of 17% female 4% 7% 10% 13% 15% 17% Annual Availability
male farmers using female and male reports of funds
modern irrigation and farmers used
systems male irrigation
farmers
use
93
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
irrigatio
n
94
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
availability
of funds
% of female and 34% 75% 50% 55% 60% 63% 70% 75% District’s Farmers
male farmers using annual willingness
improved seeds Reports and
availability
of funds
Nbr of seeds 8 20 seeds 10 12 14 16 18 20 District’s Farmers
multipliers multipliers annual willingness,
established per crop Reports Availability
of funds
Level of farmers 39% 90% 40% 45% 60% 70% 90% 90% District Willingness
engaged in self- reports of farmers,
reliance program Availability
of funds
Output: Size of consolidated and exploited land increased
Number of ha of 8,055 14,000 13,127 13,400 13,680 13690 13695 14000 District Farmers
land belonging to reports willingness,
independent famers and
consolidated (ha) adaptation
Nbr of ha land 5,117 8,725 8,752 8,752 8,752 8752 8752 8752 District Farmers
belonging to reports willingness,
cooperatives and
consolidated adaptation
Output: Productivity increased and household resilience strengthened
95
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
Number of Tons of 4.3 t/ha 7t/ha 4.8T/ha 5.8 t/ha 6t/ha 6.5t/ha 6.8t/ha 7 t/ha District Farmers
Maize per ha reports willingness,
(kg/ha) and
adaptation
Nbr of Tones of 0.8 t/ha 2.3t/ha 1.8T/ha 1.9 t/ha 2t/ha 2.1t/ha 2.3 t/ha 2.3 t/ha District Farmers
Beans per ha reports willingness
(kg/ha) and
adaptation
Nbr of kg of 60 kg 120kg/plant 80 kg 90 kg 100 kg 120 kg 120 kg 120 kg District Farmers
banana produced reports willingness
per ha (kg/plant) & and
adaptation
Output :Capacity building of farmers improved
Nbr of model 3 rice 11 1 3 5 7 9 11 District Availability
farmer cooperatives cooperat reports and
developed ives willingness
of
cooperative
&
Availability
of funds
Number of model 15M 92 Male and 23 Male 40 Male 42 Male 53 Male 70 Male 92 Male District Availability
male and female 88 female and 15 and 38 and 58 and 38 and 83 and 88 reports of funds
famers trained in female female female female female female
agriculture
techniques
Nbr of Ha of 1,295 3,600 ha 600 600 600 600 600 600 District Availability
mechanized land mechanized reports of funds
96
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
642 Build capacities 772 772 772 772 772 772 District Willingness
of 772 Farmer Farmer Farmer Farmer Farmer Farmer Farmer report of famers
Promoters Promoters Promoters Promoter Promoter Promoters Promoter &Availabili
Build capacities of s s s ty of funds
Farmer Promoters
0 100% women 100% 100% 100% 100% 100% District Willingness
Capacity building for in agribusiness women in women women women in women report of famers
developing skills and given skills agribusine in in agribusine in &Availabili
increased ss given agribusin agribusin ss given agribusin ty of funds
involvement of skills ess given ess given skills ess given
women in skills skills skills
agribusiness
Training/mentoring 0 70% of youth 30% 40% 50% 60% 70% District Availability
for business who did annual of funds
incubation (Youth agriculture and reports
who did agriculture livestock
and livestock related related
programs at programs
University or mentored on
secondary school) business
Output: Exploited soil protected against erosion
% of cultivated land 60% 90% 70% 76% 80% 83% 87% 90% District Availability
protected against reports of land &
erosion Availability
of funds
Nbr of ha covered 18,920h 9000 new ha 1,500 1,500 1,500 1500 1500 1500 District Availability
by agro-forest trees a reports of land and
(ha) Availability
of funds
97
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
Number of Ha of 1168 ha 600 100 100 100 100 100 100 District Availability
new bench (radical) reports and of farmers
terraces constructed physical and lands,
verification Availability
of funds
Number of Ha of 2,800ha 1,200ha 200 200 200 200 200 200 District Availability
progressive terraces reports of farmers
constructed and lands
Availability
of funds
Number of ha of 1,628 ha 600 50 110 110 110 110 110 District Availability
exploited land reports of land,
protected by Availability
Ditches of funds
Output: Sustainable post-harvest plants for both handling and storage secured by the private sector Agricultural yield added value
increased
Number of new 1 4 agro 1 (Maize) 0 1 (for 0 1 (for 1 (for District Available of
agro-processing processing coffee) milk) banana) reports and Investors,,
plants established plant physical Available of
established verification land, and
(maize, Availability
coffee, of funds
banana and
milk)
Nbr of post-harvest 12 14 new Post 1 2 3 3 3 2 District Available
handling and harvest reports investors,
storage storage Availability
facilities/infrastruct facilities of funds
ure constructed (drying
98
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
ground and
storage)
Number of 0 500ha model 50 100 200 300 400 500 District Available
exploited land farmers reports insurance
covered by model insured companies
farmers insured Availability
of funds
% of female and 23% 70% 35% 50% 60% 63% 65% 70% District Famers and
male farmers reports Banks
accessing to willingness,
agricultural bank Availability
loans under CIP of Banks
Outcome: Improved livestock sector
Output: Large and small livestock increased especially within poorest families
Number of new men 18,777 8,100 cows 1,350 1,350 1,350 1,350 1,350 1,350 District Hhs headed
and women headed distributed reports mobilized
households got and
cows on behalf of willingness
Girinka program to make
farming,
Availability
of funds
99
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
Number of new 2,844 11,100 goats, 1,850goat 1,850 1,850 1,850 1,850 1,850 Report of Availability
small livestock goat, 3,300 pigs, s, goats, goats, goats, goats, goats, animal of funds
distributed to poor 5,066 30,000 550pigs, 550 pigs, 550 550 550 pigs, 550 distributed
families by sex of pigs, poultry, 5,000 5000 pigs, pigs, 5,000 pigs,
head of HHs 15,000 10,000 poultry, poultry, 5,000 5.000 poultry, 5,000
receiver poultry, Rabbits 1,000 2,000 poultry, poultry, 2,000 poultry,
0 rabbits Rabbits Rabbits 2,000 2,000 Rabbits 3,000
Rabbits Rabbits Rabbits
Number of new 73 12 new fish 2 2 2 2 2 2 District Investors
fishery ponds ponds reports willingness
constructed constructed &
Availability
of funds
Number of 0 Construction 0 0 1 0 0 0 District Available
improved animal of animal feed reports investors
feed processing processing &Availabili
plants constructed plant ty of funds
Output: Animal feeding ensured and domestication improved
New surface forage 255.5 150 ha of 10 15 25 30 35 35 Report of Available
fields (ha) forage fields planted investors
forage &Availabili
ty of funds
Quantity of milk 28,545 57,090 per 38,000 40,000 42,000 44,000 48,000 57,090 Report of Available
produced per day day milk investors
(liters) increased produced &Availabili
ty of funds
Quantity of meat 120,480 232,480 kg 144,480 180,480 190,880 206,480 222,080 232,480 Report of Available
produced per month per month meat investors
(kg) increased produced
100
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
&Availabili
ty of funds
Number of eggs 262,844 268,844 eggs 263,844 264,844 265,844 266,844 267,844 268,844 Report of Willingness
produced per month per month eggs of farmers
increased produced &Availabili
ty of funds
Nbr of kg of Honey 25,490 171,962 kg 26,098 27,877 28,987 29,124 29,876 30,000 Report of Willingness
produced per year honey of farmers
produced &
Availability
of funds
Nbr of tones of fish 15,840 105,198 kg 16,336 17,336 18,336 19,336 19,854 20,000 Report of Availability
produced per year fish of funds
(kg) produced
Output: Local breed genetically improved to exotic one
Number of cows 1558 20956 cows 3,456 6,333 7,296 8,256 9,216 9,216 Report of Willingness
inseminated and heifers to inseminated of farmers
be animal &Availabili
inseminated ty of funds
Output 10: Animal diseases are prevented and controlled
% of animal 60% 80% animal 66% 70% 72% 74% 76% 80% Report of Willingness
vaccinated from (15,000 vaccinated vaccinated of famers &
epidemic diseases LSD, from animal Availability
15,000 epidemic of funds
BQ, diseases
15,000
FMD,
3000
RVF)
101
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
45,000/8
2,836
102
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
Number of 0 1 slaughter 0 0 1 0 0 0 District Willingness
improved house will be report of famers &
slaughterhouse established Availability
established of funds
103
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
Nbr of Ha of new 2,133ha 180 new ha 30 30 30 30 30 30 District Availability
planted coffee annual of funds
reports
Nbr of kg of Coffee 5kg 7 kg 5.5kg/ 6kg/tree 6.5kg/ 7kg/tree 7kg/ tree 7kg/ tree District Availability
(kg/tree) produced tree tree annual of funds
per tree report
104
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
Number of jobs 5,080 Create about 8,334 8,334 8,334 8,334 8,334 8,334 District Availability
created 50,000 annual of funds
productive reports
jobs for
economic
development
Number of 236 166 new 26 54 82 110 138 166 District Availabilit
operating SMEs annual y of SMEs
cooperatives and registered reports and
other businesses willingness
(including SMEs) of
registered Cooperative
s
Number of Availabl Integrated 1 ICPCs 01 Awarene Awarene Awarenes Awarene District Availabilit
Integrated craft e craft equipped operation ss and ss and s and ss and annual y of Budget
production centre agakirir production al operatio operatio operation operatio reports
(agakiriro) o centre nalizatio nalizatio alization nalizatio
constructed , infrastru (agakiriro) n of n of of ICPCs n of
equipped and cture equipped and ICPCs ICPCs ICPCs
operational operational
Output: Increased technical vocational training centers and TVET
Number of New 11 3 new TVETs 1 1 1 2 1 District Availability
TVETs constructed and 3 VTC annual of Budget
report
Priority Area : Promote industrialization and attain a structural shift in the export base to High-value goods and services with the aim of
growing exports by 17% annually
105
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
Outcome: Export growth sustained at 17% annually
Output: Industries developed
Number of Industry 0 1 0 0 1 0 0 0 reports and Available
zone developed developed funds
industrial
zone
Number of 2 Construct 4 0 1 1 0 1 1 reports and Available
industries industries in developed funds
constructed in industry zone industrial
Industry zone zone
Outcome: Increased Services share of total exports
Output : Tourism developed
Implementation of Tourism Implement 0 1 0 1 0 0 Reports Availability
development inventor tourism study of funds
tourism inventory y study
availabl
e
III. ENERGY SECTOR
Priority Area : Promote industrialization and attain a structural shift in the export base to high-value goods and services with the aim of growing
exports by 17% annually.
Outcome: Productive user access to electricity increased to 100%
Output: Access to electricity increased
Number of Km of 20km Construction 20km 10km 10km 10km 10km 10km District’s Available
electricity lines of 80km of annual funds
constructed electricity line Reports
in non-
electrified
area
106
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
% of productive use 100% of 50% 60% 70% 80% 90% 100% District’s Available
electrified productive annual funds
use electrified reports
Priority Area : Accelerate Sustainable Urbanization to 35% by 2024
Outcome: Street lighting expanded to all national and district roads.
Output: Existing major roads provided with street lighting
Number of Km of 12km 20km new 3km 5km 5km 5km 2km District Available
roads with public public light report and funds
lights physical
verification
IV. TRANSPORT
Priority area: Promote industrialization and attain a structural shift in the export base to high-value goods and services with the aim of
growing exports by 17% annually.
Outcome : Improved and sustained quality of road network
Output :Transport facilities (roads and bridges) developed
Nbr of Km of 42km New 25 Km 0 5 Km 15km 5 Km RTD and Community
asphalt road (Kayonz of asphalt/ Districts willingness,
constructed a- tarmac road reports Availability
Kagitum constructed of Funds
ba
Nbr of Km of 0 16km of 0 4.5 2.5 3 3 3 District Community
cobblestone roads cobblestone/ reports willingness,
constructed/ sealing sealing roads Availability
roads constructed constructed of Funds
Nbr of Km of feeder 237.6km Rehabilitation 48.469 66.5 65.5 20 0 0 District Community
roads rehabilitated of 200km of reports willingness,
feeder roads
107
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
Availability
of Funds
108
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
Km of existing 569.4km 569.4km of 6.8 100 100 110 159.4 93.2 Report and Available
water pipelines existing water physical funds
rehabilitated pipelines verification
rehabilitated/
maintained
Km of new water 46km 138 Km of 36 47 17.3 9.7 13 15 Report and Available
supply scheme new water physical funds
constructed supply verification
scheme
constructed
Number of public 4 12 water 3 4 1 2 1 1 Report and Available
protected spring springs will physical funds
water rehabilitated be verification
rehabilitated
Number of new 1 8 new water 2 2 2 0 0 0 Report and Available
public spring water springs will physical funds
protected and be protected verification
constructed and
constructed
Number of borehole 36 86 boreholes 30 20 0 15 21 0 Available
constructed funds
Output : Sanitation facilities ensured for all
Number of new 9 3 public 1 1 1 Report and Availanl
public latrines toilets physical funds
(markets, bars, shop constructed verification
centers,...)
constructed
109
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
Number of 0 9 2 2 2 2 1 0 Report and Availanl
dilapidated public physical funds
latrines rehabilitated verification
Number of 0 1 1 0 0 0 0 0 Report and Availanl
improved landfill physical funds
(ikimoteri) verification
constructed.
Number of waste 12 18 3 3 3 3 3 3 Report and Availanl
bins on trade centers physical funds
implemented and verification
well managed
Number of standard 1 1 0 1 0 0 0 0 Report and Availanl
incinerators physical funds
constructed at verification
hospital
Output: Diseases due to the lack of sanitation within HHs prevented
% of female-headed 68.26% 95% female- 70% 75% 80% 85% 90% 95% Report and Community
and male-headed headed and physical willingness,
HHs with rubbish 95% male- verification Availability
disposal headed HHs of Funds
with rubbish
disposal
Rate of female- 33.64% 52% female- 35% 40% 45% 50% 51% 52% Report and Communit
headed and male- headed and physical y
headed HHs with 52% male- verification willingness,
hand washing headed HHs Availability
facilities with hand of Funds
washing
facilities
110
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
VI. URBANIZATION AND RURAL SETTLEMENT
Priority area: Accelerate Sustainable Urbanization to 35% by 2024
Outcome: Developed and integrated urban and rural settlements
Output: District master plan implemented
Number of main 17 5 trading 5 5 5 5 5 5 Report and Community
trading centers centers physical willingness,
developed within developed verification Availability
sectors of Funds
Rate of 15% for 23% for 16%for 17% for 18% for 19% for 21% for 23% for Report and Community
implementation of Kabaror Kabarore and Kabarore Kabarore Kabaror Kabaror Kabarore Kabaror physical willingness,
existing district e and 21% for and 11% and e and e and and e and verification Availability
development Master 10% for Ngarama for 13%for 15%for 17% for 19%for 21% for of Funds
Plan Ngaram master plan Ngarama Ngarama Ngaram Ngaram Ngarama Ngaram
a master developed master master a master a master master a master
plan plan plan plan plan plan plan
Output: Grouped settlement developed
Rate of female- 6% 11.8% female 9.9% 8.2% 9% 10% 11.7% 11.8% Report and Community
headed and male- female – –headed and female – female – female – female – female – female – physical willingness,
headed HHs living headed 89.2% male headed headed headed headed headed headed verification Availability
in planned and 51% headed and and and 71% and 85% and 88% and of Funds
settlements male 57.1% 61.8% male male male 89.2%
headed male male headed headed headed male
headed headed headed
Number of IDP 2 3 new IDP 1 1 1 Report and Community
model villages constructed physical willingness,
constructed verification Availability
of Funds
Output: Disasters prevented on building and public places
111
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
Number of public 46 182 of public 82 109 155 182 182 182 Report and Available
and private buildings physical funds
buildings equipped equipped with verification
with lightning lightning
conductors conductors
Output: Land use developed
Progress rate of land 40% 75% of Land 50% 55% 60% 65% 70% 75% Report and Available
use master plan use master physical funds
design plan verification
implemented
Output 5: Greening and beautification improved
Ha of new green All 100% All new 100% 100% 100% 100% 100% 100% Report and Available
space created public public physical funds
institutio buildings verification
ns greened
greened
VII. INFORMATION COMMUNICATION AND TECHNOLOGY
Priority area: Establish Rwanda as a Globally Competitive Knowledge-based Economy
Outcome: Gatsibo District is connected to the outer world and people (both men and women) can access information easily
Output: ICT infrastructures and its usage improved
Rate of telephone 63.2% 88% 65% 68% 70% 73% 80% 88% Report and None
network coverage physic
(%) verification
Rate of FM network 74.5% 100% 80% 85% 100% 100% 100% 100% District Willingnes
coverage (%) annual s of partners
reports and funds
112
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
Rate of schools 97/176 70% 55.1 60% 60% 70% 70% 70% District Schools
equipped and (55.1%) annual willingness
admitted to one reports and
laptop per child availability
program of Budget
Rate of public 18/418 50% 5% 5% 30% 30% 50% 50% District Schools
institutions and (4%) annual willingness
main trade centers reports and
accessing to internet availability
through optic fiber of Budget
Output: The use of ICT increased
Rate of computer 0.50% 3% 1% 1% 2% 2% 3% 3% District Availabilit
literacy among annual y of Budget
people aged 6 and reports
above
Rate of operation E- 0% 2% 0% 0.50% 0.50% 2% 2% 2% District Availability
tracking system at annual of Budget
sector level reports
Rate of female- 50.60% 70% 60% 65% 65% 65% 70% 70% District Availability
headed and male- annual of Budget
headed HHs owning reports
mobile phone
Rate of female- 64.30% 80% 70% 7% 70% 75% 75% 80% District Availability
headed and male- annual of Budget
headed HHs owning reports
radio
Rate of female- 2.20% 15% 5% 5% 10% 10% 15% 15% District Availability
headed and male- annual of Budget
reports
113
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
headed HHs owning
television
VIII. ENVIRONMENT AND NATURAL RESOURCES
Priority area: Sustainable Management of Natural Resources and Environment to Transition Rwanda towards a Carbon Neutral Economy
Outcome: Increased sustainability and profitability of forestry management
Output: Forest coverage is increased
Ha of forest 8,757 10,557 ha of 9,057 9,357 9,657 9,957 10,257 10,557 Report Forest
managed forest will be Managemen
maintained t
Ha of new planted 34,946 30,000 ha of 5,000 5,000 5,000 5,000 5,000 5,000 Report New agro
agricultural trees Agro forest forestry
(ha) will be planted
planted
Ha covered by new 8757 1,800 ha 0f 300 300 300 300 300 300 Report New forest
planted forest trees forest will be planted
planted
Outcome: Upgraded minerals, oil & gas sector
Output: Quarry and mineral exploitation improved
Rate of 22% 100% (32/32 75% 100% 100% 100% 100% 100% Report Community
implementation of (7/32 sites of willingness,
Gatsibo mine sites of mining of Availability
master plan mining master plan of Funds
impleme will be
nted) implemented)
Rate of male and 97% 70% male and 70% male 70% 92% 85% 80% 70% Report Reduction
female brick makers male 30 of female and 30 of male and male male male and male of trees in
female and 8% and 15 and 30 bricklaying
114
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
using modern and 3 of 30 of of of 20 of of
brickyards female female female female female female
115
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
Number of new 76 270 Houses 20 75 85 90 90 90 Technical Availability
houses constructed Reports and of Funds
constructed/rehabilit List of
ated by female and Beneficiarie
male of heads of s
HHs beneficiaries
Number of new 34 240 projects. 40 40 40 40 40 40 Number of Availability
income generating Income of Funds
projects of genocide generating
survivors sponsored projects in
by male and female place
of beneficiaries
Number of genocide 492 Vulnerable 606 VGS 616VGS, 636 650 665 670 List of Availability
survivors receiving survivor genocide and 60 60childll VGS, VGS, VGS, VGS, Beneficiarie of Funds
direct surviving s and 64 survivors Childless ess 60childll 60childll 60childll 60childll s
support by female Childles receiving ess ess ess ess
and male s direct support
(Incike)
Output: Life conditions of Historical Marginalized People improved
Number of children 30 30 HMP 5 5 5 5 5 5 List of HMP Availability
from extremely reintegrate facilitated of Funds
poor HMP schools
facilitated to
reintegrate school
by female and male
Number of new 2 2 new 1 1 0 0 0 0 The existing Availability
modern potteries Modern modern of Funds
constructed potteries potteries
constructed will be used
116
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
Number of new 30 30 start up kit 5 5 5 5 5 5 Number of Availability
income generating (startup for HMP income of Funds
projects sponsored kit) generating
projects
sponsored
Output 3: Life conditions of People With Disabilities (PWDs) improved
Number of new 21 54 income 6 8 10 10 10 10 Number of Availability
income generating generating income of Funds
projects supported activities generating
for PWDs supported projects for
PWDs
supported
% of PWDs assisted 27% 80% of PWD 35% 55% 55% 60% 75% 80% Repots Availability
to health care assisted of Funds
Progress rate of 0 1 center in 0 1 Report for Availability
construction of Ngarama Special of Funds
district school for sector school
blind or mental (Wikwiheba constructed
disabilities mwana )
upgraded
% of PWDs under 3% 85% of PWD 10% 24% 30% 45% 60% 85% List of Availability
school age under PWD of Funds
integrated school by integrated in
male and female schools
Output: Poverty reduced through VUP financial program
Number of new 240,210, 144,5630,378 947,385,0 987,387, 987,387, 1,194,73 1,194,73 1,445,63 Report Availability
wage beneficiaries 000 of VUP 00 000 000 5,850 5,850 0,378 of Funds
from VUP by sex wages
117
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
Number of male and 3814 Reduced poor 2979 3179 3379 3179 2779 2379 Reports Availability
female heads of benefici people to (F=2096, (F=2237, (F=2377 (F=2237 (F=1955’ (F=1674 of Funds
HHs benefiting aries 2379 M=:883) M=942) . , M=824) ,
direct support from (2683 F, (F=1674, M=1002 M=942) M=705)
VUP and M=705) )
1131 M)
Number of new 2559 38,755 new 4,655 5,456 6,138 6,820 7,502 8,184 Number of Availability
income generating income new income of Funds
projects sported by generating generating
financial program projects projects
supported
Outcome: Universal access to basic infrastructure achieved ( electricity, shelter)
Output: Access to electricity increased
Number of female- 3850 12,000 solar 2000 2000 2000 2000 2000 2000 Physical Availability
headed and male- male power verification of funds and
headed HHs using headed and Reports land
solar-power as and
source of lighting 1150
female
headed
% of Hhs headed by 23% 70% of Hhs 34% 40% 50% 60% 65% 70% District’s Availabilit
female and male electrified annual y of funds
electrified (on-grid) reports and land
XI. HEALTH
Priority area: Enhancing demographic dividend through ensuring access to quality Health for all
Outcome: Improved healthcare services
Output: Maternal Health improved
118
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
% of births attended >99% >99% >99% >99% >99% >99% >99% >99% DHS&HMI Availabilit
at health facilities S Report y of
resources
% PW receiving 4 55% >65% 55% 57% 60% 64% >65% >65% DHS&HMI Availability
ANC Standards S Report of resources
Visits
% of women with at 38% >50 38% 45% 46% 48% 50% >50 DHS&HMI Availability
least one post natal S Report of resources
consultation in 2
days after Birth
Output: Infant/Newborn and Child health improved
Neonatal Mortality 7 <3 7 6 5 3 3 <3 DHS Report Availability
rate/1000 of resources
Infant Mortality 55 <25 55 54 51 46 40 <25 DHS Report Availability
Rate/1000 of resources
Under Five 80 <35 80 70 60 55 <35 <35 DHS Report Availability
Mortality Rate/1000 of resources
Prevalence of 32% <15% 30,6% 27,1% 20% 19% 18% <15% DHS Report Availability
Stunting (Ht/Age) of resources
ARI proportional 40% <20% 40% 36 32% 30% 25% <20% HMIS Availability
morbidity < 5 years Report of resources
Malaria 23% <10% 23% 22% 20% 18% 16% <10% HMIS Availability
proportional Report of resources
morbidity < 5 years
Diarrhea prevalence 10,3% <3% 10,3% 9% 5% 4% 3 <3% DHS&HMI Availability
for U5 children < 5 S Report of resources
Fully Children 98% >98% 98% >98% >98% >98% >98% >98% HMIS Availability
immunized Report of resources
119
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
Exclusive 42% >48% 42% 44% >46% >45% >45% >48% DHS Report Availability
Breastfeeding < 6 of resources
months
Percentage of new- 12,5% >35% 12,5% 16,9% 20% >23% >25% >35% HMIS Availability
born with at least Report of resources
one PNC visit
within the first two
days of birth
Outcome: Increased contraceptives prevalence
Output 3:FP/ASRH improved
Total Fertility Rate 4,7% <4,3% 4,7% 4,3% <4,3% DHS Report Availability
(TFR%) of resources
Contraceptive 48,1 >65% 48,1 52% 55% 58% 61% >65% DHS Report Availability
Prevalence Rate of resources
Teenage pregnancy 15,8% <3,2% 10% 9% 8% 6% 5% <3,2% DHU Availability
and motherhood Quarterly of resources
rate (15-19 years ) report
% of Unmet need 16,2% <4,2% 10% 8% 9,2% 7% 5% <4,2% DHS Report Availability
for FP of resources
Priority area: Eradicating Malnutrition
Outcome: Reduced malnutrition among children
Output:Nutrition improved
% children <5 yrs 77% >95% 77% 79% 82% 85% 90% >95% DHU Availability
screened in CBNP Quarterly of resources
report
Prevalence of 30,6% <15% 30,6% 27,1% 20% 19% 18% <15% DHS Report Availability
Stunting (Ht/Age) of resources
Priority area: Enhancing demographic dividend through ensuring access to quality Health for all
120
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
Outcome: Reduced Communicable Diseases and Non-Communicable Diseases (NCDs)
Output: HIV and AIDS reduced
HIV prevalence 2,7% 2,7% 2,7% 2,7% 2,7% 2,7% 2,7% 2,7% DHS Availability
among people aged of resources
15-49 years
Proportion of 90% >96% 90% 92% 95% >96% >96% >96% HMIS Availability
persons diagnosed Report of resources
with HIV infection
receiving sustained
ART
Output: Malaria reduced
Proportion HH with 90,5% >95% 91% 91,5% 92.50% 93,5% 94% >95% RDH Availability
at least one LLIN of resources
Malaria incidence 198 <100 190 170 160 120 110 <100 Report Availability
per 1,000 of resources
population
Malaria 33 <15% 33 31 15 <15% <15% <15% HMIS Availability
proportional Report of resources
morbidity Rate (%)
Proportion of 88,6% >95% 89% 90% 92% 93% 94% >95% DHS 2015& Availability
children under five Physical of resources
years old who slept Verification
under a LLIN the
previous night
Output: Neglected Tropical Diseases reduced
Proportion of 94% >95% 94% 95% >95% >95% >95% >95% MDA Availabilit
targeted population Report y of
who received Mass resources
121
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
Drugs
Administration
Output: TB reduced
% TB Treatment >89 >89% >89 >89% >89% >89% >89% >89% TB Annual Availability
Success Rate Report/RBC of resources
TB treatment 63% >70% 63% 65% 70% >70% >70% >70% TB Annual Availability
coverage rate Report/RBC of resources
Output: NCDs reduced
Proportion of new 0.2 >0.6 0.2 0.3 0.3 >0,6 >0,6 >0.6 Report Availability
cases treated in of resources
health facilities
(HC+DH) for
mental disorders”
Teeth and gum <2 % <1,84% <2 % <2 % <2 % <1,84% <1,84% <1,84% Report Availability
diseases morbidity of resources
rate at health facility
level
Eye diseases <2,6 <2 <2,6 <2,6 <2,6 <2 <2 <2 Report Availability
problem morbidity of resources
rate at health facility
level
Output: GBV reduced
%DHs with One 100% 100% 100% 100% 100% 100% 100% 100% Report Availability
Stop Centre (GBV) of resources
functional
122
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
% of Health centers 100% 100% 100% 100% 100% 100% 100% 100% Report Availability
with integrated OSC of resources
services
% of GBV victims 100% 100% 100% 100% 100% 100% 100% 100% Report Availability
received preventive of resources
care according to
national norms
Output: Environmental Health improved
% of HHs with hand 10,3% >50% 10,3% 15,6% 25% 33,7% 40% >50% DHS Availability
washing facilities &District of resources
Hygiene
report
% of HHs with 73,4% >98% 73,4% 79,6 83% 92% 95% >98% ECIV3&Hy Availability
improved latrines giene report of resources
Number of 0 2 1 0 0 1 0 0 Availability
Hospitals with of resources
water treatment
plants according to
standards
% public Health 21% >40% 21% 28% 35% >40% >40% >40% Report and Availability
Facilities (DH , HC, Physical of resources
HP ) with effective verification
waste management
systems according
to standards
% of CHCs 44% 55% 45% 46% 47% 48% 50% 55% Report and Availability
functional at village physical of resources
level verification
Outcome: Increased health of workforce
123
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
Output: Human Resource for Health improved
Doctor/pop ratio 1/19683 <1/12300 1/18683 1/17683 1/15046 1/13046 1/11046 <1/1230 Report and Availability
0 Physical of resources
verification
Nurse/pop ratio 1/1453 <1/1200 1/1450 1/1448 1/1443 1/1380 1/1300 <1/1200 Report and Availability
Physical of resources
verification
Midwife/pop ratio 1/13122 Jan-27 1/13012 1/12712 1/12510 1/11510 1/10510 Jan-27 Report and Availability
Physical of resources
verification
Pharmacist/pop 1/11284 1/56423 1/102844 1/92844 1/75300 1/72423 1/66423 1/56423 Report and Availability
ration 4 Physical of resources
verification
Lab tech/pop ratio Jan-14 <1/3125 Jan-14 Jan-14 Jan-31 Jan-25 Jan-25 <1/3125 Report and Availability
Physical of resources
verification
Outcome: Improved healthcare services
Output: Leadership, Planning Governance , Health Coordination and Monitoring and Evaluation improved
% Functional 100% 100% 100% 100% 100% 100% 100% 100% Report and Availability
DHMT Physical of resources
verification
Number of 100% 100% 100% 100% 100% 100% 100% 100% Report and Availability
Quarterly Physical of resources
coordination verification
meeting done
Number of CHWs 100% 100% 100% 100% 100% 100% 100% 100% Report and Availability
Cooperatives in Physical of resources
terms of capacity verification
building
124
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
% of BoDs and 65% 100% 65% 100% 100% 100% 100% 100% Report and Availability
Health Committees Physical of resources
trained on Efficient verification
management of
Health Facility
% District PBF 100% 100% 100% 100% 100% 100% 100% 100% Report and Availability
steering committee Physical of resources
verification
Output: Medical products, vaccines and technologies improved
% HFs with < 5% of 78% >95% 78% 81% 85% 89% 92% >95% Report and Availability
vital medical Physical of resources
products stock-outs verification
District Pharmacy 85% >95% 85% 85% >95% >95% >95% >95% Report and Availability
with good storage Physical of resources
conditions and verification
sufficient capacity
%HFs Using 100% 100% 100% 100% 100% 100% 100% 100% Report and Availability
effectively e-limes Physical of resources
system verification
Outcome: Increased financial sustainability for the health sector
Output: Health Financing improved
% of population 90% >95% 90% 91,1% 92% >95% >95% >95% Report and Availability
covered by CBHI Physical of resources
verification
% of District 11,2% >15% 11,2% 12,% >15% >15% >15% >15% Report and Availability
Budget allocated to Physical of resources
Health verification
125
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
% HFs &DP with 6% 100% 6% 100% 100% 100% 100% 100% Report and Availability
financial mgt Physical of resources
software and other verification
Mgt tools
% HFs visited for >80% >80% >80% >80% >80% >80% >80% >80% Report and Availability
audit purposes Physical of resources
verification
Output: Quality Assurance and Accreditation of Health Facility improved
# DH accredited at 0 2 0 2 0 0 0 0 Report and Availabilit
level 1 Physical y of
verification resources
#District Hospital 0 2 0 0 0 0 2 2 Availability
eligible for of resources
Accreditation level
2
% of HC with 100% 100% 100% 100% 100% 100% 100% 100% Report and Availability
functional QA team Physical of resources
verification
#of HC eligible for 0 4 0 2 1 0 1 0 Report and Availability
Accreditation Physical of resources
verification
% of HP offering 50% 100% 50% 70% 100% 100% 100% 100% Report and Availability
minimum package Physical of resources
according to the verification
norms and
standards(National)
Output 17:Health Information System improved
126
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
Percentage of 14,2% >35% 14,2% 19% 28,5% >35% >35% >35% Report and Availability
Health centers with Physical of resources
functional internet verification
(Fiber Optical) and
local area network
connectivity
% of public health 9,5% >30% 9,5% 14,2% 19% 28,2% >30 >30% Report and Availability
facilities (HC,DH,) Physical of resources
using EMR full verification
package system
% of private 100% 100% 100% 100% 100% 100% 100% 100% Report and Availabilit
facilities regularly Physical y of
reporting through verification resources
national data
collection systems
(DHIS-2 and e-
IDSR)
% HFs with 100% 100% 100% 100% 100% 100% 100% 100% Report and Availabilit
functional Physical y of
suggestion boxes verification resources
Output 19:Health Geographical Accessibility improved
127
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
Number of Health 23 15 4 3 2 2 2 2 Report and Availability
Post Constructed Physical of resources
verification
Number of 2 7 2 1 1 1 1 1 Report and Availability
Maternity ward Physical of resources
constructed in HFs verification
Number of Health 2 7 2 1 1 1 1 1 Availability
Center of resources
Rehabilitated/
upgraded
#Construction of 1 2 1 0 1 0 0 0 Availability
District Hospital for of resources
Extension
#HFs Equipped for 5 20 5 5 2 3 2 3 Report and Availability
Medical Physical of resources
Equipments verification
Ratio ground 1/50153 <1/45138 1/50153 1/50100 1/49153 1/47153 1/46153 <1/4513 Report and Availability
ambulance / 8 Physical of resources
population verification
Average time to <55 <30 52 48 45 40 35 <30 ECIV Availability
walk to a nearby HF of resources
(in minutes)
Output 20:Public-Private Partnership improved
% of Health Post 33% 100% 38% 50% 60% 70% 90% 100% Report and Availability
Operating under Physical of resources
PPCP verification
Number of Private 0 2 1 0 0 0 1 0 Report and Availability
clinic Established Physical of resources
verification
128
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
Number of Private 1 3 1 0 1 0 1 0 Report and Availability
Dispensary Physical of resources
Established verification
XII. EDUCATION
Priority area: Enhancing demographic dividend through improved access to quality education
Outcome: Improved education quality in primary and secondary education
Output: Educational infrastructures improved
Number of primary 3 35 10 5 5 5 5 5 Reports, Availability
schools rehabilitated Physical of budget
verification
Number of 0 14 2 4 2 2 2 2 Reports, Availability
secondary schools Physical of budget
rehabilitated verification
Number of new 2,265 360 new 60 60 60 60 60 60 Reports, Availability
classrooms class classrooms Physical of budget
constructed rooms verification
Number of new 44 12 2 2 2 2 2 2 Reports, Availability
schools upgraded to Physical of budget
12YBE verification
Progress rate of 1 1 0 0 0 0 1 0 Reports, Availability
implementation of Physical of budget
colleges of verification
technology or
higher education
institute
Output: Qualified staff in education increased
129
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
Number of new 67 399 59 62 65 68 71 74 School Availability
qualified teachers Placement of budget
recruited in Primary
Schools
Number of new 16 201 31 32 33 34 35 36 School Availability
qualified teachers Placement of budget
recruited in
Secondary Schools
Output: School attendance and competition improved
Number of schools 42 12 2 2 2 2 2 2 Reports, Availability
with school-meal Physical of budget
program verification
Rate of schools with 65 35 6 6 6 6 6 5 Reports, Availability
Parent-Teacher Physical of budget
Associations verification
sensible to
education
Percentage of 70% 100% 80% 90% 100% Reports, Availability
schools equipped Physical of budget
with school verification
materials (chairs,
tables, Books, etc)
Rate of enrollment 97.70% 99% 98% 98.2% 98.4% 98.6% 98.6% 99% Reports Availability
in primary schools of budget
Rate of enrollment 32.90% 35% 33% 33.5% 34% 34.4% 34.8% 35% Reports Availability
in secondary of budget
schools
Outcome: Increased adult literacy rates
Output: Literacy promoted among adult people
130
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
% of adult literacy 74% 92% 77% 80% 83% 86% 89% 92% Reports Availability
of budget
Rate of attendance Femeles 92% 77% 80% 83% 86% 89% 92% Reports Availability
of illiterate people : 9742 of budget
by male and female (55.2%),
Males
:7885
(44.8%)
131
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
Rate of good service 79.40% 100% 80% 95% 97% 98% 100% 100% RGB Availability
delivery reports. of Funds
Number of new 9 18 4 5 5 5 5 5 Awards Availability
competence awards distributed of Funds
distributed to
district staff
Priority area: : Increased Citizens Participation and Engagement in Development
Outcome: Improved scores for citizen participation
Output: People involved in community score card
Number of cell 12 24 4 4 4 4 4 4 Reports Availability
dialogues organized of Funds
at cell level
Output: District plans and achievements are accessible by the community
Nbr of open days 3 6 1 1 1 1 1 1 Reports Availability
organized by the of Funds
District JADF
Number of District 4 24 4 4 4 4 4 4 Report Availability
council meetings of Funds
conducted
Outcome: Enhanced decentralization system
Output: Partnership in planning, monitoring and evaluation of District partners’ activities Reinforce
133
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
134
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
Progress rate of 0 one district 0 50% 100% We did not Availability
construction of min-stadium construc plan any of Funds
district min-stadium ted stadium.
135
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
monument
sites
136
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
Anti-GBV at
villages level
137
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
Rate of self- 4% 13.50% 6% 7.50% 9% 10% 12% 13.50% District Availability
contribution to the Reports of Funds
annual budget
Rate of district 802,270, 1,079,918,014 931,546,7 959,493, 988,277, 1048464 1079918 1079918 District Availability
internal income 926 66 168 964 091 014 014 Reports of Funds
sources (markets,
mining and quarry,
forest products)
privatized
Rate of contribution 7.4 3.50% 7% 6% 5.30% 4.70% 4.10% 3.50% District Availability
to the annual budget Reports of Funds
from donors
Rate of contribution 85% 81% 82% 82.40% 82.80% 82.20% 81.90% 81% District Availability
to the annual budget Reports of Funds
from central
government
Number of taxpayer 1 11 1 2 2 2 2 2 District Availability
day organized Reports of Funds
Number of tax- 6 152 10 15 25 28 34 40 District Availability
motivation Reports of Funds
campaigns
organized
Priority area: Increase Domestic Savings and position Rwanda as a hub for financial services to promote investments
Outcome: Enhanced long-term savings and innovative financing mechanisms
Output 1: Financial institutions improved
Number of 17 12 New 2 2 2 2 2 2 District Availability
microfinance microfinance Reports of Funds
operating in Gatsibo branches
138
Output Indicator Baseline Six years Target Target Target Target Target Target Means of Assumption
(2017/1 target (2018- (2018/19) (2019/20) (2020/2 (2021/2 (2022/23) (2023/2 verification
8) 2024) 1) 2) 4)
(including
SACOOs)
Level of 100% 100% of 100% of 100% of 100% of 100% of 100% of Very District Availability
implementation of SACCO SACCO SACCO SACCO SACCO SACCO High Reports of Funds
District SACCO operation operation operation operatio operatio operation
(association of n n
Umurenge SACCOs
operating in the
district)
100% 100 Baseline is
Indicator: picked form
Percentage (%)of last
adult population finscopey
financially included Finscope Survey of
(15 year and above) 87% 90 93 95 97 98 survey 2016
Number of new 2 6 new 1 1 1 1 2 District Availability
UMURENGE Umurenge Reports of Funds
SACCO outlets SACCO
implemented outlets
Number of new 14 14 SACCOs 7 7 District Availability
UMURENGE equippe computerized/ SACCOs SACCO Reports of Funds
SACCO’s offices d automated and computer s
equipped/ automated district ized/ compute
and district SACCO SACCO set up. automated rized/
set up. automate
d and
district
SACCO
set up.
139
Table 7:Priority action matrix
District Priority Actions
DDS Priority
Priority action
SN DDS Priority outcome 2018/ Target
description 2019/20 2020/21 2021/22 2022/23
indicator 19 2023/24
AGRICULTURE SECTOR
1 Independent 60 water ponds Availability of 10 10 water 10 water 10 water 10 water 10 water
agriculture and 3 valley government water ponds and ponds and 1 ponds ponds ponds
systems from dams constructed funds for valley ponds 1 valley valley dam constructed constructed constructed
rainfall and 360 motor dams and 1 dam constructed and 60 and 60 and 60
promoted pumps construction , valley constructed and 60 motor motor motor
purchased Engagement of dam and 60 motor pumps pumps pumps
private sector in constr motor pumps purchased purchased purchased
management of ucted pumps purchased
irrigation and 60 purchased
systems; avail motor
to farmers pumps
adequate purcha
irrigation sed
systems
2 Crops 100% of HHs are Promote the 65% 70% of 75% of 78% of 80% of 85% of
production and free of hunger Plantation of of selected selected selected selected selected
productivity while 80% of selected food selecte food are food are food are food are sold food are
increased to production is crops including d food sold on sold on sold on on formal sold on
satisfy local sold on formal Rice, Maize, are formal formal formal markets formal
consumption markets Beans, sold markets markets markets markets
and targeting Soybeans, on
market Cassava formal
marke
ts
3 Use of 100% of farmers Promote 81% 85% of 90% of 95% of 98% of 100% of
improved access on time accessibility of consolidate consolidated consolidated consolidated consolidate
140
District Priority Actions
DDS Priority
Priority action
SN DDS Priority outcome 2018/ Target
description 2019/20 2020/21 2021/22 2022/23
indicator 19 2023/24
agricultural and nearby their and use of consol d land will land will use land will use land will use d land will
inputs increased farms the improved idated use required and required required and use
improved inputs agricultural land required improved and improved required
inputs (seeds, will and agricultural improved agricultural and
fertilizers, etc) use improved inputs agricultural inputs improved
through requir agricultural inputs agricultural
engagement of ed inputs inputs
private sector organi
and other c and
mechanisms chemi
cal
fertiliz
ers on
maize,
rice
and
coffee
Sustainable Rehabilitation of Engage farmers Rehab Rehabilitati Rehabilitati Rehabilitatio Rehabilitatio Rehabilitati
post-harvest 10 and to Supply the ilitatio on of 2 and on of 3 and n of 1 n of 1 on of 1
plants for both equipment of 3 coffee cherries n of 2 equipment equipment coffee coffee coffee
handling and coffee washing at coffee and of 1 coffee of 1 coffee washing washing washing
storage secured stations in washing equip washing washing stations stations stations
by the private Murambi, stations ment stations stations and
sector Muhura, of 1 Constructio
Agricultural Gasange, coffee n of 1
yield added Kageyo,Remera, washi coffee
value increased Nyagihanga and ng roasting
Gatsibo sectors station ground
and Construction s factory in
141
District Priority Actions
DDS Priority
Priority action
SN DDS Priority outcome 2018/ Target
description 2019/20 2020/21 2021/22 2022/23
indicator 19 2023/24
of 1 coffee Muhura
roasting ground Sector
factory in
Muhura Sector
post-harvest Construction Aware Awareness Awareness Awareness Awareness supply
plants increased and equipment ness and and and and yield every
of 50% to ensure of 1 maize and operationali operationaliz operationaliz operationaliz year
yield added value processing operati zation of ation of ation of ation of
factory in onaliza maize maize maize maize
Rugarama tion of processing processing processing processing
Sector maize factory factory factory factory
proces
sing
factor
y
TRANSPORT SECTOR
Intra-district Construction of Construct new New New 20 km New 20 km New 20 km New 20 km New 20 km
transport new 120 Km of feeder roads 20 km of feeder of feeder of feeder of feeder of feeder
network feeder roads in of roads roads roads roads roads
improved Gatsibo District feeder constructed constructed constructed constructed constructed
roads
constr
ucted
7,606 Km of rehabilitate 48.5K 66.55Km 65.55Km of 205Km of 0 0
existing feeder damaged feeder m of of Feeder Feeder roads Feeder roads
roads roads Feeder roads
rehabilitated roads
ENERGY SECTOR
142
District Priority Actions
DDS Priority
Priority action
SN DDS Priority outcome 2018/ Target
description 2019/20 2020/21 2021/22 2022/23
indicator 19 2023/24
Reduced use of 70% of HHs Electrify 40% 50% of 55% of 60% of 65%of grouped 70% of
firewood as accessing to grouped of grouped grouped groupe villages grouped
source of electricity villages group villages villages d electrified villages
cooking and ed electrified electrified villages electrified
lighting energy. village electrifi
s ed
electri
fied
100% of Electrify 60% 70% of 80% of 90% of 100% of 100% of
community community of community community commu community community
facilities facilities comm facilities facilities nity facilities facilities
accessing to (trading unity electrified electrified facilitie electrified electrified
electricity centers, faciliti s
markets, es electrifi
schools, etc) electri ed
fied
30% of HHs Promote use of 5% of 10% of HH 15% of HH 20% of 25% of HH s use 30% of HH
using gas as gas through HH s s use gas as s use gas as HH s gas as source of s use gas as
source of cooking increasing its use source of source of use gas cooking energy source of
energy accessibility by gas as cooking cooking as cooking
HHs source energy energy source energy
of of
cookin cooking
g energy
energy
PRIVATE SECTOR
Access to basic 2 of new modern Construct new Capac 1new 1new
trade markets modern ity modern modern
infrastructures constructed markets buildi markets markets
143
District Priority Actions
DDS Priority
Priority action
SN DDS Priority outcome 2018/ Target
description 2019/20 2020/21 2021/22 2022/23
indicator 19 2023/24
and formal ng of Constructe Constru
business Privat d cted
improved e
sector.
4 of existing rehabilitate 1 1 modern 1 modern 1
modern markets endomaged moder market market modern
rehabilitated modern n rehabilitate rehabilitated market
markets marke d rehabili
t tated
rehabi
litated
Employment 30,480 new off- Construct and 1 1 existing
rate increased farm jobs created equip new existin integrated
annually Intergrated g craft
craft integr equiped
production ated
center (ICPCs)/ craft
Agakiriro equipe
d
Operationalize 14 14 14 Business 14 14 Business 14
Business Busin Business developmen Busines development Business
Development ess developme t advisors s advisors developme
Advisors to develo nt advisors operational develop operational nt advisors
support pment operational ment operational
creation of adviso advisor
SMEs rs s
operat operati
ional onal
WATER AND SANITATION SECTOR
144
District Priority Actions
DDS Priority
Priority action
SN DDS Priority outcome 2018/ Target
description 2019/20 2020/21 2021/22 2022/23
indicator 19 2023/24
Access to 100% of Increase water 82 % 90 % of HH 95 % of HH 100 % 100 % of HH 100 % of
improved households connectivity to of HH access to access to of HH access to clean HH access
water and accessing to HHs, Construct access clean water clean water access water to clean
sanitation improved water new boreholes, to to clean water
increased promote the clean water
harvest of rain water
water
Explore water Faisab Execution Execution at Water Extension of Extension
of lake Muhazi ility at 50% 100% Supply Water Supply of Water
to increase Study Supply
water supply
by Contruction
of Kiramuruzi
water treatment
plant
Sanitation 100% of HHs Construction of 0 1 land fill 1 land fill 2 land 2 land fills 3 land fills
facilities and community landfill constructed constructed fills constructed constructed
ensured for all facilities have (Ikimoteri), constru
sanitation Ensure cted
facilities possission of
improved
toilets by HHs,
construct
latrines in
public places
URBANIZATION SECTOR
Grouped 100% of HHs Zoning rural 95% 100 % of 100% of 100 % 100 % of HH 100 % of
settlements that live in grouped settlement of HH HH live in HH live in of HH live in grouped HH live in
maximize the settlements sites, live in live in settlements
145
District Priority Actions
DDS Priority
Priority action
SN DDS Priority outcome 2018/ Target
description 2019/20 2020/21 2021/22 2022/23
indicator 19 2023/24
use land Demarcate group grouped grouped groupe grouped
promoted plots in urban ed settlements settlements d settlements
area, Construct settle settlem
IDP model ments ents
villages
ENVIRONMENT AND NATURAL RESOURCES SECTOR
Prevention of 40% of district Plant 200 ha of 6882 6000 ha 6000 ha 6000ha 6000 ha 6000ha
disasters and surface covered new agro-forest ha
protection of by forest trees trees,
natural Rationalize the 50% 55% 60% 65% 70% 75%
resources exploitation of
promoted forests and
other natural
resources
80% of rain water Construction of Sewag Sewage Sewage Sewage Sewage ravine Sewage
and sewage Sewage ravine e ravine ravine ravine constructed in ravine
drained in (Ruhurura) in ravine constructed constructed constru towns at 80% constructed
Kabarore Sector Kabarore town constr in Kabarore in Kabarore cted in in towns at
ucted town at town at 80% towns 100%
in 60% at 50%
Kabar
ore
town
at
50%
EDUCATION SECTOR
Educational 360 new Construction of New New 60 New 60 New New 60 New 60
infrastructures classrooms and new class 60 classrooms classrooms 60 classrooms classrooms
improved education rooms classr constructed constructed classro constructed constructed
146
District Priority Actions
DDS Priority
Priority action
SN DDS Priority outcome 2018/ Target
description 2019/20 2020/21 2021/22 2022/23
indicator 19 2023/24
facilities ooms oms
constructed constr constru
ucted cted
90% of education Equipment for 50% 60% of 60% of 70% of 80% of education 90% of
centers equipped VTC, of education education educati centers equipped education
Polytechinics educat centers centers on centers
and ion equiped equiped centers equipped
rehabilitation center equiped
of TSS s
equipe
d
HEALTH SECTOR
Access to 30 new health Construct and 14 14 health 4 health 4 health 4 health posts 4 health
quality health facilities equip health health posts posts posts constructed and posts
services ensured constructed and posts posts equiped constructed constru equiped constructed
for all equipped constr and equiped cted and
ucted and equiped
equiped
Health center Constr Construct Constru Construct
extended uct and equip 2 ct and and equip 1
and maternity equip 1 maternity
equip block materni block
0 0
Construct and 1 ty
equip maternity mater block
at health nity
centers block
SOCIAL PROTECTION SECTOR
Livelihood 200 new houses Construct 20 25 houses 35 houses of 40 40 houses of 40 houses
condition of of genocide houses of houses of genocide genocide houses genocide of genocide
147
District Priority Actions
DDS Priority
Priority action
SN DDS Priority outcome 2018/ Target
description 2019/20 2020/21 2021/22 2022/23
indicator 19 2023/24
vulnerable survivors genocide of survivors survivors of survivors survivors
groups constructed survivors genoci constructed constructed genocid constructed constructed
improved de e
surviv survivo
ors rs
constr constru
ucted cted
60% of Support to 15% 25% of 35% of 40% of 50% of 60% of
beneficiaries of vulnerable of beneficiarie beneficiaries benefici beneficiaries of beneficiarie
VUP program people in benefi s of VUP of VUP aries of VUP program s of VUP
graduates from category one ciaries program program VUP graduated program
their socio- and two in of graduated graduated progra graduated
economic VUP VUP m
quantile components progra graduat
m ed
gradua
ted
YOUTH, SPORTS AND CULTURE SECTOR
Historical 14 playgrounds Construction of Constr Constructio Constructio Constru Construction of 2 Constructio
memory and constructed 14 playgrounds uction n of 3 n of 2 ction of playgrounds n of 2
health youth in all sectors of 3 playground playgrounds 2 playground
promoted playgr s playgro s
ounds unds
Kiziguro Construct and Constr Construct Maintain Maintai Maintain Maintain
genocide equip Kiziguro uct and equip Kiziguro n Kiziguro Kiziguro
memorial Site Genocide and Kiziguro Genocide Kizigur Genocide Genocide
constructed and Memorial Site equip Genocide Memorial o Memorial Site Memorial
equipped Kizigu Memorial Site Genoci Site
ro Site de
148
District Priority Actions
DDS Priority
Priority action
SN DDS Priority outcome 2018/ Target
description 2019/20 2020/21 2021/22 2022/23
indicator 19 2023/24
Genoc Memori
ide al Site
Memo
rial
Site
The use of drugs Sensitization The The use of The use of The use The use of drugs The use of
among youth to campaign and use of drugs drugs of among youth drugs
be reduced at empowerment drugs among among drugs reduced of 80% among
90% of anti-drug among youth youth among youth
clubs youth reduced of reduced of youth reduced of
reduce 50% 60% reduced 90%
d of of 70%
50%
DECENTRALIZATION SECTOR
Enhanced 80% of local Construct 30% 40% of cell 50% of cell 60% of 70% of cell and 80% of cell
equitable, entities have ,maintain and of cell and and villages cell and villages have and
efficient and improved offices rehabilitate and villages have villages improved offices villages
effective service villages and village have improved have have
delivery cells offices s improved offices improv improved
have offices ed offices
impro offices
ved
offices
6 sector offices Rehabilitation Rehab Rehabilitati Rehabilitati Rehabil Rehabilitation of Rehabilitati
rehabilitated of sector ilitatio on of 1 on of 1 itation 1 sector office on of 1
offices n of 1 sector sector office of 1 sector
sector office sector office
office office
JUSTICE, RECONCILIATION, LAW AND ORDER
149
District Priority Actions
DDS Priority
Priority action
SN DDS Priority outcome 2018/ Target
description 2019/20 2020/21 2021/22 2022/23
indicator 19 2023/24
Patriotism, 215,720 men and Institutionalize28055 28055 men 28055 men 28055 men 34500 men 34500 men
unity, 154,900 women itorero men and 19750 and 19750 and 19750 and 37950 and 37950
reconciliation belonging to ry'Igihugu up and women women women women women
and equitable Itorero to village level19750
justice ry’Igihugu wome
guaranteed for n
all Crimes reduced Enhance Crime Crimes Crimes Crimes Crimes Crimes
of 80% at all community s reduced of reduced of reduced of reduced of reduced of
levels policing system reduce 50% 60% 65% 70% 80%
d of
50%
FINANCIAL SECTOR DEVELOPMENT
Access to 80% of adults Sensitization 40% 50% of 60% of 65% of 70% of 80% of
finance ensured have bank campaign and of adults have adults have adults have adults have adults have
for all account in either advocacy adults bank bank bank bank bank
commercial bank have account account account account account
or micro financial bank
institution accou
nt
50% of financial Sensitization 15 % 20% of 25% of 30% of 40% of 50% of
transactions are campaign and of financial financial financial financial financial
done advocacy financ transactions transactions transactions transactions transactions
electronically ial are done are done are done are done are done
transa electronical electronicall electronicall electronicall electronical
ctions ly y y y ly
are
done
electro
nically
150
District Priority Actions
DDS Priority
Priority action
SN DDS Priority outcome 2018/ Target
description 2019/20 2020/21 2021/22 2022/23
indicator 19 2023/24
PUBLIC FINANCE MANAGEMENT SECTOR
Public finance Recommendation Implement Reco Recommen Recommend Recommend Recommend Recommen
well managed s of OAG recommendatio mmen dations of ations of ations of ations of dations of
implemented at n of OAG dation OAG OAG OAG OAG OAG
90% s of implemente implemente implemente implemented implemente
OAG d at 80% d at 85% d at 90% at 90% d at 100%
imple
mente
d at
80%
Clean audit comply with Clean Clean audit Clean audit Clean audit Clean audit Clean audit
report ensured financial audit report report report report report
annually management report ensured ensured ensured ensured ensured
manual ensure
d
151
4.6.Crosscutting areas and associated challenges related to the District’s development
The DDS elaboration took into consideration the cross cutting areas challenges and are reflected below by each cross cutting area
1. Capacity Development
Insufficient skills of staff at local levels in planning, budgeting, procurement procedures and results based management as pre-
requisite to well implement their planned activities or performance contract
Limited skills in human and resources management and low skills in technical areas and ICT
Lack of capacity in many sectors especially energy, good governance and decentralization, urbanization and rural settlement,
2. Regional integration
Gatsibo District is still having a small production in agriculture and livestock for export
Low level of quality of education especially technical skills in different foreign languages like Kiswahili, English and French
Lack of use of international language in different skills
District roads network is in bad condition that result high cost of transport
152
4. Environment and Climate change
Limited alternative sources of energy to biomass usage,
Limited knowledge and skills on environmental health
Within Gatsibo district, 93.2% use firewood for cooking, this have a negative impact as the environment is destroyed
5. Disaster Management
Existence of many people who are scatted in high risk sites (Zones)
Many run off and landslide from hillside and misuse of land master plan
The mismanagement of forest has a negative impact on the environment as it is a main factor of appearance of floods.
Rain water from shelters and main roads not retained that cause the erosion of adjacent soils.
The use of traditional techniques in mining is a source of several deaths at mining sites.
Limited infrastructure such as lightning road in public places exposes to accidents.
153
7. HIV/ AIDS and Non Communicable Diseases
Low awareness on HIV/ AIDS and Non Communicable Diseases prevention and treatment
Low knowledge on non-communicable diseases
Increased prevalence of continued spread of HIV/AIDS infection and non-Communicable diseases and high malnutrition which
exacerbates the HIV/AIDS.
The cross cutting areas are mainstreamed in DDS as elaborated and the above challenges are taken into consideration and appropriate
strategic intervention were elaborated and integrated in the district priority actions to overcome these challenges.
1. Capacity Development
To support and train the staff in ICT use and increase awareness and utilization of new ICT tools in the Public institutions.
Mainstream governance for production across sectors and enhance capacities of public institutions and performance.
The district will offer trainings of semi-skilled & unskilled youth, women and PWDs under Massive short term vocational
training.
2. Regional integration
Work with the private sector to build post-harvest handling and storage facilities across the country and to add value to
agricultural produce (processing).
154
Establish program to improve professionalization of livestock farmers and improve the quality, production and productivity of
their output.
To apply international standards in technical skills and languuage for developing the education sector in the region
Awareness campaign on the important of Country participation in EAC and opportunities from the neighbors countries
155
Promote, coordinate and enable the sustainable management of Rwanda’s natural resources to safeguard green growth and achieve
high standards of living across generations.
Continue to mainstream Disaster Risk Reduction and Management into all development sectors
Promote Conservation of the Environment
6. Disability and social inclusion
Provide special teaching materials for mental disable children
Identify and Provide direct support to eligible PWDs
Increase access to off-grid solutions (Provide off-grid electricity to vulnerable PWDs)
Accessible infrastructure and information
Training and sensitization of parents to provide special care for disabled children
During the elaboration of this DDS, Greening was taken into consideration as follow:
District challenges faced in the implementation of DDSs
Under EDPRSII, are presented below under different sectors:
With green growth in Agriculture, Gatsibo District has the problem of practices that are not in conformity with the green economy. They include:
Climate change that brings prolonged drought that affected livestock and agriculture, Crop diseases such as Bacteria xynthomonas wilt disease
156
(Kirabiranya) which affected banana production, burning of post-harvest crop-biomass which generates heavy smoke in the atmosphere, little
application of organic manure and human activities that are harmful to the environment
In this DDS, measures will be put in place to correct the above issues and ensure green economy in the District especially by shifting to modern-
water-saving irrigation systems where sustainable agricultural practices have many benefits. These are represented in reduced water and energy
consumption costs, increased revenue resulting from increased land productivity, crop yields, reduced labour cost as well as the cost of fertilizers
and pesticides. Benefits from sustainable agriculture are also reflected in improved application of organic manure and human activities due to
improved environmental quality and the food chain.
Sometime the private sector establishes their activities without considering the protection of environment in that area and the environment may be
destroyed by these activities.eg Establishment of petroleum station across the roads,
During this elaboration of DDS, this issue is reflected in two possible ways:
First one is the District in collaboration with Rwanda Environment Management Authority (REMA) shall work with the proprietors of petroleum
stations to ensure that before construction environmental impact studies are carried out with care to ensure environmental friendliness in all activities
designed to promote the private sector, be it in their routine activities or during the construction of infrastructure.
Second one is the District through capable bodies like the Rwanda Standards Board (RSB) shall also ensure that petrol stations observe environmental
standards for example ensuring that disposal of petroleum products’ wastes has been provided for and the facilities to store the waste are well kept.
157
Transport Sector
To help improve greening in the transport sector there will a need to improve drainage on all new roads and the ones being rehabilitated to protect
roads from further erosion and destruction. Similarly impact assessment studies shall be a necessity for all roads being constructed because it has
been realized that most environmental issues arise due to lack of environmental impact assessment studies.
For this sector the effort will be put on encouraging population to reduce biomass consumption by using domestic biogas stoves and
other energy saving stoves to make the energy sector environmentally more friendly, It is also important to note that as more
households start using electricity for lighting, environment will get more protected since they will be able to depend less on biomass
for lighting.
It is noted that unhygienic sanitary facilities for waste disposal, poor management of solid and liquid wastes and inadequate hygienic practices are
causing for a large portion of the population’s disease burden. Sound environmental health conditions are a key prerequisite to enhance quality of
life and impact positively sustainable economic growth. Waste management including recycling of the waste will be one of the priorities in this DDS
to address the problem of waste management with a view to protecting the environment.
This DDS has identified and prioritized green that embody a comprehensive integrated management system. This will be achieved through investing
in solid waste collection and sorting in addition to landfilling and processing services (waste re-use, energy and recycling) and all related
infrastructure. These interventions should work simultaneously complement each other and fill existing investment gaps that act a barriers against
the proper management of the sector. Most importantly it will significantly reduce waste accumulation in streets and waterways across Gatsibo
District.
158
Greening Urbanization and Rural settlement sector
It must be noted that in many cases if urbanization is not planned well, there are some environmental issues that may emerge. Already Gatsibo
District suffer from the lack of town gardens and greening as well as beautification programmes. This is an environmental issue that has to be
contained. There are also problems of flooding and landslides caused by climate change which can be handled better through proper environmental
management practices. Another problem is that in rural areas, even in public infrastructure like schools there are no storage tanks to collect and store
rain water.
In this DDS the sensitization of the population therefore shall be essential for the construction of storage rain water tanks. This will not only protect
the environment but help the population to store water for their domestic use.
Greening ICT
Greening ICT for Gatsibo District, the focus will be on disposing the old ICT equipment that can cause damage to the environment. The District
will explore ways of working with the private sectors to see how the old equipment can be recycled to produce other products.
In terms of promoting the green economy and greening in general, the strategies explained above will go a long way to protect our
environment and promote the strengthening of green economy in the District.
Some roads of Gatsibo District do not have the trees to protect, for greening this sector, the trees will be planted across the roads and in other areas
that may be destroyed by the lack trees across the district. This will promote the friendly environmental issues
159
To promote greening in the social protection sector, all beneficiaries getting shelter shall be requested to plant trees and flowers in
their compounds. Similarly, during construction, rain water storage tanks shall be provided. This will help to collect rain water and
stop the creation of gullies in the surrounding areas. It is important also to note that before the construction of houses begins;
environmental impact studies shall be conducted to ensure that no damage is done. Selection of sites for construction shall be done in
a way that it is only the agriculturally poor sites that can be selected so that we don’t misuse good agricultural land.
Enhance hygiene and sanitation conditions in public spaces and household’s is critical.
To protect the environment and promote green economy in the health sector, will require all the parties involved in the provision of health services
and the seekers of the services. The seekers of the services will be required to maintain high level of cleanliness i.e. not disposing the waste
everywhere; again the litter should be put in places reserved for it for the hospital administration to collect. The Hospital administration are also
required to observe high degree of cleanliness and also be careful especially when disposing some dangerous products used in hospital so that they
disposed in the right places safe for the protection of environment. Hospital administration should also plant flowers and trees on their compounds
not only to beautify their compounds but also to protect the environment. Where new infrastructure is to be built environmental impact studies will
be done to determine whether there will not any damage to the environment. The District will continue to sensitize the hospitals and population to
protect the environment as a way of beautification of health centres
To promote green economy and greening in general where new classrooms are to be constructed, effort shall be made to ensure that environmental
impact studies are done before construction begins. Planting trees and flowers on school compounds shall also be done to protect environment around
the schools to beautify the surroundings. On top of this, using biogas and other energy saving technologies in school kitchens shall be intensified to
reduce emissions of smoke in the atmosphere.
In this DDS elaboration, the District will also promote the establishment and operationalization of environment and climate change clubs and monitor
the numbers of students.
160
CHAPTER V: IMPLEMENTATION OF DDS
5.1.Introduction
The DDS will be implemented within the district by different institutions: public Institutions,
national and international NGOs and civil society. Before this implementation, the district will
organize workshop per year progress and to set out strategies and proper mechanism to
implement DDS successfully.
I. AGRICULTURE SECTOR
161
maize, rice and agricultural agricultural improved improved agricultural
coffee inputs inputs agricultura agricultural inputs
l inputs inputs
4. Sustainable Rehabilitation of Rehabilitati Rehabilitation Rehabilita Rehabilitati Rehabilitatio
post-harvest 2 and equipment on of 2 and of 3 and tion of 1 on of 1 n of 1 coffee
plants for of 1 coffee equipment equipment of 1 coffee coffee washing
both handling washing stations of 1 coffee coffee washing washing washing stations
and storage washing stations and stations stations
secured by stations Construction of
the private 1 coffee roasting
sector ground factory
Agricultural in Muhura
yield added Sector
value Construction and Awareness Awareness and Awareness Awareness Awareness
increased equipment of 1 and operationalizatio and and and
maize processing operationaliz n of maize operational operationali operationaliza
factory in ation of processing ization of zation of tion of maize
Rugarama Sector maize factory maize maize processing
processing processing processing factory
factory factory factory
162
network 4.5km of 2.5 km of stone 3 km of 3 km of stone 3 km of stone
improved stone roads roads stone roads roads
roads
163
cooking cooking cooking cooking
energy energy energy energy
164
maximize grouped grouped grouped grouped grouped grouped
the use land settlements settlements settlements settlements settlements settlements
promoted
165
1. Livelihood 20 houses of 25 houses of 35 houses of 40 houses of 40 houses of 40 houses of
condition of genocide genocide genocide genocide genocide genocide
vulnerable survivors survivors survivors survivors survivors survivors
groups constructed constructed constructed constructed constructed constructed
improved 15% of 25% of 35% of 40% of 50% of 60% of
beneficiarie beneficiaries beneficiaries beneficiaries beneficiaries beneficiarie
s of VUP of VUP of VUP of VUP of VUP s of VUP
program program program program program program
graduated graduated graduated graduated graduated graduated
166
XIII. JUSTICE, RECONCILIATION, LAW AND ORDER
S/N Project FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24
1. Patriotism, 28055 men 28055 men 28055 men 28055 men 34500 men 34500 men
unity, and 19750 and 19750 and 19750 and 19750 and 37950 and 37950
reconciliatio women women women women women women
n and Crimes Crimes Crimes Crimes Crimes Crimes
equitable reduced of reduced of reduced of reduced of reduced of reduced of
justice 50% 50% 60% 65% 70% 80%
guaranteed
for all
167
5.3.DDS Implementation Strategy
The elaboration of Gatsibo DDS followed a participatory approach involving a various number of
stakeholders. In the same way, the implementation of this DDS cannot be achieved without the
involvement of those stakeholders. The success of its implementation will be a result from the
involvement of public institutions, private sectors, Civil society including NGOs (local and
International), Community Based Structure (CBS) including National Women Council, National
Youth Council, National Commission for people with Disability, etc. The implementation of DDS
will also involve Faith Based Organization such as religious, responsible of churches etc.
The role of citizen of Gatsibo will be of paramount importance as beneficiaries and actors of this
DDS. The following session describes the role of every stakeholder in the implementation of this
DDS.
Ministry of Trade and Industry (MINICOM) by implementing its program of promotion of SMES
and Cooperatives support, Ministry of Infrastructure (MININFRA) through RTDA, REG and
WASAC which contributes mostly in roads development, electrification of the district, Water
Supply and sanitation facilities respectively. Rwanda Development Board (RDB) also intervenes
in tourism development within Akagera National Park, Ministry of Education (MINEDUC) and
its affiliated agencies provide more efforts in education development by enhancing skills
development and so on.
168
5.3.2. The role of the Province and Provincial Steering Committee
The Province is the Districts overseer entity and is entrusted with the power to coordinate all
decentralized activities from sector to district. It shall coordinate, monitor and evaluate progress
and annual district performance aligned to the set annual targets. it shall ensure that interventions
of the district respond to national priorities and those of the district, it will ensure that sector
priorities are well captured especially those which will only be reflected in action plans including
national issues, it shall advocate for resources and other necessary interventions, and bring
together districts thematic working groups and partners for joint planning.
It shall also be the role of district to mobilize resources and partners in and out of the district,
whereas the DDS will cost billions, the district own revenue are in millions thus the district will
undertake mobilization efforts of the private sector, government sectors and the civil society for
supplementary resources.
169
coordinates them in having a joint planning and budgeting. They will ensure that their interventions
respond to the aspirations of the district and the national priorities, they will monitor and evaluation
the interventions of the district and those of their own through their forum. They will plan together
with the district to avoid duplication of intervention and scattering of resources which were
reflected in the DDP/EDPRS 2 and lastly but most importantly they will implement the DDS
through pulling resources.
Therefore the local population shall be involved to implement the DDS by the extent of their
abilities. The local population shall have on annual basis home Imihigo or performance contracts
regarding hygiene, socio-economic development, home security, home base investment, peace and
gender based harmony among others which will be instrumental in achieving the district priorities.
It shall also be mobilized to exploit opportunities of interventions and ensure the suitability of the
projects
170
Imihigo, the districts will regularly report to the provincial steering committee about the progress,
emerging priorities in Gatsibo district and outstanding challenges. Bottom up planning from
district sectors through JADF at sector and cell level shall serve as a coordination and information
sharing mechanism.
The scattering of development partners’ efforts. Effective and better organization of JADFs at
the district, sector and cell level is to be under taken to mitigate against this risk.
Man power turnover was by far the biggest challenge in the previous DDP. In order to
minimize this, capacity building shall be ensured, monitory motivation of the district staff by
use of district revenue as by the laws shall be used, and good working conditions especially at
sectors, cells and villages are to be ensured through the construction of offices, and their
equipment and non-monetary support. Besides this, the district will ensure that more competent
man power is recruited in line with the new district structure as means become available.
Non ownership of the DDS interventions and their sustainability challenges. While poverty
reduction was a priority in the last DDS as an example, it is not clear if the social protection
programs stopped today, the beneficiaries would not sink back into poverty. This DDS is
prepared therefore with this benchmark. Therefore locals shall be mobilized and involved in
the implementation of the DDS and in the evaluation process. Intervention shall be followed
by impact assessment.
Limited financial resources: the global economy has been since 2007 constantly moving into
recession and there is no indication that the situation is improving either. Gatsibo district is
being depend on the development partners and government grants, this is a likely risk.
Therefore innovations, use of home grown solutions , engagement of the private sector using
the PP approach, proper coordination, improved PFM shall be used to ensure better use of
limited resources.
Sustainability and environmental issues should also be taken into account during the
implementation of this DDS. The District should therefore, ensure that Environmental Impact
Assessments (EIA) and/or Environmental Management Plans (EMP) are always carried out
for development projects as required
171
5.6.Communication and marketing strategy for the District
The implementation of DDS will involve a number of stakeholders or actors who need to be
informed and communicated on a regular basis about the progress against DDS implementation as
well as challenges therein. The effective communication and marketing during implementation of
DDS will enhance planning, organizing, leading and control mechanism for the delivery of
District’s objectives.
Ensure participation of all District stakeholders in annual planning and monitoring of the
implementation of the set annual priorities.
Use of structured District council and JADF meetings to communicate to the members
about the implementation status of DDS.
Use of community outreach assemblies to communicate the progress against DDS before
citizens in a bid to rise up their role and involvement in implementation.
Disseminate progress reports for DDS implementation via District website and enhance the
use of social media to market the District activities.
Work closely with media (radio, televisions and newspapers) to inform the public about
District activities and DDS implementation status.
Use of District and sector level coordinating committee meetings as a mechanism to discuss
bout District development progress and challenges.
172
CHAPTER VI: MONITORING AND EVALUATION
6.1.Introduction
The implementation of this DDS will require a closed monitoring and evaluation system. This will
be performed by a joint action of different actors both internal and external. However, the
assessment or monitoring and evaluation of level of implementation of DDSs' Projects allow
determining whether all Projects planned in DDSs are aligned to planned schedule of planned
activities, and it will assess whether projects of DDS being producing the desired impacts.
In this regards, monitoring and evaluation will help Gatsibo District as follows:
1. To learn from experiences to improve practices and activities in the future DDSs;
2. To have internal and external accountability of the resources used and the results obtained
in the spirit of Socio-transformation of District and entire Population;
3. To take informed decisions on the future initiatives, in regards of strategic projects to the
Districts Authorities, and District’s council;
5. Not only have these, but also, the evaluation of implementation assessed, as systematically
and objectively as possible, a completed projects (or a phase of an ongoing project that has
been completed). Evaluations appraise data and information that inform strategic decisions,
thus improving the project in the future DDSs.
6. At the end, the evaluations will help the District to draw conclusions about five main
aspects of the intervention:
a) Relevance
b) Effectiveness
c) Efficiency
d) Impact
e) Sustainability
Information gathered in relation to these aspects during the monitoring process will provide the
basis for the evaluative analysis and the catch-up to the remaining projects to attain 2018-2024
targets planned in Districts Development Strategies, and in NST1.
173
6.2. Methodology that will be used to monitor and evaluate DDS
Monitoring and evaluation need to establish a clear template with the indicators and means of
verifications that have already set.
For this reason, the following is the template and the Schedule for monitoring and evaluation of
the implementation of DDSs’ Projects of Gatsibo District:
6.3.How to Assess District’s DDS?
To ask all Departments and Partners of the District under implementation of DDS’s
Projects to show the progress of approved DDSs priorities related to their domains.
To ask the District’s staff in different departments and Authorities if they did strategies
they intended to do on DDS.
The overall goal of assessing a DDS Document is to determine how well it has been
implemented (including, who, what, when, where, and how activities were accomplished), and
know the gap compared to the planned Projects and completed projects.
Ongoing monitoring of trends that may be impacting the progress, or lack of progress,
towards goals. This will include identifying individual goals and objectives that are
progressing well according to the plan, and those that are falling short, and suggesting any
actions or adjustments that may be needed for the plan to succeed.
A final evaluation after the plan is concluded to determine overall success and impact. This
stage will be supposed to be conducted by end of June 2024.
174
In this regards, the Gatsibo District will put on place and institutionalize a Management Review
Process (MRP), and Measuring and Monitoring Process (M&MP) steps. These steps will help
Gatsibo District to make a review on any priority captured into the DDS toward achievements to
bridge the gap compared to the baseline and the targeted achievements in terms of time and
beneficiaries, since it has socio-economic impacts. The failure to follow these steps, it will be
affected the real results and timeline of said plans or intended outputs and outcomes.
6.5.Role of external actors
Central Government through its respective ministries especially MINECOFIN and MINALOC and
other institutions will ensure the implementation of DDS in the whole country. Moreover, they
will ensure the availability as required. The Province will ensure the execution of planned activities
of the districts through Approved Budget and Signed District Performance Contracts. It will
analyze the reports submitted from the District and recommend or advise accordingly in order to
align the reported achievements and an intended Outputs mentioned into the DDS.
NGOs and other partners will contribute technically and financially in the implementation of the
DDS. Moreover, they will provide the required information regarding integrated activities and
submit relevant reports to JADF. The latter will moderate the exchange between partners and
executive committee.
Table 8: Duties and responsibilities of M&E actors
Actor Duties Means of Periodicity
Verificationon
Central Elaboration and monitoring of Sector Strategic Programs/Priorities, Quarterly,
Government Plans, and avail financing resources Annual Budget, Midi-term,
Imihigo Evaluation Annually
Reports
Province Ensure the advice, and coordinate of Reports Quarterly,
implementation of national programs/priorities and Midi-Term
directives, monitor and evaluate performance of and
District Budgets and Performance contracts and Annually.
entire DDSs Projects.
District Coordination, monitoring and evaluation of DDS, Field visit reports & Monthly,
Prepare and implement Budget & Performance Assessment reports quarterly
contracts of district and
Annually
Sectors Prepare action Plans and Imihigo and Prepare Assessed and Monthly,
Budget related, carry out implementation, consolidated reports quarterly
monitoring and evaluation of actions plans and fields visit reports. and
respective Performance Contracts “Imihigo” at Annual
their level. Collects and
analyses quantitative and qualitative data,
transmits reports to District
Beneficiaries Contribute to the implementation of projects; Field visit reports Monthly,
participate in the field evaluation and provide Quaretly
175
feedback on which activities are off track and on and
track for improvement and appreciation or success annualy
stories.
JADF/ CSOs Avail financing resources, Coordinates the Meeting reports & Quarterly
exchange between partners and District Open day reports and
Semester
6.6.Reporting system
Different reports under the DDS will be done both by soft and hard copies. However, in order to
ensure the authenticity of data, only hard copies will be considered as official and will be stored
by the concerned institutions. The reporting channel will vary accordingly the played role by
different actors. The District ensures the integration of all planned activities into District Annually
actions, District Budget and Stakeholders Plans. Each stakeholder has to report officially to the
District implemented priority. The District consolidates quarterly, Midi-term and annually the
execution reports and submits these related reports to the District Council, Province, Ministries
and other responsible public institutions.
A graph can be proposed here to illustrate the reporting system.
176
Public institutions: Province, Ministries
and Agencies
Village level: Village Leader evaluates Village level: Village Leader evaluates
families Imihigo and consolidated families Imihigo and consolidated
relevant achievements and submits the relevant achievements and submits the
report at cell level report at cell level
Note that: The District with the support of MINECOFIN and MINALOC shall develop formats for the reports.
As we prepare to monitor and evaluate the progress of the DDS, there will be a need for us to ask ourselves the following questions:
1. Who prepares the monitoring report? As mentioned above, it is the responsibility of the District Executive Committee to produce the M&E
report. However, the officer in charge of monitoring and evaluation in the District shall prepare the reports on behalf of the Executive committee
177
and submit them to the Executive Secretary for subsequent submission to other levels. However, it should be noted that the M&E reports
submitted to higher levels are properties of the District and therefore, shall be fully owned by the District Executive Committee.
2. When are the M&E reports prepared and submitted? There are three reports to be prepared: The monthly M&E report prepared for the
consumption of the District Executive Committee to help them follow implementation progress of the DDS, Quarterly reports submitted to the
District Council through its bureau, JADF through its committee at the District, the Province, MINECOFIN and MINALOC. These reports
shall be prepared and submitted every quarter i.e. every three months. There shall also be annual reports to the District Council, JADF, the
Province, MINECOFIN and MINALOC to show the progress of the DDS for the whole year. The deadline for the submission of the reports
shall be the 15th of the month proceeding the period for which the report is about.
3. To whom are the M&E reports submitted? The M&E reports shall be submitted to the District Executive Committee through the Executive
Secretary, the Council through its bureau, JADF through its representative at the District, the Province, MINECOFIN and MINALOC.
4. How will data (District indicators) be stored and retrieved? Initially, the M&E data e.g. indicators shall be stored manually in the printed
hard copies and filed in the department of planning and M&E to serve as backups. The data shall also be kept in excel sheets filed in folders
and stored in the PCs of the department. However, with time, when the M&E system of the District is computerized which should be the ultimate
aim of the District at some future time, the data should be stored and retrieved electronically.
5. How will reports be stored? The reports shall be stored manually in the manual files as backups but shall also be stored electronically in the
computers and retrieved when the need arises
6. What will be the role of the JADF in M&E? Although JADF is not a line structure on District’s organization chart, it exists as a supporting
structure and its role in the development of the District is very important. Members of JADF meet quarterly and it has a committee and an
employee of the District to coordinate its activities on daily basis. The District shall submit Quarterly and annual reports to JADF committee
for the committee to study the reports and react on them during their quarterly and annual meetings. Their inputs shall be very crucial in the
elaboration and implementation of the DDS, since their interventions are part and parcel of the District’s interventions.
7. What is the evaluation plan for the DDS? Annual evaluation shall be conducted for shorter activities whose implementation can be completed
in one year. This evaluation shall be conducted by an independent organization to ensure un biased results. Hopefully, IPAR shall continue to
carry out the evaluation as they have shown impartiality and credibility in their work. It must be noted, however, that for the DDS as a whole,
there shall be a mid-term evaluation which shall be conducted midway during implementation, precisely, after three years of implementation
and final evaluation which shall be conducted after full implementation of the DDS i.e. at the end of the sixth year. The most fundamental
reason of carrying out mid-term evaluation is to assess the progress made midway between a program’s commencement and its presumed end
with a view to making corrections and necessary adjustments to achieve the best results possible. More often than not, after a midterm evaluation,
178
reprogramming of interventions is done to address any issues that could have hampered the progress of the program during implementation so
that the program can be on schedule again. On the other hand, a final evaluation is conducted to assess the impact of the program on the
beneficiaries. End of tem or final evaluation of the DDS therefore, shall be conducted to assess its Socio-Economic impact on the citizens of
Gatsibo District, document lessons learnt and challenges so that they can be used to inform the designing of the proceeding (next) DDS.
The implementation of strategic plan requires resources, both financial and human resources. In this regards, this chapter presents the needed
financial resources for the implementation or execution of the planned DDS projects referring to the available sources of funds including the
mobilized funds from various District Stakeholders such as Private and Non-Governmental Organizations as well. Under this part, it will be also
shown in detail the estimated budget of the main DDS projects by showing their amount of money that will be needed at each financial year
under the DDS implementation period for the district projects execution.
The implementation of the DDS projects will need the collaboration and cooperation of all District Stakeholders through resource mobilization.
The following main types of sources of revenues will be considered during Budgeting process and allocation of funds for implementation of
respective projects:
Government Funds (Earmarked transfers, Transfers from other GoR Agencies, and external grants)
District own revenues
Local and international donors
Private sources
And other sources
179
The cost of the Gatsibo DDS is a sum of total annual costs of all six years. All the outputs in the logframe have been costed on annual basis to
produce aggregated costs for the whole implementation period. Refer to sensitivity and timeline of implementation, some outputs implementation
plan schedule are less than six years while others will cover six years to implement them. The costing shall be done on “per unit basis” where it
is possible to define outputs in terms of units and “whole project basis” where it is difficult to break an output into units and therefore for simplicity
purpose the output is considered as a project whose implementation in different years shall be done in parts or percentages.
The costing currency is expressed in Rwandan Francs. The total estimated cost of the DDS for Six years (2018/19 to 2023/24 fiscal years) is One
Hundred Seven Billions Twenty Millions Two Hundred Thousands Rwandan francs(107,020,200,000. Frw). The table below is summarizing
the DDS Cost in respective Pillars.
180
Here below, the table shows the estimated detailed cost of Gatsibo DDS for six years (2017/19 to 2023/24)
PILLAR ESTIMATED BUDGET
(RWF)
PILLAR ECONOMIC TRANSFORMATION 63,700,500,000
SOCIAL TRANSFORMATION 39,778,000,000
TRANSFORMATIONAL GOVERNANCE 3,541,700,000
PRIORITY AREA UNDER EACH PILLAR
ECONOMIC TRANSFORMATION
Priority Create 1.5m(over 214000 annually) decent and 8,731,000,000
area 1 productive jobs for economic development
Outcome Increased number of Rwandans with 8,605,000,000
1 appropriate skills tailored to labour market
demands
Outcome Off farm jobs created 126,000,000
2
Output 1 Youth workforce skills developed 126,000,000
Activity 1 Youth cooperatives benefiting from craft 39,000,000
centers
Activity 2 700 men and 650 Women youth trained in 39,000,000
entrepreneurship
181
Activity 3 350 new youth off-farm employment 48,000,000
opportunities
Priority Accelerate Sustainable Urbanization from 38,908,500,000
area 2 17.3%(2013/14) to 35% by 2024
Outcome Productive user access to electricity increased 3,415,000,000
to 100%
Outcome Street lighting expand to all national and district 605,000,000
2 roads
Outcome Improved public transport services ,effective 31,960,500,000
3 and safe traffic management
Outcome Integrated urban and rural settlement 2,928,000,000
4 development
Output 1 Grouped settlement developed 2,101,000,000
Activity 1 3 New IDP constructed 2,035,000,000
Activity 2 11.8% female-headed and 89.2% male headed 66,000,000
settle in grouped settlement
Output 2 District master plan implemented 635,000,000
Activity 1 30 trading centers developed 155,000,000
Activity 2 23% for KABARORE and 21% for 480,000,000
NGARAMA master plan developed
Output 3 Land use developed 12,000,000
Activity 1 75% of land use master plan implemented 12,000,000
182
Output 4 Green and beautification improved 180,000,000
Activity 1 100% all new public buildings greened 180,000,000
Priority Establish Rwanda as a Globally Competitive 1,330,000,000
Area Knowledge-based Economy
Outcome District is connected to the outer world and 1,330,000,000
1 people(both men and women) can access
information
Output 1 ICT Infrastructure and its usage improved 1,210,000,000
Activity 1 Public institutions and main trade centers 520,000,000
accessing to internet through optic fiber
Activity 2 14 schools equipped and admitted to one laptop 150,000,000
per child program
Activity 3 100% telephone network coverage 270,000,000
Activity 4 100% of FM Network coverage 270,000,000
Output 1 The use of ICT increased 120,000,000
Activity 1 Reduce computer literacy among people aged 6 60,000,000
and above
Activity 2 Operational E-tracking system at Sector level 60,000,000
Priority Promote Industrialization and attain a structural 1,845,000,000
area 4 shift in the export base to High-value goods and
services with the aim of growing exports by
17% annually
183
Outcome Increased exports of value-added goods 1,845,000,000
1
Output 1 7 Agro-processing plants for meat, maize, 1,845,000,000
leather ,milk, tomato and rice constructed
Activity: 1 Construct (Coffee , banana and Milk) industries 1,845,000,000
in Industry zone
Priority Increase Domestic savings and position 24,000,000
area 5 Rwanda as a hub for financial services to
promote investments
Outcome Enhanced long-term savings and innovative 24,000,000
1 financing mechanisms
Output 1 Financial institutions improved 24,000,000
Activity 1 110% of SACCO operation 12,000,000
Activity 2 12 New microfinance branches 6,000,000
Activity 3 New UMURENGE SACCO outlets 6,000,000
implemented
Activity 4 New UMURENGE SACCO’s offices equipped 6,000,000
Priority Sustainable management of natural resources 1,984,000,000
area 5 and environment to transition Rwanda towards
a carbon neutral economy
184
Outcome Increased sustainability and profitability of 1,890,000,000
2 forestry management
Output 1 Forest coverage is increased 1,890,000,000
Activity 1 10557 ha of forest will be maintained 630,000,000
Activity 2 30,000 ha of agro forest will be planted 630,000,000
Activity 3 New 1,800 ha of forest will be planted 630,000,000
Priority Modernize and increase productivity and 10,878,000,000
area 6 livestock
Outcome Increased agricultural production and 5,429,000,000
1 productivity
Outcome Increased financing and infrastructure for 3,183,000,000
2 agriculture
Outcome Improved livestock sector 2,266,000,000
3
Output 1 Large and small livestock especially within 1,656,000,000
poorest families increased
Activity 1 8100 cows distributed 1,116,000,000
Activity 2 11,100 goats, 3,300 pigs, 30,000 poultry 480,000,000
distributed
Activity 3 12 new fish ponds constructed 60,000,000
Activity 3 Construction of animal feed processing plan 830,000,000
185
Output 1 Animal feeding ensured and domestication 33,000,000
improved
Activity 1 150 ha of forage fields 15,000,000
Activity 2 Quantity of animal produced per day increased 18,000,000
Output 1 Local breed genetically improved to exotic one 45,000,000
Activity 1 20,956 Cows and heifers to be inseminated 30,000,000
Activity 2 Veterinary pharmacies/clinics established 15,000,000
Output 1 Value of animal products improved 514,000,000
Activity 1 New milk collection center and improvement of 105,000,000
5 existingMCS
Activity 2 Dairy plant established 310,000,000
Activity 3 Slaughterhouse will be established 40,000,000
Activity 4 Veterinary laboratory will be operational 4,000,000
Activity 5 Hatchery constructed 55,000,000
Output 1 Increased diseases are prevented and controlled 18,000,000
Activity 1 80% animal vaccinated from epidemic diseases 18,000,000
Pillar 2: Social Transformation
Priority Enhance graduation from extreme poverty and 5,021,000,000
area 2.1 promoting resilience
Outcome Increased graduation from extreme poverty 5,021,000,000
1
186
Output 1 Life condition of genocide survivors improved 2,196,000,000
Activity 1 270 Houses of genocide survivors constructed 1,170,000,000
Activity 2 240 new income generating projects of 123,000,000
genocide survivors sponsored by male and
female of beneficiaries
Activity 3 670 Vulnerable genocide survivors receiving 903,000,000
direct support
Output 1 Life conditions of Historical Marginalized 77,000,000
People improved
Activity 1 30 HMP reintegrate schools 33,000,000
Activity 2 2 new Modern potteries constructed 11,000,000
Activity 3 30 startup kit for HMP 33,000,000
Output 1 Life conditions of People with 45,000,000
Disabilities(PWDs)
Activity 1 54 income generating activities of PWDs 33,000,000
supported
Activity 2: Center in Ngarama sector (Wikwiheba mwana ) 12,000,000
1 upgraded
Output 1 Male and Female heads of HHs benefiting 2,703,000,000
direct support from VUP
Activity Reduced poor people to 2379 2,703,000,000
Priority Eradicating Malnutrition 423,000,000
Area 2:2
187
Outcome Reduced malnutrition among the children 423,000,000
1
Output Nutrition improved 423,000,000
Activity 1 Children <5 years screened in CBNP 423,000,000
Priority Enhancing demographic dividend through 4,492,000,000
Area 2.3 ensuring access to quality health for all
Outcome Improved healthcare services 156,000,000
1
Outcome Increased financial sustainability for the health 4,258,000,000
2 sector
Output 1 Health Financing improved 210,000,000
Activity 1 Population covered by CBHI increased 210,000,000
Output 2 Service Delivery improved 18,000,000
Activity 1 HF with standard guidelines, procedures, 18,000,000
protocols, available and used
Output 1 Health Geographical Accessibility improved 4,030,000,000
Activity Health Post Constructed 420,000,000
1:
Activity 2 Maternity ward constructed in HFs 480,000,000
Activity 3 Health Center Rehabilitated/ upgraded 530,000,000
Activity 4 District Hospital for Extension/rehabilitated 2,000,000,000
188
Activity 5 HFs Equipped for Medical Equipments 600,000,000
Outcome Reduced Communicable Diseases and Non- 60,000,000
3 Communicable disease(NCDs)
Outcome Increased Contraceptives prevalence 18,000,000
4
Output 1 Family Planning/ASRH improved 18,000,000
Activity 1 Contraceptive Prevalence Rate increased 18,000,000
Priority Enhance demographic dividend through 9,360,000,000
Area 2.4 ensuring access to quality education
Outcome Improved education quality in priority in 9,090,000,000
5 primary and secondary
Outcome Increased access to pre-primary education 270,000,000
6
Output 1 Early childhood developed 270,000,000
Activity 1 new ECDs constructed 270,000,000
Priority Moving towards a Modern Rwandan Household 20,482,000,000
Area 2.5
Outcome Universal Access to basic infrastructure (Water, 20,452,000,000
1 Sanitation, Electricity, ICT, shelter)
Outcome Increase of the population’s quality of living 30,000,000
2
Output 1 Mainstreaming disaster risk reduction and 30,000,000
management into all development sectors
189
Activity 1 182 of public buildings equipped with lightning 30,000,000
conductors
TRANSFORMATIONL GOVERNACE
Priority Reinforce Rwanda culture and values as a 2,947,500,000
Area 3.1 foundation for peace and unity
Outcome Enhance unity among Rwandans 2,947,500,000
1
Output 1 Order and Patriotism promoted 308,000,000
Activity 1 602 Itorero campaigns in Villages 154,000,000
Activity 2 28055 men and 19750 women of people 154,000,000
belonging to Itorero ry’Igihugu program by sex
Output 2 Genocide memorials and cemeteries improved 2,034,000,000
Activity 1 One genocide Memorial rehabilitated and three 2,005,000,000
a monument sites
Activity 2 Public cemeteries well managed and organized 29,000,000
Output 1 Youth’s health improved through sport 605,500,000
activities
Activity 1 Playgrounds developed within cells 75,000,000
Activity 2 One district min-stadium 505,000,000
Activity 3 One district team 25,500,000
Priority Strengthen Justice, Law, and Order 145,200,000
area 3.4
190
Priority Strengthen Capacity, Service Delivery and 227,000,000
area 3.5 Accountability of Public Institution
Priority Increase Citizens’ Participation, engagement 222,000,000
area 3.6 and partnership in development
191
Table:List of JADF members of GATSIBO District 2018-2019
(Source: GATSIBO JADF )
No Category Number of NGOs (Local and International ) Budget submitted in action plans
1 International NGOS 23 4,657,995,426 Rwf
2 Local NGOs 22 378,511,854 Rwf
TOTAL 45 5,045,507,280 Rwf
Nº Name of NGO Domain Administrative entities of Implementing Beneficiaries Name and Contact Total Budget in Source of
(Intervention Area) interventions partner of the the action plan Funds
(Sectors) geographical Representative in
coverage the district
1 Hinga Weze-Feed the Nutrition, agriculture Kageyo,Gasange Hinga Weze Farmers USAID
Future productivity Celestin Musoni:
106,696,000
0788425006cmusoni
Rwf
@cnfarwanda.org
2 Clinton Foundation Agriculture Ngarama, Muhura, Clinton Farmers Pascal Nkikabahizi 61,174 USD= Clinton
Gasange, Foundation Tel:0788463890 Foundation
51,997,900RWf
Murambi,Gatsibo, Gitoki,
Nyagihanga and
Rwimbogo
192
3 Norwegian People’s Good governance All Sectors in Gatsibo AJPRODHO and Local Felipe Atkins 36,361,420Rwf Norway
Aid District RWN community nparwanda@npaid.or
g
julkwizera@npaid.org
0788424994
0788300899
4 Volunteer Services Education Sector Secondary and Primary Secondary and Pre-primary David 0788417604 179,263.13USD USAID
Overseas schools Primary schools children ,head
=152,373,660.5
teachers and
parents Rwf
5 Plan International Education, child Murambi, Rwimbogo, Plan international Vulnerable 0788752625 620,807,655Rwf Plan
protection and social Kiramuruzi, Kabarore and and YWCA families Alice Rugelindinda Internationa
protection Kiziguro and Nyabiheke l
refugees camp
6 CARE International Economic Nyabiheke refugees Nyabiheke VSL group Mutsinzi Jean 5,416USD = Master
Development Camps refugees members Francois Regis Card
4,603,000Rwf
Jeanfrancois.mutsinzi
@care.org
078923506
7 World Vision Economic Kabarore, Rugarama, World Vision- Vulnerable Eduard MUHORANA 655.415USD CANADA
Rwanda’s development health kiramuruzi, Gitoki. Kiramuruzi households 0788651209
=557,102,750
and nutrition Akagera Cluster and children
aged between
3-12
8 Vision for a Nation Health (Primary eye All health centers MOH All Abdhall 0786653860 12,000,000Rwf James
Foundation Care) communities E-MAIL: CHEN &
info@vfanf.org USAID
9 American Refugees Health Nutrition Gatsibo District American Congolese Victor 0788318624 785,313.92USD UNHCR
Committees Shelter Refugees Refugees in PRM
=667,516832Rwf
Wash Committees Nyabiheke
Livelihoods camp
193
10 Food for Hungry Education, health, Murambi and Mayange Cell Sector Education Children Alice Kamau (country 146,051,107Rwf FH Rwanda
Rwanda livelihood and disaster in NYAGIHANGA Sector Officers, Parents (Students), director ). e-mail:
risk reduction youth,commu akamau@fh.org
nity ,jhakizimana@fh.org
volunteers, tel:
water access 078920353/07887117
Rwanda 82
fndayisaba@fh.org
11 Heifer International Livestock Ngarama, Muhura, Heifer Farmers in Kiiza David 84,336,232Rwf Heifer
Rwanda Gasange, Nyagihanga , International Ngarama, david.kiiza@heifer.or Internationa
Gatsibo and Murambi Rwanda Muhura, g l Rwanda
Sectors Gasange, 0785240473
Nyagihanga ,
Gatsibo and
Murambi
12 ONE ACRE FUND - Agriculture (agricultural Gatsibo, Gitoki, One Acre Fund - Populations Irene Hakizimana 392,165.00USD Private
TUBURA trainings (planting, soil Kabarore, Kageyo, Tubura (10,000 0788607107 Donors and
=333,340250Rwf
management, Kiramuruzi, farmers hakizimana@oneacre Farmer
composting, trees, Kiziguro, Murambi, (excluding fund.org Repayment
harvesting, Remera and agro dealer
nutrition), to increase Rugarama sectors. sales))
agriculture production)
13 AVSI Rwanda Socio-éducatif , Kageyo, Gasange, Remera AVSI Rwanda, 671 Enfants NAHIMANA M. Rose 132,848,152Rwf AVSI/SAD,
. Foundation renforcement and Muhura Sectors. et leurs avsi.gatsibo16@gmai CEI et FDH
économique des familles l.com
familles, child Tel: 0788557803/
protection and GBV 0784431012
14 Save the Children- Mureke Dusome All Schools Umuhuza Teachers, 0787168319 172,112.25 USD IKEA
Umuhuza Project head teachers Alex.Alubisia@saveth Foundation
=146,295,200Rw
echildren.org
f
Rwanda.info@saveth
echildren.org
194
15 Hope and Home for Care of children All Sectors HHC and NCC Children and 0788846884 308,336.00USD= HHC
Children Rwanda without parental care their families, Bwiza Christelle
262,085600Rwf
and family, families foster Project Coordinator
with high malnutrition families,
rate Home of
Mercy
Institution
16 Compassion Holistic child Kiramuruzi CECA KIGASHA Children from GAKUBA Emmanuel 433,473,037 United
International Rwanda development and Gatsibo CECA KAYISHA various State of
social protection Gabiro ADEPR MUGERA churches 0788493389 America
Rugarama EAR MUHURA egakuba@rw.ci.org
Muhura EAR KIBONDO Irene Ingabire
Rwimbogo ADEPR 0788472614
Gitoki KIRAMURUZI
Kiziguro ADEPR GABIRO
UEBR
RWAGITIMA
EAR
KIRAMURUZI
EAR BISHENYI
EAR KABARORE
EAR MATARE
REVELATION
KABARORE
REVELATION
RUGARAMA
DOVE NDAMA
CELPAR
KABARORE
17 Catholic Relief Capacity building of Kabarore,Rwimbogo,Rugar Cooperatives Catholic CRS- 9,435,000Rwf USAID
Services cooperatives ama,Gitiki,Gatsibo,Muhura members Relief RW@global.crs.or
and Kageyo Services 0788891722Vincent
18 Humanity and Inclusive education TTC Kabarore TTC Kabarore Humanity and j.michel@hi.org 10,626USD=
Inclusion Inclusion 9032100Rwf
195
19 MLFM Water and Sanitation Muhura and Murambi Community from MLFM Ngamije SAFINA 287,867,500Rwf MLFM
Muhura and 0788640416
Murambi Sector ngamijesafina@gmail
.com
20 ADRA Rwanda Social protection and ADRA Nyabiheke Refugees Nyabiheke ADRA 0781002395 563,187.00= ADRA
Camps Refugees Rwanda 478708950Rwf Rwanda
21 Energy 4Impact Renewable Kabarore Rutenderi Absolute patrick.mwizerwa@e 10,850,000 SIDA(Swed
energy/SOGER community energy,Gatsib nergy4impact.org Rwf ish
(Scaling up Off Grid o district and Mwizerwa Patrick Internationa
Energy in Rwanda) Rutenderi 07888520996 l
community Developme
nt Agency)
22 International Union for Forest restoration and Kabarore,Gitoki ,Gatsibo Community Gatsibo Dukuzumuremyi 124,525,000 IUCN
Conservation of Nature Environmental and district Donata 0788768642
Protection Rwimbogo,Nyagihanga, ,RWFA and ddukuzumuremyi@g
Gasange and Murambi IUCN mail.com
1 Rwanda Good Gasange, Gatsibo, Kageyo, RWN Citizens of Gasange, Emmaus SIBOMANA 9,807,500Rwf NPA
women’s net governance(Citiz Murambi and Nyagihanga Gatsibo, Kageyo, 0788696136
work en participation in Sectors Murambi and 0782840753
governance Nyagihanga Sectors emmasibo@yahoo.fr
through rwawnet@rwanda1.rw
community score
card)
196
2 Youth Good Rwimbogo, Gitoki, AJPRODHO Governance focus (AJPRODHO-JIJUKIRWA 18,248,600Rwf NPA
Association governance(Citiz Rugarama, Ngarama and persons, paralegals, 0788308964
for Human en participation in Kabarore Sectors of Gatsibo local citizens ajprodhojijukirwa@yahoo.c
Rights governance District om
Promotion through
and community score
Development card)
3 Pro- Gender Equality Gatsibo District/Selected Pro- Local leaders and UMUBYEYI Mediatrice 8,305,320 Rwf NPA
Femmes/Twe promotion in categories Femmes/Twe Women Profemme2012@gmail.co
se Hamwe Public Policies se Hamwe representatives. m0788537118,0788416379
Women in (Media)
Leadership,
Fighting Gender
Based Violence
5 Society for Health/ HIV All sectors Health General UMULISA Lilianne , 18.546.347Rwf USAID,
Family prevention Centers and 197ampaign197197 regional representative tel: Global Fund
Health Community especially women +250788771872,
Based and men in lumulisa@sfhrwanda.org
Organizations reproductive age
6 CARITAS Nutrition Nyagihanga. Gatsibo, Gitoki, CARITAS Orphans and Father Jean Marie Vianey 30,306650Rwf USAID
RWANDA/US Kabarore, Kageyo, Muhura, Rwanda Vulnerable Children , TWAGIRAYEZU
AID Ngarama, Nyagihanga, Support most info@caritasrwanda.org
GIMBUKA Rwimbogo vulnerable families 0788793355
197
Ngarama
Kabarore
8 Fondation Social protection Les secteurs de : Nyakayaga Commaunaute lacale Rudasingwa venuste 3984000Rwf Concordia
Concordia Kiziguro, Murambi, and Kiziguro et associations des Venuster@yahoo.fr Centrale,
Ineza Kiramuruzi, Rugarama, Parish familles vulnerable) coordinateur Espagne, et
Rwimbogo, Kabarore, Gitoki, Tel:0783546761 cotization au
Rwimbogo. Pere TWIZEYIMANA niveau des
Eduard representant legal associations
twizedu@yahoo.fr
tel: 0789163489
10 Young Agriculture and Kageyo, muhura anad YWCA Children Under 5 and Guy Evrard Kayinamura 21,000,000Rwf USAID
Women Nutrition and Nyagihanga lactating women 0788685363
Christian Right to
Association protection and
participation
project
11 Reach Out Livestock Kiziguro Reach Out Poor household Bizimana Emmy 1,575.000Rwf Reach Out
Initiative for Initiative for 0788732619 Initiative for
Sustainable Sustainable Risd2017@gmail.com Sustainable
Development Development Developmen
t
12 Education Tailoring, and Remera, Muhura, Kabarore EHE Support poor families MUHAMED Amin 21,000,000Rwf EHE
Health and distribution of 0784657576
Economic sewing machines
Organization
13 MOUCEC Church and Kiziguro and Rwimbogo Moucecore Local church and Dr.Claudette Uwimana 25,857,220Rwf Tear fund
ORE community community 0 788471152
transformation
14 Women Women Ngarama ,Nyagihanga and Women Duteraninkunga wopu@yahoo.com0783152 5,925.000Rwf European
Organization empowerment Muhura Organization Cooperative and 298 Union and
for Promoting for Promoting Nyakarundi kanziza Epiphanie Irish Aid
Unit Unit
198
15 Strive HIV Prevention Kabarore, Kiramuruzi and Strive HIV Contaminated 27,050,162Rwf RBS
foundation Ngarama Foundation women strivefoundation2000@yah
oo.co.uk
Jacques: 0784147534
16 Maarifa Africa Youth readiness Gatsibo, kabarore, Maarifa Africa Youth Ndekezi Maarifa Vincent 16,375,000Rwf USAID
(frontiers and kiziguroand Kiramuruzi (frontiers 0788453979
Adventures entrepreneurship Adventures ndekezi@gmail.com
Great Lakes Great Lakes
Ltd)
17 CLADHO Child protection Nyagihanga, Kabarore and Local leaders Children cldho@rwanda1.rw 20,602,100Rwf Plan
and participation Gatsibo and children dr Emmanuel Safari International
07884888022
18 Centre de USAID-EDC MUHURA,REMERA AND CPJSP Youth cpjsp@yahoo.com 33,720,000Rwf EDC CPJSP
Promotion HUGUKA RUGARAMA 0788895476/0788497403
des Jeunes DUKORE Habimana Celestin
Pour Sortir de
la Pauvrete
19 Economy Youth skills Rwimbgo,Gitoki and Muhura Rwanda Youth Umuhoza Issa 30.310.000Rwf Islam
Health and developments Muslim 0784657576
Economy community issamuhoza@yahoo.com
20 Caritas Family nutrition Nyagahanga 8 FFLS Caritas Diocese of 0788481931 1,050,824 Rwf Catholic
Diocese of groups (240 Byumba E-mail: Relief
Byumba beneficiarie caritsbyumba@yahoo.fr Services
s)
21 Family care Child protection Kiramuruzi Children Family care for familycareforchildren 5,570,000Rwf Family care
for Children Children @gmail.com for Children
gakwaya JMV.
0788726245/0784453
372
22 Inspire Education(Suppo All Sectors All teachers IEE Rwanda and ieerwanda.directorate.o 10,569,198 Rwf UNICEF
,Educate and rt to in service and learners REB rg@gmail.com
Empower teacher EMMANUEL Murenzi
199
development in public murenziemma@yahoo.co.uk
through the schools. 0788 800 330
school based
mentorship BEATRICE Kabera
ptrogram) kabeerabetty@yahoo.com
0788 611 870
23 African CAVAP:Social Kiramuruzi,Kiziguro,Murambi, AEE aeegatsibo@yahoo.fr, 99,302,030 BMZ-KNH
Evangelistic economic Gasange ,Remera and 400Self mrubagumya@aeerw
Enterprises Domain Rugarama health anda.ong0788747460
group, Moses Rubagumya
(4224B
eneficia
ries)
200