VIKAS

The document outlines a detailed estimate for interior work by Shyam Sunder Sharma, including various components such as ceilings, wall paneling, and bathroom fixtures. The total estimated amount for the project is 1,050,750. Each item includes specific measurements and corresponding costs.

Uploaded by

vk944382
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Shyam sunder sharma Mob No- 8448552314

Email id – shayamsunder@gmail.com

3 S INTERIOR Z
________________
1. CILLING 30’*10’ = 300 FIT *250 = 75000 AMOUNT
2. TABLE CUTTING TABLE MODIFE = 40000 AMOUNT

3. CILLING SIDE 30’ FIT * 4 = 120 FIT = 30000 AMOUNT
4. CILLING SIDE 10’ *4’ = 40 FIT = 10000 AMOUNT
5. WALL PALING 6.5 * 11.5 = 74 FIT = 59800 AMOUNT
6. WALL PALING 12.5 * 11.5 = 143 FIT 115000 AMOUNT
7. BIM PALING 4 * 9 = 36 FIT = 28800 AMOUNT
8. LCD WALL PALING 8 FIT * 12 FIT = 96 FIT = 96000 AMOUNT
9. BIM 5.5 * 8.5 = 46 FIT = 37400 AMOUNT
10. PATISAN / LOWER 29 * 8 = 232 FIT = 185600 AMOUNT
11. WALL PALING 91 * 16 = 144 FIT = 86400 AMOUNT
12. SELF WALL 2 PIC TRACK LIGHT = 25000 AMOUNT
13. LADIES TOILET WASHPANCEN 5 PIC = 50000 AMOUNT
14. STONE GIRINIGHT = 33600 AMOUNT
15. BATHROOM MIRROR = 26100 AMOUNT
16. BATHROOM BOX = 35000 AMOUNT
17. JENAS BATHROOM WASHPESON = 50000 AMOUNT
18. STONE GIRNIGHT = 34800 AMOUNT
19. BOX CABNIT BATHROOM = 26250 AMOUNT
20. W C REPAIR 4 PIC = 6000 AMOUNT
TOTAL AMOUNT = 1050750