Ofd SSS 502 R00
Ofd SSS 502 R00
QA1(CB) QA1(CB)
KEY
F0A
NEW QC11
QB11 QB21
QC11
(DEA1) (SA1-2 SA1) (SA1-2 SA2) (DEA1)
QB1/QC1 M M M QB1/QC1 M
QA1
FUTURE F7 (DA/DEM1) F3 F1 (SA1-2 CB) F2 F4 (DA/DEM1) F8
A1 220kV BUSBAR A1 A2 A1 220kV BUSBAR
CT MULTICORE CT M P1 P2 P2 P1 M
QB1/QC1 QB1/QC1 QB1/QC1 CT CT QB1/QC1 QB1/QC1 QB1/QC1
(DA/DEM1) M F5 (DA/DEM1) M (DA/DEM1) M (DA/DEM1) M (DA/DEM1) M F6 M (DA/DEM1)
(OHL) OVER HEAD LINE
CABLE QA1(CB) SEE NOTE 9 QA1(CB) SEE NOTE 9 QA1(CB) SEE NOTE 9 QA1(CB) SEE NOTE 9 QA1(CB) SEE NOTE 9 QA1(CB) SEE NOTE 9
NOTE 1:
THIS SLD IS AN ELECTRICAL REPRESENTATION OF THE STATION. P1 P1 P1 P1 P1 P1
FOR PHYSICAL LAYOUT REQUIREMENTS REFER TO EIRGRID GENERAL FUNCTIONAL CT CT CT CT CT CT
SPECIFICATION XDS-GFS-00-001.
P2 P2 P2 P2 P2 P2
NOTE 2:
QB9/QC2 QB9/QC2 QB9/QC2 QB9/QC2 QB9/QC2 QB9/QC2
C THE SPECIFIC MINIMUM 3 PHASE SHORT CIRCUIT BAY RATING 40kA. APPLIES TO BOTH
ELECTRICAL AND MECHANICAL FORCES.
(DS/DEM2)
M
(DL/DEM2)
M
(DF/DEM2)
M
(DF/DEM2)
M
(DL/DEM2)
M
(DS/DEM2)
M
NOTE 3:
ALL 220kV DISCONNECTS SHALL BE MOTORISED.
VT VT VT VT VT VT
NOTE 4:
THIS IS AN SCS STATION.
QC3(DEM3) QC9(DE) QC3(DEM3) QC3(DEM3) QC9(DE) QC3(DEM3)
THIS IS A GIS STATION.
M M M M M M
NOTE 5:
REFER TO PROJECT SPECIFIC PROTECTION SPEC FOR: GIS GIS GIS GIS
1. SPECIFIC BAY CT & VT RATINGS, BURDEN & ACCURACY CLASS REQUIREMENTS. INTERFACE INTERFACE INTERFACE INTERFACE
2. TELEPROTECTION CHANNEL REQUIREMENTS P1 P1 P1 P1 P1 P1
3. Tx NEUTRAL EARTH REQUIREMENTS
CT CT CT CT CT CT
NOTE 6: P2 P2 P2 P2 P2 P2
A PROTECTION SLD SHALL BE SUBMITTED FOR DETAILED DESIGN & AS-BUILT PURPOSES
INCLUDING THE FOLLOWING:
1. HV PLANT RATINGS FOR ALL HV COMPONENTS INCLUDING PROTECTION STATCOM HARMONIC FILTER HARMONIC FILTER STATCOM
REQUIREMENTS AS OUTLINED IN NOTE 5. (IF REQUIRED) (IF REQUIRED) (IF REQUIRED) (IF REQUIRED)
2. A LEGEND OUTLINING PROTECTION RELAY DETAILS USED INCLUDING RELAY
TYPE, ANSI DEVICE NUMBERS AND LONG RELAY MLFB/ORDER CODE.
3. PROTECTION RELAY INPUTS SHOWN WIRED TO INSTRUMENT TRANSFORMER
D CORES.
SHUNT SHUNT
NOTE 7: SA SA
REACTOR REACTOR
ALL SA REQUIREMENTS TO BE CONFIRMED BASED ON INSULATION COORDINATION R2001 R2001
M M
STUDY. QB9(DR) QB9(DR)
P1 P2 SA P1 P2 P1 P2 SA P1 P2
NOTE 8: CT VT CT CT VT CT
CONNECTION TO THE ESBN SUBSTATION SHALL COMPLY WITH POLICY 18. M M
SA QC3(DEM3) SA QC3(DEM3)
NOTE 9:
FOR SOFT SWITCHING REQUIREMENTS, REFER TO PROJECT SPECIFIC PROTECTION
SPECIFICATION.
NOTE 10:
FUTURE EXTENSION REQUIREMENTS WILL BE CONFIRMED BY EIRGRID.
OFFSHORE OFFSHORE
SUBSTATION SUBSTATION
(OSP) (OSP)
PROJECT
EirGrid plc
STANDARD 220kV GIS SLD
DRAWING IS NOT TO SCALE - IF IN DOUBT, ASK