The document outlines the bill of materials and estimates for the roofing replacement project of the Mushroom Production House at Isabela State University. It includes detailed descriptions, quantities, and costs for various materials and labor, totaling an estimated cost of 188,419.50 PHP. The project is prepared by Engr. Mark Vincent M. Dy and reviewed by Armald C. Marcos, with approval from Dr. Precila C. Delima.

Uploaded by

fablab.cauayan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views5 pages

Mushroom

The document outlines the bill of materials and estimates for the roofing replacement project of the Mushroom Production House at Isabela State University. It includes detailed descriptions, quantities, and costs for various materials and labor, totaling an estimated cost of 188,419.50 PHP. The project is prepared by Engr. Mark Vincent M. Dy and reviewed by Armald C. Marcos, with approval from Dr. Precila C. Delima.

Uploaded by

fablab.cauayan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

2.

438

12.45 5.9 73.455 30.1292 35

6.55 16.688 23.238 9.531583

36.7 15.05332

632.528

1.4691
Republic of the Philippines
Isabela State University
Cauayan City, Isabela

Project: Roofing Replacement of Mushroom Production House


Owner: Isabela State University - Cauayan Campus
Subject: Bill of Materials and Estimates
Contract Duration:
Date:

ESTIMATED
ITEM NO. DESCRIPTION QUANTITY UNIT DIRECT
COST/UNIT

I PRELIMINARIES
Safety & Health 1 lot
Demolition & Chipping Works 1 lot
Mobilization/Demobilization 1 lot
Tarpaulin 1 lot

II Roofing Corrugated
Corrugated Roof 8ft 35 pcs 500.00
Insulator Double sided 1 x 50m 2 rolls 3,000.00
Tekskrew for wood 32mm 7 box 500.00
Chicken Wire 1x50m 2 rolls 3,000.00
Channel bar 2"x4" x 1.5mm 14 pcs 3,000.00
Gutter 17 pcs 600.00
Ridge Roll 12 Pcs 450.00
PVC Elbow 3" 12 pcs 150.00
PVC Pipe 3" 10 pcs 150.00
Consumables 1 lot 5,000.00

Prepared by: Reviewed by:


Engr. Mark Vincent M. Dy Armald C. Marcos
Director, Infrastructure Member,TWG

Recommending Approval:

Eduardo D. Mateo
End-User Chairman, PMET
ISUCYN-INFO-POW-002
Effectivity:
Revision: 0
ic of the Philippines
a State University
ayan City, Isabela

m Production House
uayan Campus

TOTAL
INDIRECT TOTAL COST
COST

2,500.00
2,500.00
5,000.00
1,000.00

150.00 22,750.00
900.00 7,800.00
150.00 4,550.00
900.00 7,800.00
900.00 54,600.00
180.00 13,260.00
135.00 7,020.00
45.00 2,340.00
45.00 1,950.00
1,500.00 6,500.00

Material Cost 139,570.00


Labor Cost 48,849.50
Total Cost 188,419.50
g Approval: Approved By:

Dr. Precila C. Delima


Executive Officer