0% found this document useful (0 votes)
26 views1 page

Ss Hanging Stan & Rack Cutting

This document is a quotation from Paradigm Outsourcing Solution for SS hanging stan fitting and a large kitchen rack, detailing the materials and costs involved. The total cost for the SS hanging frame is 45,000 and for the kitchen rack is 20,000, with specific terms regarding price increases, delivery, and payment. The quotation excludes TAX and VAT and specifies a delivery time of 4 days after the work order is received.

Uploaded by

MD Jabed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views1 page

Ss Hanging Stan & Rack Cutting

This document is a quotation from Paradigm Outsourcing Solution for SS hanging stan fitting and a large kitchen rack, detailing the materials and costs involved. The total cost for the SS hanging frame is 45,000 and for the kitchen rack is 20,000, with specific terms regarding price increases, delivery, and payment. The quotation excludes TAX and VAT and specifies a delivery time of 4 days after the work order is received.

Uploaded by

MD Jabed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

To Date : 02/12/2024

Paradigm Outsourcing solution 360

Office : House , 318 , Road , 21 , DOHS Mohakhali

Subject : Quotation for SS hanging stan fitting & kitchen big size rack cutting wilding & finishing
With materials

Site: Site: Plat no 01, Road No- 109 & Block H – Gulshan, Dhaka – 1213 (GRS)

Sl Description Qty Rate

SS Hanging Stan Frame


* Fitting Item : 1-1/2"×1-1/2" metal angle maximum 90'+ thickness 4mm
1 * Hanging 10mm thrade nut bold setting any size 6 pcs 45,000
* 2" flat bar clump setting
* All SS hanging frame cutting wilding finishing & droing megarment setting
* All wilding materials ( 304G 100% )
* Salver color enamel paint

kitchen big size rack cutting wilding & finishing


*side basement to my Factory then work complete & side basement delivery 1 pcs 20,000
* All wilding materials ( 304G 100% )

Terms & Condition:

1. If the price of the product increases before the completion of the work, Company will
have to pay the increase in price.
2. After calculating the possible freight in the design distribution, if any additional freight
is required for design changes, the amount of freight required shall be paid to Company.
3. Delivery : 4 days after received the work order.
4. Mode of Payment: 50% advance along with work order of 50% amount should be paid
within 7 days after delivery.
5. Quotation price is excluded TAX & VAT

Best Regards

You might also like