1.
Pre-construction: This phase includes planning, design, and obtaining necessary
permits.
2. Sitework and Foundation: This involves clearing the site, excavation, and laying
the foundation.
3. Rough Framing: The basic structure of the building is constructed, including
walls, roof, and floors.
4. Rough-In: This stage involves installing the essential systems such as plumbing,
electrical, and HVAC, but without making the final connections.
5. Exterior Construction: This includes installing windows, doors, and exterior
finishes like siding or brick.
6. MEP (Mechanical, Electrical, Plumbing): Final connections and installations of
mechanical systems, electrical wiring, and plumbing fixtures are completed.
7. Finishes and Fixtures: Interior finishes such as drywall, painting, flooring,
and installation of fixtures like cabinets and countertops are done.
8. Final Inspection and Closeout: The project undergoes final inspections to ensure
everything meets code and standards before the building is handed over to the
owner.