Construction Stages

The document outlines the phases of construction, starting from pre-construction planning and permitting to final inspection and project closeout. Key stages include sitework, foundation laying, rough framing, installation of essential systems, exterior construction, mechanical and electrical installations, and interior finishes. The process culminates in a final inspection to ensure compliance with codes before handing over the building to the owner.

Uploaded by

christopherd
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views1 page

Construction Stages

The document outlines the phases of construction, starting from pre-construction planning and permitting to final inspection and project closeout. Key stages include sitework, foundation laying, rough framing, installation of essential systems, exterior construction, mechanical and electrical installations, and interior finishes. The process culminates in a final inspection to ensure compliance with codes before handing over the building to the owner.

Uploaded by

christopherd
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
You are on page 1/ 1

1.

Pre-construction: This phase includes planning, design, and obtaining necessary


permits.

2. Sitework and Foundation: This involves clearing the site, excavation, and laying
the foundation.

3. Rough Framing: The basic structure of the building is constructed, including


walls, roof, and floors.

4. Rough-In: This stage involves installing the essential systems such as plumbing,
electrical, and HVAC, but without making the final connections.

5. Exterior Construction: This includes installing windows, doors, and exterior


finishes like siding or brick.

6. MEP (Mechanical, Electrical, Plumbing): Final connections and installations of


mechanical systems, electrical wiring, and plumbing fixtures are completed.

7. Finishes and Fixtures: Interior finishes such as drywall, painting, flooring,


and installation of fixtures like cabinets and countertops are done.

8. Final Inspection and Closeout: The project undergoes final inspections to ensure
everything meets code and standards before the building is handed over to the
owner.