0% found this document useful (0 votes)
230 views2 pages

KPLC Bill

This document is an electricity bill from The Kenya Power and Lighting Company Ltd for the account number 2417454-24, issued to Babatunde Oladiji. The total amount due is KShs. 2,773.80, which must be paid by 27/08/2024 to avoid disconnection of service. Failure to pay by the due date will result in additional reconnection fees if the service is disconnected.

Uploaded by

JARED ATANDI
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
230 views2 pages

KPLC Bill

This document is an electricity bill from The Kenya Power and Lighting Company Ltd for the account number 2417454-24, issued to Babatunde Oladiji. The total amount due is KShs. 2,773.80, which must be paid by 27/08/2024 to avoid disconnection of service. Failure to pay by the due date will result in additional reconnection fees if the service is disconnected.

Uploaded by

JARED ATANDI
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Electricity Bill

Contract No. / Account No: 2417454-24


THE KENYA POWER AND LIGHTING COMPANY LTD. Central Office – Stima Plaza Kolobot Road P.O. Box 30099 Nairobi Tel: 243366 or 3201301 Fax: 337351 VAT Reg. No.: 0010608 PIN: 000591096X

BABATUDE OLADIJI
ONGATA RONGAI HSE 6
P.O BOX 30305-NAIROBI

Bill Number : Maximum Authorised Load (KW) : Date of Issue: Date Due:
2417454-03-18/07/2024-2 3 23/08/2024 27/08/2024

Method of Charge No.: Supply Location:


DOMESTIC CONSUMERS (DC) Deposit: Ksh. 2 500.00 PLT 3456 O. RONGAI HSE 676

CONSUMPTION DATA BILLING DETAILS


Consumption Type Meter Previous Current Conversion Consumption BILLING CONCEPT AMOUNT IN SHILLINGS
Number Reading Reading Factor
BALANCE BROUGHT FORWARD 2,665.00

FIXED CHARGE 120.00

ACTIVE (A0) 20454434 9498 9679 1 181 CONSUMPTION 1,161.10

FUEL COST CHARGE 711.0 1,286.91


cents/kwh
FOREX ADJ. 81.0 cents/kwh 141.61

INFLATION ADJ. 9.0 cents/kwh 16.29

ERC Levy 3.0 cents/kwh 5.43

REP Levy 5.00 % 58.05

VAT 12.00 % 14.40

20110507-PAYMENT -2,665.00

20110507-ADVANCE PAYMENT -35.00

18/04/2024 – 17/05/2024 (Act)


KVAh/KWh : Consumption Period : Power Factor :

The monthly bill is KShs. 2,808.80

V2.01 EIMANOR.20170823_07.56.00ag 1678 5672 02

This electricity bill is payable before 27/08/2024.


Notice is hereby given that if this bill is not paid within fourteen Round Adjustment 0.01
days from 27/08/2024, i.e. on 11/09/2024, your supply shall be liable
to disconnection without any further notice to you.

Should the supply be disconnected, in addition to settling the


outstanding amount, you will be required to pay the applicable
Reconnection (RC) fee before reconnection. The RC fees are
as follows: Sh580 for cut-out RC or Sh3,828 for pole RC or
Sh13,920 for service line RC. The said RC fees are inclusive
of an 16% VAT charge. In addition, you will also be required to
top up your deposit to 2 times your average monthly bill Total Amount: 2,773.80

All enquiries to Customer Services Eng. MBAGATHI RD,O.RONGAI P.O. BOX 30177, NAIROBI TEL.0723963839
customercarenairobi@kplc.co.ke
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
E-mail: Website: www.kplc.co.ke

To be posted with cheque payments

Customer’s Name: BABATUNDE OLADIJI House Address: ONGATA RONGAI HSE 676 NAIROBI

8755
Date Due: Bill Number: Amount: Form Serial Number:
11/0/2024 2417454-03-18/07/2024-2 KShs. 2,733.80
The net balance for the supply as at 23/08/2024 is Kshs. 2,773.80. Please pay this amount

E90B323B25A59FD2716156304B9249024D4F575D 2902 00662405 1105201309 AIP0600676

You might also like