2 OEC FlexiView 8800 Mobile Imaging System Installation Procedure
© August 2001
GE Medical systems
This manual may not be reproduced, in whole or in part, without the written permission of
GE Medical Systems.
The contents of this document are accurate at the time of publication. However, changes in design and
additional features can, at any time, be incorporated in the hardware and software and may not be reflected in
this version of the document. Contact GE OEC Technical Support for clarification, if discrepancies arise.
The OEC FlexiView 8800 C-Arm and 1K X1K Workstation is manufactured under the following U.S.
Patents: 5,596,228; 08/209,001; 5,426,683; 5,506,882; 5,583,909; 4,797,907; 07/638,176..
Other Patents Pending.
This manual dose not contain Procedures which can be performed by the operator. This manual is intended
for trained service engineers who performed theinstallation, maintenance, calibration of the system. This
manual is intended to complement the training offered by GE Medical Systems,. Do not attempt any
procedures in this manual unless you have received training on the ystem. Reading this manual does not
qualify the reader to maintain or service the system.
August 2001
GE Medical Systems
OEC FlexiView 8800 Mobile Imaging System Installation Procedure 3
TABLE OF CONTENTS
1. Overview.................................................................................................................................................5
5. Installation Procedures........................................................................................................................8
5.1 Cover Removal, Internal & Cable Inspection, Partial Setup ............................................................8
5.2 Mechanical Checks .........................................................................................................................11
5.3 The Power Cord Assembly ............................................................................................................11
5.4 Isolation Transformer Strapping .....................................................................................................12
5.5 Power ON System...........................................................................................................................16
5.6 Line Voltage Regulation .................................................................................................................20
5.7 C-Arm Control Panel and Foot/handswitch Check.........................................................................21
5.8 Workstation Keyboard Check.........................................................................................................23
5.9 Backup the Configuration Files ......................................................................................................24
5.10 Options..........................................................................................................................................24
5.11 Radiographic Beam Alignment Test.............................................................................................26
5.12 Reporting........................................................................................................................................29
6. Installation Comments.......................................................................................................................30
Appendix 1 The FlexiView 8800 Mobile C-arm DICOM Network Questionnaire.......................30
Network ................................................................................................................................................30
PACs Server or Image Review Stations ...............................................................................................31
Printer....................................................................................................................................................32
GE OEC DICOM Interface...................................................................................................................33
OEC FlexiView 8800 Mobile Imaging System Installation Procedure 5
1. Overview
Access the latest version of the The FlexiView 8800 Mobile C-arm Installation Report/Checklist 00-
884006-01and use it in conjunction with this document. Follow the installation procedures in the
order written, and note that the sections of the procedures correspond to the same section title in the
Report/Checklist.
1. Before unpacking, inspect the shipping enclosure/boxes for damage and report to the shipper if
available. Note any damage in the Installation Comments section of the Report/Checklist, 00-
884006-01
2. Remove the banding from the Workstation and C-Arm shipping enclosure/pallets. See Figure 1
(next page).
3. Remove the ramps from the top of the Workstation enclosure. See Figure 1 (next page).
4. Remove the cardboard cap and lift the cardboard from the top of both enclosures. Discard both
cardboard items.
5. Remove the clear plastic covers from the Workstation and the C-Arm.
6. Use the depalletization instructions located on the Workstation cable hanger (00-881509-XX) and
C-Arm’s cross-arm (00-881508-XX) to depallet the Workstation and the C-Arm.
7. Record the results in the latest version of the The FlexiView 8800 Mobile C-arm Installation
Report/Checklist,00-884006-01.
6 OEC FlexiView 8800 Mobile Imaging System Installation Procedure
3. Installation Report
Visually inspect the system according to the separate C-Arm and Workstation matrices in the The
FlexiView 8800 Mobile C-arm Installation Report/Checklist, 00-884006-01 Each matrix lists the
area to inspect in the left-most column, and the possible condition on the top row.
The areas to inspect are grouped according to the larger visible, easily accessible assemblies and/or
modular parts of the system. Each inspection of an assembly area should include its visible
component parts and sub-assemblies; for example, inspection of the Image Intensifier should
account for its cover, handles, screws, etc.
5 Installation Procedures
Follow these installation procedures in the order written to get the The FlexiView 8800 Mobile C-
arm system operational, and record the information asked for in the corresponding sections of the
The FlexiView 8800 Mobile C-arm Installation Report/Checklist, 00-884006-01 (access the latest
version).
1. Check the antistatic drag cable on the Workstation and the C-Arm.
2. Inspect the interconnect cable, AC power cable and the C arm cable for wear, abrasion and bent
or broken pins.
3. Remove Workstation covers and inspect the internal cables and PCB seating. Look for loose
parts. See Figure 2 (next page).
OEC FlexiView 8800 Mobile Imaging System Installation Procedure 9
FIGURE 3 − REMOVE THE C-ARM COVERS (COVERS ARRANGED FOR ILLUSTRATION PURPOSES)
OEC FlexiView 8800 Mobile Imaging System Installation Procedure 11
E1 E1
Note: The factory has attempted to provide the proper power cable plug assembly, but due to different
international requirements, the proper power plug assembly may not be furnished. If assistance is
required, contact GE Medical Systems,
12 OEC FlexiView 8800 Mobile Imaging System Installation Procedure
WARNING Electrical circuits inside the equipment use voltages that are capable of causing serious
injury or death from electrical shock. Use appropriate precautions.
1. Connect the interconnect cable to the C-Arm and plug the power cord into the wall outlet.
2. If the system is equipped with a 100-127 VAC power cord, measure the voltage from the BRN wire to
WHT/BLU on T1 primary and record the results in the table on p. 5 of the Report/Checklist.
If the system is equipped with a 200-250 VAC power cord, measure the voltage from the BRN wire to
WHT/BLU on the T1 primary and record the results in the table on p. 5 of the Report/Checklist.
Note: If the voltage measured in step one measures from 100 –127 VAC use Table 1 (next page). If the
voltage measured in step one measures between 200 –250 VAC use Table 2 (next page).
For example, if the voltage measured equals 112 VAC, use Table 1 (100 – 127 VAC). The correct
voltage taps would be found in the row described by voltage range 110.0 to 115.9. Connect the
wires as described in that row.
For Example: If the voltage measured equals 224 VAC, use Table 2 (220 – 250 VAC). The correct
voltage taps would be found in the row described by voltage range 220.0 – 231.9 VAC. Connect
the wires as described in that row.
3. Find the corresponding voltage range in the first column of the table and determine the voltage
taps.
OEC FlexiView 8800 Mobile Imaging System Installation Procedure 13
PRIMARY 2 PRIMARY 1
4. With all options switched ON and the system fully booted, measure the following voltages at the
primary and secondary of the isolation transformer (T1) and verify that they meet the specification.
Record the measured value in the corresponding table in the Report/Checklist.
10 9800 Mobile Imaging System Installation Procedure
SECONDARY 1
WHT/BLU
AC1
(C)
VAC
(A) PRIMARY 1 CT
VAC
(D)
VAC
TAPS ARE
DEPENDENT BRN AC2
UPON INCOMING
LINE VOLTAGE
BLU
SECONDARY 2
AC
RTN
WHT/BRN
MONITOR FANS
(1 EACH SIDE)
MONITOR
FILTER (1)
CPU
FAN
POWER
SUPPLY
FAN (1)
REAR
WORKSTATION
FAN (FILTER
ON REAR COVER)
POWER
SUPPLY FAN
WARNING This procedure produces high energy X-rays. Take the appropriate precautions. Because
of the high radiation output produced, non-service personnel should not be present in the
room during the following test.
1. Measure the wall outlet voltage (Vn) or use the value measured in the Isolation Transformer Strapping
procedure. Write the measured value in the corresponding section of the Report/Checklist.
2. While taking a radiographic exposure at 100 kVp @ 80 mAs, measure the wall outlet voltage (Vl) again.
Write the measured value in the corresponding section of the Report/Checklist.
3. Use the following formula to calculate the percentage of line voltage regulation and record the result in
the corresponding section of the Report/Checklist.
(Vn − Vl )
Line Regulation = 100 × = % Line Voltage Regulation
Vl
4. If the results above do not fall within the range of 0 - 15 %, note this in the Report/Checklist, and inform
the hospital administration that they will need to correct this problem. Note this also on the FSR or
Case.
OEC FlexiView 8800 Mobile Imaging System Installation Procedure 21
WARNING: Some of the following procedures produces X-rays. Take appropriate precautions.
1. Press the X-ray ON switch and verify the following Image Orientation functions:
A. Image Rotation key rotates the image clockwise and counter-clockwise.
B. Image Invert key inverts and reinverts the image.
2. Pressing the field size key repeatedly allows you to select any of the three available field sizes: NORM,
MAG1 and MAG2.
3. Using the Converging Line pairs/millimeter (lp/mm) tool on the Image Intensifier, verify the resolution
in lp/mm is equal to, or greater than, the values listed below. Record the measured values in the
corresponding section of the Report/Checklist:
4. Press the SAVE key and verify that it saves left monitor image to the Workstation hard-drive.
5. Press the SWAP key and verify the image on the left monitor shifts to the right monitor.
6. Press each of the following collimator switches and verify that the graphical icon indicates the correct
collimator function:
A. Collimator iris opens/closes
B. Collimator semitransparent leaves open and close
C. Collimator semitransparent leaves rotate
7. Press each of the following collimator switches while pressing the X-Ray ON switch and verify each of
the following collimator functions again.
A. Collimator iris opens/closes
B. Collimator semitransparent leaves open and close
C. Collimator semitransparent leaves rotate
8. Press the MANUAL CONTRAST/BRIGHTNESS key and verify that you can increment and decrement
through a series of preset levels of contrast and brightness.
9. Press the AUTO CONTRAST/BRIGHTNESS key and verify that the system automatically selects the
optimum amount of contrast and brightness.
10. Press the kVp and mA keys and verify that the technique can be adjusted manually.
11. Select Auto Fluoro mode and the NORM field size and verify that the kVp tracks accurately as copper
filters are inserted into the field per the following ranges, then record the kVp value in the
corresponding table in the Report/Checklist.
22 OEC FlexiView 8800 Mobile Imaging System Installation Procedure
1. Verify the EDGE ENHANCEMENT function displays an indicator bar and that the amount of edge
enhancement can be increased and decreased.
2. Verify the NOISE FILTER function displays an indicator bar and that the amount of filtering can be
increased and decreased. The noise in the image should decrease as noise filtering is increased.
3. Verify the ZOOM function displays a square box known as the region of interest (ROI) and that you can
magnify the ROI by touching the 2X and 4X buttons.
4. Verify the NEGATE function reverses the light and dark values on the image displayed on the left
monitor.
5. Verify the CONTRAST function displays an indicator bar and that the amount of contrast can be
increased and decreased.
6. Verify the BRIGHTNESS function displays an indicator bar and that the amount of brightness can be
increased and decreased.
7. Verify the AUTO CONTRAST/BRIGHTNESS automatically selects the optimum values of contrast
and brightness.
8. Verify the SWAP function exchanges images from the left and right monitors (need to have two
different images on the left and right monitors).
9. Verify the SAVE function saves the image on the left monitor to the Workstation's hard drive.
10. Verify the PATIENT INFORMATION function activates the Patient Information screen. Enter patient
information, display scheduled patients, display saved exams screen.
11. Verify the IMAGE DIRECTORY function allows you to review, print, and archive stored images and
dose information.
12. Verify the IMAGE ANNOTATION function allows you to place markers, add comments and crop
images.
13. Verify the SPECIAL APPLICATIONS function allows access to additional applications, if available.
14. Verify the CUSTOMIZE function allows access to the Customize screen.
24 OEC FlexiView 8800 Mobile Imaging System Installation Procedure
Note: You will be saving two files with two different extensions, .rtg & .rtw
9. Then copy these files to a floppy disk. They are saved under the directory
C:\Program Files\gems\utility suite.
10. Leave the floppy with the system.
5.10 Options
Refer to the 1k x 1k Workstation or Series The FlexiView 8800 Mobile C-Arm Operator’s Guide for
operating instructions if necessary. Check the appropriate boxes in the corresponding section of the
Report/Checklist. Ignore any following sections that are non-applicable to the system.
1. Verify that a cine run can be recorded to the hard disk.
2. Verify the recorded run can be played back.
VCR Test
1. Verify the VCR RECORD function.
2. Verify the VCR PLAY function.
OEC FlexiView 8800 Mobile Imaging System Installation Procedure 25
IR Transmitter Test
1. Press the Remote Control Screen key and verify that the remote control screen displays on the
monitor.
2. Use the cursor control to move the cursor to an executable button and press the ENTER key.
3. Press the EXIT key to exit.
DICOM
1. If DICOM option is available: Contact the system administrator and ask them if they are ready
to have the DICOM option installed.
If they are ready, have the system administrator complete the DICOM Network Questionnaire
found as the last section of this document (Appendix 2), then attach it to the The FlexiView
8800 Mobile C-arm Installation Report/Checklist and mail them in together. Then Continue
with DICOM installation.
If the Hospital is not ready for DICOM installation: photocopy the DICOM Network
Questionnaire, leave it with the system administrator or equivalent, and schedule a time to
complete DICOM installation. In the Report/Checklist, record the scheduled time that DICOM
is to be installed (indicate time by MMDDYY). Continue with system installation.
Note: If the System Administrator completed a “copy” of the Network Questionnaire, attach the
copy to the The FlexiView 8800 Mobile C-arm Installation Report/Checklist and mail
them in together.
Film Exposure
1. Check to see if a film processor is located on site.
If a functional Film processor is located on site, proceed with test.
If no film processor is on site, then you are not able to perform Radiographic Beam Alignment Test.
Note this in the The FlexiView 8800 Mobile C-arm Installation Report/Checklist.
If the film processor is not functional, then you are not able to perform Radiographic Beam Alignment
Test. Note this in the The FlexiView 8800 Mobile C-arm Installation Report/Checklist.
2. To nominalize C-Arm flexure, release the C-Arm brake and position the C-Arm at 45°.
3. Attach the Beam Alignment Tool on the Image Intensifier.
4. Load a film cassette in the Beam Alignment Tool.
5. Make the following four exposures on one sheet of film:
6. Select Manual - Fluoro, Normal field and then Film mode. Take a 50 KVp @ 1.3 mAs exposure.
7. Select Manual - Fluoro, MAG 1 field and then Film mode. Take a 50 KVp @ 1.3 mAs exposure.
8. Select Manual - Fluoro, MAG 2 field and then Film mode. Take a 50 KVp @ 1.3 mAs exposure.
9. Select Manual - Fluoro and completely close the collimator iris. Select Film mode. Take a 50 KVp @
1.3 mAs exposure.
10. Remove the film cassette and develop the film.
50 mm x 50 mm Field Verification
1. Verify the 50 mm x 50 mm exposure, with the collimator iris closed, is within the 50 mm square in the
middle of the beam alignment tool. If a stop sign pattern is displayed, measure the image from the
center of the flats.
OEC FlexiView 8800 Mobile Imaging System Installation Procedure 27
Centering
1. Using the film and a ruler, draw lines from corner to corner of the film. This locates the center of the
film.
2. Verify that the center of the image is centered on the center of the film.
3. Measure the offset distance in the X and Y planes (Xoffset and Yoffset) that the center of the image deviates
from the center of the film, then in the Report/Checklist, record and add those offset values. Use the
following equation:
Xoffset + Yoffset = Sum
The sum should be less than 16mm (13/16″), or 2% of the SID.
4. The offsets’ sum cannot be greater than 16mm (13/16″), or 2% of the SID. If it is, a beam alignment is
necessary. Perform a beam alignment procedure to correct this deviation.
Pass or Fail
If the measurements recorded for each field size (50 mm x 50 mm, NORM, MAG1 and MAG2) are within
the limits specified, indicate in the Report/Checklist that the Beam Alignment Test passed. If it passed,
continue with the Installation Procedure.
If the measurements recorded for each field size are not within the limits specified, indicate in the
Report/Checklist that the Beam Alignment Test failed. If it failed, perform the beam alignment procedure
contained in the FlexiView 8800 Mobile C-Arm Service Manual.
OEC FlexiView 8800 Mobile Imaging System Installation Procedure 29
5.12 Reporting
Upon Completion of the system installation, the technician performing the installation must follow
all local and regional regulatory reporting requirements regarding the installation of Medical X-ray
equipment and as outlined in the instructions supplied in the Field Service Documentation package.
For systems installed in the United States or US Military Installations overseas, complete and file
FDA Form 2579.
Reporting for Domestic Systems
• For domestic US systems: Complete FDA form 2579. By law, reporting and distribution of this
form must be done within 15 days from the date of assembly (installation).
• Verify the serial and model numbers listed on the back of the system and note these on FDA
form 2579. Verify that the control numbers on the system agree with those listed on FDA form
2579. The Control Number, dash number, and manufacturing date must be noted on FDA form
2579.
• Distribute FDA form 2579 (all copies) and the Installation Report/Checklist, as outlined in Field
Service Procedure FSP-10.
• The Field Service Report (FSR) or Child Case MUST list any and all deficiencies encountered
during the installation of this system, including problem codes, descriptions and any parts which
may have been replaced.
• The GE OEC Medical System, Inc. Representative MUST sign the Completion Form on the
following page of this Installation Report and Checklist, verifying Field Service acceptance of
the unit. If installation cannot be completed, the customer MUST be notified that the system is
not yet ready for use.
6 Installation Comments
Write any comments important to the installation in the corresponding section of the
Report/Checklist.
Appendix 1
The FlexiView 8800 Mobile C-arm DICOM Network Questionnaire
The purpose of this questionnaire is to collect and document information needed to complete the installation
Answer all questions.
Site Name:
Network Contact Person:
Phone #: ( )
E-mail address:
Network
1. Is there currently a network at the site? Yes No
2. Does the site currently have a method for assigning IP addresses?
Yes No
If yes, describe the method.
. . . . . .
. . . . . .
. . . . . .
. . . . . .
. . . . . .
. . . . . .
. . . . . .
. . . . . .
. . . . . .
. . . . . .
4. Possible modalities: RF XA SC
32 OEC FlexiView 8800 Mobile Imaging System Installation Procedure
Printer
1. List the printer(s) make(s) and model(s)
2. Printer Contact Person
Phone #: ( )
E-mail address:
3. What is the printer(s) class? Grayscale _______ Color ________
4. List the information below for all Printers:
Common or IP Address Port AE Title
Alias Name Number
5. Printer setup:
Border Density (black or white)
Empty Density (black or white)
Copies
Print Priority (low, medium, high)
Destination (magazine, processor )
Medium Type (paper, clear, blue)
Film Size
Preferred Format
CD Contents