Plumbing Notes and Specification For DWV Piping Layout

The document outlines plumbing plans and specifications for a residential house in the Philippines, emphasizing compliance with the National Building Code and coordination with other trades. It details requirements for sanitary works, water supply systems, and the responsibilities of the contractor regarding installation and verification of plumbing systems. Additionally, it includes notes on the necessary materials, equipment, and procedures to ensure a fully operational plumbing system.

Uploaded by

Claire Tabor
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views1 page

Plumbing Notes and Specification For DWV Piping Layout

The document outlines plumbing plans and specifications for a residential house in the Philippines, emphasizing compliance with the National Building Code and coordination with other trades. It details requirements for sanitary works, water supply systems, and the responsibilities of the contractor regarding installation and verification of plumbing systems. Additionally, it includes notes on the necessary materials, equipment, and procedures to ensure a fully operational plumbing system.

Uploaded by

Claire Tabor
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Republic of the Philippines

TABLE OF CONTENTS: OFFICE OF THE BUILDING OFFICIAL


PLUMBING PLANS AND
PLUMBING NOTES AND SPECIFICATION FOR DWV PIPING LAYOUT PLUMBING SYMBOLS AND LEGENDS DRAWINGS

· ALL SANITARY WORKS HEREIN SHALL BE EXECUTED ACCORDING TO THE PROVISIONS OF THE 1. GENERAL NOTES AND DISTRICT/CITY/MUNICIPALITY
NATIONAL BUILDING CODE OF AND ITS IMPLEMENTING RULES AND REGULATIONS. CATCH BASIN SPECIFICATIONS
2. DRAINAGE/SEWER
· COORDINATE DRAWING WITH OTHER RELATED DRAWINGS AND SPECIFICATIONS. THE CLEAN OUT SYSTEM LAYOUT
3.WATER DISTRIBUTION
ARCHITECT OR ENGINEER BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCIES FOUND THEREIN DOWN SPOUT SYSTEM LAYOUT
HIS/HER DECISIONS SHALL BE FINAL. 4.STORM DRAINAGE
· ALL PIPES SHALL BE INSTALLED AS INDICATED. ANY RELOCATION REQUIRED FOR PROPER P-TRAP LAYOUT
5.SEPTIC TANK/SEPTIC
LAND USE AND ZONING
RE-EXECUTION OF OTHER TRADES SHALL BE WITH PRIOR APPROVAL OF THE VAULT (IF NEEDED)
6.ISOMETRIC
ARCHITECT/ENGINEER.
· PROPOSE SANITARY UTILITIES SHALL CONFORM THE ACTUAL LOCATION, DEPTH, AND IN EVERY
WYE -DRAINAGE/SEWER SYSTEM
-WATER DISTRIBUTION
SYSTEM
ELEVATION VERIFIED BY THE CONTRACTOR. STORM DRAINAGE DIRECTION -STORM DRAINAGE SYSTEM
· THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REQUIRED WALL OPENINGS AND FLOORS. 7.DETAILS AND ROUGH INS LINE AND GRADE
· ALL SLOPES FOR HORIZONTAL DRAINAGE SHALL MAINTAIN 2% MINIMUM SLOPE UNLESS 40 DEGREE ELBOW OF PLUMBING FIXTURES
-KITCHEN SINK
OTHERWISE NOTIFIED. 90 DEGREE ELBOW 8.LEGENDS AND SYMBOLS
· THE SIZE OF WATER SUPPLY LINE PIPE TO FIXTURES SHALL BE IN ACCORDANCE WITH THE
MANUFACTURERS INSTRUCTIONS.
· ALL FIXTURES SHALL BE VENTED UNLESS OTHERWISE NOTED. KS KITCHEN SINK ARCHITECTURAL
· THE WORK THROUGHOUT SHELL BE EXECUTED IN THE BEST AND MOST THROUGH MANNER
KNOWN TO THE TRADE AND TO THE SATISFACTION OF ARCHITECT/ENGINEER. WM
· REFER TO THE TECHNICAL SPECIFICATIONS FOR DETAILED MATERIAL SPECIFICATION.
WATER METER
CV CHECK VALVE CIVIL/STRUCTURAL

PLUMBING NOTES AND SPECIFICATION FOR WATER SUPPLY SYSTEM GV GATE VALVE
· THE CONTRACTOR SHALL BE FURNISH AND INSTALL THE PLUMBING SYSTEMS COMPLETER WITH
ALL THE EQUIPMENT PIPING VALVES INSULATION CONTROLS HANGERS TRIM ACCESSORIES
AND ASSOCIATED WORK. IN THE ACCORDANCE WITH THE BUILDING CODE ALL AUTHORITIES CB CATCH BASIN ELECTRICAL

HAVING JURISDICTION AND THIS SPECIFICATION.


· ALL WORKS SHALL COMPLY WITH THE PHILIPPINE BUILDING CODE AND PHILIPPINE PLUMBING
CODE.
DS DOWN SPOUT
· THE WORK SHALL INCLUDE ALL LABOR MATERIALS EQUIPMENT HOSTING AND RIGGING
MECHANICAL
SCAFFOLDING LOADING AND UNLOADING CLEAN-UP OF DEBRIS AND OTHER SERVICES TO CO
PROVIDE THE OWNER WITH FULLY OPERATIONAL SYSTEMS.
CLEAN OUT
· ALL WORKS SHALL BE PROPERLY COORDINATED WITH THE WORK OF OTHER TRADES TO AVOID
CONFLICTS. REFER TO THE ARCHITECTURAL AND STRUCTURAL DRAWINGS ONLY FOR
SANITARY LINE
INFORMATION USED TO PREPARE COORDINATED DRAWINGS.
· BIDDERS PRIOR TO SUBMITTING PROPOSAL SHALL VISIT THE SITE FULLY EXAMINE THE AREAS WATER LINE SANITARY

INVOLVED WITH THIS WORK TO FAMILIARIZE THEMSELVES WITH EXACT CONDITIONS AND
DIFFICULTIES THAT MAY ATTEND THE EXECUTION OF THIS WORK. STORM DRAINAGE LINE
· WATER DISTRIBUTION PIPE THAT HAS BEEN TERMINATED OR IS UNUSED SEGMENT SHALL HAVE
NO DEAD ENDS. PLUMBING
· EACH PLUMBING FIXTURES SHALL BE PROVIDED WITH AN ADEQUATE SUPPLY OF POTABLE
RUNNING WATER SO ARRANGED AS TO FLUSH AND KEEP SAFE CLEAN AND HEALTHFUL
CONDITIONS WITHOUT BACK FLOW OF CROSS-CONNECTION.
· VERIFY AND DETERMINE SUBJECT TO THE ARCHITECTS APPROVAL THE BEST SOURCE OF
WATER THE CONTRACTOR SHALL BE RESPONSIBLE FOR TAPPING THE WATER SYSTEM TO THE ELECTRONICS
SOURCE EITHER FROM:
A. THE MAIN LOCAL SOURCE
B. ANY ADDITIONAL SOURCE PROVIDED BY THE OWNER.

GEODETIC ENGINEER
CODE DESIGNED BY: PROJECT TITLE: OWNER: SHEET CONTENT: REVISIONS: SHEET NO:
CLAIRE B. TABOR
GENERAL NOTES AND
NO. DATE DESCRIPTION
21-UR-1324 PROPOSED THREE BEDROOM
STUDENTS' NAME MS. CLAIRE B. TABOR
SPECIFICATION, P
BUNGALOW RESIDENTIAL HOUSE LEGENDS AND SYMBOLS

CHECKED BY:
CAD BY: JGD 1 5
ELMAR T. ANTOLIN
FACULTY, CIVIL ENGINEERING DEPARTMENT LOCATION: ADDRESS: CHECKED BY: