Watercourse Inventory (OFWM Punjab)
A. General Information Feb 12,2025
District Khanewal Tehsil Mian Channu Channel Name 8AR Disty Watercourse No. 41275/L
Village/Chak No. 4/8-AR UC 13 PP 207 NA 152
Mogha Type Open Flume Water Quality Fresh S. Discharge (lps) 12 D. Discharge (Ips) 70
GCA (Acres) 130 CCA (Acres) 130 Total Length (m) 3573 Share Holder (No.) 15
Admin. District Khanewal Admin. Tehsil Mian Channu Remarks Length changed from 2234 on 27-11-2020 From 1950 As per irrigation dptt on
23-10-2023
B. Works Involved
Farmers' Share (Rs.)
Sr. Name of Project Improved Name of WUA Type of Earthen Lined Lining Naccas Culverts B.W. D. Other Govt. Skilled Un-skilled Total Total Project Component
No. Year Chairman Lining Length Length %age (No.) (No.) (No.) Plot St. Share Labour Labour Farmers' Cost (Rs.)
(m) (m) (No.) (No.) (Rs.) Share
1 USAID 1979-80 Muhammad Afzal Brick 3350 223 6 0 0 0 0 1 36702 11469 9176 20645 57347 Regular
2 PIPIP 2020-21 Muhammad Afzal PCPL 2598 752 21 36 9 0 0 1 1327453 352539 215441 567980 1895433 Additional
TOTAL 5948 975 27 36 9 0 0 2 1364155 364008 224617 588625 1952780
*This system-generated report is based on data provided by field formations and does not require a signature.
Consultant/Field formation must verify the data against OFWM and Irrigation Department records before approving the design.
The updated report must be included as part of the watercourse file.