OHS MOD PTW 05
PERMIT TO WORK EXCAVATION REV. 0
Project Date:
Permit No Time:
Section I, II and IV to be filled by Site Engineer / Supervisor
SECTION I – (REQUEST FOR PERMIT)
CONTR. Subcontractor: Plant / Equipment to be used
Location / Area: (Attach Drawing) 1
Kind of Activity: 2
Depth of Excavation: 3
Slope: 4
SECTION II
Prior to excavation on site please comply to the following:
1) Check MS / RA. 7) Barriers to prevent person falling.
2) Check permanent services (Local Authorities) 8) Barriers if vehicle crossing.
9) Excavation not undermines other structure, scaffold or
3) Is cable detector used to verify above.
foundation.
4) Emergency Management included & personal 10) All Drivers and operators are in possession of valid
trained. licence / competency certificate.
5) Work-in-charge and operatives aware of risk
11) Plant & Equipment got valid third-party certification.
involved and control measures to follow.
6) Prevention to stop sides collapse is on site
12) Flagman / Signalman provided.
(battering / safe angle)
• The above precautions / requirements are in place.
• CONTR. Subcontractor Risk Assessment No. ……………………... Dated …………………… was addressed to the
team and work in-charge on (Date)………………., and they are fully aware of the same.
Site Manager / Engineer(Name): Signature:
HSE Officer(Name): Signature:
Section III
This Permit is valid till (Date): Time: Hrs.
Contractor Site Manager / Engineer Contractor HSE Officer
Name: Name:
Signature: Signature:
Section IV
This permit should be returned to the approving authority after completion of works signed by Site Engineer / Work In-charge.
Name: Signature
Date: Time
NB: Drawing indicating proposed excavation to be attached to Excavation Permit.
Consultant HSE Engineer
Name:
Signature:
Document Reference Number: ORG1-06-002-MOD-TS0-0-PRM-TEM-2835
Revision Number: 00
Date: 05 January 2020
Page 1 of 1