0% found this document useful (0 votes)
15 views1 page

STRUCTURE02

The document outlines the foundation plan and general construction notes for a retail building renovation at 2901 E Busch Blvd, Tampa, FL. It specifies compliance with the 2023 Florida Building Code and includes requirements for materials, installation, and site conditions. The contractor is responsible for adhering to the specifications and obtaining necessary approvals and permits.

Uploaded by

AMIR Badillo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views1 page

STRUCTURE02

The document outlines the foundation plan and general construction notes for a retail building renovation at 2901 E Busch Blvd, Tampa, FL. It specifies compliance with the 2023 Florida Building Code and includes requirements for materials, installation, and site conditions. The contractor is responsible for adhering to the specifications and obtaining necessary approvals and permits.

Uploaded by

AMIR Badillo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

BETA

26' - 9 1/2" 25' - 8 1/2" 27' - 3 1/2"

DESING
PERMIT:

STAMP

54' - 9 1/2"

8"CMU STEM WALL GROUT WALL SOLID 8"CMU STEM WALL GROUT WALL SOLID
(1) #5 AT OPENING, CORNERS, AND 48" O.C. MAX. (1) #5 AT OPENING, CORNERS, AND 48" O.C. MAX.
9 GAGE 304SS LADDER WIRE EVERY 2ND ROW., 9 GAGE 304SS LADDER WIRE EVERY 2ND ROW.,

1'x2' FOOTING 3000 PSI CONCRETE, 1'x2' FOOTING 3000 PSI CONCRETE,
3" COVER MIN 3" COVER MIN

PERMIT APPROVAL

DESING
RETAIL BUILDING
RENOVATION
2901 E Busch Blvd
BETA Tampa, FL 33612
1
04

Fundation plan
1 3/8" = 1'-0"
MARK DATE DESCRIPTION

GENERAL NOTES • A LICENSED LAND SURVEYOR OR CIVIL ENGINEER SHALL ESTABLISH BUILDING CORNERS, STRUCTURAL COLUMNS, POSTS, GRADES AND OTHER IMPROVEMENTS IN THE FIELD. ISSUE:
• MANUFACTURED MATERIALS, EQUIPMENT, ETC., SHALL BE INSTALLED PER MANUFACTURES RECOMMENDATIONS, INSTRUCTIONS AND APPLICABLE ICBO REPORTS UNLESS
• ALL CONSTRUCTION SHALL COMPLY WITH THE 2023 FBC, IECC AND ALL LOCAL CODES AND ORDINANCES, AND ALL OTHER STATE RULES AND REGULATIONS, AS WELL AS ALL OTHERWISE NOTED OR INSTRUCTED. PROJECT NO: -
CITY, COUNTY AND FEDERAL RULES, REGULATIONS, ORDINANCES, SAFETY LAWS AND SANITARY ORDINANCES. IF THE DRAWINGS AND/OR THE SPECIFICATIONS ARE AT • ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE BEST PRACTICES OF THE VARIOUS TRADES INVOLVED. ALL WORK SHALL BE ERECTED AND INSTALLED PLUMB,
VARIANCE THEREWITH, THE CONTRACTOR SHALL SO NOTIFY THE ARCHITECT IMMEDIATELY. LEVEL, SQUARE AND TRUE IN PROPER ALIGNMENT. DATE: 02/17/20245
• SLOPE GRADE AWAY FROM STRUCTURE A MIN. OF 5% FOR 5 FEET. • THE CONTRACTOR SHALL NOT PROCEED WITH ANY ADDITIONAL WORK REQUIRING ADDITIONAL COMPENSATION BEYOND THE CONTRACT AMOUNT WITHOUT WRITTEN
• ROOF AND DECK DOWNSPOUTS, FOUNDATION PERIMETER DRAIN LINE, DRIVEWAY AND PATIOS SHALL BE CONNECTED TO A SUBTERRANEAN SYSTEM WHERE REQUIRED BY AUTHORIZATION FROM THE OWNER. FAILURE TO OBTAIN AUTHORIZATION SHALL INVALIDATE ANY CLAIM FOR EXTRA COMPENSATION. DRAWN BY: BRAYAN B.
CURRENT STORM DRAINAGE ORDINANCE. • THE CONTRACTOR SHALL BE RESPONSIBLE FOR DISTRIBUTION OF THE DRAWINGS AND SPECIFICATIONS TO ALL TRADES UNDER HIS JURISDICTION.
• PRIOR TO INSPECTION OF ROOF FRAMING, ENGINEERED CALCULATIONS FOR THE MANUFACTURED ROOF TRUSSES, AS PER PLAN, WILL BE SUBMITTED TO THE BUILDING • SUBSTITUTIONS, REVISIONS OR CHANGES MUST HAVE PRIOR WRITTEN APPROVAL BY THE THE ARCHITECT. CHECKED BY: KEVIN BERNAL
DEPARTMENT FOR APPROVAL. • NO WORK DEFECTIVE IN CONSTRUCTION OR QUALITY OR DEFICIENT IN ANY REQUIREMENT OF THE DRAWINGS OR NOTES WILL BE ACCEPTABLE AS A CONSEQUENCE OF THE
• THE GENERAL NOTES ARE COMPLEMENTARY TO THE GENERAL CONDITIONS AND SPECIFICATIONS. SHOULD CONFLICTS OCCUR, THEY SHALL BE BROUGHT TO THE ARCHITECT'S ARCHITECTS FAILURE TO DISCOVER OR POINT OUT DEFECTS OR DEFICIENCIES DURING CONSTRUCTION. DEFECTIVE WORK REVEALED WITH IN THE TIME REQUIRED BY
COPYRIGHT: HB DESIGN AND
ATTENTION. GUARANTEES SHALL BE REPLACED BY WORK CONFORMING WITH THE INTENT OF THE CONTRACT DOCUMENTS. NO PAYMENT, EITHER PARTIAL OR FINAL, SHALL BE CONSTRUED
• SHOULD CONFLICTS OCCUR BETWEEN THE DRAWINGS AND SPECIFICATIONS, DRAWINGS SHALL GOVERN IN MATTERS OF DIMENSION OR QUANTITY; SPECIFICATIONS SHALL AS AN ACCEPTANCE OF DEFECTIVE WORK OR IMPROPER MATERIALS. INGINEERING
GOVERN IN MATTERS OF MATERIALS, INSTALLATION OR FINISHES. • IN THE EVENT CERTAIN FEATURES OF CONSTRUCTION ARE NOT FULLY SHOWN ON THE DRAWINGS OR CALLED FOR IN THE NOTES OR SPECIFICATIONS, THEN THE
• DURING CONSTRUCTION, REPORT ALL DISCREPANCIES AND/OR CONFLICTS IN THE DRAWINGS TO THE ARCHITECT IMMEDIATELY. CONSTRUCTION SHALL BE SIMILAR AND OF THE SAME CHARACTER AS SIMILAR CONDITIONS THAT ARE SHOWN OR CALLED FOR. SHEET TITLE:
• VERTICAL AND HORIZONTAL FIRE BLOCKING SHALL CONFORM TO FBC R608.2. • THE CONTRACTOR SHALL DO ALL WORK IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS APPROVED BY THE BUILDING OFFICIAL. THE APPROVED DRAWINGS AND
• THE CONTRACTOR SHALL FURNISH AND INSTALL ALL MATERIALS AND LABOR REQUIRED TO COMPLETE THE WORK. EXCLUSION OF AN ITEM OR ITEMS DOES NOT IMPLY OMISSION. SPECIFICATIONS SHALL NOT BE CHANGED OR MODIFIED WITHOUT THE APPROVAL OF THE BUILDING OFFICIAL. FUNDATION PLAN
THE CONTRACTOR'S RESPONSIBILITY IS TO NOTIFY THE ARCHITEC T & OWNER OF THESE OMISSIONS PRIOR TO THE SUBMISSION OF BIDS. THE CONTRACTOR SHALL COMPLY • THE CONTRACTOR SHALL NOTIFY THE OWNER UPON COMPLETION OF THE WORK. AT THAT TIME THE OWNER SHALL COMPLETE A "PUNCH LIST" OF CORRECTIONS. THE OWNERS
WITH THE SPIRIT AND INTENT OF THESE DOCUMENTS AND SHALL COMPLETE THE WORK SATISFACTORILY AND IN A MANNER ACCEPTABLE TO THE OWNER. THESE DOCUMENTS FINAL ACCEPTANCE WILL BE CAUSE FOR FINAL PAYMENT UNDER TERMS OF THE OWNER/CONTRACTOR AGREEMENT.
ILLUSTRATE THE MINIMUM STANDARDS OF CONSTRUCTION AND THE CONTRACTOR SHALL MEET OR EXCEED NORMAL CONSTRUCTION TECHNIQUES AND STANDARDS FOR A • THE PROJECT SHALL BE LEFT COMPLETELY CLEAN AND CLEAR TO THE SATISFACTION OF THE OWNER.
BUILDING OF THIS TYPE. • ALL WORK AND MATERIAL SHALL BE NEW AND UNUSED AND OF THE HIGHEST QUALITY IN EVERY RESPECT UNLESS OTHERWISE AUTHORIZED BY THE ARCHITECT. VICINITY MAP
• NEITHER THE ARCHITECT, THE ENGINEER, OR THE OWNER SHALL BE RESPONSIBLE FOR THE CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES OF • CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING FINAL CITY APPROVALS AND A CERTIFICATE OF OCCUPANCY. DRAWING SHEET NO:
THE CONTRACTOR; SAFETY PRECAUTIONS AND PROGRAMS OF CONTRACTOR; THE ACTS OR OMISSIONS OF THE CONTRACTOR; OR THE FAILURE OF THE CONTRACTOR TO CARRY

S1-02
OUT THE WORK IN ACCORDANCE WITH THE DRAWINGS OR SPECIFICATIONS.
• VERIFY DIMENSIONS, GRADES, ELEVATIONS AND CRITICAL LOCATIONS, SUCH AS STRUCTURAL SUPPORTS, BEFORE COMMENCING WORK AFFECTED BY THEM. THE CONTRACTOR
SHALL REPORT ANY DISCREPANCIES TO THE ARCHITECT.
• THE CONTRACTOR SHALL THOROUGHLY REVIEW THE DRAWINGS, SPECIFICATIONS AND EXISTING SITE CONDITIONS AND NOTIFY THE ARCHITECT OF ANY DISCREPANCIES,
ERRORS OR OMISSIONS PRIOR TO CONSTRUCTION.

You might also like