The document is an Inspection and Test Plan (ITP) checklist for boiler installation, outlining essential checks to be completed by the Mechanical Contractor before startup and commissioning. It includes sections for quality control, installation, and commissioning, with specific criteria to confirm compliance. Each check requires a yes/no response, along with space for comments and signatures from the conducting and approving parties.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views2 pages

Itp Mum12 - Boiler

The document is an Inspection and Test Plan (ITP) checklist for boiler installation, outlining essential checks to be completed by the Mechanical Contractor before startup and commissioning. It includes sections for quality control, installation, and commissioning, with specific criteria to confirm compliance. Each check requires a yes/no response, along with space for comments and signatures from the conducting and approving parties.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Inspection and Test Plans (ITP) – MUM-12

Boiler Installation Checklist

Client: Project Name: Project No:

Area: Drawing No’s: Date: Sheet: 1 of 2

Check Conducted By: Signature: Check Approved By: Signature:

INSPECTION CHECKLIST FOR: BOILER


The below checks are to be completed by the Mechanical Contractor prior to start up and unit commissioning

INSPECTION HISTORY
NO: DESCRIPTION: INSPECTION:
ACCEPTABLE: DATE: COMMENTS:

Quality Control
Boiler type, model number and manufacturer approved
1 Yes No Yes No
for use
2 Units not being used are correctly stored Yes No Yes No
Installation
3 Drawings on site are the latest issue Yes No Yes No
4 Boiler and gas train are not damaged in anyway Yes No Yes No
Boiler installed in correct location as per approved
5 Yes No Yes No
drawings and equipment schedule
Boiler installed with approved vibration isolation on a
6 concrete plinth on which mounted and with approved Yes No Yes No
isolation from the pipework connected to it
Boiler clearly labelled including number, manufacturer
7 Yes No Yes No
model number and duty
Confirm pipework connections to the boiler are correct
8 and include all fittings, valves and accessories as Yes No Yes No
documented
Confirm all test points, sensors and gauges have been
9 Yes No Yes No
provided and installed as documented
10 Confirm correct electrical connections to the boiler as per Yes No Yes No

1
INSPECTION HISTORY
NO: DESCRIPTION: INSPECTION:
ACCEPTABLE: DATE: COMMENTS:
the manufacturers wiring schematic
Confirm all interlocks are in accordance with
11 Yes No Yes No
manufacturers wiring schematic
Confirm HHW pipe work and gas pipe work are installed
12 Yes No Yes No
as per the approved drawings
Confirm approved pipe work insulation has been installed
13 and has adequate support and is sheathed when exposed Yes No Yes No
to weather or mechanical damage
Confirm boiler flue and insulation is installed as per the
14 Yes No Yes No
approved drawings
Commissioning
Confirm HHW and gas pipe work has been pressure
15 Yes No Yes No
tested and filled with appropriate water/gas
Confirm all HHW pipe work have been power flushed with
clean water until no debris present in the sample using a
16 Yes No Yes No
pump to achieve >110% of the maximum design flow rate
of the pipework
17 Confirm gas is available Yes No Yes No
Confirm boiler manufacturer has attended site and
18 Yes No Yes No
commissioned the boiler
Confirm unit operates to provide heating when heating
19 Yes No Yes No
signal provided
Confirm high level interface is operational and is
20 Yes No Yes No
communicating all nominated points to the BMCS
Mark alterations, sizes + final location on As Built
21 Yes No Yes No
drawings for record purposes

ADDITIONAL COMMENTS: