0% found this document useful (0 votes)
8 views5 pages

Blasting

The document contains detailed blasting bills for M/S Mudduluru Infratech, including various dates, locations, and measurements for blasting operations at Vaddahalli and Mulbagal sites. It includes data on the number of holes, depth, and total feet for each operation, along with a summary of total feet and amounts payable. Additionally, it records tractor breaker hours worked at the Vaddahalli site.

Uploaded by

Dushyanth Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views5 pages

Blasting

The document contains detailed blasting bills for M/S Mudduluru Infratech, including various dates, locations, and measurements for blasting operations at Vaddahalli and Mulbagal sites. It includes data on the number of holes, depth, and total feet for each operation, along with a summary of total feet and amounts payable. Additionally, it records tractor breaker hours worked at the Vaddahalli site.

Uploaded by

Dushyanth Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

M/S MUDDULURU INFRATECH 07-09-2024

VADDAHALLI CHEMICAL BLASTING BILL


SL NO Date From To SIDE UOM Length Nos of holes Depth total depth
Secoundry boulders
1 5/26/2024 for trial at first time 140 2 280
2 8/15/2024 226+725 226+730 LHS feet 5 66 5 330
3 8/20/2024 226+725 226+730 LHS feet 10 82 5 410 second step
4 8/25/2024 226+730 226+735 LHS feet 6 26 5 130
5 9/5/2024 226+730 226+735 LHS feet 10 82 5 410 second step
6 8/27/2024 226+735 226+740 LHS feet 5 25 5 125
7 8/29/2024 226+740 226+748 LHS feet 8 204 5 1020 second step
8 9/2/2024 226+740 226+748 LHS feet 8 89 5 445
9 226+740 226+748 LHS feet 8 18 3 54
10 8/20/2024 226+650 226+658 LHS feet 8 50 5 250
11 9/10/2024 226+695 226+705 LHS feet 10 40 5 200
12 226+695 226+705 LHS feet 10 22 3 66
13 8/21/2024 226+705 226+710 LHS feet 10 30 5 150 first step
14 8/21/2024 226+710 226+715 LHS feet 10 30 5 150 1st step
20 9/11/2024 226+710 226+715 LHS feet 10 33 5 165 second step
226+710 226+715 LHS feet 10 21 3 63
20 9/11/2024 226+715 226+720 LHS feet 10 33 5 165
226+715 226+720 LHS feet 10 21 3 63
15 9/3/2024 226+720 226+725 LHS feet 10 40 5 200 1st step
226+720 226+725 LHS feet 10 20 3 60
20 9/11/2024 226+770 226+780 LHS feet 10 15 3 45
226+780 226+788 LHS feet 8 18 3 54

28 9/20/2024 226+725 226+730 RHS feet 10 68 5 340 FIRST STEP


29 9/21/2024 226+725 226+730 RHS feet 10 45 5 225
28 9/20/2024 226+730 226+735 RHS feet 10 68 5 340 2ND STEP
29 9/21/2024 226+730 226+735 RHS feet 10 45 5 225
28 9/20/2024 226+730 226+735 RHS feet 10 68 5 340
29 9/21/2024 226+730 226+735 RHS feet 10 45 5 225
6 8/22/2024 226+730 226+735 RHS feet 10 78 5 390 1ST STEP
6 8/22/2024 226+735 226+740 RHS feet 10 78 5 390 1ST STEP
10 8/31/2024 226+740 226+750 RHS feet 10 101 5 505
16 9/6/2024 226+740 226+750 RHS feet 8 24 5 120
17 226+740 226+750 RHS feet 8 22 2.5 55
11 8/31/2024 226+580 226+600 RHS feet 20 64 3 192
226+580 226+600 RHS feet 20 56 5 280
14 9/4/2024 226+695 226+700 RHS feet 5 38 5 190
24 9/16/2024 226+695 226+700 RHS feet 10 30 5 150 2ND STEP
25 9/17/2024 226+695 226+700 RHS feet 10 8 3 24
24 9/16/2024 226+700 226+705 RHS feet 10 30 5 150
25 9/17/2024 226+700 226+705 RHS feet 10 8 3 24
22 9/13/2024 226+695 226+700 RHS feet 10 15 5 75 3RD STEP
226+695 226+700 RHS feet 10 4 2 8
22 9/13/2024 226+700 226+705 RHS feet 10 15 5 75 2ND STEP
226+700 226+705 RHS feet 10 4 2 8
22 9/13/2024 226+705 226+715 RHS feet 10 15 5 75
226+705 226+715 RHS feet 10 4 2 8
21 9/12/2024 226+700 226+705 RHS feet 13 48 5 240 2ND STEP
226+700 226+705 RHS feet 13 52 3 156
21 9/12/2024 226+705 226+715 RHS feet 13 48 5 240 2ND STEP
226+705 226+715 RHS feet 13 52 3 156
26 9/18/2024 226+720 226+725 RHS feet 5 34 3 102
226+720 226+725 RHS feet 5 13 2.5 32.5
23 9/13/2024 226+745 226+755 RHS feet 10 9 3 27
27 9/19/2024 226+770 226+780 RHS feet 10 72 5 360

TOTAL FEETS 7718.5

PREPARED BY CHECKED BY APPROVED BY

M/S MUDDULURU INFRATECH 23-09-2024

MULBAGAL BLASTING BILL


SL NO Date From To SIDE UOM Length Nos of holes Depth total depth
1 5/17/2024 238+610 238+640 RHS feet 30 40 3 120
238+610 238+640 RHS feet 30 46 5 230
2 6/7/2024 238+620 238+650 RHS feet 30 16 5 80
30 18 3 54
3 7/31/2024 238+610 238+650 RHS feet 40 1 5 5
40 6 3 18
4 8/26/2024 238+610 238+650 RHS feet 40 16 3 48
40 35 3 105
40 35 5 175
5 8/31/2024 238+610 238+650 RHS feet 40 36 3 108
Total feets 943
Rate /feet 70
Total Amount 66010
net amount payable 66010

PREPARED BY CHECKED BY APPROVED BY


M/S MUDDULURU INFRATECH
VADDAHALLI SITE 23-09-2024

VADDAHALLI TRACTOR BREAKER BILL


SL NO DATE STARTING TIME ENDING TIME WORK IN HOURS
1 6/22/2024 3:00 PM 6:05PM 3:05
2 7/17/2024 10:40AM 12:25PM 1:45
3 7/23/2024 10:20AM 12:50PM 2:30
2:20PM 4:30PM 2:10
4 8/26/2024 10:04AM 12:20PM 2:16
2:20PM 5:40PM 3:20
5 7/27/2024 10:10AM 1:00PM 2:50
2:00PM 4:30PM 2:30
6 8/17/2024 9:30AM 12:30PM 3:00
7 8/19/2024 10:00AM 12:40PM 2:40
TOTAL HOURS 26:06:00

PREPARED BY CHECKED BY APPROVED BY

6 8/22/2024 226+730 226+740 RHS feet 10 78 5 390


10 8/31/2024 226+740 226+750 RHS feet 10 101 5 505
11 8/31/2024 226+580 226+600 RHS feet 20 64 3 192
226+580 226+600 RHS feet 20 56 5 280
14 9/4/2024 226+695 226+700 RHS feet 5 38 5 190
16 9/6/2024 226+740 226+748 RHS feet 8 24 5 120
17 226+740 226+748 RHS feet 8 22 2.5 55
21 9/12/2024 226+700 226+713 RHS feet 13 48 5 240
226+700 226+713 RHS feet 13 52 3 156
22 9/13/2024 226+695 226+715 RHS feet 10 15 5 75
226+695 226+715 RHS feet 10 4 2 8
23 9/13/2024 226+745 226+755 RHS feet 10 9 3 27
24 9/16/2024 226+695 226+705 RHS feet 10 30 5 150
25 9/17/2024 226+695 226+705 RHS feet 10 8 3 24
26 9/18/2024 226+720 226+725 RHS feet 5 34 3 102
226+720 226+725 RHS feet 5 13 2.5 32.5
27 9/19/2024 226+770 226+780 RHS feet 10 72 5 360
28 9/20/2024 226+725 226+735 RHS feet 10 68 5 340
29 9/21/2024 226+725 226+735 RHS feet 10 45 5 225
M/S MUDDULURU INFRATECH 07-10-2024
MULBAGAL BLASTING BILL
SL NO Date From To SIDE UOM Length Nos of holes Depth total depth
1 5/17/2024 238+610 238+640 RHS feet 30 40 3 120
238+610 238+640 RHS feet 30 46 5 230
2 6/7/2024 238+620 238+650 RHS feet 30 16 5 80
30 18 3 54
3 7/31/2024 238+610 238+650 RHS feet 40 1 5 5
40 6 3 18
4 8/26/2024 238+610 238+650 RHS feet 40 16 3 48
40 35 3 105
40 35 5 175
5 8/31/2024 238+610 238+650 RHS feet 40 36 3 108
Total feets 943
Rate /feet 70
Total Amount 66010
net amount payable 66010

PREPARED BY CHECKED BY APPROVED BY

M/S MUDDULURU INFRATECH


VADDAHALLI SITE 07-09-2024

VADDAHALLI TRACTOR BREAKER BILL


SL NO DATE STARTING TIME ENDING TIME WORK IN HOURS
1 6/22/2024 3:00 PM 6:05PM 3:05
2 7/17/2024 10:40AM 12:25PM 1:45
3 7/23/2024 10:20AM 12:50PM 2:30
2:20PM 4:30PM 2:10
4 8/26/2024 10:04AM 12:20PM 2:16
2:20PM 5:40PM 3:20
5 7/27/2024 10:10AM 1:00PM 2:50
2:00PM 4:30PM 2:30
6 8/17/2024 9:30AM 12:30PM 3:00
7 8/19/2024 10:00AM 12:40PM 2:40
TOTAL HOURS 26:06:00
RATE PER HOUR 750RS
TOTAL AMOUNT 19575RS

PREPARED BY CHECKED BY APPROVED BY

6 8/22/2024 226+730 226+740 RHS feet 10 78 5 390


10 8/31/2024 226+740 226+750 RHS feet 10 101 5 505
11 8/31/2024 226+580 226+600 RHS feet 20 64 3 192
226+580 226+600 RHS feet 20 56 5 280
14 9/4/2024 226+695 226+700 RHS feet 5 38 5 190
16 9/6/2024 226+740 226+748 RHS feet 8 24 5 120
17 226+740 226+748 RHS feet 8 22 2.5 55
21 9/12/2024 226+700 226+713 RHS feet 13 48 5 240
226+700 226+713 RHS feet 13 52 3 156
22 9/13/2024 226+695 226+715 RHS feet 10 15 5 75
226+695 226+715 RHS feet 10 4 2 8
23 9/13/2024 226+745 226+755 RHS feet 10 9 3 27
24 9/16/2024 226+695 226+705 RHS feet 10 30 5 150
25 9/17/2024 226+695 226+705 RHS feet 10 8 3 24
26 9/18/2024 226+720 226+725 RHS feet 5 34 3 102
226+720 226+725 RHS feet 5 13 2.5 32.5
27 9/19/2024 226+770 226+780 RHS feet 10 72 5 360
28 9/20/2024 226+725 226+735 RHS feet 10 68 5 340
29 9/21/2024 226+725 226+735 RHS feet 10 45 5 225