This document is a mandatory work permit for construction that outlines safety procedures and requirements for contractors. It includes sections for identifying hazards, required personal protective equipment (PPE), and a declaration from the contractor regarding understanding and compliance with environmental health and safety (EHS) requirements. The permit must be closed after the completion of work, confirming that all safety protocols were followed and waste was disposed of properly.

Uploaded by

prwankhede79
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
60 views1 page

Construction Work Permit

This document is a mandatory work permit for construction that outlines safety procedures and requirements for contractors. It includes sections for identifying hazards, required personal protective equipment (PPE), and a declaration from the contractor regarding understanding and compliance with environmental health and safety (EHS) requirements. The permit must be closed after the completion of work, confirming that all safety protocols were followed and waste was disposed of properly.

Uploaded by

prwankhede79
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Form No / REV No F/PA/20, 00

WORK PERMIT FOR CONSTRUCTION


Porcedure No SPR-02
WORK
Effec. Date 15.02.2014
Put wherever Applicable
This permit is Mandatory for all contractors such as All types of construction work
New permit Permit extension Permit No.
Location of Work :
Permit Issue Date and Time :
Contractor's Name :
No of employees : Permit Closing date and Time

Nature of work :

Identify the hazards & risks in the work ( Write Yes/ No )Safety Checks/Guide line for this particular work

Risk of falling from height : Area is cordoned off properly


At height work scaffold should be
Foot injuries possible:
used
Ensure there will be no electrical
Chance of eye injuries
live cables/ loose cables.
At the time of slab two access
Hand injuries possible:
should be defined
At height work full body harness
Body Injury
should be used
Precaution to be taken at the time
Chances of Electrical shock
carpentry work.

PPE for this particular work


Safety Helmet Safety goggles
Hand gloves Safety shoes
Full body harness with two
lanyards
1 Is the risk & hazards explained to contractor
2 Is the emergency response plan made known to contractor
3 Is the EHS requirements made known to contractor
4 Availability of fire extinguishers ; first aid boxes made known to contractor.
Declaration by the contractor
I have understood the EHS requirement of EPPL, I will follow the instruction given to me and I will take the responsibility to safe working
in EPPL site.
Contractor : Permit initiated by : Dept Head EHS / HR Dept.

Permit closing
After Completion of work permit should be closed
I certify that I have completed the work specified in this permit. All my workmen and equipment have been removed from vicinity of the
above work and all genrated waste are disposed in proper manner as per hazardous waste rule

Contractor : Permit initiator Dept Head EHS / HR Dept.