Demolition Cost Analysis for Hostel Construction

The document outlines the demolition work required for the construction of a new girls' hostel at Government Ladies Hostel near Gujarat College, Ahmedabad. It details the quantities and costs associated with the demolition of Blocks B, D, and F, with a total estimated cost of Rs. 12,64,529.21. The document includes credit values and is signed by the Deputy Executive Engineer and Executive Engineer of the relevant divisions.

Uploaded by

Rohan Rajput
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views1 page

Demolition Cost Analysis for Hostel Construction

The document outlines the demolition work required for the construction of a new girls' hostel at Government Ladies Hostel near Gujarat College, Ahmedabad. It details the quantities and costs associated with the demolition of Blocks B, D, and F, with a total estimated cost of Rs. 12,64,529.21. The document includes credit values and is signed by the Deputy Executive Engineer and Executive Engineer of the relevant divisions.

Uploaded by

Rohan Rajput
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Name of work:- Construction of New Girls Hostel at Government Ladies Hostel near Gujarat College, Ahmedabad

Demolition Sheet

Item No. Quantities Item of Work Item Rate Unit Total Amount
estimated but may according to
be less or more estimated
In Figures In Words quantities
Rs. Ps.
1 2 3 4 5 6 7
140 1.00 Job Demolition of Block B, Block D & Block 2569706.10 Rupees Job 2569706.10
F including all building items like RCC Twenty Five
work, Brick Work,Flooring Work, Door, Lac Sixty Nine
Window, Plumbing and Furniture work Thousand
etc. completed as per direction of Seven
Engineer In-charge Hundred Six
and Ten Paise
Only
9 1.00 Job Credit Value of Block B, Block D & -3834235.31 Rupees Thirty Job -3834235.31
Block F Eight Lac
Thirty Four
Thousand Two
Hundred Thirty
Five and Thirty
One Paise
Only

TOTAL : -1264529.21
Rs. In words : Rupees Twelve Lac Sixty Four Thousand Five Hundred Twenty nine and Paisa Twenty One Only.

Deputy Executive Engineer Executive Engineer


Gujarat Collage (R&B) Sub Dn. Navarangpura (R&B) Division
Ahmedabad Ahmedabad