0% found this document useful (0 votes)
118 views2 pages

Rear Headlight & Inclinometer Guide

The document outlines the procedure for replacing the inclinometer and rear headlight bulb in a machine, emphasizing safety measures and the need for calibration. It details the steps required to remove and install the inclinometer, including the use of a spirit level for proper alignment. Additionally, it provides instructions for ensuring the machine is level and calibrating the inclinometer after installation.

Uploaded by

cesar.diniro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
118 views2 pages

Rear Headlight & Inclinometer Guide

The document outlines the procedure for replacing the inclinometer and rear headlight bulb in a machine, emphasizing safety measures and the need for calibration. It details the steps required to remove and install the inclinometer, including the use of a spirit level for proper alignment. Additionally, it provides instructions for ensuring the machine is level and calibrating the inclinometer after installation.

Uploaded by

cesar.diniro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

REPLACING THE REAR HEADLIGHT INCLINOMETER

The inclinometer is installed in the start of the boom to check


the position of the machine in the axle X and Y.
If you need to remove or replace the sensor you must calibrate,
here below the procedure.

Inclinometer
Receiver

plate light
INCLINOMETER REPLACEMENT PROCEDURE

Before starting the procedure, make sure you have all the necessary materials to perform the operations.
The machine must be turned off and in a safe position, without any mechanical, hydraulic or electrical component being in motion.
It’s necessary to use protective devices (PPE, personal protective equipment) suitable for the activity to be carried out.
It is also necessary to use special supports with appropriate capacity in which to carry out the necessary steps.
tank protection For the inclinometer replacement procedure proceed as follows:

Remove the tank protector figure 1 Disconnect the connector from


the headlight and remove the 4 fixing bolts to the frame figure 2

1- Turn off the engine and remove the electrical connector X235 and 3- Put a spirit level in the frame on the rear side of the machine. Start
REPLACING THE REAR HEADLIGHT BULB the inclinometer by the 3 screws. the engine and, with the help of the levelling system of the machine,
check if the machine is correctly levelled.

2- Install the new inclinometer and fix it without tightening the 4-Lift completely the boom and with the spirit level check if the ma-
screws. chine is correctly levelled.
Loosen the 2 screws. Remove the headlight lens and replace the bulb. If it isn’t use the levelling of the machine for put it in correct position.

274 | BIG RANGE WORKSHOP MANUAL BIG RANGE WORKSHOP MANUAL | 275
READ A SCHEME

LEGENDA / LEGEND
B batteria battery LEGENDA COLORE FILI ELETTRICI /
ELECTRICAL WIRES LEGEND COLOR
componenti elettrici ed elettronici ,ac- electrical and electric components,
C
cessori accessories B bianco white

F fusibile fuse N nero black

FM fusibile situato vano motore fuse inside the engine compartment M marrone brown

K relè relay R rosso red

KM relè situato vano motore relay inside the engine compartment L blu blue

L luci lights

S selettori, pulsanti selectors, buttons


B1 :
Y elettrovalvola solenoid valve
- B = colore del filo / color of the wire
M punto di connessione massa a telaio chassis to ground connection point - 1 = diamentro filo / wire diameter

X connettore connector

1.3B (posizione / position) :


CONNETTORE / CONNECTOR FUSIBILE / FUSE -1 = numero pagina / page number
- 3B = quadrante / cross - quadrant
puntalino femmina / pin female
5- Lower the boom and with the spirit level put the machine in cor- 8- Lift completely the boom and check if the axle Y is on 0. puntalino maschio / pin male
rect levelled position. If Y is 0 tighten the screws checking the value of Y doesn’t change.

RELÈ / RELAY CIRCUITO INTERNO / INTERNAL CIRCUIT


1.2C (posizione / position) :
-1 = numero pagina / page number
- 2C = quadrante / cross - quadrant

CONTATTO RELÈ / RELAY CONTACT


PUNTO CONNESSIONE MASSA A TELAIO /
CHASSIS GROUND TO CONNECTION POINT

FARESIN INDUSTRIES SPA - Via dell’Artigianato, 36 - 36042 Breganze, Vicenza


Tel. +39 0445 800300 - Fax. +39 0445 800340 - faresin.com

6- Turn off the engine and after turn it on. Enter in the page of the 9- If axle Y isn’t 0 with a rubber hammer move slowly the inclinome-
axles X and Y on the display. ter until the Y on displays goes on 0. After that tightening the screws
checking the value of Y doesn’t change..

LED

RECEIVER

7- With the apposite remote controller press its button when it is 10- Lower the boom and check if on display X=0 and Y=0.
near the receiver (the black part in the receiver). The remote con- It is accepted an error of ± 0.5, but it is better until maximum ±0.2.
troller light one time the led.
Press the remote controller button once again, the led flashes for
more time for confirm the operation.
The calibration is now done and on display appears X=0 and Y=0.

276 | BIG RANGE WORKSHOP MANUAL BIG RANGE WORKSHOP MANUAL | 277