GROUT HOLE RECORD SHEET
Remedial Works for Staff Accomodation
PROJECT NAME: REPORT NO. GMD/I-0 /GHRS/
Complex at Fahud
OWNER OMAN GAS COMPANY (SAOG) GROUT HOLE NO.
CONSULTANT DATE OF GROUT
MAIN
TARGET LLC ORIENTATION Horizontal
CONTRACTOR
DRILLING DETAILS GROUTING DETAILS STRUCTURE STRUCTURE
Date Date
Time Time DRAWING NO DRAWING NO
Starts Finish Starts Finish
Horizontal Horizontal
Depth Max. Depth Max.
Grout Volume Grout Volume
Rig Rig below Pressure below Pressure
[litres] [litres]
Footing [bar] Footing [bar]
Level [m] Level [m]
Drill Method Mix Method
1.0 21.0
Drilling Medium Cement [Kg]
2.0 22.0
Casing Dia [mm] Water [litres]
3.0 23.0
Working Platform Level [m] Lime [Kg]
4.0 24.0
Toe Level [m] Sand/Gravel [Kg]
5.0 25.0
Grouting top level [m]
6.0 26.0
Drilled Length [m]
Total Volume 7.0 27.0
Grouted Length [m] [litres]
Poured
8.0 28.0
REMARKS:
9.0 29.0
10.0 30.0
11.0 31.0
12.0 32.0
13.0 33.0
14.0 34.0
15.0 35.0
16.0 36.0
17.0 37.0
18.0 38.0
19.0 39.0
20.0 40.0
Initialing Personnel Identification
ACCEPTANCE SIGNATURES
Initial Name Company
GREAT MOUNTAIN
Sub contractor / date
DEVELOPMENT
Main Contractor / date
Client/Consultant / date