HOUSE KEEPING CHECKLIST
PROJECT NAME : GE, CHAKAN, PUNE
INSPECTED BY :
DATE :
SL NO POINTS OBSERVATIONS MEASURES
STRUCTURAL FABRICATION / ERECTION
SITE
1 Walkways, passages kept clear of material.
2 Area and roads kept clear for manoeuvring of
cranes and material handling equipment.
3 Scrap, cut-pieces, welding electrode stubs, hand-
tools kept tidy in workarea and disposed
suitably.
4 Scrap-bin available at site.
5 Welding cables, power cables routed properly to
avoid run-over by vehicle or tripping hazards
and obstruction to personnel movement.
6 Compressed gas hoses routed properly in the
site.
7 Compressed gas cylinders and hoses kept away
from hot work and grinding work.
8 At least 1 metre on both sides of gantry rails is
kept clear of material.
9 Floor kept clear of water, oil spillage /
accumulation.
CIVIL WORK AREA
10 All approach, aisle, ingress / egress to / from
site, excavated pits, ramps, walkways kept clear
of material debris tools etc.
11 Scaffolding material,(H-beam, H-D tower frames,
bracing , clamps.) shuttering boards, acrosspans
etc. are stacked properly at site.
12 Stacking of bricks, hollow blocks are done in safe
manner.
13 Nails removed from wooden planks / timber and
not protruding out.
14 Saw dust, wood chips and scrap wood cleared
from carpentry shop and disposed suitably.
15 Debris from demolition and excavated earth
cleared from site and accesses
ELECTRICAL INSTALLATIONS & BOOTHS
16 Approach to DB, Panels, Switches kept clear
17 Fire extinguishers installed at an easy accessible
location.
18 Welding cables and power cables are routed
separately.
19 Routing of cables are done properly to avoid
obstruction & tripping hazards.
20 Floor of electrical booths kept dry.
21 Rubber mats are in place at electrical panels.
STORES
22 Walkways, entry and exits kept clear.
23 Materials placed on racks are safely accessible.
24 Compressed gas cylinders are segregated as full
or empty and type of gas.
25 Vertically stored cylinders are secured / chained
to avoid toppling and horizontal once guarded
against rolling down.
26 Flammable storage areas are isolated from
store, office and work areas.
27 Cement bags are stacked in proper gradient
safely.
28 Corrosive material (e.g. acids, alkalis) are stored
away from other material and kept on collection
trays to safeguard against accidental leakage.
29 Storing area for lifting tools & tackles, ropes,
wire ropes & PPE is dry, clean & free of
corrosive material
30 Easy accessibility to installed fire extinguishers
ensured in store.
GENERAL
31 Separate scrap yard is allocated for the site.
32 Approaches to workstations, offices, time
offices, stores, P&M are well laid and
demarcated.
33 Site roads are kept clear of stacked material for
free & safe vehicular movement.
34 Heavy materials stacking are taken care of to
prevent slips, collapse and rolling.