Form - 1
Application form - Net Metering/Bi-directional/Gross Metering Connection
To,
The Designated Officer
TPCODL, Place
Date:
I/we intend to connect Renewable Energy System through net-metering/ bi-directional/ Gross metering
arrangement in compliance to order dated 19.08.2016 or OERC on Net Metering/bi-directional metering
and their connectivity with respect to Solar PV projects as amended on 05.05.2022 and subsequent
amendments from time to time. The details are given below:
1. Name of the Registered applicant/consumer
2. Address of the Registered
applicant/consumer
3. Consumer No.
4. Telephone number(s) of Consumer/Applicant
(Mobile No.)
5. Email ID of Consumer/Applicant
6. Type of RE (Solar/Wind) & Capacity of RE
system (Watts)
7. Sanction load as per latest electricity bill
(kW)
8. Meter procurement by Beneficiary □
(Please Tick) DISCOM □
9. Location of proposed RE system (RTS
system/Ground mounted system)
10. Solar PV Project inverter make and type
11. Solar PV Project inverter has automatic isolation
protection (Y/N)?
12. Are there any existing Solar or Renewable
Energy plants currently installed? (Y/N)
13. Capacity of existing Solar/RE plant.
14 Expected date of commissioning of solar
PV Project.
15 Category of consumer (Domestic/ Industrial/
Commercial/ Govt. establishment etc.)
16 Supply voltage level of RE system proposed
to be connected [230 V (1-phase)/ 415 V (3-
phase/11 kV & above (3–phase)]
DECLARATION
I hereby request you to provide grid connectivity to the solar Rooftop PV system installed or
planning to install at premises owned/occupied by me. I do hereby declare that the information
furnished above for NM/BD/GM have been checked & verified to the best of my knowledge and
belief.
Signature with Name of the applicant /consumer:
Address: