100% found this document useful (1 vote)
237 views1 page

Net Meter Application Form 1NM

This document is an application form for connecting a Renewable Energy System through net metering, bi-directional, or gross metering arrangements. It requires detailed information from the applicant, including personal details, type and capacity of the renewable energy system, and declaration of the provided information's accuracy. The form is intended for compliance with specific regulatory orders regarding solar PV projects.

Uploaded by

drout909
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
237 views1 page

Net Meter Application Form 1NM

This document is an application form for connecting a Renewable Energy System through net metering, bi-directional, or gross metering arrangements. It requires detailed information from the applicant, including personal details, type and capacity of the renewable energy system, and declaration of the provided information's accuracy. The form is intended for compliance with specific regulatory orders regarding solar PV projects.

Uploaded by

drout909
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Form - 1

Application form - Net Metering/Bi-directional/Gross Metering Connection

To,

The Designated Officer


TPCODL, Place

Date:

I/we intend to connect Renewable Energy System through net-metering/ bi-directional/ Gross metering
arrangement in compliance to order dated 19.08.2016 or OERC on Net Metering/bi-directional metering
and their connectivity with respect to Solar PV projects as amended on 05.05.2022 and subsequent
amendments from time to time. The details are given below:
1. Name of the Registered applicant/consumer
2. Address of the Registered
applicant/consumer
3. Consumer No.
4. Telephone number(s) of Consumer/Applicant
(Mobile No.)
5. Email ID of Consumer/Applicant
6. Type of RE (Solar/Wind) & Capacity of RE
system (Watts)
7. Sanction load as per latest electricity bill
(kW)
8. Meter procurement by Beneficiary □
(Please Tick) DISCOM □
9. Location of proposed RE system (RTS
system/Ground mounted system)
10. Solar PV Project inverter make and type
11. Solar PV Project inverter has automatic isolation
protection (Y/N)?
12. Are there any existing Solar or Renewable
Energy plants currently installed? (Y/N)
13. Capacity of existing Solar/RE plant.
14 Expected date of commissioning of solar
PV Project.
15 Category of consumer (Domestic/ Industrial/
Commercial/ Govt. establishment etc.)
16 Supply voltage level of RE system proposed
to be connected [230 V (1-phase)/ 415 V (3-
phase/11 kV & above (3–phase)]

DECLARATION
I hereby request you to provide grid connectivity to the solar Rooftop PV system installed or
planning to install at premises owned/occupied by me. I do hereby declare that the information
furnished above for NM/BD/GM have been checked & verified to the best of my knowledge and
belief.

Signature with Name of the applicant /consumer:


Address:

You might also like