100% found this document useful (1 vote)
78 views1 page

QW-403 18

QW-403.18 outlines the regulations regarding changes from one P-Number to another or to a base metal not listed in Table QW/QB-422, with specific exceptions noted in QW-423 and QW-420. It also addresses changes in the P-Number or A-Number of tubesheet cladding material during tube-to-tubesheet welding. Compliance with these guidelines is essential for proper welding procedures.

Uploaded by

Charles Jacob
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
78 views1 page

QW-403 18

QW-403.18 outlines the regulations regarding changes from one P-Number to another or to a base metal not listed in Table QW/QB-422, with specific exceptions noted in QW-423 and QW-420. It also addresses changes in the P-Number or A-Number of tubesheet cladding material during tube-to-tubesheet welding. Compliance with these guidelines is essential for proper welding procedures.

Uploaded by

Charles Jacob
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

QW-403.

18

QW-403.18 A change from one P‐Number to any other P‐Number or to a base metal not listed in Table
QW/QB-422, except as permitted in QW-423, and in QW-420. For tube-to-tubesheet welding: a change in
the P-Number or A-Number of the tubesheet cladding material (if the cladding material is part of the
weld).

You might also like